Exh A CDRL A002 NonIMRL PProp Ctrx Inv 28 Mar 2011.doc

DOC document 92 KB Posted

Attached to
Contractor Maintenance Support Services for FRCMA
Solicitation number
N6134011R0039
Issued by

About this file

Exhibit A CDRLs

View the file

Other files

File Type Posted
N61340-11-R-0039.doc DOC document
N61340-11-R-0039 Amendment 0004.doc DOC document
Exh A CDRL A012 MO CMSS PERF MAN PWR RPRT 28 MAR 2011.doc DOC document
Exh A CDRL A003 QA PLAN 28 Mar 2011.doc DOC document
Exh A CDRL A011 CFSR 28 Mar 2011.doc DOC document
N61340-11-R-0039 Amendment 03.doc DOC document
Exh A CDRL A005 IT 28 Mar 2011.doc DOC document
EXH A CDRL A001 Annex IMRL Inventory 28 Mar 2011.rtf RTF text file
Exh A CDRL A010 Maint Act Summary Rprt 28 Mar 2011.doc DOC document
Exh A CDRL A007 Mo Maint Plan 28 Mar 2011.doc DOC document
Att 13 CDRL Distr Addr List .doc DOC document
Pax CBA modified 01-18-2011.pdf PDF
Exh A CDRL A001 IMRL Inv 28 Mar 2011.doc DOC document
N61340-11-R-0039 .doc DOC document
Att 1- FRCMAPAX SOW 21 Apr 11.doc DOC document
Exh A DI-ADMIN-81250A Conf Min 28 Mar 2011.pdf PDF
Exh A Annex CDRL 0006 SOW 4 3 1 2 Std Form sf85p Trusted Posit CAC 28 Mar 2011.pdf PDF
Exh A CDRL A004 SAFETY PLAN 28 Mar 2011.doc DOC document
Exh A CDRL A013 CONF MIN- 28 MAR 2011.doc DOC document
Exh A CDRL A009 Daily Bench Stat Rprt 28 Mar 2011.doc DOC document
Exh A DI-MISC-80508B Tech Rprt Serv 28 Mar 2011.pdf PDF
Exh A ANNEX CDRL 0012 _0006 RPRT FORMAT 28 Mar 2011.xls XLS spreadsheet
Exh A CDRL A006 CVS TA_CAC REPORT 28 Mar 2011.doc DOC document
Exh A DI-MGMT-80227 Prog Stat Mgmt Rprt 28 Mar 2011.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOTS I-V
TDP

TM

OTHER
LOGISTICS DATA
D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
FRCMA-PAX CMSS
N61340-11-R-0039
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A002
Technical Report – Study/Services
Non-IMRL/ Plant Property & Contractor Property Inventory Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-Misc-80508B
SOW PARA 3.1.4, 3.2.5, & 4.7.2
NAWCTSD PJM
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
D
ASREQ
SEE BLK 16

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

SEE BLK 16

Reg
Repro
16. REMARKS
NAWCTSD PCO
LTR ONLY

1. BLK 4: ONLY DID PARAGRAPH 3 (C).(2) APPLIES. ATTACHED CDRL ANNEX PARA GRAPHS 1.0 TO 2.2 APPLIES AND DELINEATES REPORT FORMAT.

2. THE CONTRACTOR INVENTORY SHALL REPORT THE GOVERNMENT FURNISHED PROPERTY PROVIDED AND ANY SUBSEQUENT GOVERNMENT AUTHORIZED CHANGES DURING THIS CONTRACT’S PERIOD OF SERVICE.

3. BLK 12: FIRST SUBMISSION (AN INITIAL (BASELINE) MOBILIZATION INVENTORY REPORT FOR GFP ITEMS PROVIDED IN SUPPORT OF THIS CONTRACT) SHALL BE SUBMITTED 5 WORKING DAYS PRIOR TO CONTRACT SUPPORT DATE (CSD), FOR EACH LOT/OPTION PERIOD WHERE CONTRACTOR MAINENANCE SUPPORT SERVICES (CMSS) ARE PROVIDED, A GFP - NON IMRL / PLANT PROPERTY INVENTORY REPORT SHALL BE SUBMITTED TO THE COR FOR SIGNATURE WITHIN FIVE (5) WORKING DAYS AFTER THE END OF EACH LOT/OPTION PERIOD (NORMALLY ANNUALLY). ADDITIONAL SUBMISSIONS MAY BE REQUIRED BY THE GOVERNMENT (NORMALLY ASSOCIATED WITH A COMMANDING OFFICER OR MAINTENANCE OFFICER CHANGE OR BY DIRECTIVE).

4. BLK 13: FINAL SUBMISSION (TRANSITION CLOSE-OUT) SHALL BE SUBMITTED 5 DAYS PRIOR TO THE END OF CMS SERVICES UNDER THIS CONTRACT. DISTRIBUTION OF FINAL SUBMISSION SHALL BE DUE NLT 2 WORKING DAYS AFTER APPROVAL/SIGNATURE OF COR.

5. THE GOVERNMENT WILL HAVE 60 WORKING DAYS FROM RECEIPT OF SUBMISSION FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. GOVERNMENT WILL RESPOND ONLY AS NECESSARY.

6. BLK 14: SUBMISSIONS SHALL BE SENT VIA EMAIL TO RESPECTIVE COR’S SITES. SUBMISSIONS SHALL BE AN EMAIL ATTACHMENT IN MS-WORD/MS-EXCEL 2003 OR LATER COMPATIBLE FORMAT. EMAIL ADDRESSES ARE PROVIDED IN THE CONTRACT SCHEDULE. UNLESS RESTRICTED BY SIZE, EXCEL REPORTS SHALL BE IN ONE SPREADSHEET WITH MULTIPLE WORKSHEETS FOR EACH APPLICABLE AREA SPECIFIED IN PARAGRAPH 2.0 OF ANNEX A.

7. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTIBUTION D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY, (ADMINISTRATIVE OR OPERATIONAL USE), (10 NOV 2009). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (NAWCTSD PCO, CODE 25332), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

NAWCTSD PJM

NAWCTSD LOG MGR

FRCMAPAX COR

1
1

FRCMAPAX ACOR

15. Total
0
1
4
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
L. DANIELS, NAWCTSD PJM
28 MAR 2011
B. HICKS, NAWCTSD PDX
28 MAR 2011
DD FORM 1423-1, FEB 2001
Previous editions may be used
Page
1
of
4
Pages

ANNEX TO CDRL A002

NON-IMRL / PLANT PROPERTY & CONTRACTOR PROPERTY INVENTORY REPORT

FTSS N61340-11-C-00__ CDRL REQUIREMENT

1.0 REPORT CONTENTS: This report is to document the inventory of government and/or contractor items/equipment required by the contract statement of work. Contract Data Requirements List (CDRL) shall tailor each report’s requirements by applying CDRL annex paragraphs 1.0 through 2.2, as applicable.

1.1 FORMAT. CDRL submissions shall be in hard copy and/or electronic Microsoft @ Excel 2003 multiple worksheet spreadsheets.

1.1.1 Hard Copy: When specified CDRL Blocks 14b and 16, individual areas shall be prepared as delineated in the contract/task order on 8 ½” by 11” to 11” by 15” size paper.

1.1.2 E-Mail: When specified in CDRL Blocks 14B and 16. reports shall be attached files to Internet Electronic Mail that are compatible to MICROSOFT@ Office EXCEL 2003 formats as specified in block 16 of the CDRL. (Contractor shall ensure destination addresses are capable of file attachment size).

1.1.2.1 Electronic File Title Format. File names shall include; CDRL number, title ,and report period or applicable LOT for annual submissions (e.g., A002, IMRL Inv LOT I

1.1.2.2 Email Subject Lines Title Format. Internet Electronic-Mail subject line shall include Contract Number, CDRL Data Item Number, Location and period (e.g., N61340-11-C-xxxx -A00x- FRCMAPAX -1Oct11-30Sep11).

1.2 REPORT BODY.

1.2.1 HEADER INFORMATION. Inventory hard copies and electronic worksheets shall have the following header information:

a. CDRL # and Title. CDRL Block 1, and Blocks 3 and 4 of DD Form 1423-1 CDRL

b. Contract #: Block E or contract number per Order of Supplies and Services DD Form 1155 or Amendment of Solicitation/Modification of Contract SF: 30.

b. Contractor. Enter name of contractor's firm.

c. Reporting Period. Enter the start and completion dates for CDRL reporting period dmmmyy to ddmmmy.

d. Contractor Name: Enter prime contractors name as noted on DD 1155 or SF 30.

e. Contractor Site Manager Date: (Name, phone, Email address

2.0 Report Content Areas. The Contractor Inventory/Utilization Report shall consist of the following areas (worksheets) to the detail and format delineated in detail in below:

a. Area 1: Contractor provided tools and equipment/furnishings.

b. Area 2: Items and Equipment identified by the COR.

Although all Areas are usually inventoried annually, all or a subset of the Areas listed may be required to be inventoried more often when directed by the COR.

2.1. Each record/report shall contain the following area data elements:

a. Item name - Self-explanatory/ Nomenclature.

b. Manufacturer Name –

c. CAGE Code – (Four alphanumeric)

d. Manufacturer’s Model # or Part Number -

e. Serial number –

f. Plant Property #/BAR Code -

g. National Stock Number (NSN) – If available, 13 alpha numeric characters

(e.g., _ _ _ _-_ _-_ _ _- _ _ _ _)

h. Quantity Allowed- The number of the items that should be in inventory

i. Quantity in Inventory - (includes any officially checked out)

j. Quantity Missing or Extra from Allowance - (-) Missing; (+) Additional

j. Item Owner - G-Government or C-Contractor or Other (specify)

k. Calibration due date - In yymmdd format. N/A if non-applicable.

l. Calibration Cycle - In months. N/A if non-applicable.

m. Bar code - Number assigned to identify item.

n. Location - Location of item (e.g., Site Location, Building number, Room number, Work

Center, Bin number, Box, safe number).

o. Remarks - Indicate status, condition, and quantity of items that are missing from the government issued inventory. Status shall include date part ordered and expected time of arrival date. Note any changes to government issued inventory quantity shall be noted and dated (changed, substituted, removed or added) in remarks. Indicate item security classification and restrictions if applicable (confidential, secret, top secret, NORFORN, etc.) in the remarks. If an item is a kit, list items/parts in kit.

The COR may add other data items (in writing)..

2.2 Summary Memo:

30 August 2010

MEMORANDUM

From:

I. M. Worthy, ABC Maintenance, Inc.

To:

FRCMA Patuxent River Maintenance Officer

Via:

Contracting Officer’s Representative, Contract N00123-10-F-0010

Subj:

Annual NON- IMRL Plant Property Inventory

(or other appropriate title: Change of Command, Change of Charge (OIC), etc.)

Ref:

(a) CNAFINST 4790.2A

(b) NAVAIRINST 13650.1

1.

IAW Refs. (a) & (b), inventory complete with no discrepancies.

I. M. WORTHY

FRCMA Patuxent River Site Manager

----------------------------------------------------------- OR ----------------------------------------------------

1. IAW Refs. (a) & (b), inventory complete with the following missing items:

Nomenclature Serial Number

NSN/NIIN

Cost Qty:

widget 33333

XXX-XX-XXX-XXXX

$7500 2.

2. MLSR action initiated with the Material Control Officer.

I. M. WORTHY

FRCMA Patuxent River Site Manager

----------------------------------------------------------- OR ----------------------------------------------------

*Whatever appropriate paragraphs to describe the problem circumstances discovered in the inventory process

File details come from the government source that posted it. Updated .