CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOTS I-V ASK \* MERGEFORMAT |
| TDP ______ |
| TM ______ |
| OTHER: LOGISTICS DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| FRCMA-PAX CMSS |
| N61340-11-R-0039 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A007 |
| TECHNICAL REPORT – STUDY/SERVICES |
| MONTHLY MAINTENANCE PLAN INPUTS |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MISC-80508B |
| SOW PARA 3.1.4, 3.2.5, 4.4.3 & 4.7.2 |
FRCMA-PAX MMCO
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| MTHLY |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| F |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
SEE BLK 16
| Reg |
| Repro |
| 16. REMARKS |
| FRCMA PAX COR |
| 1 |
| 1 |
1. BLK 4: ONLY DID PARAGRAPH 3 (C).(2) APPLIES. CONTRACTOR FORMAT IS ACCEPTABLE AS APPLICABLE. REFER TO ATTACHED CDRL ANNEX FOR CONTENT/ AREAS OF APPLICATION.
2. BLK 12: SUBMISSIONS SHALL BE DUE MONTLY. FIRST SUBMISSION SHALL BE DUE NO LATER THAN THE 15TH OF THE MONTH AFTER CONTRACTOR SUPPORT DATE (CSD).
3. BLK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE THE 15TH OF EACH MONTH FOR THE MONTHLY MAINTENANCE PLAN MEETING.
4. THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION.
5. BLK 14: SUBMISSION SHALL BE AN ELECTRONIC MICROSOFT @ OFFICE WORD 2003 OR LATER COMPATIBLE FORMAT, OR HARD COPY (AS DETERMINED BY MMCO/COR).
6. ACCEPTANCE OF ANY REPORT THAT INCLUDES INFORMATION CONCERNING CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/ SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
7. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION F: DISTRIBUTION AUTHORIZED ONLY AS DIRECTED BY THE CONTROLLING OFFICE (FRCMA-PAX MAINTENANCE MATERIAL CONTROL OFFICER), (FOUO ADMINISTRATIVE OR OPERATIONAL USE ONLY), (10 NOV 2009). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (NAWCTSD PCO, CODE 1363), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
FRCMA-PAX ACOR
| 1 |
| 1 |
FRCMA-PAX MMCO
| 1 |
| 1 |
| 15. TOTAL ▬▬▬▬► |
| 0 |
| 3 |
| 3 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| L. DANIELS, NAWCTSD PJM |
| 28 MAR 2011 |
| B. HICKS, NAWC TSD PDX |
| 28 MAR 2011 |
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 1 of 2 Pages
ANNEX TO EXHIBIT A - CDRL A007
Monthly Maintenance Plan Input
1.0 CDRL FORMAT. This CDRL shall use the FRCMA-PAX Monthly Maintenance Plan and Training Plan format. Unless the MCMCO required a specific format media, hard copy or electronic copy shall be the choice of the Contractor. Contractor shall make input into the following as applicable:
a. FRCMA-PAX Phone List
b. FRCMA-PAX Program Mangers / Monitor
c. Signature Authorizations
d. Quality Assurance Representatives / Collateral Duties
e. Special Qualifications/ Certifications/ Team Member Assignments / NAMP Collateral Duty
f. Support Equipment License Qualifications
g. NDI Lab Radiation Protection Requirements and NDI Lab Radiation Calibrations
h. FRCMA-PAX Support Equipment /Facility Maintenance Schedule
i. Outstanding Technology Directives /Projected Schedule Items Inducted for Test and Check AWSE Projected Check and Test /Support Equipment Planned Maintenance System.
j. ALSS Projected Major Inspections
k. Recurring Meetings / Reports Due/ Quarterly Audit Schedule
l. Local MRCs List
m. Program Cross References Matrix
n. Support Equipment Training Schedule and Special Events Calendar
o. Monthly Training Plan
p. Prospective Gains / Prospective Losses.
Note: Format content may be changed by the MMCO, MO, or COR.