Exh A CDRL A003 QA PLAN 28 Mar 2011.doc

DOC document 75 KB Posted

Attached to
Contractor Maintenance Support Services for FRCMA
Solicitation number
N6134011R0039
Issued by

About this file

Exhibit A CDRLs

View the file

Other files

File Type Posted
N61340-11-R-0039.doc DOC document
N61340-11-R-0039 Amendment 0004.doc DOC document
Exh A CDRL A012 MO CMSS PERF MAN PWR RPRT 28 MAR 2011.doc DOC document
Exh A CDRL A011 CFSR 28 Mar 2011.doc DOC document
N61340-11-R-0039 Amendment 03.doc DOC document
Exh A CDRL A005 IT 28 Mar 2011.doc DOC document
EXH A CDRL A001 Annex IMRL Inventory 28 Mar 2011.rtf RTF text file
Exh A CDRL A010 Maint Act Summary Rprt 28 Mar 2011.doc DOC document
Exh A CDRL A002 NonIMRL PProp Ctrx Inv 28 Mar 2011.doc DOC document
Exh A CDRL A007 Mo Maint Plan 28 Mar 2011.doc DOC document
Att 13 CDRL Distr Addr List .doc DOC document
Pax CBA modified 01-18-2011.pdf PDF
Exh A CDRL A001 IMRL Inv 28 Mar 2011.doc DOC document
N61340-11-R-0039 .doc DOC document
Att 1- FRCMAPAX SOW 21 Apr 11.doc DOC document
Exh A DI-ADMIN-81250A Conf Min 28 Mar 2011.pdf PDF
Exh A Annex CDRL 0006 SOW 4 3 1 2 Std Form sf85p Trusted Posit CAC 28 Mar 2011.pdf PDF
Exh A CDRL A004 SAFETY PLAN 28 Mar 2011.doc DOC document
Exh A CDRL A013 CONF MIN- 28 MAR 2011.doc DOC document
Exh A CDRL A009 Daily Bench Stat Rprt 28 Mar 2011.doc DOC document
Exh A DI-MISC-80508B Tech Rprt Serv 28 Mar 2011.pdf PDF
Exh A ANNEX CDRL 0012 _0006 RPRT FORMAT 28 Mar 2011.xls XLS spreadsheet
Exh A CDRL A006 CVS TA_CAC REPORT 28 Mar 2011.doc DOC document
Exh A DI-MGMT-80227 Prog Stat Mgmt Rprt 28 Mar 2011.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOTS I-V
TDP

TM

OTHER
X

LOGISTICS DATA/COMS

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
FRCMA-PAX CMSS
N61340-11-R-0039
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A003
Technical Report – Study/Services
Contractor Quality Assurance Plan
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-Misc-80508B
SOW PARA 2.2, 3.1.4, 3.2.5, 4.3.4 & 4.7.2; CNAFINST 4790.2 CHPT 7

NAWCTSD PJM

7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
C
ASREQ
SEE BLK 16

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

SEE BLK 16

Reg
Repro
16. REMARKS
NAWCTSD PCO
LTR ONLY

1. BLK 4: ONLY DID PARAGRAPH 3 (C).(2) APPLIES. CONTRACTOR FORMAT IS ACCEPTABLE AS APPLICABLE WITH COR FORMAT APPROVAL.

2. THE CONTRACTOR QUALITY ASSURANCE (QA) PLAN SHALL BE A LIVING DOCUMENT, CHANGED AS REQUIRED.

3. BLK 12: FIRST SUBMISSION (AN INITIAL) CONTRACTOR QA PLAN SHALL BE SUBMITTED NLT 5 WORKING DAYS PRIOR TO CONTRACT SUPPORT DATE (CSD), SUBSEQUENT SUBMISSIONS SHALL BE SUBMITTED AS REQUIRED TO AMEND THE PLAN AS NEEDED.

4. THE GOVERNMENT WILL HAVE 15 WORKING DAYS FROM RECEIPT OF SUBMISSION FOR REVIEW OF DRAFT AND/OR ACCEPTANCE/REJECTION OF EACH SUBMISSION.

5. BLK 13: THE CONTRACTOR SHALL SUBMIT FINAL SUBMISSION AFTER GOVERNMENT REVIEW OF DRAFT WITHIN 10 WORKIND DAYS FROM RECIEPT OF GOVERNMENT COMMENTS.

6. BLK 14: SUBMISSIONS SHALL BE SENT VIA EMAIL. SUBMISSIONS SHALL BE AN EMAIL ATTACHMENT IN MS-WORD 2003 OR LATER COMPATIBLE FORMAT. EMAIL SUBJECT LINE SHALL BE CONTRACT NUMBER, CDRL NUMBER, TITLE, DATE OF DOCUMENT (E…G., N61340-11-C-XXXX, A003 QA PLAN 15 JUN 11.)

7. ACCEPTANCE OF ANY REPORT THAT INCLUDES INFORMATION CONCERNING CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/ SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.

8. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED IN THE DELIVERABLE:

DISTIBUTION C: DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS, (ADMINISTRATIVE OR OPERATIONAL USE), (10 NOV 2009). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (NAWCTSD PCO CODE 25332), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

NAWCTSD PJM
1
NAWCTSD LOG MGR
1
FRCMAPAX COR
1
FRCMAPAX ACOR
1
15. Total
4
0
4
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
L. DANIELS, NAWCTSD PJM
28 MAR 2011
BRIAN HICKS, NAWC TSD PDX
28 MAR 2011
DD FORM 1423-1, FEB 2001
Previous editions are obsolete
Page
1
of
1
Pages

File details come from the government source that posted it. Updated .