WI_130-11-002_ERRATA1.pdf
PDF 56 KB Posted
- Solicitation number
- N5523618R0011
About this file
WORK ITEM 130-11-002 ERRATA
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N5523618R0011_A0005.pdf | ||
| J-2_PRICING_WORKBOOK_REV2_01-18-2019.xlsm | XLSM spreadsheet | |
| 993-00-001_E1.pdf | ||
| 992-11-007_E1.pdf | ||
| N5523618R0017A0004.pdf | ||
| 593-11-004_E1.pdf | ||
| 992-11-001_E1.pdf | ||
| N5523618R0011_A0003.pdf | ||
| J-2_PRICING_WORKBOOK_REV1_12-21-18.xlsm | XLSM spreadsheet | |
| N5523618R0011_0002.pdf | ||
| N5523618R0011_AMENDMENT_0001.pdf | ||
| EXHIBIT_B_-_GFP_ARCO.xlsx | XLSX spreadsheet | |
| J-3_Execution_Milestones_and_Key_Events.xlsx | XLSX spreadsheet | |
| Attachment_S-2_-_Request_for_Specification_Clarification.doc | DOC document | |
| CDRLS_A001_-_A008.pdf | ||
| Attachment_S-4_-_Eligibility_Criteria_Data_Sheet_ARCO.docx | DOCX document | |
| J-2_PRICING_WORKBOOK.xlsm | XLSM spreadsheet | |
| Attachment_S-3_-_Past_Performance_Reference_List.docx | DOCX document | |
| Attachment_S-5_-_Past_Performance_Questionnaire_ARCO.docx | DOCX document | |
| N5523618R0017_ARCO_(ARDM-5)_FY19_DSCO_REQUEST_FOR_PROPOSAL.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHIP: ARCO (ARDM 5) ITEM NO: 130-11-002 (E1)
COAR: 28 PCN: See Attachment A
CMP: NONE
PLANNER: STOUT, MICHAEL
ALMARIO, DIONISIO
SSP: SSSD-501-18 1 of 4 ITEM NO: 130-11-002 ERRATA NO. One
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Crane Rail, and Crane Rail Foundation, Inspection and Repair;
accomplish
1.2 Location of Work:
1.2.1 Port Side, Top Deck, Frame 0 through 432
1.2.2 Starboard Side, Top Deck, Frame 0 through 432
1.3 Identification:
1.3.1 Quantity (40 EA), Crane Rail Track 135 LB/YD, 35 36 feet long, Pc. No. 86
(E1)
1.3.2 Quantity (4 EA), Crane Rail Track 135 LB/YD, 35 feet-9inch long, Pc. No. 19
1.3.3 Quantity (4 EA), Crane Rail Track 135 LB/YD, 23 feet-9inch long, Pc. No. 20
1.3.4 Quantity (1600 EA) Rail Clip Assembly, A-295-T5, Pc. No.1, Weldlok 43.
1.3.5 Quantity (88 EA) Rail Clip Assembly, A-295-T5, Pc. No.17, Weldlok 43.
1.3.6 Inboard and Outboard Rail Foundation, Top Deck, Port Side, Frame 0 through 432
1.3.7 Inboard and Outboard Rail Foundation, Top Deck, Starboard Side, Frame 0 through 432
2. REFERENCES:
2.1 Standard Items, (FY19)
2.2 573-4802213 Rev D, ARDM-5 Crane Installation Arrg't and Details
2.3 150-4802187 Rev C, ARDM-5 Wingwall Struct. Frame "0"-64
2.4 150-4802188 Rev D, ARDM-5 Wingwall Struct. Frame 64-128
2.5 150-4802189 Rev G, ARDM-5 Wingwall Struct. Frame 128-192
2.6 150-4802190 Rev E, ARDM-5 Wingwall Struct. Frame 192-255
2.7 150-4802191 Rev C, ARDM-5 Wingwall Struct. Frame 256-320
2.8 150-4802192 Rev B, ARDM-5 Wingwall Struct. Frame 320-384
2.9 150-4802193 Rev D, ARDM-5 Wingwall Struct. Frame 384-432
2.10 SWRMC Engineering Memorandom, 241 (TV) 14 August 2014, Serial No.
21356 ARCO (ARDM-5) Port and Stbd Crane Rail Clips
2.11 MIL-STD-1625D (SH), Safety Certification Program for Drydocking Failities and Shipbuilding Ways for U. S. Navy Ships
SHIP: ARCO (ARDM 5)
SSP: SSSD-501-18 2 of 4 ITEM NO: 130-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2.12 Structural Repir Criteria For (ARDM-5), (5 MAY 2009)
2.13 MRC: 18 8FEG N Perodicity: S-17, Inspect Crane Rails
2.14 Orgo-Thermit, Inc., Instructions ORGOTHERM SkS an SkV Thermit Welding For Crane Rail Supported Joints
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-90 of 2.1, for the removal removal,and installation installation, of the equipment identified in
1.3.1 through 1.3.5, located in 1.2.1 and 1.2.2.
(E1)
3.1.1 Remove the existing equipment identified in 1.3.1 through 1.3.5, located in 1.2.1 and 1.2.2, using 2.2 and through 2.10 as guidance.
(E1)
3.1.2 Accomplish an inspection of the equipment removed in 3.1.1, identified in 1.3.1 through 1.3.3, using 2.11 through 2.13 as guidance.
3.1.2.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.1.2 to the SUPERVISOR, within 2 working days of completion of inspection.
3.2 Accomplish the requirements of 2.11 paragraph paragraphs 5.1.3.4.2, 5.1.6.5.7.1,6, and 2.13, using 2.2 through 2.9, 2.11, and 2.12 for guidance, for the equipment identified in 1.3.1 throught through 1.3.3, 1.3.6, and 1.3.7, located in 1.2.1 and 1.2.2.
(E1)
3.2.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.2 to the SUPERVISOR within 48 hours.
3.2.2 Clad weld 30 square foot of damaged deck per side( 60 Square feet total) using 2.12 as guidance, when authorized by SUPERVISOR.
3.2.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7 and 9, for for each area identified in 3.2.
3.3 Reinstall the equipment identified in 1.3.1 through 1.3.3, using 2.2 through 2.10, and 2.14 as guidance, when authorized by SUPERVISOR.
3.3.1 Welding of rails shall be in accordance with 2.14, Thermit SKS Full Preheat Process.
(E1)
3.4 Install new the equipment identified in 1.3.4 and 1.3.5, for the equipment identified in 1.3.1 through 1.3.3, using 2.2 and 2.10 as guidance.
3.4.1 Accomplish the requirments of 009-12 Table 2, column A, Lines 1 through 7.
(V)(G) "FINAL INSPECTION"
3.5 Accomplish a joint inspection, with the SUPERVISOR, and Ships Force designated representative E-7 or above, for acceptance of the final
SSP: SSSD-501-18 3 of 4 ITEM NO: 130-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
product.
3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed area.
4. NOTES:
4.1 New Rail clip assemblies shall not be painted by the contractor as directed by the SUPERVISOR.
4.2 Known source for rail inspection: Midland Sierra Northern Rail, Steve Lackner, VP Maintenance, (530)-681-1038, E-Mail midlandrail8@gmail.com
4.3 Known source for Thermite Welding: Orgo-Thermit INC. 3500 Colonial Drive North, Manchester, NJ 08759-5730 (732) 657-5781
4.4 Known Source for new rail clips: Gantrex, Tom Berringer
tomberringer@gantrex.com. Phone No.: 1-800-242-6873 Ext. 104
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SSP: SSSD-501-18 4 of 4 ITEM NO: 130-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Attachment A
PCN Identification
EC01-0092 IMPROPER RAIL CLAMP (SCO)
DA01-0121 CRANE RAIL STAPLE PRESERVATION
DA01-0258 DECK REPAIRS STBD WINGWALL
DA01-0257 DECK REPAIRS PORT WINGWALL
EC01-0149 ***DSCO 2018***BENT RAIL CLAMP
DA01-0256 NDT REQUIRED STBD WINGWALL
DA01-0120 CRANE RAIL STAPLE PRESERVATION
DA01-0255 NDT REQUIRED PORT WINGWALL
EC01-0160 CORROSION AND PITTING ON RAILS
EC01-0161 CORROSION AND PITTING ON RAILS
File details come from the government source that posted it.