993-00-001_E1.pdf
PDF 42 KB Posted
- Solicitation number
- N5523618R0011
About this file
WORK ITEM 993-00-001 ERRATA
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N5523618R0011_A0005.pdf | ||
| J-2_PRICING_WORKBOOK_REV2_01-18-2019.xlsm | XLSM spreadsheet | |
| 992-11-007_E1.pdf | ||
| N5523618R0017A0004.pdf | ||
| WI_130-11-002_ERRATA1.pdf | ||
| 593-11-004_E1.pdf | ||
| 992-11-001_E1.pdf | ||
| N5523618R0011_A0003.pdf | ||
| J-2_PRICING_WORKBOOK_REV1_12-21-18.xlsm | XLSM spreadsheet | |
| N5523618R0011_0002.pdf | ||
| N5523618R0011_AMENDMENT_0001.pdf | ||
| EXHIBIT_B_-_GFP_ARCO.xlsx | XLSX spreadsheet | |
| J-3_Execution_Milestones_and_Key_Events.xlsx | XLSX spreadsheet | |
| Attachment_S-2_-_Request_for_Specification_Clarification.doc | DOC document | |
| CDRLS_A001_-_A008.pdf | ||
| Attachment_S-4_-_Eligibility_Criteria_Data_Sheet_ARCO.docx | DOCX document | |
| J-2_PRICING_WORKBOOK.xlsm | XLSM spreadsheet | |
| Attachment_S-3_-_Past_Performance_Reference_List.docx | DOCX document | |
| Attachment_S-5_-_Past_Performance_Questionnaire_ARCO.docx | DOCX document | |
| N5523618R0017_ARCO_(ARDM-5)_FY19_DSCO_REQUEST_FOR_PROPOSAL.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHIP: ARCO (ARDM 5) ITEM NO: 993-00-001 (E1)
COAR: 28 PCN: DAMC-Q298
CMP: NONE
PLANNER: ALMARIO, DIONISIO
CUSTODIO, DONATO
STOUT, MICHAEL
SSP: SSSD-501-18 1 of 2 ITEM NO: 993-00-001 ERRATA NO. One
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Pier Services; provide
1.2 Location of Work:
1.2.1 Contractor's Facility
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items, (FY-19)
3. REQUIREMENTS:
3.1 Provide crane, material handling services, forklift, manlift, rigging material, and operators, during the entire availability to include loading, transporting, and unloading of ship's Force material and equipment and equipment/material loading/unloading supporting the availability.
(E1)
3.1.1 Provide crane service on 360 ocassions (720 hours); crane shall be capable of safely handling lifts of 10,000 pounds.
3.1.1.1 Crane shall be capable of handling material from the top deck to the furthest outboard point of the ship.
3.1.2 Provide forklift service on 720 occasions at 2 hours per occasion (1440 continuous hours). Forklift shall be capable of 2,000 pounds.
3.1.3 Provide DELETEDShip's Force the services of two-man manlifts for 120 days.
(E1)
3.1.4 All manlifts, cranes and forklift shall include fuel. (E1)
3.1.5 Vehicle shall be park in berms to collect leaking oil and shall be drained and clean daily.
3.2 Provide crane, material handling services, forklift, manlift, rigging material, and operators, during the entire availability for loading, transporting, and unloading off equipment/materials.
(E1)
3.3 Submit one legible copy, in approved transferrable media, of a weekly report of hours/lifts of usage for the equipment provided in 3.1.1, 3.1.2 and 3.1.3 to the SUPERVISOR.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
SHIP: ARCO (ARDM 5)
SSP: SSSD-501-18 2 of 2 ITEM NO: 993-00-001 ERRATA NO. One
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
File details come from the government source that posted it.