Attachment_S-4_-_Eligibility_Criteria_Data_Sheet_ARCO.docx
DOCX document 18 KB Posted
- Solicitation number
- N5523618R0011
About this file
ATTACHMENT S-4: ELIGIBILITY CRITERIA DATA SHEET
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N5523618R0011_A0005.pdf | ||
| J-2_PRICING_WORKBOOK_REV2_01-18-2019.xlsm | XLSM spreadsheet | |
| 993-00-001_E1.pdf | ||
| 992-11-007_E1.pdf | ||
| N5523618R0017A0004.pdf | ||
| WI_130-11-002_ERRATA1.pdf | ||
| 593-11-004_E1.pdf | ||
| 992-11-001_E1.pdf | ||
| N5523618R0011_A0003.pdf | ||
| J-2_PRICING_WORKBOOK_REV1_12-21-18.xlsm | XLSM spreadsheet | |
| N5523618R0011_0002.pdf | ||
| N5523618R0011_AMENDMENT_0001.pdf | ||
| EXHIBIT_B_-_GFP_ARCO.xlsx | XLSX spreadsheet | |
| J-3_Execution_Milestones_and_Key_Events.xlsx | XLSX spreadsheet | |
| Attachment_S-2_-_Request_for_Specification_Clarification.doc | DOC document | |
| CDRLS_A001_-_A008.pdf | ||
| J-2_PRICING_WORKBOOK.xlsm | XLSM spreadsheet | |
| Attachment_S-3_-_Past_Performance_Reference_List.docx | DOCX document | |
| Attachment_S-5_-_Past_Performance_Questionnaire_ARCO.docx | DOCX document | |
| N5523618R0017_ARCO_(ARDM-5)_FY19_DSCO_REQUEST_FOR_PROPOSAL.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N55236-18-R-0011: ARCO (ARDM-5)
ELGIBILITY CRITERIA DATA SHEET
MASTER SHIP REPAIR AGREEMENT (MSRA)
MSRA Contract Number:
ARDM-5 CAPABLE PIER
Pier Name/Identification:
Pier Owner:
Pier POC:
POC Phone Number:
POC Email Address:
The proposed pier is capable of berthing the ARDM-5 and has, at minimum, the following characteristics: YES NO
| Pier Facilities |
| Pier Length: >= 435 FT |
| Min Water depth (MLW) |
| 17 FT |
| Electric Power |
| 1600 amps, 450 volts, 60 hz, 3 ph (3 cables 400amps each) |
| Saltwater |
| 1000 GPM (UFC 4-150-02 Table C-3), 150 PSI measured at the most remote outlet |
| Potable Water |
| 1200 GPD (UFC 4-150-02 Table C-4) |
| Compressed Air |
| 55.6m3/hr 38 BAR |
| Telephone |
| 15 direct trunk lines connected to municipal telephone system |
| Waste Water |
| Ability to accommodate and dispose of 5000 GPD of effluent and waste water |
| T-1 |
| T-1 line capable of delivering Non-secure Internet Protocol Router Network (NIPRNET) and Secure Internet Protocol Router Network (SIPRNET) service |
FOR GOVERNMENT USE ONLY:
| MSRA MEETS ELIGIBILITY REQUIREMENT: | YES | NO | |
| PIER MEETS ELIGIBILITY REQUIREMENT: | YES | NO |
SOURCE SELECTION INFORMATION Attachment S-4
SEE FAR 2.101 AND 3.104
N55236-18-R-0011
File details come from the government source that posted it.