992-11-007_E1.pdf

PDF 39 KB Posted

Attached to
ARCO (ARDM-5) FY-19 Docking Service Craft Overhaul
Solicitation number
N5523618R0011
Issued by

About this file

WORK ITEM 992-11-007 ERRATA

View the file

Other files

File Type Posted
N5523618R0011_A0005.pdf PDF
J-2_PRICING_WORKBOOK_REV2_01-18-2019.xlsm XLSM spreadsheet
993-00-001_E1.pdf PDF
N5523618R0017A0004.pdf PDF
WI_130-11-002_ERRATA1.pdf PDF
593-11-004_E1.pdf PDF
992-11-001_E1.pdf PDF
N5523618R0011_A0003.pdf PDF
J-2_PRICING_WORKBOOK_REV1_12-21-18.xlsm XLSM spreadsheet
N5523618R0011_0002.pdf PDF
N5523618R0011_AMENDMENT_0001.pdf PDF
EXHIBIT_B_-_GFP_ARCO.xlsx XLSX spreadsheet
J-3_Execution_Milestones_and_Key_Events.xlsx XLSX spreadsheet
Attachment_S-2_-_Request_for_Specification_Clarification.doc DOC document
CDRLS_A001_-_A008.pdf PDF
Attachment_S-4_-_Eligibility_Criteria_Data_Sheet_ARCO.docx DOCX document
J-2_PRICING_WORKBOOK.xlsm XLSM spreadsheet
Attachment_S-3_-_Past_Performance_Reference_List.docx DOCX document
Attachment_S-5_-_Past_Performance_Questionnaire_ARCO.docx DOCX document
N5523618R0017_ARCO_(ARDM-5)_FY19_DSCO_REQUEST_FOR_PROPOSAL.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHIP: ARCO (ARDM 5) ITEM NO: 992-11-007

COAR: 28 PCN: DAMC-Q814

CMP: NONE

PLANNER: STOUT, MICHAEL

CUSTODIO, DONATO

SSP: SSSD-501-18 1 of 2 ITEM NO: 992-11-007

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Open Ocean Tow Enhancement Removal and Re-installation;

accomplish (OPTION ITEM)

1.2 Location of Work:

1.2.1 Contractor's Facility

1.3 Identification:

1.3.1 Arco (ARDM-5)

2. REFERENCES:

2.1 Standard Items, (FY19)

2.2 SL740-AA-MAN-010 Rev 3, U.S. Navy Towing Manual

2.3 613-4802169 Rev D, ARDM-5 Preparation for Coastal Towing

2.4 613-4802223, ARDM-5 Mooring & Towing Arrangements & Dets

2.5 613-8763593, FWD Outrigger Stowage For Tow Modifications

2.6 613-8763594, Modified Towing Arrangement and Details

2.7 613-8763595, FWD Tow Padeye and Flying Bridge Securing Mods

2.8 613-8763596, Aft Tow Padeye & Chock Modifications

2.9 581-8763597, Modified Anchor & Chain Billboard Install and Stowage

2.10 613-8763598, Fwd and Aft Wavebreak Fabrication & Installation

2.11 631-8763601, Tow Preparation PID

2.12 505-8763218, Towprep - Fr 432 (P/S) Gritblast Drainwell Reach Rod Modifications

2.13 835-8763600, Engineering Calculations Supporting Wavebreak Installation

2.14 581-4802215 Rev C, Anchor Handling Arr & Dets

2.15 631-4802231, Paint and Coating Schedule

2.16 132-4802186 Rev B, ARDM-5 Fwd and Aft Outriggers

2.17 192-7239932, Surface Ship Tightness Requirements

2.18 635-4802234, Thermal Insulation Arrgt & Det

2.19 810-4734309, Vlv Oper Gear & Ext Rods Surf Ships

2.20 S9505-AG-MMM-010, Rigid Rod Valve Remote Control System

3. REQUIREMENTS:

3.1 Accomplish the removal of the installed equipment for open ocean tow of the Service Craft identified in 1.3.1, in accordance with 2.2 through 2.14, using 2.15 through 2.20 as guidance, when directed by the

SHIP: ARCO (ARDM 5)

SSP: SSSD-501-18 2 of 2 ITEM NO: 992-11-007

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SUPERVISOR.

3.1.1 Submit a report in hard copy or approved transferrable media, of a report listing of each removed equipment in 3.1 to the

SUPERVISOR.

3.1.2 Stow the equipment removed from 3.1 and retain for re-

installation.

3.2 Reinstall the equipment removed in 3.1, in accordance with 2.2 through 2.14, using 2.15 through 2.31 as guidance, when directed by the

SUPERVISOR.

3.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.

3.2.2 Re-install flooding alarms, draft indicators, and other alarms in accordance with paragraph 5-7.1.1 of 2.2.

(I)(G) "TOWING INSPECTION"

3.3 Accomplish a tow inspection in accordance with 2.31 para 5-10.1 through 5-10.4.

3.4 Accomplish the requirements of 009-32 of 2.1, for new and disturbed surfaces.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

jeffrey.park Rectangle jeffrey.park Rectangle

File details come from the government source that posted it.