Request for Specification Clarification (Bidders Questions 011-015).pdf
PDF 79 KB Posted
- Attached to
- USNS HUNTER (TSV-3) Docking Phased Maintenance Availability (DPMA) Federal contract opportunity
- Solicitation number
- N50054-21-R-0005
About this file
This document contains questions from contractors regarding a solicitation for maintenance work on the USNS HUNTER (TSV-3). Key details include:
-
The solicitation is for a Docking Phased Maintenance Availability for the USNS HUNTER (TSV-3) issued by the Department of the Navy Naval Sea Systems Command.
-
Work includes ABS survey and repair of tanks and voids, MDE 10,000 hour top end overhaul, inspection and repair of bow thruster and marine crane, installation of galley sink, dock and sea trials, temporary services, cleaning and pumping, and paint abatement of approximately 50 square feet.
-
Contractors raised questions about missing references and clarification on pricing workbooks and milestones. The Navy provided responses addressing reference availability, revising pricing growth projections, and clarifying crew rest periods and discrepancy corrections.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO: Ship Check
TITLE: Soliciation
PARA. NO:
PAGE NO:
ITEM NO: 042-00-001
TITLE: Work Completion Certification
PARA. NO: 2.2
PAGE NO: 1 of 5
ITEM NO: 123-11-001
TITLE: ABS Survey and Repair of Tanks and Voids
PARA. NO: 2.29
PAGE NO: 2 of 7
ITEM NO: 233-11-001
TITLE: MDE 10,000 Hour Top End Overhaul
PARA. NO: 2.2, 2.6, 2.7, 2.8
PAGE NO: 1 of 7
ITEM NO: 568-11-001
TITLE: Bow Thruster; Inspect and Repair
PARA. NO: 2.13
PAGE NO: 1 of 5
ITEM NO: 589-11-001
TITLE: Hydro Pro Marine Crane; repair
PARA. NO: 2.2
PAGE NO: 1 of 5
ITEM NO: 651-11-002
TITLE: Galley Sink; install
PARA. NO: 2.2
PAGE NO: 1 of 2
CONTRACTOR QUESTION 1: Where will the USNS HUNTER be located for the ship check?
GOVERNMENT RESPONSE: HUNTERS SHIP CHECK LOCATION
WILL BE JEBLC, PIER 58.
CONTRACTOR QUESTION 2: Reference 2.2 Joint Fleet Maintenance Manual could not be found in the references provided. Please provide this reference.
GOVERNMENT RESPONSE: This document should be readily accessible to the company.
https://www.navsea.navy.mil/Portals/103/Documents/SUBMEPP/00_J FMM.pdf
CONTRACTOR QUESTION 3: Reference 2.29 810-4714432, Rev J, Std Pipe Hangers Fabrication Details & Installation Instructions could not be found in the references provided. Please provide this reference.
GOVERNMENT RESPONSE: Reference sent via to those who requested DODSafe 2/9/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil
CONTRACTOR QUESTION 4: The following references could not be found in the references proviede. Please rpovide these references; 2.2 SEBU5561-01, Caterpillar Operation and Maintenance Manual, 2.6 S923- CJ-HBK-10, US Navy Diesel Engine Inspector Handbook, Part I, Inspection Procedures; With Changes A-e, 2.7 S9086-HB-STM-010/CH- 233, Diesel Engines, 2.8 S9086-GX-STM-030/CH220, Corrosion and contamination Control for Diesel Engine Cooling Water System.
GOVERNMENT RESPONSE: Reference 2.2 will be deleted in the upcoming Errata 3. References 2.6, 2.7, 2.8 was sent to those who requested via DODSafe on 2/9/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil
CONTRACTOR QUESTION 5: Reference 2.13 MIL-STD-271, Requirements for Non-destructive Teating Methods could not be found in the references provided. Please provide this reference.
GOVERNMENT RESPONSE: This reference was sent to those who requested via DODSafe on 2/5/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil
CONTRACTOR POC:
REQUEST FOR SPECIFICATION CLARIFICATION
CONTRACTOR PHONE:
DATE OF REQUEST: 2/9/2021 SOLICITATION NO: N50054-21-R-0005
TITLE: USNS HUNTER (TSV-3) Drydock Phased Maintenance Availability (DPMA) MARMC POC: Veronica Johnson Amy Caraway
CONTRACTOR: MARMC PHONE: (757) 400-
0214 (757) 400-0173
CONTRACTOR QUESTION 6: Reference 2.2 Hydro Pro Marine Crane Model HP40-18K, Owner's Manual could not be found in the references provided. Please provide this reference.
GOVERNMENT RESPONSE: Reference was sent to those who requested via DODSafe on 2/9/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil
CONTRACTOR QUESTION 7: Reference 2.2 8171276, Berthing, Galley, Lounge, Pantry and Head Installtion could not be found in the references provided. Please provide this reference.
GOVERNMENT RESPONSE: Errata 1 addresses this reference.
ITEM NO: 982-31-001
TITLE: Dock Trial, Fast Cruise and Sea Trial
PARA. NO: 2.2
PAGE NO: 1 of 2
ITEM NO: 992-11-001
TITLE: Temporary Services, provide PARA. NO: 2.2, 2.6, 2,7 and 2.8
PAGE NO: 1 of 8
ITEM NO: 992-31-002
TITLE: Cleaning and Pumping, accomplish
PARA. NO: 2.4
PAGE NO: 2 of 7
ITEM NO: 4.7 of RFP TITLE: Paint Abatement
PARA. NO: 4.7
PAGE NO: 14 of 116
ITEM NO: Attachment S-5 Eligibility Criteria Data Sheet
TITLE:
PARA. NO:
PAGE NO:
ITEM NO: Attachment J-1 Pricing Workbo0k
TITLE:
PARA. NO:
PAGE NO:
ITEM NO: Attachment J-3 Commencement and Completion Milestones
TITLE:
PARA. NO:
PAGE NO:
ITEM NO: RFP Section L TITLE: Past Performance
PARA. NO: VI
PAGE NO: 107 of 116
CONTRACTOR QUESTION 10: Reference 2.4 United Facilities Guide specifications-33 01 50.60, Cleaning Petroleum Storage Tanks could not be found in the references provided. Please provide this reference.
GOVERNMENT RESPONSE: Reference was sent to those who requested via DODSafe on 2/9/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil
CONTRACTOR QUESTION 8: Reference 2.2 S9086-C4-STM-000/CH- 94, Trials could not be found in the references provided. Please provide this reference.
GOVERNMENT RESPONSE: Reference was sent to those who requested via DODSafe on 2/9/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil
CONTRACTOR QUESTION 9: The following referecnes could not be found in the references provided. Please provide these referenes; 2.2 UFC 4-152-01, Unified Facilities Criteria (UFC), Design: Piers and Wharves,
2.6 NFPA Standard 30, Flammable and Combustable Liquids Code, 2.7 NFPA Standard 70, National Fire Code, 2.8 Standard 701, National Fire Protection Association.
GOVERNMENT RESPONSE: Reference 2.2 was sent to those who requested via DODSafe on 2/9/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil. Reference 2.6, 2.7, and 2.8 references can be found at https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=30
CONTRACTOR QUESTION 15: Factor VI, Past Performance, dictates that the contractor may submit up to five (5) previous contracts. However, on page 102 in the chart of page limitations, the contractor is held to 2 pages per reference, 6 total pages. Typically, only 3 recent and relevant past performance contracts are requested, and since the page number for 5 contracts at 2 pages per reference would be 10, please clarify the total number of Past Performance contracts requested. Is it 5 contracts at 2 pages or 10 total, or is it 3 contracts at 2 pages, total of 6?
GOVERNMENT RESPONSE: Section L, Factor VI - Past Performance has been updated to reflect 3 previous contracts. (2) pages per reference, a total of six (6) pages.
CONTRACTOR QUESTION 11: Paragraph 4.7 Paint Abatement specifies that the contactor should abate paint in accrodnace with 009-
32. Please confirm this is in regards for the heavy metal paint abatement requirement set forth in para. 3.1.2.1 of the Standard Item? Further, please confirm the total square footage of heavy metal paint that the contractor should "plan" to remove on this vessel, as the TSV class is not one of the listed classes in the table under paragraph 3.1.2.1 of the Standard Item?
GOVERNMENT RESPONSE: Yes, this is in regards to Heavy metal Abatement. Per 009-32, 3.1.2.1 table and size of our vessel, 50 square feet
CONTRACTOR QUESTION 12: The first requirement criteria is to have a pier with a water depth of 35 ft MLW while listing the Full Load Draft as 13 ft. Doesn't this seem excessive? Can this requiremnt be reduced to encourage competition?
GOVERNMENT RESPONSE: This answer is forthcoming.
Awaiting Engineering input.
GOVERNMENT RESPONSE: Please see revised J-1 Pricing workbook. The growth projection is 24,821 man hours and $153,902.58 material.
CONTRACTOR QUESTION 13: Attachment J-1 Pricing Workbook has an amount of 79,428 mahours for a growth projection to be priced by the Contractor. In light of work items 110-21-001, 110-21-002 & 123-11-001 which include large amounts of plate replacement and welding to be priced to cover discrepancies found in these items, isn't this amount of 79,428 hours seem excessive? Experience has shown this amount to be almost impossible to be absorbed during a 75 day availability. Can this amount be reduced to a reasonable amount?
CONTRACTOR QUESTION 14: Attachment J-3 Commencement and Completion Milestones has a milestone labelled Crew Rest with no date scheduled for it. Is it safe to assume it falls between Start and Completion of Fast Cruise and Start and Completion of Sea Trial?
Are there any contractural requirements foe the Contractor during this period? Will the Contractor be allowed to correct discrepancies discovered during Fast Cruise during the time period.? Please clarify.
GOVERNMENT RESPONSE: The is no contractual requirements for Crew Rest. Yes, Contractors will be allowed to correct discrepancies.