Request for Specification Clarification (Bidders Questions 011-015).pdf

PDF 79 KB Posted

Attached to
USNS HUNTER (TSV-3) Docking Phased Maintenance Availability (DPMA) Federal contract opportunity
Solicitation number
N50054-21-R-0005
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains questions from contractors regarding a solicitation for maintenance work on the USNS HUNTER (TSV-3). Key details include:

  • The solicitation is for a Docking Phased Maintenance Availability for the USNS HUNTER (TSV-3) issued by the Department of the Navy Naval Sea Systems Command.

  • Work includes ABS survey and repair of tanks and voids, MDE 10,000 hour top end overhaul, inspection and repair of bow thruster and marine crane, installation of galley sink, dock and sea trials, temporary services, cleaning and pumping, and paint abatement of approximately 50 square feet.

  • Contractors raised questions about missing references and clarification on pricing workbooks and milestones. The Navy provided responses addressing reference availability, revising pricing growth projections, and clarifying crew rest periods and discrepancy corrections.

View the file

Other files for this federal contract opportunity

Other files attached to USNS HUNTER (TSV-3) Docking Phased Maintenance Availability (DPMA), newest first.
File Type Posted
S-7 Request for Specification Clarification (Bidders Questions 074 - 083).pdf PDF
N50054-21-R-0005 0011 Conformed.pdf PDF
N50054-21-R-0005 0011.pdf PDF
S-7 Request for Specification Clarification (Bidders Questions 062-073).pdf PDF
N50054-21-R-0005 0010.pdf PDF
N50054-21-R-0005 0010 Conformed.pdf PDF
HUNTER (TSV-3) N5005421R0005 0009.pdf PDF
HUNTER (TSV-3) Conformed N5005421R0005 0009.pdf PDF
N50054-21-R-0005 0008CONFORMED.pdf PDF
N50054-21-R-0005 0008.pdf PDF
N50054-21-R-0005 0007 CONFORMED.pdf PDF
N50054-21-R-0005 0007.pdf PDF
N50054-21-R-0005 0006.pdf PDF
Request for Specification Clarification (Bidders Questions 060-061).pdf PDF
Request for Specification Clarification (Bidders Questions 052-059).pdf PDF
N50054-21-R-0005 0005.pdf PDF
Request for Specification Clarification (Bidders Questions 016-051).pdf PDF
N50054-21-R-0005 0004.pdf PDF
N50054-21-R-0005 0003.pdf PDF
N50054-21-R-0005 0002.pdf PDF
Request for Specification Clarification (Bidders Questions 002-010).pdf PDF
Request for Specification Clarification (Bidders Question 1).pdf PDF
N50054-21-R-0005 0001.pdf PDF
Attachment S-2_Past Performance_CPARS_Reference_List.docx DOCX document
Attachment S-8 DBIDS.pdf PDF
A004 TECHNICAL REPORT STUDIES-SERVICES DI-MISC-80508B.pdf PDF
B001 TECHNICAL DATA PACKAGE DI-SESS-80776A.pdf PDF
N50054-21-R-0005 - USNS HUNTER.pdf PDF
J-4 GFP Spreadsheet.xlsx XLSX spreadsheet
Attachment S-6 - Annual Representations and Certifications.pdf PDF
Attachment S-7 Request for Specification Clarification (Bidders Questions).xlsx XLSX spreadsheet
Attachment S-10 SHIP ACCESS FORM.xlsx XLSX spreadsheet
Attachment S-11 FORM 889.pdf PDF
A001 Revisions to Existing Government Documents DI-ADMN-80925A.pdf PDF
J-5 Quality Assurance Surveillance Plan (QASP) USNS HUNTER (TSV-3) DPMA update.docx DOCX document
Attachment S-3_Past_Performance_Questionnaire.docx DOCX document
Attachment S-9 Ship Access Request Instructions.docx DOCX document
A003 Small Business Subcontract Report DI-MGMT-81642.pdf PDF
Attachment S-1_Manpower_Utilization_Data_Sheet.xlsx XLSX spreadsheet
Attachment S-4_Pier_and_Drydock_Graphical_Representation_Template.xlsx XLSX spreadsheet
A002 Liason Action Request DI-MGMT-81792.pdf PDF
A005 Contract Summary Report DI-ADMN-80447A.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO: Ship Check

TITLE: Soliciation

PARA. NO:

PAGE NO:

ITEM NO: 042-00-001

TITLE: Work Completion Certification

PARA. NO: 2.2

PAGE NO: 1 of 5

ITEM NO: 123-11-001

TITLE: ABS Survey and Repair of Tanks and Voids

PARA. NO: 2.29

PAGE NO: 2 of 7

ITEM NO: 233-11-001

TITLE: MDE 10,000 Hour Top End Overhaul

PARA. NO: 2.2, 2.6, 2.7, 2.8

PAGE NO: 1 of 7

ITEM NO: 568-11-001

TITLE: Bow Thruster; Inspect and Repair

PARA. NO: 2.13

PAGE NO: 1 of 5

ITEM NO: 589-11-001

TITLE: Hydro Pro Marine Crane; repair

PARA. NO: 2.2

PAGE NO: 1 of 5

ITEM NO: 651-11-002

TITLE: Galley Sink; install

PARA. NO: 2.2

PAGE NO: 1 of 2

CONTRACTOR QUESTION 1: Where will the USNS HUNTER be located for the ship check?

GOVERNMENT RESPONSE: HUNTERS SHIP CHECK LOCATION

WILL BE JEBLC, PIER 58.

CONTRACTOR QUESTION 2: Reference 2.2 Joint Fleet Maintenance Manual could not be found in the references provided. Please provide this reference.

GOVERNMENT RESPONSE: This document should be readily accessible to the company.

https://www.navsea.navy.mil/Portals/103/Documents/SUBMEPP/00_J FMM.pdf

CONTRACTOR QUESTION 3: Reference 2.29 810-4714432, Rev J, Std Pipe Hangers Fabrication Details & Installation Instructions could not be found in the references provided. Please provide this reference.

GOVERNMENT RESPONSE: Reference sent via to those who requested DODSafe 2/9/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil

CONTRACTOR QUESTION 4: The following references could not be found in the references proviede. Please rpovide these references; 2.2 SEBU5561-01, Caterpillar Operation and Maintenance Manual, 2.6 S923- CJ-HBK-10, US Navy Diesel Engine Inspector Handbook, Part I, Inspection Procedures; With Changes A-e, 2.7 S9086-HB-STM-010/CH- 233, Diesel Engines, 2.8 S9086-GX-STM-030/CH220, Corrosion and contamination Control for Diesel Engine Cooling Water System.

GOVERNMENT RESPONSE: Reference 2.2 will be deleted in the upcoming Errata 3. References 2.6, 2.7, 2.8 was sent to those who requested via DODSafe on 2/9/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil

CONTRACTOR QUESTION 5: Reference 2.13 MIL-STD-271, Requirements for Non-destructive Teating Methods could not be found in the references provided. Please provide this reference.

GOVERNMENT RESPONSE: This reference was sent to those who requested via DODSafe on 2/5/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil

CONTRACTOR POC:

REQUEST FOR SPECIFICATION CLARIFICATION

CONTRACTOR PHONE:

DATE OF REQUEST: 2/9/2021 SOLICITATION NO: N50054-21-R-0005

TITLE: USNS HUNTER (TSV-3) Drydock Phased Maintenance Availability (DPMA) MARMC POC: Veronica Johnson Amy Caraway

CONTRACTOR: MARMC PHONE: (757) 400-

0214 (757) 400-0173

CONTRACTOR QUESTION 6: Reference 2.2 Hydro Pro Marine Crane Model HP40-18K, Owner's Manual could not be found in the references provided. Please provide this reference.

GOVERNMENT RESPONSE: Reference was sent to those who requested via DODSafe on 2/9/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil

CONTRACTOR QUESTION 7: Reference 2.2 8171276, Berthing, Galley, Lounge, Pantry and Head Installtion could not be found in the references provided. Please provide this reference.

GOVERNMENT RESPONSE: Errata 1 addresses this reference.

ITEM NO: 982-31-001

TITLE: Dock Trial, Fast Cruise and Sea Trial

PARA. NO: 2.2

PAGE NO: 1 of 2

ITEM NO: 992-11-001

TITLE: Temporary Services, provide PARA. NO: 2.2, 2.6, 2,7 and 2.8

PAGE NO: 1 of 8

ITEM NO: 992-31-002

TITLE: Cleaning and Pumping, accomplish

PARA. NO: 2.4

PAGE NO: 2 of 7

ITEM NO: 4.7 of RFP TITLE: Paint Abatement

PARA. NO: 4.7

PAGE NO: 14 of 116

ITEM NO: Attachment S-5 Eligibility Criteria Data Sheet

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: Attachment J-1 Pricing Workbo0k

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: Attachment J-3 Commencement and Completion Milestones

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: RFP Section L TITLE: Past Performance

PARA. NO: VI

PAGE NO: 107 of 116

CONTRACTOR QUESTION 10: Reference 2.4 United Facilities Guide specifications-33 01 50.60, Cleaning Petroleum Storage Tanks could not be found in the references provided. Please provide this reference.

GOVERNMENT RESPONSE: Reference was sent to those who requested via DODSafe on 2/9/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil

CONTRACTOR QUESTION 8: Reference 2.2 S9086-C4-STM-000/CH- 94, Trials could not be found in the references provided. Please provide this reference.

GOVERNMENT RESPONSE: Reference was sent to those who requested via DODSafe on 2/9/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil

CONTRACTOR QUESTION 9: The following referecnes could not be found in the references provided. Please provide these referenes; 2.2 UFC 4-152-01, Unified Facilities Criteria (UFC), Design: Piers and Wharves,

2.6 NFPA Standard 30, Flammable and Combustable Liquids Code, 2.7 NFPA Standard 70, National Fire Code, 2.8 Standard 701, National Fire Protection Association.

GOVERNMENT RESPONSE: Reference 2.2 was sent to those who requested via DODSafe on 2/9/2021. Contact Mr. Pope to ensure receipt of DODSafe Drop, email: veal.pope@navy.mil. Reference 2.6, 2.7, and 2.8 references can be found at https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=30

CONTRACTOR QUESTION 15: Factor VI, Past Performance, dictates that the contractor may submit up to five (5) previous contracts. However, on page 102 in the chart of page limitations, the contractor is held to 2 pages per reference, 6 total pages. Typically, only 3 recent and relevant past performance contracts are requested, and since the page number for 5 contracts at 2 pages per reference would be 10, please clarify the total number of Past Performance contracts requested. Is it 5 contracts at 2 pages or 10 total, or is it 3 contracts at 2 pages, total of 6?

GOVERNMENT RESPONSE: Section L, Factor VI - Past Performance has been updated to reflect 3 previous contracts. (2) pages per reference, a total of six (6) pages.

CONTRACTOR QUESTION 11: Paragraph 4.7 Paint Abatement specifies that the contactor should abate paint in accrodnace with 009-

32. Please confirm this is in regards for the heavy metal paint abatement requirement set forth in para. 3.1.2.1 of the Standard Item? Further, please confirm the total square footage of heavy metal paint that the contractor should "plan" to remove on this vessel, as the TSV class is not one of the listed classes in the table under paragraph 3.1.2.1 of the Standard Item?

GOVERNMENT RESPONSE: Yes, this is in regards to Heavy metal Abatement. Per 009-32, 3.1.2.1 table and size of our vessel, 50 square feet

CONTRACTOR QUESTION 12: The first requirement criteria is to have a pier with a water depth of 35 ft MLW while listing the Full Load Draft as 13 ft. Doesn't this seem excessive? Can this requiremnt be reduced to encourage competition?

GOVERNMENT RESPONSE: This answer is forthcoming.

Awaiting Engineering input.

GOVERNMENT RESPONSE: Please see revised J-1 Pricing workbook. The growth projection is 24,821 man hours and $153,902.58 material.

CONTRACTOR QUESTION 13: Attachment J-1 Pricing Workbook has an amount of 79,428 mahours for a growth projection to be priced by the Contractor. In light of work items 110-21-001, 110-21-002 & 123-11-001 which include large amounts of plate replacement and welding to be priced to cover discrepancies found in these items, isn't this amount of 79,428 hours seem excessive? Experience has shown this amount to be almost impossible to be absorbed during a 75 day availability. Can this amount be reduced to a reasonable amount?

CONTRACTOR QUESTION 14: Attachment J-3 Commencement and Completion Milestones has a milestone labelled Crew Rest with no date scheduled for it. Is it safe to assume it falls between Start and Completion of Fast Cruise and Start and Completion of Sea Trial?

Are there any contractural requirements foe the Contractor during this period? Will the Contractor be allowed to correct discrepancies discovered during Fast Cruise during the time period.? Please clarify.

GOVERNMENT RESPONSE: The is no contractual requirements for Crew Rest. Yes, Contractors will be allowed to correct discrepancies.