About this file

This document contains a past performance questionnaire template for a federal solicitation. The Navy is seeking a contractor to perform the USNS HUNTER (TSV-3) Docking Phased Maintenance Availability, as detailed in solicitation N50054-21-R-0005. Offerors must provide past performance references using the questionnaire, which will be completed by the references and sent directly to evaluators at the Navy. The questionnaire contains sections for offeror information, a performance rating scale, and an evaluator section. Offerors must also submit a description of relevant past work. Responses to the questionnaire are required by August 11, 2020. The solicitation attachments were not included but are available upon written request to the contracting officers.

View the file

Other files for this federal contract opportunity

Other files attached to USNS HUNTER (TSV-3) Docking Phased Maintenance Availability (DPMA), newest first.
File Type Posted
N50054-21-R-0005 0011 Conformed.pdf PDF
N50054-21-R-0005 0011.pdf PDF
S-7 Request for Specification Clarification (Bidders Questions 074 - 083).pdf PDF
N50054-21-R-0005 0010.pdf PDF
N50054-21-R-0005 0010 Conformed.pdf PDF
S-7 Request for Specification Clarification (Bidders Questions 062-073).pdf PDF
HUNTER (TSV-3) N5005421R0005 0009.pdf PDF
HUNTER (TSV-3) Conformed N5005421R0005 0009.pdf PDF
N50054-21-R-0005 0008CONFORMED.pdf PDF
N50054-21-R-0005 0008.pdf PDF
N50054-21-R-0005 0007 CONFORMED.pdf PDF
N50054-21-R-0005 0007.pdf PDF
N50054-21-R-0005 0006.pdf PDF
Request for Specification Clarification (Bidders Questions 060-061).pdf PDF
Request for Specification Clarification (Bidders Questions 052-059).pdf PDF
N50054-21-R-0005 0005.pdf PDF
N50054-21-R-0005 0004.pdf PDF
Request for Specification Clarification (Bidders Questions 016-051).pdf PDF
N50054-21-R-0005 0003.pdf PDF
Request for Specification Clarification (Bidders Questions 011-015).pdf PDF
Request for Specification Clarification (Bidders Questions 002-010).pdf PDF
N50054-21-R-0005 0002.pdf PDF
Request for Specification Clarification (Bidders Question 1).pdf PDF
N50054-21-R-0005 0001.pdf PDF
J-5 Quality Assurance Surveillance Plan (QASP) USNS HUNTER (TSV-3) DPMA update.docx DOCX document
Attachment S-9 Ship Access Request Instructions.docx DOCX document
A003 Small Business Subcontract Report DI-MGMT-81642.pdf PDF
N50054-21-R-0005 - USNS HUNTER.pdf PDF
J-4 GFP Spreadsheet.xlsx XLSX spreadsheet
Attachment S-6 - Annual Representations and Certifications.pdf PDF
Attachment S-7 Request for Specification Clarification (Bidders Questions).xlsx XLSX spreadsheet
Attachment S-10 SHIP ACCESS FORM.xlsx XLSX spreadsheet
Attachment S-11 FORM 889.pdf PDF
A001 Revisions to Existing Government Documents DI-ADMN-80925A.pdf PDF
Attachment S-2_Past Performance_CPARS_Reference_List.docx DOCX document
Attachment S-8 DBIDS.pdf PDF
A004 TECHNICAL REPORT STUDIES-SERVICES DI-MISC-80508B.pdf PDF
B001 TECHNICAL DATA PACKAGE DI-SESS-80776A.pdf PDF
Attachment S-1_Manpower_Utilization_Data_Sheet.xlsx XLSX spreadsheet
Attachment S-4_Pier_and_Drydock_Graphical_Representation_Template.xlsx XLSX spreadsheet
A002 Liason Action Request DI-MGMT-81792.pdf PDF
A005 Contract Summary Report DI-ADMN-80447A.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment S-9

PAST PERFORMANCE QUESTIONNAIRE

Instructions to Offeror

The Offeror will complete Part A of the Questionnaire. Separately, the Offeror shall provide the entire Past Performance Questionnaire, with Part A completed, to each customer for them to complete Parts B and C. In addition, the Offeror shall provide for all Past Performance References, a short description of the work performed and why the Offeror considers it relevant to the requirements of this solicitation. Completed questionnaires shall be forwarded directly to the Naval Sea Systems Command point of contact listed in this letter.

NOTE: ONCE COMPLETED BY THE POC, QUESTIONNAIRES MUST BE DIRECTLY TRANSMITTED TO THE GOVERNMENT AS DESCRIBED ON THE FOLLOWING PAGE. COMPLETED QUESTIONNAIRES RECEIVED FROM OFFERORS ARE NOT ACCEPTABLE.

Instructions to Evaluator

The Naval Sea Systems Command is requesting an evaluation of an Offeror’s past performance for source selection purposes. Accordingly, request your candid assessment of the Offeror’s past performance; please see Section A below for the identity of the Offeror and contract of interest.

Once completed, this questionnaire and any appended information becomes Source Selection Sensitive and must be protected from disclosure. Access to this information shall be limited to Government procurement officials.

Please forward the completed questionnaire no later than 11 August 2020 to Amy.caraway@navy.mil and veronica.johnson1@navy.mil

Hand-written evaluations are acceptable. Please answer each question in SECTION B by circling one of the ratings: E V S M U N/A, where:

EExceptional; VVery Good; S-Satisfactory;

MMarginal; UUnsatisfactory; N/ANot Applicable

Exceptional - Contractor performance substantially exceeded expected levels of performance.

Very Good - Contractor performance exceeded expected levels.

Satisfactory – Performance met expected levels.

Marginal - Performance was less than expected.

Unsatisfactory - Performance was significantly less than expected.

In addition, please provide supporting comments for each rating. Please use your supporting comments to highlight the Offeror’s specific strengths and weaknesses. You may use additional sheets if required. Your ratings and comments should reflect only “contractor liable” performance. You may supplement your knowledge with the knowledge and judgment of others in your organization.

Please enter the requested information in SECTION C for the person primarily responsible for completing the questionnaire, then transmit the completed questionnaire to the point of contact identified above. Thank you for your assistance in this matter.

PLEASE DO NOT PROVIDE COMPLETED QUESTIONNAIRES TO THE OFFEROR

SECTION A (To Be Completed by the Offeror)

1. Name of Offeror/Contractor: __________________________________________________

Address of Offeror/Contractor: ________________________________________________

2A. Contract Number (between Prime and Sub):_______________________________________

Task or Order No., where applicable: ___________________________________________

2B. Contract Number (between Government and Prime):________________________________

Task or Order No., where applicable: ___________________________________________

3A. Period of Performance: ______________________________________________________

3B. Place of Performance: _______________________________________________________

4. Detailed Description of Work/Scope of Effort: ___________________________________

5. Detailed Explanation Demonstrating Similarity to current Solicitation: _________________

6.POCName:
Address:
Tel. No.:
Voice:
Facsimile:

7. Method and Date Questionnaire Sent to POC:

Date: ____________________
Method: _______________________________

SECTION B (To Be Completed by Evaluator)

E Exceptional; V-Very Good; S-Satisfactory;

M Marginal; U Unsatisfactory; N/A Not Applicable

1. Overall Contract Outcome: E V S M U N/A Ability to satisfactorily complete all tasks while conforming to customer requirements, standards of good workmanship and safe practices.

Comments: _____________________________________________________________________

2. Cost Performance: E V S M U N/A Ability to accurately forecast and control costs throughout all phases of the contract.

Comments: _____________________________________________________________________

3. Schedule Performance: E V S M U N/A Ability to develop accurate work schedules and adhere to those schedules, as well as the ability to adapt to changes in requirements and work schedules.

Comments: _____________________________________________________________________

4. Technical Performance (Quality of Product): E V S M U N/A Ability to overcome technical challenges by applying sound engineering principles, complete required engineering analyses and develop adequate technical reports and plans.

Comments: _____________________________________________________________________

4. Subcontracting Plan Adherence and Coordination: E V S M U N/A If a subcontracting plan was required please describe the offerors success in meeting planned goals and/or efforts made to overcome goal deficiencies and challenges as well as the offeror’s ability to successfully manage and integrate subcontractors.

Comments: _____________________________________________________________________

SECTION C (To Be Completed by Evaluator)

1. Name of Evaluator: _____________________________________________________________

2. Position Title: _________________________________________________________

3. Administrating Authority/Agency: _________________________________________________

4. Telephone Number:Voice __________________
Facsimile _______________

5. Signature: ______________________________Date: ____________

Please transmit completed questionnaire to Amy.caraway@navy.mil and veronica.johnson1@navy.mil