This document is a local work template outlining requirements for contractors performing work at the Norfolk Naval Shipyard. It specifies that contractors must comply with various safety regulations for cranes, aerial platforms, diving operations, and other activities. Contractors are responsible for obtaining approvals and inspections for equipment and temporary structures. They must also coordinate work that could interfere with other operations, such as hot work, painting, or use of solvents. The document provides guidance on topics like no smoking areas, tagging materials brought on base, and installing temporary covers for access points.

J-3 - LWT 042-009, General Requirements for Work Within Norfolk Naval Shipyard (For Ships/Craft Utilizing Convenience Berthing)

View the file

Other files for this federal contract opportunity

Other files attached to Messing & Berthing Barges Support, newest first.
File Type Posted
Bidder's_Questions_and_Answers_(022-025).pdf PDF
Exhibit_A-E.xlsx XLSX spreadsheet
Amendment_0001_SF-30_RFP_N5005419R0017.pdf PDF
Bidder's_Questions_and_Answers_(002-021).pdf PDF
Bidder's_Questions_and_Answers_(001).pdf PDF
RFP_N5005419R0017.docx DOCX document
Exhibit_A-E.xlsx XLSX spreadsheet
J-15_Past_Performance_Assessment_Questionnaire.docx DOCX document
J-5_LWT_042-005.pdf PDF
J-4_LWT_042-006.pdf PDF
J-16_Request_for_Specification_Clarification.docx DOCX document
J-9_SWT_042-005.pdf PDF
J-8_LWT_042-037.pdf PDF
J-7_LWT_042-038.pdf PDF
J-11_BSEC-Barge_Systems_and_Equipment_Check_List.pdf PDF
J-13_Capacity_Evaluation_Form.xlsx XLSX spreadsheet
J-12_Attachment_B-WINTERIZATION.pdf PDF
J-2_LWT_042-005.pdf PDF
J-10_SWT_077-001.pdf PDF
J-14_Past_Performance_Reference_List.docx DOCX document
J-6_LWT_042-007.pdf PDF
J-1_CDRLs.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCAL WORK TEMPLATE

<<INSERT ACTIVITY>>

SHIP: N/A ITEM NO: 042-00

COAR: N/A PCN: N/A

LWT FILE NO: 042-009 CMP: N/A

REVISED: 19 May 2018 PLANNER: N/A

1 of 5 ITEM NO: 042-009

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 General Requirements for Work Within Norfolk Naval Shipyard (FOR SHIPS/CRAFT UTILIZING CONVENIENCE BERTHING); accomplish

1.2 Location of Work:

1.2.1 Norfolk Naval Shipyard (NNSY)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 29 CFR 1915, Occupational Safety and Health Administration (OSHA)

2.2 NAVSHIPYDNORINST 11450.2A, Contractor Operated Crane Access and Utilization Within the Confines of NNSY

3. REQUIREMENTS:

3.1 Accomplish the following requirements, in addition to the specific requirements of the Job Order, for work accomplished on naval ships and craft located at NNSY. The Naval Supervising Activity (NSA) for this work will be MARMC.

3.1.1 No regulatory agencies shall be allowed into the Shipyard without notification to the NSA for submittal to NNSY Code 106 and approval by Code 106. No information concerning Navy property or operations, or operations performed under contract to the Navy, shall be released to regulatory agencies without the approval of the NSA and NNSY Code 106.

3.1.2 CRANE SAFETY REQUIREMENTS. Each crane rented or owned by the contractor shall meet the requirements of 2.1 and 2.2, all state and local regulations, NNSY crane regulations for contractors, and predetermined ground loading capacities. Schedule an initial inspection with NNSY Code 742, via the NSA, Code 603, in the parking lot of building 1502, Pass Office, for crane validation prior to entering NNSY.

3.1.2.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report during the initial inspection listing documentation supporting certification requirements, the names of each crane operator including qualifications on specific crane being utilized, and crane ground loading requirements to the NSA, Code 603.

3.1.2.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing crane ground loading

SHIP: CG 47

2 of 5 ITEM NO: 042-009

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

data calculated using crane weight, load(s) weight to be lifted, boom extension and angle, lift radius, and sufficient strength and size of matting materials to determine maximum load on outriggers to the NSA, Code 240, 72 hours prior to the initial inspection.

3.1.2.3 Obtain maximum ground loads for the crane working area in NNSY from the NSA, Code 240.

3.1.2.4 Submit report required in 3.1.2.2 to the NSA not later than 24 hours before the end of the last preceding day shift, when initial crane inspections are scheduled after normal day shift working hours, on a weekend, or on a federal holiday.

3.1.2.5 The lifting of personnel with a live hoist/friction

crane is not allowed.

3.1.2.6 Wedged socket and connections shall not be used to

handle ammunition, hazardous or explosive material or for lifting personnel.

3.1.2.7 Blockage of crane rails (within yellow travel zones)

must be coordinated with NNSY, Code 742, via the NSA.

3.1.2.8 Contractors using subcontractors to perform any work

involving weight handling equipment will ensure their subcontractors' work practices follow and adhere to these guidelines.

3.1.3 AERIAL PLATFORMS. Accomplish a verification inspection of each aerial platform rented or owned by the contractor prior to utilization on production work. Inspection can be performed at the job site. Record inspection results for each aerial platform on NNSY form (Pre-entry Aerial Inspection Form). Submit a completed and signed copy of each form to NNSY Code 970.2, via the NSA, Code 603, by fax or delivery of hard copy. Upon submission, production work may proceed. The form will serve as notification to NNSY of the presence and location of the equipment and afford NNSY the opportunity to visually inspect to confirm the information received to ensure and maintain the safety and protection for its employees and Naval facilities. The contractor/vendor remains responsible for the safety, reliability, certifications and operation of the equipment, all operators, and other personnel affected.

3.1.3.1 Copies of a form for providing the above information

will be provided upon request by Code 603. An asterisk on the form denotes items operator(s) shall inspect at job location after set-up of unit. Maintain a copy of the document with the unit. For aerial platforms delivered and/or requiring replacing after 1600, perform the verification inspection and submit the completed and signed form no later than 0800 the following day.

Any aerial platform requiring lifting at the job site by NNSY will require prior approval by NNSY Code 700. Aerial platforms equipped with lifting pads and an approved manufacturer's procedure/sketch for lifting in accordance with the requirements of ATTACHMENT A will be approved for lifting without any production delay. Aerial platforms not equipped with lifting pads with an approved manufacturer's procedure/sketch for lifting

3 of 5 ITEM NO: 042-009

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

will require a minimum of one working day for Code 700 review/approval.

3.1.3.2 Each operator shall have available at the job site a

copy of their certification of training for the specific unit being utilized. Provide for review upon request.

3.1.3.3 Grove aerial platform model AMZ131XT with articulating boom will not be allowed into NNSY.

3.1.3.4 Perform daily pre-use inspections by the operator(s)

prior to assuming operating responsibility.

3.1.3.5 Report verbally each accident (i.e., personnel injury, material or equipment damage, collision or unplanned contact with objects) to the NSA as soon as management becomes aware; provide a formal written report of the event to the NSA within 24 hours of each accident, followed with a summary of circumstances, explanation of cause, and corrective actions taken. Secure the accident site, protect evidence, and withhold further aerial platform operations until the cause is determined and corrective actions are implemented and approved by the NSA.

3.1.3.6 Ensure each subcontractor follow and adhere to these

guidelines.

3.1.3.7 NNSY inspection team will be performing random

monitoring of each aerial platform while in use. Any unsafe operations/conditions observed/found will be questioned and may result in stoppage of work operations.

3.1.4 DIVING OPERATIONS. Notify Port Operations within thirty minutes of divers entering the water. Submit one legible copy of the Port Operation notification to the NSA. Ensure that the ship's "Code ALPHA" flag is up each day prior to and during all diving operations.

3.2 CONTRACTOR PROVIDED TRAILERS FOR CONTRACTOR OFFICE SPACE USE.

Trailers for contractor use, temporary services (potable water, sewage disposal and electricity) shall be requested through the NSA.

3.2.1 Trailers' location other than on-board ship must have the NSA's Fire Department and/or NNSY Code 300.2 approval.

3.2.2 Each trailer shall meet Federal, State, and local building and environmental requirements, i.e., lighting, ventilation, heating, cooling, safety, etc. In addition, two fully charged 15 pound CO2 wall-mounted fire extinguishers shall be provided in convenient locations.

3.2.3 Provide, install, connect, maintain and remove each temporary water/sewer line, and each electric cable between the NNSY electrical power, and each water/sewer source to the contractor's trailer(s).

3.3 NO SMOKING AREAS. All Naval vessels shall be designated NO SMOKING AREAS unless otherwise designated by the vessel's Commanding Officer.

3.4 COORDINATION OF INCOMPATIBLE OPERATIONS. Prior to start of work each work day, coordinate all potentially incompatible work operations with the NSA and Ship's Force. DO NOT PROCEED WITH ANY WORK UNTIL INCOMPATIBILITIES ARE RESOLVED. Operations that may be incompatible and may require coordination of scheduling prior to start up are: ventilation

4 of 5 ITEM NO: 042-009

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

of toxic or flammable/combustibles; spray painting and paint application;

use of solvents; hot work; tank work; fueling/defueling operations; CO2 fire extinguisher system work; asbestos work; mercury work; energizing circuits and starting machines; working aloft; removing floor plates or gratings; diving operations; abrasive blasting; compressed air (blow down); and, CHT (Sewage) work. Note: The above list is presented as a guide and is not all inclusive. The contractor is expected to be alert to the possibility of potentially incompatible operations, and resolve incompatabilities to ensure hazards are adequately controlled.

3.5 Prior to loading materials, tools and equipment aboard ship, the contractor shall install identification tags consisting of contractors name, description and destination. Each tag must endure repair process.

3.6 For each temporary service requested by the contractor, the contractor is responsible for possessing the necessary materials to connect each hookup at locations pierside, provided by the NSA. The contractor is responsible to run each service from the NSA provided location to their worksite, shipboard or pierside. Each connection used by the contractor must be capable of adapting to the following shipyard temporary service connections:

3.6.1 Temporary services will be provided from pierside riser connections.

3.6.1.1 NSA will only supply steam to the 2 inch diameter

line/connection.

3.6.1.2 NSA will only supply Electric 440V 3 Phase and/or 110V single phase.

3.6.1.3 NSA will only supply potable water 2 1/2 inch diameter.

3.6.1.4 NSA will only supply L.P. Air 2 inch diameter.

3.6.2 The contractor will not be allowed to use electric air

compressors in NNSY. Only diesel air compressors are allowed.

3.6.3 All temporary services shall be tagged at the source and destination stating: use, source, destination and contractor's name.

Each identification tag should also be used at each bulkhead penetration. Quick disconnects shall be used when necessary within 3 feet of a safety bulkhead if the services penetrate the bulkhead.

All waivers shall be requested through the NSA.

3.7 TEMPORARY COVERS. Template, fabricate and install each temporary top hat on each tank top manhole for tanks and voids that open into bilges of machinery spaces.

3.7.1 Fabricate top hats from 1/4 inch thick aluminum.

3.7.2 Top hats shall not exceed 12 inches in height.

3.7.3 Install each top hat using new 3/16 inch thick gaskets

conforming to MIL-C-6183, Class I, grade firm, synthetic rubber and cork composition. Install each top hat using the existing fasteners;

replace 25 per cent of fasteners found missing or unserviceable.

4. NOTES:

4.1 Operations of gasoline fueled vehicles and machinery on-board the

5 of 5 ITEM NO: 042-009

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

ship is prohibited.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.