Exhibit_A-E.xlsx
XLSX spreadsheet 92 KB Posted
- Attached to
- Messing & Berthing Barges Support Federal contract opportunity
- Solicitation number
- N5005419R0017
About this file
This is an exhibit to a solicitation for messing and berthing barge support services. The exhibit provides pricing details for various services over a potential five-year ordering period, including towing, temporary services, cleaning and sanitization, inspections, fire equipment maintenance, galley equipment repairs, habitability repairs, electrical and HVAC work, piping replacement, and miscellaneous repairs. Pricing is listed by estimated quantities and unit prices for over 150 individual line items organized under different task areas. Notes specify that pricing must be fully burdened and include potential escalation, as well as implementation of standard Navy work items and data requirements. Subcontracting must be priced separately from material pools. Overtime is not authorized without express task order approval.
EXHIBIT A-E
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001_SF-30_RFP_N5005419R0017.pdf | ||
| Bidder's_Questions_and_Answers_(022-025).pdf | ||
| Bidder's_Questions_and_Answers_(002-021).pdf | ||
| Bidder's_Questions_and_Answers_(001).pdf | ||
| RFP_N5005419R0017.docx | DOCX document | |
| Exhibit_A-E.xlsx | XLSX spreadsheet | |
| J-15_Past_Performance_Assessment_Questionnaire.docx | DOCX document | |
| J-12_Attachment_B-WINTERIZATION.pdf | ||
| J-2_LWT_042-005.pdf | ||
| J-10_SWT_077-001.pdf | ||
| J-14_Past_Performance_Reference_List.docx | DOCX document | |
| J-6_LWT_042-007.pdf | ||
| J-1_CDRLs.pdf | ||
| J-9_SWT_042-005.pdf | ||
| J-8_LWT_042-037.pdf | ||
| J-7_LWT_042-038.pdf | ||
| J-11_BSEC-Barge_Systems_and_Equipment_Check_List.pdf | ||
| J-13_Capacity_Evaluation_Form.xlsx | XLSX spreadsheet | |
| J-5_LWT_042-005.pdf | ||
| J-3_LWT_042-009.pdf | ||
| J-4_LWT_042-006.pdf | ||
| J-16_Request_for_Specification_Clarification.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| Contractor Name | |||||
| Supplies/Services | Est Qty | Unit | Unit | ||
| Price | Amount |
| A | 101 | Tow Barges | ||||
| A | 101AA | Tow (one way, up to 40 miles), APL Class - except APL-61, APL-66, APL-67 Class | 12 | EA | $0.00 | |
| A | 101AB | Tow (one way, up to 40 miles), YR, YRBM, YRBM(L) Class | 30 | EA | $0.00 | |
| A | 101AC | 4 | EA | $0.00 | ||
| A | 101AD | Tow (one way, up to 800 miles, Ocean tow), APL Class - except APL-61, APL-66, APL-67 Class | 6 | EA | $0.00 | |
| A | 101AE | Tow (one-way, up to 800 miles, Ocean tow), YR, YRBM, YRBM(L) Class | 14 | EA | $0.00 | |
| A | 101AF | Tow (one-way, up to 800 miles, Ocean tow), APL-66 Class, APL-67 Class | 2 | EA | $0.00 | |
| A | 101AG | Tow (One-way, up to 800 miles, Ocean tow), APL-61 Class | 2 | EA | $0.00 | |
| A | 102 | Temporary Services | ||||
| A | 102AA | Tie up or cast off berthing barge (Down River) | 50 | EA | $0.00 | |
| A | 102AB | Tie up AND cast off berthing barge (In Plant) | 15 | EA | $0.00 | |
| A | 102AC | Install and remove sewage, potable water, steam, shore power, telephone, fire main, gangways and cable television connections (Down River) | 60 | EA | $0.00 | |
| A | 102AD | Provide, install and maintain all services to include gangways, oil booms, safety nets, shore power, sewage, steam, Firemain, and potable water (In Plant) | 320 | DAY | $0.00 | |
| A | 102AE | Provide and install 1 inch KEVLAR mooring lines (150 ft. in length). With 6' loop in both ends, with Chafing gear installed. | 60 | EA | $0.00 | |
| A | 102AF | Provide and install 2 inch KEVLAR mooring lines (200 ft. in length). With 6' loop in both ends, with Chafing gear installed. | 20 | EA | $0.00 | |
| A | 103 | Cleaning and Sanitizing (including waxing and buffing of tile decks, if applicable) | ||||
| A | 103AA | Deep clean and sanitize the entire Craft (YR Class) | 6 | EA | $0.00 | |
| A | 103AB | Deep clean and sanitize the entire Craft (YRBM Class) | 10 | EA | $0.00 | |
| A | 103AC | Deep clean and sanitize the entire Craft (YRBM(L) Class) | 45 | EA | $0.00 | |
| A | 103AD | Deep clean and sanitize the entire Craft (APL Class) - except APL-61, APL-66, APL-67 Class | 15 | EA | $0.00 | |
| A | 103AE | Deep clean and sanitize the entire Craft (APL-61) | 4 | EA | $0.00 | |
| A | 103AF | Deep clean and sanitize the entire Craft (APL-66, APL-67 Class) | 4 | EA | $0.00 | |
| A | 103AG | Fumigate/Exterminate - YR Class | 6 | EA | $0.00 | |
| A | 103AH | Fumigate/Exterminate - YRBM Class | 10 | EA | $0.00 | |
| A | 103AJ | Fumigate/Exterminate - YRBM(L) Class | 45 | EA | $0.00 | |
| A | 103AK | Fumigate/Exterminate - APL Class except APL-61, APL-66, APL-67 Class | 12 | EA | $0.00 | |
| A | 103AL | Fumigate/Exterminate - APL-61 | 2 | EA | $0.00 | |
| A | 103AM | Fumigate/Exterminate - APL-66, APL-67 Class | 2 | EA | $0.00 | |
| A | 103AN | Winterize - YR Class | 4 | EA | $0.00 | |
| A | 103AP | Winterize - YRBM Class | 6 | EA | $0.00 | |
| A | 103AQ | Winterize - YRBM(L) Class | 20 | EA | $0.00 | |
| A | 103AR | Winterize - APL Class - except APL-61, APL-66, APL-67 Class | 12 | EA | $0.00 | |
| A | 103AS | Winterize - APL-61 | 2 | EA | $0.00 | |
| A | 103AT | Winterize - APL-66, APL-67 Class | 2 | EA | $0.00 | |
| A | 104 | Test and Inspections | ||||
| A | 104AA | Accomplish a preliminary and final visual and operational inspection of all systems and equipment utilizing barge systems and equipment check off list (Planning Memorandum No. 601-005). Submit a detailed report of all discrepancies. | 50 | EA | $0.00 | |
| A | 104AB | Clean, gas free safe for entry and hot work, inspect and test CHT system, replacing 4 floats per system (YR, YRBM, YRBM(L), and all APL's except for APL-61) | 30 | SY | $0.00 | |
| A | 104AC | Clean, gas free safe for entry and hot work, inspect and test CHT system, replacing 4 floats per system (APL-61) | 2 | SY | $0.00 | |
| A | 104AD | Clean, gas free safe for entry and hot work, and air test tanks and voids. | 40 | EA | $0.00 | |
| A | 105 | Fire Fighting Equipment: Replace, Repair and Maintenance | ||||
| A | 105AA | Accomplish Annual Inspection and Certification existing fire extinguishers, 20 lbs. or less | 200 | EA | $0.00 | |
| A | 105AB | Re-charge existing fire extinguishers, 20 lbs. or less | 100 | EA | $0.00 | |
| A | 105AC | Install new dry chemical fire extinguishers, 20 lbs. | 50 | EA | $0.00 | |
| A | 105AD | Accomplish Annual Inspection and Certification of Gaylord Hood system | 25 | EA | $0.00 | |
| A | 105AE | Accomplish Annual Inspection and Certification of Range Guard (Deep Fat Fryer extinguishing) systems | 25 | EA | $0.00 | |
| A | 105AF | Accomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for legacy IC/SM Systems. | 5 | EA | $0.00 | |
| A | 105AG | Accomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for Siemens Systems. | 10 | EA | $0.00 | |
| A | 105AH | Accomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment Notifier Systems. | 10 | EA | $0.00 | |
| A | 105AJ | Calibrate and Certify H2S System | 10 | EA | $0.00 | |
| A | 105AK | Calibrate Gage and submit report. | 100 | EA | $0.00 | |
| A | 106 | Repair Galley/Messing Equipment and Fixtures | ||||
| A | 106AA | Provide commercial type garbage disposal, remove existing, replace and operational test | 6 | EA | $0.00 | |
| A | 106AB | Provide household type garbage disposal, remove existing, replace and operational test | 10 | EA | $0.00 | |
| A | 106AC | Replace disposable filters (industrial fire retardant) for galley systems | 30 | EA | $0.00 | |
| A | 106AD | Steam clean permanent filters | 40 | EA | $0.00 | |
| A | 106AE | Replace permanent filters | 25 | EA | $0.00 | |
| A | 107 | Laundry Equipment, Replace | ||||
| A | 107AA | Remove existing, provide and install new single function clothes washer, commercial style, accomplish operational test | 20 | EA | $0.00 | |
| A | 107AB | Remove existing, provide and install new single function clothes dryer, commercial style, accomplish operational test | 20 | EA | $0.00 | |
| A | 108 | Habitability Repairs | ||||
| A | 108AA | Replace urinal | 20 | EA | $0.00 | |
| A | 108AB | Replace toilet | 40 | EA | $0.00 | |
| A | 108AC | Replace sink | 40 | EA | $0.00 | |
| A | 108AD | Replace shower head | 250 | EA | $0.00 | |
| A | 108AE | Replace shower mixing valve | 200 | EA | $0.00 | |
| A | 108AF | Replace flushometer | 200 | EA | $0.00 | |
| A | 108AG | Replace sink mixing valve | 200 | EA | $0.00 | |
| A | 108AH | Deck Drain - Clean free of obstructions to include piping | 100 | EA | $0.00 | |
| A | 108AJ | Replace composition ceiling panel (2 ft. x 4 ft.) vinyl coated | 1500 | EA | $0.00 | |
| A | 108AK | Replace ceiling tile T-Rail | 1000 | LF | $0.00 | |
| A | 108AL | Replace towel rack | 50 | EA | $0.00 | |
| A | 108AM | Replace soap dish | 50 | EA | $0.00 | |
| A | 108AN | Replace shower curtain including hooks | 500 | EA | $0.00 | |
| A | 108AP | Replace shower mat | 500 | EA | $0.00 | |
| A | 108AQ | Replace toilet paper holder (frame and spool) | 100 | EA | $0.00 | |
| A | 108AR | Replace water fountain | 30 | EA | $0.00 | |
| A | 108AS | Replace mini blind | 1000 | EA | $0.00 | |
| A | 108AT | Replace flushometer hoses | 100 | EA | $0.00 | |
| A | 108AU | Fabricate replacement key as per sample | 500 | EA | $0.00 | |
| A | 108AV | Fabricate replacement keys (4 EACH) from existing doorknob. Label and place 2 EACH in BOTH Keyboxes | 10 | EA | $0.00 | |
| A | 108AW | Open and reset pin type lock sets to include 2 replacement keys | 100 | EA | $0.00 | |
| A | 108AX | Provide and install new locking doorknob set | 100 | EA | $0.00 | |
| A | 108AY | Open and reset combination on high security/classified lock on door and/or safe (Cypher Lock or Sargeant & Greenleaf mechanical type) | 100 | EA | $0.00 | |
| A | 108AZ | Open and reset combination on high security X-09 or X10 lock | 5 | EA | $0.00 | |
| A | 108BA | Open and install new lock set and reset combinations on high security/classified lock on doors and/or safe (Cypher Lock or Sargeant & Greenleaf mechanical type) | 50 | EA | $0.00 | |
| A | 108BB | Open and install new lock set and reset combination on high security X-09 or X-10 lock | 5 | EA | $0.00 | |
| A | 108BC | Open Class 5 Security Container (SIPR Safe) | 5 | EA | $0.00 | |
| A | 108BD | Replace automatic door closures | 100 | EA | $0.00 | |
| A | 108BE | Replace bulkhead insulation (2" thick) | 3000 | SF | $0.00 | |
| A | 108BF | Replace bulkhead insulation (1" thick) | 3000 | SF | $0.00 | |
| A | 108BG | Replace deck drains up to 4" to include piping | 100 | EA | $0.00 | |
| A | 109 | Electrical Repairs | ||||
| A | 109AA | Replace fluorescent tubes in closed fixtures: 12 inch | 300 | EA | $0.00 | |
| A | 109AB | Replace fluorescent tubes with LED bulb in closed fixtures: 12 inch | 200 | EA | $0.00 | |
| A | 109AC | Replace fluorescent tubes in closed fixtures: 24 inch | 300 | EA | $0.00 | |
| A | 109AD | Replace fluorescent tubes with LED bulb in closed fixtures: 24 inch | 200 | EA | $0.00 | |
| A | 109AE | Replace fluorescent tubes in closed fixtures: 48 inch | 300 | EA | $0.00 | |
| A | 109AF | Replace fluorescent tubes in with LED bulb closed fixtures: 48 inch | 200 | EA | $0.00 | |
| A | 109AG | Replace bulbs in closed incandescent fixtures | 150 | EA | $0.00 | |
| A | 109AH | Replace bulbs with screw-in LED bulb in closed incandescent fixtures | 100 | EA | $0.00 | |
| A | 109AJ | Replace bulbs in spotlight fixtures | 100 | EA | $0.00 | |
| A | 109AK | Replace bulbs with LED bulb in spotlight fixtures | 20 | EA | $0.00 | |
| A | 109AL | Replace starters | 200 | EA | $0.00 | |
| A | 109AM | Replace Ballast on Fluorescent light fixture | 100 | EA | $0.00 | |
| A | 109AN | Replace bulb and battery in emergency light fixtures | 150 | EA | $0.00 | |
| A | 109AP | Install new nickel cadmium rechargeable emergency light fixtures | 200 | EA | $0.00 | |
| A | 109AQ | Replace fuses | 150 | EA | $0.00 | |
| A | 109AR | Install new exit light fixtures | 50 | EA | $0.00 | |
| A | 110 | Piping Replacement | ||||
| A | 110AA | Replace valves up to 2 inches in diameter (CU-NI) | 30 | EA | $0.00 | |
| A | 110AB | Replace piping up to 2 inches in diameter (CU-NI) | 600 | LF | $0.00 | |
| A | 110AC | Replace piping 2 inches to 4 inches in diameter (CU-NI) | 800 | LF | $0.00 | |
| A | 110AD | Replace valves 2 inches to 4 inches in diameter (CU-NI) | 20 | EA | $0.00 | |
| A | 110AE | Replace flanges and fittings up to 4 inches in diameter (CU- NI) | 60 | EA | $0.00 | |
| A | 110AF | Replace and preserve pipe lagging up to 4 inches in diameter | 800 | LF | $0.00 | |
| A | 110AG | Replace and preserve lagging pads | 200 | SF | $0.00 | |
| A | 110AH | Install in-line potable water filters | 100 | EA | $0.00 | |
| A | 110AJ | Replace in-line potable water filters | 200 | EA | $0.00 | |
| A | 111 | Heating Ventilation and Air Condition Repairs | ||||
| A | 111AA | Accomplish repairs to A/C and refrigeration equipment | 1000 | HR | $0.00 | |
| A | 111AB | Material (in support of ELIN 111) to accomplish repairs to A/C and refrigeration equipment (for bidding purposes only) | 25000 | US Dollars | $1.00 | $25,000.00 |
| A | 111AC | Material G&A/Handling (in support of ELIN 111) (Contractor to submit a percentage) | 25000 | % | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| A | 111AD | Replace ventilation duct (12 in. x 20 in.) | 300 | LF | $0.00 | |
| A | 111AE | Replace ventilation duct diffusers (12 in. x 12 in.) | 75 | EA | $0.00 | |
| A | 111AF | Replace ventilation and duct inspection covers | 50 | EA | $0.00 | |
| A | 111AG | Replace thermostats | 100 | EA | $0.00 | |
| A | 111AH | Replace thermostat on Mitsubishi system | 20 | EA | $0.00 | |
| A | 111AJ | Clean, Inspect and Preserve all HVAC Condenser Coils - APL-61 | 1 | EA | $0.00 | |
| A | 111AK | Clean, Inspect and Preserveall HVAC Condenser Coils - APL-66 | 1 | EA | $0.00 | |
| A | 111AL | Clean, Inspect and Preserveall HVAC Condenser Coils - APL-42 | 1 | EA | $0.00 | |
| A | 111AM | Clean, Inspect and Preserve HVAC Condenser Coils - Residential Type Condensing Unit (old APLs) | 90 | EA | $0.00 | |
| A | 111AN | Clean, Inspect and Preserveall HVAC Condenser Coils - MITSUBISHI YRBM(L) | 6 | EA | $0.00 | |
| A | 111AP | Clean, Inspect and Preserve Condensing Coil for Walk-in Reefer/Freezer | 10 | EA | $0.00 | |
| A | 111AQ | Replace disposable filters (up to 25 in. x 25 in.), 1 inch thick | 2500 | EA | $0.00 | |
| A | 111AR | Replace disposable filters (up to 25 in. x 25 in.), 2 inches thick | 1000 | EA | $0.00 | |
| A | 111AS | Replace disposable filters (up to 25 in. x 25 in.), 4 inches thick | 1,000 | EA | $0.00 | |
| A | 111AT | Fabricate and install vent screens (24 in. x 30 in.) | 25 | EA | $0.00 | |
| A | 111AU | Steam clean permanent filters | 40 | EA | $0.00 | |
| A | 111AV | Replace permanent filters | 25 | EA | $0.00 | |
| A | 111AW | Insulate and preserve vent duct with 1" closed cell foam | 1500 | LF | $0.00 | |
| A | 112 | Miscellaneous Repairs | ||||
| A | 112AA | Replace decking or bulkhead plating (15.3# O.S.) | 300 | SF | $0.00 | |
| A | 112AB | Replace hull plating (20.4# O.S.) | 800 | SF | $0.00 | |
| A | 112AC | Replace support structure (6" x 4" x 1/4" tee bar, O.S.) | 500 | LF | $0.00 | |
| A | 112AD | Replace hand rail | 200 | LF | $0.00 | |
| A | 112AE | Replace handrail safety chain (3/8” chain to include shackle on each end) | 200 | LF | $0.00 | |
| A | 112AF | Sand and reseal PRC (using compatible sealant) | 75000 | SF | $0.00 | |
| A | 112AG | Sand, colorcoat, re-flake and reseal PRC decking | 50000 | SF | $0.00 | |
| A | 112AH | Replace rubber based PRC, including underlayment | 1,000 | SF | $0.00 | |
| A | 112AJ | Sand and reseal terrazzo decking | 15,000 | SF | $0.00 | |
| A | 112AK | Replace terrazzo decking | 2,500 | SF | $0.00 | |
| A | 112AL | Overlay 1/4 in. thick PRC over existing terrazzo | 30,000 | SF | $0.00 | |
| A | 112AM | Replace vinyl tile, including underlayment | 2,500 | SF | $0.00 | |
| A | 112AN | Overcoat Exterior non-skid with TRAX Coat | 50,000 | SF | $0.00 | |
| A | 112AP | Replace non-skid | 50,000 | SF | $0.00 | |
| A | 112AQ | Replace "Peel-and-stick" non-skid strips in sets of 3 strips (box of 50 each) | 20 | EA | $0.00 | |
| A | 113 | Preservation | ||||
| A | 113AA | Exterior preservation up to 1,000 sq. ft. | 10,000 | SF | $0.00 | |
| A | 113AB | Exterior preservation greater than 1,000 sq. ft. | 120,000 | SF | $0.00 | |
| A | 113AC | Interior preservation (90% Interior Compartments, 10% Wet Spaces) | 50000 | SF | $0.00 | |
| A | 114 | Maintenance - Maintenance support to the ship's crew occupying the craft | ||||
| A | E114AA | Maintenance - Straight Time (in support of ELIN 114) | 20,000 | HR | $0.00 | |
| A | 114AB | Maintenance - Material (in support of ELIN 114) | 200,000 | US Dollars | $1.00 | $200,000.00 |
| A | 114AC | Maintenance - Material G&A/Handling (in support of ELIN 114) (Contractor to submit a percentage) | 200,000 | % | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| A | 115 | Undisclosed Work (Correct Discrepancies) | ||||
| A | 115AA | Undisclosed Work (Correct Discrepancies) - Straight Time (in support of ELIN 115) | 16,000 | HR | $0.00 | |
| A | 115AB | Undisclosed Work (Correct Discrepancies) - Material (in support of ELIN 115) (for bidding purposes only) | 100,000 | US Dollars | $1.00 | $100,000.00 |
| A | 115AC | Undisclosed Work (Correct Discrepancies) - Material G&A/Handling (in support of ELIN 115) (Contractor to submit a percentage) | 100,000 | % | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| A | 116 | Undisclosed Work (Statement of Work) | ||||
| A | 116AA | Undisclosed Work (Statement of Work) - Straight Time (in support of ELIN 116) | 12,000 | HR | $0.00 | |
| A | 116AB | Undisclosed Work (Statement of Work) - Material (in support of ELIN 116) (for bidding purposes only) | 175,000 | US Dollars | $1.00 | $175,000.00 |
| A | 116AC | Undisclosed Work (Statement of Work) - Material G&A/Handling (in support of ELIN 116) (Contractor to submit a percentage) | 175,000 | % | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| A | 117 | Travel | ||||
| A | 117AA | Travel/Per Diem (for bidding purposes only) | 25,000 | US Dollars | $1.00 | $25,000.00 |
| A | 117AB | Travel G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052 | 25,000 | % | $0.00 |
A 118 Contract Data Requirements (DD Form 1423) NSP
Total Estimate for Base Year No Bid
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work (Correct Discrepancies), Undisclosed Work (Statement of Work), and Maintenance - Maintenance support to the ship's crew occupying the craft), equipment rental, services, overhead, profit, and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: Overtime is not authorized under the terms and conditions of this contract and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense unless otherwise expressly specified in a written task order or written modification to a task order.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.
Second Year (Option I)
| Contractor Name | |||||
| Supplies/Services | Est Qty | Unit | Unit | ||
| Price | Amount |
| B | 101 | Tow Barges | ||||
| B | 101AA | Tow (one way, up to 40 miles), APL Class - except APL-61, APL-66, APL-67 Class | 12 | EA | $0.00 | |
| B | 101AB | Tow (one way, up to 40 miles), YR, YRBM, YRBM(L) Class | 30 | EA | $0.00 | |
| B | 101AC | Tow (one way, up to 40 miles), APL-61, APL-66, or APL-67 Class | 4 | EA | $0.00 | |
| B | 101AD | Tow (one way, up to 800 miles, Ocean tow), APL Class - except APL-61, APL-66, APL-67 Class | 6 | EA | $0.00 | |
| B | 101AE | Tow (one-way, up to 800 miles, Ocean tow), YR, YRBM, YRBM(L) Class | 14 | EA | $0.00 | |
| B | 101AF | Tow (one-way, up to 800 miles, Ocean tow), APL-66 Class, APL-67 Class | 2 | EA | $0.00 | |
| B | 101AG | Tow (One-way, up to 800 miles, Ocean tow), APL-61 Class | 2 | EA | $0.00 | |
| B | 102 | Temporary Services | ||||
| B | 102AA | Tie up or cast off berthing barge (Down River) | 50 | EA | $0.00 | |
| B | 102AB | Tie up AND cast off berthing barge (In Plant) | 15 | EA | $0.00 | |
| B | 102AC | Install and remove sewage, potable water, steam, shore power, telephone, fire main, gangways and cable television connections (Down River) | 60 | EA | $0.00 | |
| B | 102AD | Provide, install and maintain all services to include gangways, oil booms, safety nets, shore power, sewage, steam, Firemain, and potable water (In Plant) | 320 | DAY | $0.00 | |
| B | 102AE | Provide and install 1 inch KEVLAR mooring lines (150 ft. in length). With 6' loop in both ends, with Chafing gear installed. | 60 | EA | $0.00 | |
| B | 102AF | Provide and install 2 inch KEVLAR mooring lines (200 ft. in length). With 6' loop in both ends, with Chafing gear installed. | 20 | EA | $0.00 | |
| B | 103 | Cleaning and Sanitizing (including waxing and buffing of tile decks, if applicable) | ||||
| B | 103AA | Deep clean and sanitize the entire Craft (YR Class) | 6 | EA | $0.00 | |
| B | 103AB | Deep clean and sanitize the entire Craft (YRBM Class) | 10 | EA | $0.00 | |
| B | 103AC | Deep clean and sanitize the entire Craft (YRBM(L) Class) | 45 | EA | $0.00 | |
| B | 103AD | Deep clean and sanitize the entire Craft (APL Class) - except APL-61, APL-66, APL-67 Class | 15 | EA | $0.00 | |
| B | 103AE | Deep clean and sanitize the entire Craft (APL-61) | 4 | EA | $0.00 | |
| B | 103AF | Deep clean and sanitize the entire Craft (APL-66, APL-67 Class) | 4 | EA | $0.00 | |
| B | 103AG | Fumigate/Exterminate - YR Class | 6 | EA | $0.00 | |
| B | 103AH | Fumigate/Exterminate - YRBM Class | 10 | EA | $0.00 | |
| B | 103AJ | Fumigate/Exterminate - YRBM(L) Class | 45 | EA | $0.00 | |
| B | 103AK | Fumigate/Exterminate - APL Class except APL-61, APL-66, APL-67 Class | 12 | EA | $0.00 | |
| B | 103AL | Fumigate/Exterminate - APL-61 | 2 | EA | $0.00 | |
| B | 103AM | Fumigate/Exterminate - APL-66, APL-67 Class | 2 | EA | $0.00 | |
| B | 103AN | Winterize - YR Class | 4 | EA | $0.00 | |
| B | 103AP | Winterize - YRBM Class | 6 | EA | $0.00 | |
| B | 103AQ | Winterize - YRBM(L) Class | 20 | EA | $0.00 | |
| B | 103AR | Winterize - APL Class - except APL-61, APL-66, APL-67 Class | 12 | EA | $0.00 | |
| B | 103AS | Winterize - APL-61 | 2 | EA | $0.00 | |
| B | 103AT | Winterize - APL-66, APL-67 Class | 2 | EA | $0.00 | |
| B | 104 | Test and Inspections | ||||
| B | 104AA | Accomplish a preliminary and final visual and operational inspection of all systems and equipment utilizing barge systems and equipment check off list (Planning Memorandum No. 601-005). Submit a detailed report of all discrepancies. | 50 | EA | $0.00 | |
| B | 104AB | Clean, gas free safe for entry and hot work, inspect and test CHT system, replacing 4 floats per system (YR, YRBM, YRBM(L), and all APL's except for APL-61) | 30 | SY | $0.00 | |
| B | 104AC | Clean, gas free safe for entry and hot work, inspect and test CHT system, replacing 4 floats per system (APL-61) | 2 | SY | $0.00 | |
| B | 104AD | Clean, gas free safe for entry and hot work, and air test tanks and voids. | 40 | EA | $0.00 | |
| B | 105 | Fire Fighting Equipment: Replace, Repair and Maintenance | ||||
| B | 105AA | Accomplish Annual Inspection and Certification existing fire extinguishers, 20 lbs. or less | 200 | EA | $0.00 | |
| B | 105AB | Re-charge existing fire extinguishers, 20 lbs. or less | 100 | EA | $0.00 | |
| B | 105AC | Install new dry chemical fire extinguishers, 20 lbs. | 50 | EA | $0.00 | |
| B | 105AD | Accomplish Annual Inspection and Certification of Gaylord Hood system | 25 | EA | $0.00 | |
| B | 105AE | Accomplish Annual Inspection and Certification of Range Guard (Deep Fat Fryer extinguishing) systems | 25 | EA | $0.00 | |
| B | 105AF | Accomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for legacy IC/SM Systems. | 5 | EA | $0.00 | |
| B | 105AG | Accomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for Siemens Systems. | 10 | EA | $0.00 | |
| B | 105AH | Accomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment Notifier Systems. | 10 | EA | $0.00 | |
| B | 105AJ | Calibrate and Certify H2S System | 10 | EA | $0.00 | |
| B | 105AK | Calibrate Gage and submit report. | 100 | EA | $0.00 | |
| B | 106 | Repair Galley/Messing Equipment and Fixtures | ||||
| B | 106AA | Provide commercial type garbage disposal, remove existing, replace and operational test | 6 | EA | $0.00 | |
| B | 106AB | Provide household type garbage disposal, remove existing, replace and operational test | 10 | EA | $0.00 | |
| B | 106AC | Replace disposable filters (industrial fire retardant) for galley systems | 30 | EA | $0.00 | |
| B | 106AD | Steam clean permanent filters | 40 | EA | $0.00 | |
| B | 106AE | Replace permanent filters | 25 | EA | $0.00 | |
| B | 107 | Laundry Equipment, Replace | ||||
| B | 107AA | Remove existing, provide and install new single function clothes washer, commercial style, accomplish operational test | 20 | EA | $0.00 | |
| B | 107AB | Remove existing, provide and install new single function clothes dryer, commercial style, accomplish operational test | 20 | EA | $0.00 | |
| B | 108 | Habitability Repairs | ||||
| B | 108AA | Replace urinal | 20 | EA | $0.00 | |
| B | 108AB | Replace toilet | 40 | EA | $0.00 | |
| B | 108AC | Replace sink | 40 | EA | $0.00 | |
| B | 108AD | Replace shower head | 250 | EA | $0.00 | |
| B | 108AE | Replace shower mixing valve | 200 | EA | $0.00 | |
| B | 108AF | Replace flushometer | 200 | EA | $0.00 | |
| B | 108AG | Replace sink mixing valve | 200 | EA | $0.00 | |
| B | 108AH | Deck Drain - Clean free of obstructions to include piping | 100 | EA | $0.00 | |
| B | 108AJ | Replace composition ceiling panel (2 ft. x 4 ft.) vinyl coated | 1500 | EA | $0.00 | |
| B | 108AK | Replace ceiling tile T-Rail | 1000 | LF | $0.00 | |
| B | 108AL | Replace towel rack | 50 | EA | $0.00 | |
| B | 108AM | Replace soap dish | 50 | EA | $0.00 | |
| B | 108AN | Replace shower curtain including hooks | 500 | EA | $0.00 | |
| B | 108AP | Replace shower mat | 500 | EA | $0.00 | |
| B | 108AQ | Replace toilet paper holder (frame and spool) | 100 | EA | $0.00 | |
| B | 108AR | Replace water fountain | 30 | EA | $0.00 | |
| B | 108AS | Replace mini blind | 1000 | EA | $0.00 | |
| B | 108AT | Replace flushometer hoses | 100 | EA | $0.00 | |
| B | 108AU | Fabricate replacement key as per sample | 500 | EA | $0.00 | |
| B | 108AV | Fabricate replacement keys (4 EACH) from existing doorknob. Label and place 2 EACH in BOTH Keyboxes | 10 | EA | $0.00 | |
| B | 108AW | Open and reset pin type lock sets to include 2 replacement keys | 100 | EA | $0.00 | |
| B | 108AX | Provide and install new locking doorknob set | 100 | EA | $0.00 | |
| B | 108AY | Open and reset combination on high security/classified lock on door and/or safe (Cypher Lock or Sargeant & Greenleaf mechanical type) | 100 | EA | $0.00 | |
| B | 108AZ | Open and reset combination on high security X-09 or X10 lock | 5 | EA | $0.00 | |
| B | 108BA | Open and install new lock set and reset combinations on high security/classified lock on doors and/or safe (Cypher Lock or Sargeant & Greenleaf mechanical type) | 50 | EA | $0.00 | |
| B | 108BB | Open and install new lock set and reset combination on high security X-09 or X-10 lock | 5 | EA | $0.00 | |
| B | 108BC | Open Class 5 Security Container (SIPR Safe) | 5 | EA | $0.00 | |
| B | 108BD | Replace automatic door closures | 100 | EA | $0.00 | |
| B | 108BE | Replace bulkhead insulation (2" thick) | 3000 | SF | $0.00 | |
| B | 108BF | Replace bulkhead insulation (1" thick) | 3000 | SF | $0.00 | |
| B | 108BG | Replace deck drains up to 4" to include piping | 100 | EA | $0.00 | |
| B | 109 | Electrical Repairs | ||||
| B | 109AA | Replace fluorescent tubes in closed fixtures: 12 inch | 300 | EA | $0.00 | |
| B | 109AB | Replace fluorescent tubes with LED bulb in closed fixtures: 12 inch | 200 | EA | $0.00 | |
| B | 109AC | Replace fluorescent tubes in closed fixtures: 24 inch | 300 | EA | $0.00 | |
| B | 109AD | Replace fluorescent tubes with LED bulb in closed fixtures: 24 inch | 200 | EA | $0.00 | |
| B | 109AE | Replace fluorescent tubes in closed fixtures: 48 inch | 300 | EA | $0.00 | |
| B | 109AF | Replace fluorescent tubes in with LED bulb closed fixtures: 48 inch | 200 | EA | $0.00 | |
| B | 109AG | Replace bulbs in closed incandescent fixtures | 150 | EA | $0.00 | |
| B | 109AH | Replace bulbs with screw-in LED bulb in closed incandescent fixtures | 100 | EA | $0.00 | |
| B | 109AJ | Replace bulbs in spotlight fixtures | 100 | EA | $0.00 | |
| B | 109AK | Replace bulbs with LED bulb in spotlight fixtures | 20 | EA | $0.00 | |
| B | 109AL | Replace starters | 200 | EA | $0.00 | |
| B | 109AM | Replace Ballast on Fluorescent light fixture | 100 | EA | $0.00 | |
| B | 109AN | Replace bulb and battery in emergency light fixtures | 150 | EA | $0.00 | |
| B | 109AP | Install new nickel cadmium rechargeable emergency light fixtures | 200 | EA | $0.00 | |
| B | 109AQ | Replace fuses | 150 | EA | $0.00 | |
| B | 109AR | Install new exit light fixtures | 50 | EA | $0.00 | |
| B | 110 | Piping Replacement | ||||
| B | 110AA | Replace valves up to 2 inches in diameter (CU-NI) | 30 | EA | $0.00 | |
| B | 110AB | Replace piping up to 2 inches in diameter (CU-NI) | 600 | LF | $0.00 | |
| B | 110AC | Replace piping 2 inches to 4 inches in diameter (CU-NI) | 800 | LF | $0.00 | |
| B | 110AD | Replace valves 2 inches to 4 inches in diameter (CU-NI) | 20 | EA | $0.00 | |
| B | 110AE | Replace flanges and fittings up to 4 inches in diameter (CU- NI) | 60 | EA | $0.00 | |
| B | 110AF | Replace and preserve pipe lagging up to 4 inches in diameter | 800 | LF | $0.00 | |
| B | 110AG | Replace and preserve lagging pads | 200 | SF | $0.00 | |
| B | 110AH | Install in-line potable water filters | 100 | EA | $0.00 | |
| B | 110AJ | Replace in-line potable water filters | 200 | EA | $0.00 | |
| B | 111 | Heating Ventilation and Air Condition Repairs | ||||
| B | 111AA | Accomplish repairs to A/C and refrigeration equipment | 1000 | HR | $0.00 | |
| B | 111AB | Material (in support of ELIN 111) to accomplish repairs to A/C and refrigeration equipment (for bidding purposes only) | 25000 | US Dollars | $1.00 | $25,000.00 |
| B | 111AC | Material G&A/Handling (in support of ELIN 111) (Contractor to submit a percentage) | 25000 | % | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| B | 111AD | Replace ventilation duct (12 in. x 20 in.) | 300 | LF | $0.00 | |
| B | 111AE | Replace ventilation duct diffusers (12 in. x 12 in.) | 75 | EA | $0.00 | |
| B | 111AF | Replace ventilation and duct inspection covers | 50 | EA | $0.00 | |
| B | 111AG | Replace thermostats | 100 | EA | $0.00 | |
| B | 111AH | Replace thermostat on Mitsubishi system | 20 | EA | $0.00 | |
| B | 111AJ | Clean, Inspect and Preserve all HVAC Condenser Coils - APL-61 | 1 | EA | $0.00 | |
| B | 111AK | Clean, Inspect and Preserveall HVAC Condenser Coils - APL-66 | 1 | EA | $0.00 | |
| B | 111AL | Clean, Inspect and Preserveall HVAC Condenser Coils - APL-42 | 1 | EA | $0.00 | |
| B | 111AM | Clean, Inspect and Preserve HVAC Condenser Coils - Residential Type Condensing Unit (old APLs) | 90 | EA | $0.00 | |
| B | 111AN | Clean, Inspect and Preserveall HVAC Condenser Coils - MITSUBISHI YRBM(L) | 6 | EA | $0.00 | |
| B | 111AP | Clean, Inspect and Preserve Condensing Coil for Walk-in Reefer/Freezer | 10 | EA | $0.00 | |
| B | 111AQ | Replace disposable filters (up to 25 in. x 25 in.), 1 inch thick | 2500 | EA | $0.00 | |
| B | 111AR | Replace disposable filters (up to 25 in. x 25 in.), 2 inches thick | 1000 | EA | $0.00 | |
| B | 111AS | Replace disposable filters (up to 25 in. x 25 in.), 4 inches thick | 1,000 | EA | $0.00 | |
| B | 111AT | Fabricate and install vent screens (24 in. x 30 in.) | 25 | EA | $0.00 | |
| B | 111AU | Steam clean permanent filters | 40 | EA | $0.00 | |
| B | 111AV | Replace permanent filters | 25 | EA | $0.00 | |
| B | 111AW | Insulate and preserve vent duct with 1" closed cell foam | 1500 | LF | $0.00 | |
| B | 112 | Miscellaneous Repairs | ||||
| B | 112AA | Replace decking or bulkhead plating (15.3# O.S.) | 300 | SF | $0.00 | |
| B | 112AB | Replace hull plating (20.4# O.S.) | 800 | SF | $0.00 | |
| B | 112AC | Replace support structure (6" x 4" x 1/4" tee bar, O.S.) | 500 | LF | $0.00 | |
| B | 112AD | Replace hand rail | 200 | LF | $0.00 | |
| B | 112AE | Replace handrail safety chain (3/8” chain to include shackle on each end) | 200 | LF | $0.00 | |
| B | 112AF | Sand and reseal PRC (using compatible sealant) | 75000 | SF | $0.00 | |
| B | 112AG | Sand, colorcoat, re-flake and reseal PRC decking | 50000 | SF | $0.00 | |
| B | 112AH | Replace rubber based PRC, including underlayment | 1,000 | SF | $0.00 | |
| B | 112AJ | Sand and reseal terrazzo decking | 15,000 | SF | $0.00 | |
| B | 112AK | Replace terrazzo decking | 2,500 | SF | $0.00 | |
| B | 112AL | Overlay 1/4 in. thick PRC over existing terrazzo | 30,000 | SF | $0.00 | |
| B | 112AM | Replace vinyl tile, including underlayment | 2,500 | SF | $0.00 | |
| B | 112AN | Overcoat Exterior non-skid with TRAX Coat | 50,000 | SF | $0.00 | |
| B | 112AP | Replace non-skid | 50,000 | SF | $0.00 | |
| B | 112AQ | Replace "Peel-and-stick" non-skid strips in sets of 3 strips (box of 50 each) | 20 | EA | $0.00 | |
| B | 113 | Preservation | ||||
| B | 113AA | Exterior preservation up to 1,000 sq. ft. | 10,000 | SF | $0.00 | |
| B | 113AB | Exterior preservation greater than 1,000 sq. ft. | 120,000 | SF | $0.00 | |
| B | 113AC | Interior preservation (90% Interior Compartments, 10% Wet Spaces) | 50000 | SF | $0.00 | |
| B | 114 | Maintenance - Maintenance support to the ship's crew occupying the craft | ||||
| B | E114AA | Maintenance - Straight Time (in support of ELIN 114) | 20,000 | HR | $0.00 | |
| B | 114AB | Maintenance - Material (in support of ELIN 114) | 200,000 | US Dollars | $1.00 | $200,000.00 |
| B | 114AC | Maintenance - Material G&A/Handling (in support of ELIN 114) (Contractor to submit a percentage) | 200,000 | % | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| B | 115 | Undisclosed Work (Correct Discrepancies) | ||||
| B | 115AA | Undisclosed Work (Correct Discrepancies) - Straight Time (in support of ELIN 115) | 16,000 | HR | $0.00 | |
| B | 115AB | Undisclosed Work (Correct Discrepancies) - Material (in support of ELIN 115) (for bidding purposes only) | 100,000 | US Dollars | $1.00 | $100,000.00 |
| B | 115AC | Undisclosed Work (Correct Discrepancies) - Material G&A/Handling (in support of ELIN 115) (Contractor to submit a percentage) | 100,000 | % | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| B | 116 | Undisclosed Work (Statement of Work) | ||||
| B | 116AA | Undisclosed Work (Statement of Work) - Straight Time (in support of ELIN 116) | 12,000 | HR | $0.00 | |
| B | 116AB | Undisclosed Work (Statement of Work) - Material (in support of ELIN 116) (for bidding purposes only) | 175,000 | US Dollars | $1.00 | $175,000.00 |
| B | 116AC | Undisclosed Work (Statement of Work) - Material G&A/Handling (in support of ELIN 116) (Contractor to submit a percentage) | 175,000 | % | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| B | 117 | Travel | ||||
| B | 117AA | Travel/Per Diem (for bidding purposes only) | 25,000 | US Dollars | $1.00 | $25,000.00 |
| B | 117AB | Travel G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052 | 25,000 | % | $0.00 |
B 118 Contract Data Requirements (DD Form 1423) NSP
Total Estimate for Option I - Second Year Effort No Bid
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work (Correct Discrepancies), Undisclosed Work (Statement of Work), and Maintenance - Maintenance support to the ship's crew occupying the craft), equipment rental, services, overhead, profit, and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: Overtime is not authorized under the terms and conditions of this contract and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense unless otherwise expressly specified in a written task order or written modification to a task order.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.
Third Year (Option II)
| Contractor Name | |||||
| Supplies/Services | Est Qty | Unit | Unit | ||
| Price | Amount |
| C | 101 | Tow Barges | ||||
| C | 101AA | Tow (one way, up to 40 miles), APL Class - except APL-61, APL-66, APL-67 Class | 12 | EA | $0.00 | |
| C | 101AB | Tow (one way, up to 40 miles), YR, YRBM, YRBM(L) Class | 30 | EA | $0.00 | |
| C | 101AC | Tow (one way, up to 40 miles), APL-61, APL-66, or APL-67 Class | 4 | EA | $0.00 | |
| C | 101AD | Tow (one way, up to 800 miles, Ocean tow), APL Class - except APL-61, APL-66, APL-67 Class | 6 | EA | $0.00 | |
| C | 101AE | Tow (one-way, up to 800 miles, Ocean tow), YR, YRBM, YRBM(L) Class | 14 | EA | $0.00 | |
| C | 101AF | Tow (one-way, up to 800 miles, Ocean tow), APL-66 Class, APL-67 Class | 2 | EA | $0.00 | |
| C | 101AG | Tow (One-way, up to 800 miles, Ocean tow), APL-61 Class | 2 | EA | $0.00 | |
| C | 102 | Temporary Services | ||||
| C | 102AA | Tie up or cast off berthing barge (Down River) | 50 | EA | $0.00 | |
| C | 102AB | Tie up AND cast off berthing barge (In Plant) | 15 | EA | $0.00 | |
| C | 102AC | Install and remove sewage, potable water, steam, shore power, telephone, fire main, gangways and cable television connections (Down River) | 60 | EA | $0.00 | |
| C | 102AD | Provide, install and maintain all services to include gangways, oil booms, safety nets, shore power, sewage, steam, Firemain, and potable water (In Plant) | 320 | DAY | $0.00 | |
| C | 102AE | Provide and install 1 inch KEVLAR mooring lines (150 ft. in length). With 6' loop in both ends, with Chafing gear installed. | 60 | EA | $0.00 | |
| C | 102AF | Provide and install 2 inch KEVLAR mooring lines (200 ft. in length). With 6' loop in both ends, with Chafing gear installed. | 20 | EA | $0.00 | |
| C | 103 | Cleaning and Sanitizing (including waxing and buffing of tile decks, if applicable) | ||||
| C | 103AA | Deep clean and sanitize the entire Craft (YR Class) | 6 | EA | $0.00 | |
| C | 103AB | Deep clean and sanitize the entire Craft (YRBM Class) | 10 | EA | $0.00 | |
| C | 103AC | Deep clean and sanitize the entire Craft (YRBM(L) Class) | 45 | EA | $0.00 | |
| C | 103AD | Deep clean and sanitize the entire Craft (APL Class) - except APL-61, APL-66, APL-67 Class | 15 | EA | $0.00 | |
| C | 103AE | Deep clean and sanitize the entire Craft (APL-61) | 4 | EA | $0.00 | |
| C | 103AF | Deep clean and sanitize the entire Craft (APL-66, APL-67 Class) | 4 | EA | $0.00 | |
| C | 103AG | Fumigate/Exterminate - YR Class | 6 | EA | $0.00 | |
| C | 103AH | Fumigate/Exterminate - YRBM Class | 10 | EA | $0.00 | |
| C | 103AJ | Fumigate/Exterminate - YRBM(L) Class | 45 | EA | $0.00 | |
| C | 103AK | Fumigate/Exterminate - APL Class except APL-61, APL-66, APL-67 Class | 12 | EA | $0.00 | |
| C | 103AL | Fumigate/Exterminate - APL-61 | 2 | EA | $0.00 | |
| C | 103AM | Fumigate/Exterminate - APL-66, APL-67 Class | 2 | EA | $0.00 | |
| C | 103AN | Winterize - YR Class | 4 | EA | $0.00 | |
| C | 103AP | Winterize - YRBM Class | 6 | EA | $0.00 | |
| C | 103AQ | Winterize - YRBM(L) Class | 20 | EA | $0.00 | |
| C | 103AR | Winterize - APL Class - except APL-61, APL-66, APL-67 Class | 12 | EA | $0.00 | |
| C | 103AS | Winterize - APL-61 | 2 | EA | $0.00 | |
| C | 103AT | Winterize - APL-66, APL-67 Class | 2 | EA | $0.00 | |
| C | 104 | Test and Inspections | ||||
| C | 104AA | Accomplish a preliminary and final visual and operational inspection of all systems and equipment utilizing barge systems and equipment check off list (Planning Memorandum No. 601-005). Submit a detailed report of all discrepancies. | 50 | EA | $0.00 | |
| C | 104AB | Clean, gas free safe for entry and hot work, inspect and test CHT system, replacing 4 floats per system (YR, YRBM, YRBM(L), and all APL's except for APL-61) | 30 | SY | $0.00 | |
| C | 104AC | Clean, gas free safe for entry and hot work, inspect and test CHT system, replacing 4 floats per system (APL-61) | 2 | SY | $0.00 | |
| C | 104AD | Clean, gas free safe for entry and hot work, and air test tanks and voids. | 40 | EA | $0.00 | |
| C | 105 | Fire Fighting Equipment: Replace, Repair and Maintenance | ||||
| C | 105AA | Accomplish Annual Inspection and Certification existing fire extinguishers, 20 lbs. or less | 200 | EA | $0.00 | |
| C | 105AB | Re-charge existing fire extinguishers, 20 lbs. or less | 100 | EA | $0.00 | |
| C | 105AC | Install new dry chemical fire extinguishers, 20 lbs. | 50 | EA | $0.00 | |
| C | 105AD | Accomplish Annual Inspection and Certification of Gaylord Hood system | 25 | EA | $0.00 | |
| C | 105AE | Accomplish Annual Inspection and Certification of Range Guard (Deep Fat Fryer extinguishing) systems | 25 | EA | $0.00 | |
| C | 105AF | Accomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for legacy IC/SM Systems. | 5 | EA | $0.00 | |
| C | 105AG | Accomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for Siemens Systems. | 10 | EA | $0.00 | |
| C | 105AH | Accomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment Notifier Systems. | 10 | EA | $0.00 | |
| C | 105AJ | Calibrate and Certify H2S System | 10 | EA | $0.00 | |
| C | 105AK | Calibrate Gage and submit report. | 100 | EA | $0.00 | |
| C | 106 | Repair Galley/Messing Equipment and Fixtures | ||||
| C | 106AA | Provide commercial type garbage disposal, remove existing, replace and operational test | 6 | EA | $0.00 | |
| C | 106AB | Provide household type garbage disposal, remove existing, replace and operational test | 10 | EA | $0.00 | |
| C | 106AC | Replace disposable filters (industrial fire retardant) for galley systems | 30 | EA | $0.00 | |
| C | 106AD | Steam clean permanent filters | 40 | EA | $0.00 | |
| C | 106AE | Replace permanent filters | 25 | EA | $0.00 | |
| C | 107 | Laundry Equipment, Replace | ||||
| C | 107AA | Remove existing, provide and install new single function clothes washer, commercial style, accomplish operational test | 20 | EA | $0.00 | |
| C | 107AB | Remove existing, provide and install new single function clothes dryer, commercial style, accomplish operational test | 20 | EA | $0.00 | |
| C | 108 | Habitability Repairs | ||||
| C | 108AA | Replace urinal | 20 | EA | $0.00 | |
| C | 108AB | Replace toilet | 40 | EA | $0.00 | |
| C | 108AC | Replace sink | 40 | EA | $0.00 | |
| C | 108AD | Replace shower head | 250 | EA | $0.00 | |
| C | 108AE | Replace shower mixing valve | 200 | EA | $0.00 | |
| C | 108AF | Replace flushometer | 200 | EA | $0.00 | |
| C | 108AG | Replace sink mixing valve | 200 | EA | $0.00 | |
| C | 108AH | Deck Drain - Clean free of obstructions to include piping | 100 | EA | $0.00 | |
| C | 108AJ | Replace composition ceiling panel (2 ft. x 4 ft.) vinyl coated | 1500 | EA | $0.00 | |
| C | 108AK | Replace ceiling tile T-Rail | 1000 | LF | $0.00 | |
| C | 108AL | Replace towel rack | 50 | EA | $0.00 | |
| C | 108AM | Replace soap dish | 50 | EA | $0.00 | |
| C | 108AN | Replace shower curtain including hooks | 500 | EA | $0.00 | |
| C | 108AP | Replace shower mat | 500 | EA | $0.00 | |
| C | 108AQ | Replace toilet paper holder (frame and spool) | 100 | EA | $0.00 | |
| C | 108AR | Replace water fountain | 30 | EA | $0.00 | |
| C | 108AS | Replace mini blind | 1000 | EA | $0.00 | |
| C | 108AT | Replace flushometer hoses | 100 | EA | $0.00 | |
| C | 108AU | Fabricate replacement key as per sample | 500 | EA | $0.00 | |
| C | 108AV | Fabricate replacement keys (4 EACH) from existing doorknob. Label and place 2 EACH in BOTH Keyboxes | 10 | EA | $0.00 | |
| C | 108AW | Open and reset pin type lock sets to include 2 replacement keys | 100 | EA | $0.00 | |
| C | 108AX | Provide and install new locking doorknob set | 100 | EA | $0.00 | |
| C | 108AY | Open and reset combination on high security/classified lock on door and/or safe (Cypher Lock or Sargeant & Greenleaf mechanical type) | 100 | EA | $0.00 | |
| C | 108AZ | Open and reset combination on high security X-09 or X10 lock | 5 | EA | $0.00 | |
| C | 108BA | Open and install new lock set and reset combinations on high security/classified lock on doors and/or safe (Cypher Lock or Sargeant & Greenleaf mechanical type) | 50 | EA | $0.00 | |
| C | 108BB | Open and install new lock set and reset combination on high security X-09 or X-10 lock | 5 | EA | $0.00 | |
| C | 108BC | Open Class 5 Security Container (SIPR Safe) | 5 | EA | $0.00 | |
| C | 108BD | Replace automatic door closures | 100 | EA | $0.00 | |
| C | 108BE | Replace bulkhead insulation (2" thick) | 3000 | SF | $0.00 | |
| C | 108BF | Replace bulkhead insulation (1" thick) | 3000 | SF | $0.00 | |
| C | 108BG | Replace deck drains up to 4" to include piping | 100 | EA | $0.00 | |
| C | 109 | Electrical Repairs | ||||
| C | 109AA | Replace fluorescent tubes in closed fixtures: 12 inch | 300 | EA | $0.00 | |
| C | 109AB | Replace fluorescent tubes with LED bulb in closed fixtures: 12 inch | 200 | EA | $0.00 | |
| C | 109AC | Replace fluorescent tubes in closed fixtures: 24 inch | 300 | EA | $0.00 | |
| C | 109AD | Replace fluorescent tubes with LED bulb in closed fixtures: 24 inch | 200 | EA | $0.00 | |
| C | 109AE | Replace fluorescent tubes in closed fixtures: 48 inch | 300 | EA | $0.00 | |
| C | 109AF | Replace fluorescent tubes in with LED bulb closed fixtures: 48 inch | 200 | EA | $0.00 | |
| C | 109AG | Replace bulbs in closed incandescent fixtures | 150 | EA | $0.00 | |
| C | 109AH | Replace bulbs with screw-in LED bulb in closed incandescent fixtures | 100 | EA | $0.00 | |
| C | 109AJ | Replace bulbs in spotlight fixtures | 100 | EA | $0.00 | |
| C | 109AK | Replace bulbs with LED bulb in spotlight fixtures | 20 | EA | $0.00 | |
| C | 109AL | Replace starters | 200 | EA | $0.00 | |
| C | 109AM | Replace Ballast on Fluorescent light fixture | 100 | EA | $0.00 | |
| C | 109AN | Replace bulb and battery in emergency light fixtures | 150 | EA | $0.00 | |
| C | 109AP | Install new nickel cadmium rechargeable emergency light fixtures | 200 | EA | $0.00 | |
| C | 109AQ | Replace fuses | 150 | EA | $0.00 | |
| C | 109AR | Install new exit light fixtures | 50 | EA | $0.00 | |
| C | 110 | Piping Replacement | ||||
| C | 110AA | Replace valves up to 2 inches in diameter (CU-NI) | 30 | EA | $0.00 | |
| C | 110AB | Replace piping up to 2 inches in diameter (CU-NI) | 600 | LF | $0.00 | |
| C | 110AC | Replace piping 2 inches to 4 inches in diameter (CU-NI) | 800 | LF | $0.00 | |
| C | 110AD | Replace valves 2 inches to 4 inches in diameter (CU-NI) | 20 | EA | $0.00 | |
| C | 110AE | Replace flanges and fittings up to 4 inches in diameter (CU- NI) | 60 | EA | $0.00 | |
| C | 110AF | Replace and preserve pipe lagging up to 4 inches in diameter | 800 | LF | $0.00 | |
| C | 110AG | Replace and preserve lagging pads | 200 | SF | $0.00 | |
| C | 110AH | Install in-line potable water filters | 100 | EA | $0.00 | |
| C | 110AJ | Replace in-line potable water filters | 200 | EA | $0.00 | |
| C | 111 | Heating Ventilation and Air Condition Repairs | ||||
| C | 111AA | Accomplish repairs to A/C and refrigeration equipment | 1000 | HR | $0.00 | |
| C | 111AB | Material (in support of ELIN 111) to accomplish repairs to A/C and refrigeration equipment (for bidding purposes only) | 25000 | US Dollars | $1.00 | $25,000.00 |
| C | 111AC | Material G&A/Handling (in support of ELIN 111) (Contractor to submit a percentage) | 25000 | % | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| C | 111AD | Replace ventilation duct (12 in. x 20 in.) | 300 | LF | $0.00 | |
| C | 111AE | Replace ventilation duct diffusers (12 in. x 12 in.) | 75 | EA | $0.00 | |
| C | 111AF | Replace ventilation and duct inspection covers | 50 | EA | $0.00 | |
| C | 111AG | Replace thermostats | 100 | EA | $0.00 | |
| C | 111AH | Replace thermostat on Mitsubishi system | 20 | EA | $0.00 | |
| C | 111AJ | Clean, Inspect and Preserve all HVAC Condenser Coils - APL-61 | 1 | EA | $0.00 | |
| C | 111AK | Clean, Inspect and Preserveall HVAC Condenser Coils - APL-66 | 1 | EA | $0.00 | |
| C | 111AL | Clean, Inspect and Preserveall HVAC Condenser Coils - APL-42 | 1 | EA | $0.00 | |
| C | 111AM | Clean, Inspect and Preserve HVAC Condenser Coils - Residential Type Condensing Unit (old APLs) | 90 | EA | $0.00 | |
| C | 111AN | Clean, Inspect and Preserveall HVAC Condenser Coils - MITSUBISHI YRBM(L) | 6 | EA | $0.00 | |
| C | 111AP | Clean, Inspect and Preserve Condensing Coil for Walk-in Reefer/Freezer | 10 | EA | $0.00 | |
| C | 111AQ | Replace disposable filters (up to 25 in. x 25 in.), 1 inch thick | 2500 | EA | $0.00 | |
| C | 111AR | Replace disposable filters (up to 25 in. x 25 in.), 2 inches thick | 1000 | EA | $0.00 | |
| C | 111AS | Replace disposable filters (up to 25 in. x 25 in.), 4 inches thick | 1,000 | EA | $0.00 | |
| C | 111AT | Fabricate and install vent screens (24 in. x 30 in.) | 25 | EA | $0.00 | |
| C | 111AU | Steam clean permanent filters | 40 | EA | $0.00 | |
| C | 111AV | Replace permanent filters | 25 | EA | $0.00 | |
| C | 111AW | Insulate and preserve vent duct with 1" closed cell foam | 1500 | LF | $0.00 | |
| C | 112 | Miscellaneous Repairs | ||||
| C | 112AA | Replace decking or bulkhead plating (15.3# O.S.) | 300 | SF | $0.00 | |
| C | 112AB | Replace hull plating (20.4# O.S.) | 800 | SF | $0.00 | |
| C | 112AC | Replace support structure (6" x 4" x 1/4" tee bar, O.S.) | 500 | LF | $0.00 | |
| C | 112AD | Replace hand rail | 200 | LF | $0.00 | |
| C | 112AE | Replace handrail safety chain (3/8” chain to include shackle on each end) | 200 | LF | $0.00 | |
| C | 112AF | Sand and reseal PRC (using compatible sealant) | 75000 | SF | $0.00 | |
| C | 112AG | Sand, colorcoat, re-flake and reseal PRC decking | 50000 | SF | $0.00 | |
| C | 112AH | Replace rubber based PRC, including underlayment | 1,000 | SF | $0.00 | |
| C | 112AJ | Sand and reseal terrazzo decking | 15,000 | SF | $0.00 | |
| C | 112AK | Replace terrazzo decking | 2,500 | SF | $0.00 | |
| C | 112AL | Overlay 1/4 in. thick PRC over existing terrazzo | 30,000 | SF | $0.00 | |
| C | 112AM | Replace vinyl tile, including underlayment | 2,500 | SF | $0.00 | |
| C | 112AN | Overcoat Exterior non-skid with TRAX Coat | 50,000 | SF | $0.00 | |
| C | 112AP | Replace non-skid | 50,000 | SF | $0.00 | |
| C | 112AQ | Replace "Peel-and-stick" non-skid strips in sets of 3 strips (box of 50 each) | 20 | EA | $0.00 | |
| C | 113 | Preservation | ||||
| C | 113AA | Exterior preservation up to 1,000 sq. ft. | 10,000 | SF | $0.00 | |
| C | 113AB | Exterior preservation greater than 1,000 sq. ft. | 120,000 | SF | $0.00 | |
| C | 113AC | Interior preservation (90% Interior Compartments, 10% Wet Spaces) | 50000 | SF | $0.00 | |
| C | 114 | Maintenance - Maintenance support to the ship's crew occupying the craft | ||||
| C | E114AA | Maintenance - Straight Time (in support of ELIN 114) | 20,000 | HR | $0.00 | |
| C | 114AB | Maintenance - Material (in support of ELIN 114) | 200,000 | US Dollars | $1.00 | $200,000.00 |
| C | 114AC | Maintenance - Material G&A/Handling (in support of ELIN 114) (Contractor to submit a percentage) | 200,000 | % | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| C | 115 | Undisclosed Work (Correct Discrepancies) | ||||
| C | 115AA | Undisclosed Work (Correct Discrepancies) - Straight Time (in support of ELIN 115) | 16,000 | HR | $0.00 | |
| C | 115AB | Undisclosed Work (Correct Discrepancies) - Material (in support of ELIN 115) (for bidding purposes only) | 100,000 | US Dollars | $1.00 | $100,000.00 |
| C | 115AC | Undisclosed Work (Correct Discrepancies) - Material G&A/Handling (in support of ELIN 115) (Contractor to submit a percentage) | 100,000 | % | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| C | 116 | Undisclosed Work (Statement of Work) | ||||
| C | 116AA | Undisclosed Work (Statement of Work) - Straight Time (in support of ELIN 116) | 12,000 | HR | $0.00 | |
| C | 116AB | Undisclosed Work (Statement of Work) - Material (in support of ELIN 116) (for bidding purposes only) | 175,000 | US Dollars | $1.00 | $175,000.00 |
| C | 116AC | Undisclosed Work (Statement of Work) - Material G&A/Handling (in support of ELIN 116) (Contractor to submit a percentage) | 175,000 | % | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| C | 117 | Travel | ||||
| C | 117AA | Travel/Per Diem (for bidding purposes only) | 25,000 | US Dollars | $1.00 | $25,000.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .