Exhibit_A-E.xlsx

XLSX spreadsheet 92 KB Posted

Attached to
Messing & Berthing Barges Support Federal contract opportunity
Solicitation number
N5005419R0017
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is an exhibit to a solicitation for messing and berthing barge support services. The exhibit provides pricing details for various services over a potential five-year ordering period, including towing, temporary services, cleaning and sanitization, inspections, fire equipment maintenance, galley equipment repairs, habitability repairs, electrical and HVAC work, piping replacement, and miscellaneous repairs. Pricing is listed by estimated quantities and unit prices for over 150 individual line items organized under different task areas. Notes specify that pricing must be fully burdened and include potential escalation, as well as implementation of standard Navy work items and data requirements. Subcontracting must be priced separately from material pools. Overtime is not authorized without express task order approval.

EXHIBIT A-E

View the file

Other files for this federal contract opportunity

Other files attached to Messing & Berthing Barges Support, newest first.
File Type Posted
Amendment_0001_SF-30_RFP_N5005419R0017.pdf PDF
Bidder's_Questions_and_Answers_(022-025).pdf PDF
Bidder's_Questions_and_Answers_(002-021).pdf PDF
Bidder's_Questions_and_Answers_(001).pdf PDF
RFP_N5005419R0017.docx DOCX document
Exhibit_A-E.xlsx XLSX spreadsheet
J-15_Past_Performance_Assessment_Questionnaire.docx DOCX document
J-12_Attachment_B-WINTERIZATION.pdf PDF
J-2_LWT_042-005.pdf PDF
J-10_SWT_077-001.pdf PDF
J-14_Past_Performance_Reference_List.docx DOCX document
J-6_LWT_042-007.pdf PDF
J-1_CDRLs.pdf PDF
J-9_SWT_042-005.pdf PDF
J-8_LWT_042-037.pdf PDF
J-7_LWT_042-038.pdf PDF
J-11_BSEC-Barge_Systems_and_Equipment_Check_List.pdf PDF
J-13_Capacity_Evaluation_Form.xlsx XLSX spreadsheet
J-5_LWT_042-005.pdf PDF
J-3_LWT_042-009.pdf PDF
J-4_LWT_042-006.pdf PDF
J-16_Request_for_Specification_Clarification.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

Contractor Name
Supplies/ServicesEst QtyUnitUnit
PriceAmount
A101Tow Barges
A101AATow (one way, up to 40 miles), APL Class - except APL-61, APL-66, APL-67 Class12EA$0.00
A101ABTow (one way, up to 40 miles), YR, YRBM, YRBM(L) Class30EA$0.00
A101AC4EA$0.00
A101ADTow (one way, up to 800 miles, Ocean tow), APL Class - except APL-61, APL-66, APL-67 Class6EA$0.00
A101AETow (one-way, up to 800 miles, Ocean tow), YR, YRBM, YRBM(L) Class14EA$0.00
A101AFTow (one-way, up to 800 miles, Ocean tow), APL-66 Class, APL-67 Class2EA$0.00
A101AGTow (One-way, up to 800 miles, Ocean tow), APL-61 Class2EA$0.00
A102Temporary Services
A102AATie up or cast off berthing barge (Down River)50EA$0.00
A102ABTie up AND cast off berthing barge (In Plant)15EA$0.00
A102ACInstall and remove sewage, potable water, steam, shore power, telephone, fire main, gangways and cable television connections (Down River)60EA$0.00
A102ADProvide, install and maintain all services to include gangways, oil booms, safety nets, shore power, sewage, steam, Firemain, and potable water (In Plant)320DAY$0.00
A102AEProvide and install 1 inch KEVLAR mooring lines (150 ft. in length). With 6' loop in both ends, with Chafing gear installed.60EA$0.00
A102AFProvide and install 2 inch KEVLAR mooring lines (200 ft. in length). With 6' loop in both ends, with Chafing gear installed.20EA$0.00
A103Cleaning and Sanitizing (including waxing and buffing of tile decks, if applicable)
A103AADeep clean and sanitize the entire Craft (YR Class)6EA$0.00
A103ABDeep clean and sanitize the entire Craft (YRBM Class)10EA$0.00
A103ACDeep clean and sanitize the entire Craft (YRBM(L) Class)45EA$0.00
A103ADDeep clean and sanitize the entire Craft (APL Class) - except APL-61, APL-66, APL-67 Class15EA$0.00
A103AEDeep clean and sanitize the entire Craft (APL-61)4EA$0.00
A103AFDeep clean and sanitize the entire Craft (APL-66, APL-67 Class)4EA$0.00
A103AGFumigate/Exterminate - YR Class6EA$0.00
A103AHFumigate/Exterminate - YRBM Class10EA$0.00
A103AJFumigate/Exterminate - YRBM(L) Class45EA$0.00
A103AKFumigate/Exterminate - APL Class except APL-61, APL-66, APL-67 Class12EA$0.00
A103ALFumigate/Exterminate - APL-612EA$0.00
A103AMFumigate/Exterminate - APL-66, APL-67 Class2EA$0.00
A103ANWinterize - YR Class4EA$0.00
A103APWinterize - YRBM Class6EA$0.00
A103AQWinterize - YRBM(L) Class20EA$0.00
A103ARWinterize - APL Class - except APL-61, APL-66, APL-67 Class12EA$0.00
A103ASWinterize - APL-612EA$0.00
A103ATWinterize - APL-66, APL-67 Class2EA$0.00
A104Test and Inspections
A104AAAccomplish a preliminary and final visual and operational inspection of all systems and equipment utilizing barge systems and equipment check off list (Planning Memorandum No. 601-005). Submit a detailed report of all discrepancies.50EA$0.00
A104ABClean, gas free safe for entry and hot work, inspect and test CHT system, replacing 4 floats per system (YR, YRBM, YRBM(L), and all APL's except for APL-61)30SY$0.00
A104ACClean, gas free safe for entry and hot work, inspect and test CHT system, replacing 4 floats per system (APL-61)2SY$0.00
A104ADClean, gas free safe for entry and hot work, and air test tanks and voids.40EA$0.00
A105Fire Fighting Equipment: Replace, Repair and Maintenance
A105AAAccomplish Annual Inspection and Certification existing fire extinguishers, 20 lbs. or less200EA$0.00
A105ABRe-charge existing fire extinguishers, 20 lbs. or less100EA$0.00
A105ACInstall new dry chemical fire extinguishers, 20 lbs.50EA$0.00
A105ADAccomplish Annual Inspection and Certification of Gaylord Hood system25EA$0.00
A105AEAccomplish Annual Inspection and Certification of Range Guard (Deep Fat Fryer extinguishing) systems25EA$0.00
A105AFAccomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for legacy IC/SM Systems.5EA$0.00
A105AGAccomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for Siemens Systems.10EA$0.00
A105AHAccomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment Notifier Systems.10EA$0.00
A105AJCalibrate and Certify H2S System10EA$0.00
A105AKCalibrate Gage and submit report.100EA$0.00
A106Repair Galley/Messing Equipment and Fixtures
A106AAProvide commercial type garbage disposal, remove existing, replace and operational test6EA$0.00
A106ABProvide household type garbage disposal, remove existing, replace and operational test10EA$0.00
A106ACReplace disposable filters (industrial fire retardant) for galley systems30EA$0.00
A106ADSteam clean permanent filters40EA$0.00
A106AEReplace permanent filters25EA$0.00
A107Laundry Equipment, Replace
A107AARemove existing, provide and install new single function clothes washer, commercial style, accomplish operational test20EA$0.00
A107ABRemove existing, provide and install new single function clothes dryer, commercial style, accomplish operational test20EA$0.00
A108Habitability Repairs
A108AAReplace urinal20EA$0.00
A108ABReplace toilet40EA$0.00
A108ACReplace sink40EA$0.00
A108ADReplace shower head250EA$0.00
A108AEReplace shower mixing valve200EA$0.00
A108AFReplace flushometer200EA$0.00
A108AGReplace sink mixing valve200EA$0.00
A108AHDeck Drain - Clean free of obstructions to include piping100EA$0.00
A108AJReplace composition ceiling panel (2 ft. x 4 ft.) vinyl coated1500EA$0.00
A108AKReplace ceiling tile T-Rail1000LF$0.00
A108ALReplace towel rack50EA$0.00
A108AMReplace soap dish50EA$0.00
A108ANReplace shower curtain including hooks500EA$0.00
A108APReplace shower mat500EA$0.00
A108AQReplace toilet paper holder (frame and spool)100EA$0.00
A108ARReplace water fountain30EA$0.00
A108ASReplace mini blind1000EA$0.00
A108ATReplace flushometer hoses100EA$0.00
A108AUFabricate replacement key as per sample500EA$0.00
A108AVFabricate replacement keys (4 EACH) from existing doorknob. Label and place 2 EACH in BOTH Keyboxes10EA$0.00
A108AWOpen and reset pin type lock sets to include 2 replacement keys100EA$0.00
A108AXProvide and install new locking doorknob set100EA$0.00
A108AYOpen and reset combination on high security/classified lock on door and/or safe (Cypher Lock or Sargeant & Greenleaf mechanical type)100EA$0.00
A108AZOpen and reset combination on high security X-09 or X10 lock5EA$0.00
A108BAOpen and install new lock set and reset combinations on high security/classified lock on doors and/or safe (Cypher Lock or Sargeant & Greenleaf mechanical type)50EA$0.00
A108BBOpen and install new lock set and reset combination on high security X-09 or X-10 lock5EA$0.00
A108BCOpen Class 5 Security Container (SIPR Safe)5EA$0.00
A108BDReplace automatic door closures100EA$0.00
A108BEReplace bulkhead insulation (2" thick)3000SF$0.00
A108BFReplace bulkhead insulation (1" thick)3000SF$0.00
A108BGReplace deck drains up to 4" to include piping100EA$0.00
A109Electrical Repairs
A109AAReplace fluorescent tubes in closed fixtures: 12 inch300EA$0.00
A109ABReplace fluorescent tubes with LED bulb in closed fixtures: 12 inch200EA$0.00
A109ACReplace fluorescent tubes in closed fixtures: 24 inch300EA$0.00
A109ADReplace fluorescent tubes with LED bulb in closed fixtures: 24 inch200EA$0.00
A109AEReplace fluorescent tubes in closed fixtures: 48 inch300EA$0.00
A109AFReplace fluorescent tubes in with LED bulb closed fixtures: 48 inch200EA$0.00
A109AGReplace bulbs in closed incandescent fixtures150EA$0.00
A109AHReplace bulbs with screw-in LED bulb in closed incandescent fixtures100EA$0.00
A109AJReplace bulbs in spotlight fixtures100EA$0.00
A109AKReplace bulbs with LED bulb in spotlight fixtures20EA$0.00
A109ALReplace starters200EA$0.00
A109AMReplace Ballast on Fluorescent light fixture100EA$0.00
A109ANReplace bulb and battery in emergency light fixtures150EA$0.00
A109APInstall new nickel cadmium rechargeable emergency light fixtures200EA$0.00
A109AQReplace fuses150EA$0.00
A109ARInstall new exit light fixtures50EA$0.00
A110Piping Replacement
A110AAReplace valves up to 2 inches in diameter (CU-NI)30EA$0.00
A110ABReplace piping up to 2 inches in diameter (CU-NI)600LF$0.00
A110ACReplace piping 2 inches to 4 inches in diameter (CU-NI)800LF$0.00
A110ADReplace valves 2 inches to 4 inches in diameter (CU-NI)20EA$0.00
A110AEReplace flanges and fittings up to 4 inches in diameter (CU- NI)60EA$0.00
A110AFReplace and preserve pipe lagging up to 4 inches in diameter800LF$0.00
A110AGReplace and preserve lagging pads200SF$0.00
A110AHInstall in-line potable water filters100EA$0.00
A110AJReplace in-line potable water filters200EA$0.00
A111Heating Ventilation and Air Condition Repairs
A111AAAccomplish repairs to A/C and refrigeration equipment1000HR$0.00
A111ABMaterial (in support of ELIN 111) to accomplish repairs to A/C and refrigeration equipment (for bidding purposes only)25000US Dollars$1.00$25,000.00
A111ACMaterial G&A/Handling (in support of ELIN 111) (Contractor to submit a percentage)25000%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
A111ADReplace ventilation duct (12 in. x 20 in.)300LF$0.00
A111AEReplace ventilation duct diffusers (12 in. x 12 in.)75EA$0.00
A111AFReplace ventilation and duct inspection covers50EA$0.00
A111AGReplace thermostats100EA$0.00
A111AHReplace thermostat on Mitsubishi system20EA$0.00
A111AJClean, Inspect and Preserve all HVAC Condenser Coils - APL-611EA$0.00
A111AKClean, Inspect and Preserveall HVAC Condenser Coils - APL-661EA$0.00
A111ALClean, Inspect and Preserveall HVAC Condenser Coils - APL-421EA$0.00
A111AMClean, Inspect and Preserve HVAC Condenser Coils - Residential Type Condensing Unit (old APLs)90EA$0.00
A111ANClean, Inspect and Preserveall HVAC Condenser Coils - MITSUBISHI YRBM(L)6EA$0.00
A111APClean, Inspect and Preserve Condensing Coil for Walk-in Reefer/Freezer10EA$0.00
A111AQReplace disposable filters (up to 25 in. x 25 in.), 1 inch thick2500EA$0.00
A111ARReplace disposable filters (up to 25 in. x 25 in.), 2 inches thick1000EA$0.00
A111ASReplace disposable filters (up to 25 in. x 25 in.), 4 inches thick1,000EA$0.00
A111ATFabricate and install vent screens (24 in. x 30 in.)25EA$0.00
A111AUSteam clean permanent filters40EA$0.00
A111AVReplace permanent filters25EA$0.00
A111AWInsulate and preserve vent duct with 1" closed cell foam1500LF$0.00
A112Miscellaneous Repairs
A112AAReplace decking or bulkhead plating (15.3# O.S.)300SF$0.00
A112ABReplace hull plating (20.4# O.S.)800SF$0.00
A112ACReplace support structure (6" x 4" x 1/4" tee bar, O.S.)500LF$0.00
A112ADReplace hand rail200LF$0.00
A112AEReplace handrail safety chain (3/8” chain to include shackle on each end)200LF$0.00
A112AFSand and reseal PRC (using compatible sealant)75000SF$0.00
A112AGSand, colorcoat, re-flake and reseal PRC decking50000SF$0.00
A112AHReplace rubber based PRC, including underlayment1,000SF$0.00
A112AJSand and reseal terrazzo decking15,000SF$0.00
A112AKReplace terrazzo decking2,500SF$0.00
A112ALOverlay 1/4 in. thick PRC over existing terrazzo30,000SF$0.00
A112AMReplace vinyl tile, including underlayment2,500SF$0.00
A112ANOvercoat Exterior non-skid with TRAX Coat50,000SF$0.00
A112APReplace non-skid50,000SF$0.00
A112AQReplace "Peel-and-stick" non-skid strips in sets of 3 strips (box of 50 each)20EA$0.00
A113Preservation
A113AAExterior preservation up to 1,000 sq. ft.10,000SF$0.00
A113ABExterior preservation greater than 1,000 sq. ft.120,000SF$0.00
A113ACInterior preservation (90% Interior Compartments, 10% Wet Spaces)50000SF$0.00
A114Maintenance - Maintenance support to the ship's crew occupying the craft
AE114AAMaintenance - Straight Time (in support of ELIN 114)20,000HR$0.00
A114ABMaintenance - Material (in support of ELIN 114)200,000US Dollars$1.00$200,000.00
A114ACMaintenance - Material G&A/Handling (in support of ELIN 114) (Contractor to submit a percentage)200,000%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
A115Undisclosed Work (Correct Discrepancies)
A115AAUndisclosed Work (Correct Discrepancies) - Straight Time (in support of ELIN 115)16,000HR$0.00
A115ABUndisclosed Work (Correct Discrepancies) - Material (in support of ELIN 115) (for bidding purposes only)100,000US Dollars$1.00$100,000.00
A115ACUndisclosed Work (Correct Discrepancies) - Material G&A/Handling (in support of ELIN 115) (Contractor to submit a percentage)100,000%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
A116Undisclosed Work (Statement of Work)
A116AAUndisclosed Work (Statement of Work) - Straight Time (in support of ELIN 116)12,000HR$0.00
A116ABUndisclosed Work (Statement of Work) - Material (in support of ELIN 116) (for bidding purposes only)175,000US Dollars$1.00$175,000.00
A116ACUndisclosed Work (Statement of Work) - Material G&A/Handling (in support of ELIN 116) (Contractor to submit a percentage)175,000%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
A117Travel
A117AATravel/Per Diem (for bidding purposes only)25,000US Dollars$1.00$25,000.00
A117ABTravel G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-005225,000%$0.00

A 118 Contract Data Requirements (DD Form 1423) NSP

Total Estimate for Base Year No Bid

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work (Correct Discrepancies), Undisclosed Work (Statement of Work), and Maintenance - Maintenance support to the ship's crew occupying the craft), equipment rental, services, overhead, profit, and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense unless otherwise expressly specified in a written task order or written modification to a task order.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

Second Year (Option I)

Contractor Name
Supplies/ServicesEst QtyUnitUnit
PriceAmount
B101Tow Barges
B101AATow (one way, up to 40 miles), APL Class - except APL-61, APL-66, APL-67 Class12EA$0.00
B101ABTow (one way, up to 40 miles), YR, YRBM, YRBM(L) Class30EA$0.00
B101ACTow (one way, up to 40 miles), APL-61, APL-66, or APL-67 Class4EA$0.00
B101ADTow (one way, up to 800 miles, Ocean tow), APL Class - except APL-61, APL-66, APL-67 Class6EA$0.00
B101AETow (one-way, up to 800 miles, Ocean tow), YR, YRBM, YRBM(L) Class14EA$0.00
B101AFTow (one-way, up to 800 miles, Ocean tow), APL-66 Class, APL-67 Class2EA$0.00
B101AGTow (One-way, up to 800 miles, Ocean tow), APL-61 Class2EA$0.00
B102Temporary Services
B102AATie up or cast off berthing barge (Down River)50EA$0.00
B102ABTie up AND cast off berthing barge (In Plant)15EA$0.00
B102ACInstall and remove sewage, potable water, steam, shore power, telephone, fire main, gangways and cable television connections (Down River)60EA$0.00
B102ADProvide, install and maintain all services to include gangways, oil booms, safety nets, shore power, sewage, steam, Firemain, and potable water (In Plant)320DAY$0.00
B102AEProvide and install 1 inch KEVLAR mooring lines (150 ft. in length). With 6' loop in both ends, with Chafing gear installed.60EA$0.00
B102AFProvide and install 2 inch KEVLAR mooring lines (200 ft. in length). With 6' loop in both ends, with Chafing gear installed.20EA$0.00
B103Cleaning and Sanitizing (including waxing and buffing of tile decks, if applicable)
B103AADeep clean and sanitize the entire Craft (YR Class)6EA$0.00
B103ABDeep clean and sanitize the entire Craft (YRBM Class)10EA$0.00
B103ACDeep clean and sanitize the entire Craft (YRBM(L) Class)45EA$0.00
B103ADDeep clean and sanitize the entire Craft (APL Class) - except APL-61, APL-66, APL-67 Class15EA$0.00
B103AEDeep clean and sanitize the entire Craft (APL-61)4EA$0.00
B103AFDeep clean and sanitize the entire Craft (APL-66, APL-67 Class)4EA$0.00
B103AGFumigate/Exterminate - YR Class6EA$0.00
B103AHFumigate/Exterminate - YRBM Class10EA$0.00
B103AJFumigate/Exterminate - YRBM(L) Class45EA$0.00
B103AKFumigate/Exterminate - APL Class except APL-61, APL-66, APL-67 Class12EA$0.00
B103ALFumigate/Exterminate - APL-612EA$0.00
B103AMFumigate/Exterminate - APL-66, APL-67 Class2EA$0.00
B103ANWinterize - YR Class4EA$0.00
B103APWinterize - YRBM Class6EA$0.00
B103AQWinterize - YRBM(L) Class20EA$0.00
B103ARWinterize - APL Class - except APL-61, APL-66, APL-67 Class12EA$0.00
B103ASWinterize - APL-612EA$0.00
B103ATWinterize - APL-66, APL-67 Class2EA$0.00
B104Test and Inspections
B104AAAccomplish a preliminary and final visual and operational inspection of all systems and equipment utilizing barge systems and equipment check off list (Planning Memorandum No. 601-005). Submit a detailed report of all discrepancies.50EA$0.00
B104ABClean, gas free safe for entry and hot work, inspect and test CHT system, replacing 4 floats per system (YR, YRBM, YRBM(L), and all APL's except for APL-61)30SY$0.00
B104ACClean, gas free safe for entry and hot work, inspect and test CHT system, replacing 4 floats per system (APL-61)2SY$0.00
B104ADClean, gas free safe for entry and hot work, and air test tanks and voids.40EA$0.00
B105Fire Fighting Equipment: Replace, Repair and Maintenance
B105AAAccomplish Annual Inspection and Certification existing fire extinguishers, 20 lbs. or less200EA$0.00
B105ABRe-charge existing fire extinguishers, 20 lbs. or less100EA$0.00
B105ACInstall new dry chemical fire extinguishers, 20 lbs.50EA$0.00
B105ADAccomplish Annual Inspection and Certification of Gaylord Hood system25EA$0.00
B105AEAccomplish Annual Inspection and Certification of Range Guard (Deep Fat Fryer extinguishing) systems25EA$0.00
B105AFAccomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for legacy IC/SM Systems.5EA$0.00
B105AGAccomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for Siemens Systems.10EA$0.00
B105AHAccomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment Notifier Systems.10EA$0.00
B105AJCalibrate and Certify H2S System10EA$0.00
B105AKCalibrate Gage and submit report.100EA$0.00
B106Repair Galley/Messing Equipment and Fixtures
B106AAProvide commercial type garbage disposal, remove existing, replace and operational test6EA$0.00
B106ABProvide household type garbage disposal, remove existing, replace and operational test10EA$0.00
B106ACReplace disposable filters (industrial fire retardant) for galley systems30EA$0.00
B106ADSteam clean permanent filters40EA$0.00
B106AEReplace permanent filters25EA$0.00
B107Laundry Equipment, Replace
B107AARemove existing, provide and install new single function clothes washer, commercial style, accomplish operational test20EA$0.00
B107ABRemove existing, provide and install new single function clothes dryer, commercial style, accomplish operational test20EA$0.00
B108Habitability Repairs
B108AAReplace urinal20EA$0.00
B108ABReplace toilet40EA$0.00
B108ACReplace sink40EA$0.00
B108ADReplace shower head250EA$0.00
B108AEReplace shower mixing valve200EA$0.00
B108AFReplace flushometer200EA$0.00
B108AGReplace sink mixing valve200EA$0.00
B108AHDeck Drain - Clean free of obstructions to include piping100EA$0.00
B108AJReplace composition ceiling panel (2 ft. x 4 ft.) vinyl coated1500EA$0.00
B108AKReplace ceiling tile T-Rail1000LF$0.00
B108ALReplace towel rack50EA$0.00
B108AMReplace soap dish50EA$0.00
B108ANReplace shower curtain including hooks500EA$0.00
B108APReplace shower mat500EA$0.00
B108AQReplace toilet paper holder (frame and spool)100EA$0.00
B108ARReplace water fountain30EA$0.00
B108ASReplace mini blind1000EA$0.00
B108ATReplace flushometer hoses100EA$0.00
B108AUFabricate replacement key as per sample500EA$0.00
B108AVFabricate replacement keys (4 EACH) from existing doorknob. Label and place 2 EACH in BOTH Keyboxes10EA$0.00
B108AWOpen and reset pin type lock sets to include 2 replacement keys100EA$0.00
B108AXProvide and install new locking doorknob set100EA$0.00
B108AYOpen and reset combination on high security/classified lock on door and/or safe (Cypher Lock or Sargeant & Greenleaf mechanical type)100EA$0.00
B108AZOpen and reset combination on high security X-09 or X10 lock5EA$0.00
B108BAOpen and install new lock set and reset combinations on high security/classified lock on doors and/or safe (Cypher Lock or Sargeant & Greenleaf mechanical type)50EA$0.00
B108BBOpen and install new lock set and reset combination on high security X-09 or X-10 lock5EA$0.00
B108BCOpen Class 5 Security Container (SIPR Safe)5EA$0.00
B108BDReplace automatic door closures100EA$0.00
B108BEReplace bulkhead insulation (2" thick)3000SF$0.00
B108BFReplace bulkhead insulation (1" thick)3000SF$0.00
B108BGReplace deck drains up to 4" to include piping100EA$0.00
B109Electrical Repairs
B109AAReplace fluorescent tubes in closed fixtures: 12 inch300EA$0.00
B109ABReplace fluorescent tubes with LED bulb in closed fixtures: 12 inch200EA$0.00
B109ACReplace fluorescent tubes in closed fixtures: 24 inch300EA$0.00
B109ADReplace fluorescent tubes with LED bulb in closed fixtures: 24 inch200EA$0.00
B109AEReplace fluorescent tubes in closed fixtures: 48 inch300EA$0.00
B109AFReplace fluorescent tubes in with LED bulb closed fixtures: 48 inch200EA$0.00
B109AGReplace bulbs in closed incandescent fixtures150EA$0.00
B109AHReplace bulbs with screw-in LED bulb in closed incandescent fixtures100EA$0.00
B109AJReplace bulbs in spotlight fixtures100EA$0.00
B109AKReplace bulbs with LED bulb in spotlight fixtures20EA$0.00
B109ALReplace starters200EA$0.00
B109AMReplace Ballast on Fluorescent light fixture100EA$0.00
B109ANReplace bulb and battery in emergency light fixtures150EA$0.00
B109APInstall new nickel cadmium rechargeable emergency light fixtures200EA$0.00
B109AQReplace fuses150EA$0.00
B109ARInstall new exit light fixtures50EA$0.00
B110Piping Replacement
B110AAReplace valves up to 2 inches in diameter (CU-NI)30EA$0.00
B110ABReplace piping up to 2 inches in diameter (CU-NI)600LF$0.00
B110ACReplace piping 2 inches to 4 inches in diameter (CU-NI)800LF$0.00
B110ADReplace valves 2 inches to 4 inches in diameter (CU-NI)20EA$0.00
B110AEReplace flanges and fittings up to 4 inches in diameter (CU- NI)60EA$0.00
B110AFReplace and preserve pipe lagging up to 4 inches in diameter800LF$0.00
B110AGReplace and preserve lagging pads200SF$0.00
B110AHInstall in-line potable water filters100EA$0.00
B110AJReplace in-line potable water filters200EA$0.00
B111Heating Ventilation and Air Condition Repairs
B111AAAccomplish repairs to A/C and refrigeration equipment1000HR$0.00
B111ABMaterial (in support of ELIN 111) to accomplish repairs to A/C and refrigeration equipment (for bidding purposes only)25000US Dollars$1.00$25,000.00
B111ACMaterial G&A/Handling (in support of ELIN 111) (Contractor to submit a percentage)25000%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
B111ADReplace ventilation duct (12 in. x 20 in.)300LF$0.00
B111AEReplace ventilation duct diffusers (12 in. x 12 in.)75EA$0.00
B111AFReplace ventilation and duct inspection covers50EA$0.00
B111AGReplace thermostats100EA$0.00
B111AHReplace thermostat on Mitsubishi system20EA$0.00
B111AJClean, Inspect and Preserve all HVAC Condenser Coils - APL-611EA$0.00
B111AKClean, Inspect and Preserveall HVAC Condenser Coils - APL-661EA$0.00
B111ALClean, Inspect and Preserveall HVAC Condenser Coils - APL-421EA$0.00
B111AMClean, Inspect and Preserve HVAC Condenser Coils - Residential Type Condensing Unit (old APLs)90EA$0.00
B111ANClean, Inspect and Preserveall HVAC Condenser Coils - MITSUBISHI YRBM(L)6EA$0.00
B111APClean, Inspect and Preserve Condensing Coil for Walk-in Reefer/Freezer10EA$0.00
B111AQReplace disposable filters (up to 25 in. x 25 in.), 1 inch thick2500EA$0.00
B111ARReplace disposable filters (up to 25 in. x 25 in.), 2 inches thick1000EA$0.00
B111ASReplace disposable filters (up to 25 in. x 25 in.), 4 inches thick1,000EA$0.00
B111ATFabricate and install vent screens (24 in. x 30 in.)25EA$0.00
B111AUSteam clean permanent filters40EA$0.00
B111AVReplace permanent filters25EA$0.00
B111AWInsulate and preserve vent duct with 1" closed cell foam1500LF$0.00
B112Miscellaneous Repairs
B112AAReplace decking or bulkhead plating (15.3# O.S.)300SF$0.00
B112ABReplace hull plating (20.4# O.S.)800SF$0.00
B112ACReplace support structure (6" x 4" x 1/4" tee bar, O.S.)500LF$0.00
B112ADReplace hand rail200LF$0.00
B112AEReplace handrail safety chain (3/8” chain to include shackle on each end)200LF$0.00
B112AFSand and reseal PRC (using compatible sealant)75000SF$0.00
B112AGSand, colorcoat, re-flake and reseal PRC decking50000SF$0.00
B112AHReplace rubber based PRC, including underlayment1,000SF$0.00
B112AJSand and reseal terrazzo decking15,000SF$0.00
B112AKReplace terrazzo decking2,500SF$0.00
B112ALOverlay 1/4 in. thick PRC over existing terrazzo30,000SF$0.00
B112AMReplace vinyl tile, including underlayment2,500SF$0.00
B112ANOvercoat Exterior non-skid with TRAX Coat50,000SF$0.00
B112APReplace non-skid50,000SF$0.00
B112AQReplace "Peel-and-stick" non-skid strips in sets of 3 strips (box of 50 each)20EA$0.00
B113Preservation
B113AAExterior preservation up to 1,000 sq. ft.10,000SF$0.00
B113ABExterior preservation greater than 1,000 sq. ft.120,000SF$0.00
B113ACInterior preservation (90% Interior Compartments, 10% Wet Spaces)50000SF$0.00
B114Maintenance - Maintenance support to the ship's crew occupying the craft
BE114AAMaintenance - Straight Time (in support of ELIN 114)20,000HR$0.00
B114ABMaintenance - Material (in support of ELIN 114)200,000US Dollars$1.00$200,000.00
B114ACMaintenance - Material G&A/Handling (in support of ELIN 114) (Contractor to submit a percentage)200,000%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
B115Undisclosed Work (Correct Discrepancies)
B115AAUndisclosed Work (Correct Discrepancies) - Straight Time (in support of ELIN 115)16,000HR$0.00
B115ABUndisclosed Work (Correct Discrepancies) - Material (in support of ELIN 115) (for bidding purposes only)100,000US Dollars$1.00$100,000.00
B115ACUndisclosed Work (Correct Discrepancies) - Material G&A/Handling (in support of ELIN 115) (Contractor to submit a percentage)100,000%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
B116Undisclosed Work (Statement of Work)
B116AAUndisclosed Work (Statement of Work) - Straight Time (in support of ELIN 116)12,000HR$0.00
B116ABUndisclosed Work (Statement of Work) - Material (in support of ELIN 116) (for bidding purposes only)175,000US Dollars$1.00$175,000.00
B116ACUndisclosed Work (Statement of Work) - Material G&A/Handling (in support of ELIN 116) (Contractor to submit a percentage)175,000%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
B117Travel
B117AATravel/Per Diem (for bidding purposes only)25,000US Dollars$1.00$25,000.00
B117ABTravel G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-005225,000%$0.00

B 118 Contract Data Requirements (DD Form 1423) NSP

Total Estimate for Option I - Second Year Effort No Bid

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work (Correct Discrepancies), Undisclosed Work (Statement of Work), and Maintenance - Maintenance support to the ship's crew occupying the craft), equipment rental, services, overhead, profit, and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense unless otherwise expressly specified in a written task order or written modification to a task order.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

Third Year (Option II)

Contractor Name
Supplies/ServicesEst QtyUnitUnit
PriceAmount
C101Tow Barges
C101AATow (one way, up to 40 miles), APL Class - except APL-61, APL-66, APL-67 Class12EA$0.00
C101ABTow (one way, up to 40 miles), YR, YRBM, YRBM(L) Class30EA$0.00
C101ACTow (one way, up to 40 miles), APL-61, APL-66, or APL-67 Class4EA$0.00
C101ADTow (one way, up to 800 miles, Ocean tow), APL Class - except APL-61, APL-66, APL-67 Class6EA$0.00
C101AETow (one-way, up to 800 miles, Ocean tow), YR, YRBM, YRBM(L) Class14EA$0.00
C101AFTow (one-way, up to 800 miles, Ocean tow), APL-66 Class, APL-67 Class2EA$0.00
C101AGTow (One-way, up to 800 miles, Ocean tow), APL-61 Class2EA$0.00
C102Temporary Services
C102AATie up or cast off berthing barge (Down River)50EA$0.00
C102ABTie up AND cast off berthing barge (In Plant)15EA$0.00
C102ACInstall and remove sewage, potable water, steam, shore power, telephone, fire main, gangways and cable television connections (Down River)60EA$0.00
C102ADProvide, install and maintain all services to include gangways, oil booms, safety nets, shore power, sewage, steam, Firemain, and potable water (In Plant)320DAY$0.00
C102AEProvide and install 1 inch KEVLAR mooring lines (150 ft. in length). With 6' loop in both ends, with Chafing gear installed.60EA$0.00
C102AFProvide and install 2 inch KEVLAR mooring lines (200 ft. in length). With 6' loop in both ends, with Chafing gear installed.20EA$0.00
C103Cleaning and Sanitizing (including waxing and buffing of tile decks, if applicable)
C103AADeep clean and sanitize the entire Craft (YR Class)6EA$0.00
C103ABDeep clean and sanitize the entire Craft (YRBM Class)10EA$0.00
C103ACDeep clean and sanitize the entire Craft (YRBM(L) Class)45EA$0.00
C103ADDeep clean and sanitize the entire Craft (APL Class) - except APL-61, APL-66, APL-67 Class15EA$0.00
C103AEDeep clean and sanitize the entire Craft (APL-61)4EA$0.00
C103AFDeep clean and sanitize the entire Craft (APL-66, APL-67 Class)4EA$0.00
C103AGFumigate/Exterminate - YR Class6EA$0.00
C103AHFumigate/Exterminate - YRBM Class10EA$0.00
C103AJFumigate/Exterminate - YRBM(L) Class45EA$0.00
C103AKFumigate/Exterminate - APL Class except APL-61, APL-66, APL-67 Class12EA$0.00
C103ALFumigate/Exterminate - APL-612EA$0.00
C103AMFumigate/Exterminate - APL-66, APL-67 Class2EA$0.00
C103ANWinterize - YR Class4EA$0.00
C103APWinterize - YRBM Class6EA$0.00
C103AQWinterize - YRBM(L) Class20EA$0.00
C103ARWinterize - APL Class - except APL-61, APL-66, APL-67 Class12EA$0.00
C103ASWinterize - APL-612EA$0.00
C103ATWinterize - APL-66, APL-67 Class2EA$0.00
C104Test and Inspections
C104AAAccomplish a preliminary and final visual and operational inspection of all systems and equipment utilizing barge systems and equipment check off list (Planning Memorandum No. 601-005). Submit a detailed report of all discrepancies.50EA$0.00
C104ABClean, gas free safe for entry and hot work, inspect and test CHT system, replacing 4 floats per system (YR, YRBM, YRBM(L), and all APL's except for APL-61)30SY$0.00
C104ACClean, gas free safe for entry and hot work, inspect and test CHT system, replacing 4 floats per system (APL-61)2SY$0.00
C104ADClean, gas free safe for entry and hot work, and air test tanks and voids.40EA$0.00
C105Fire Fighting Equipment: Replace, Repair and Maintenance
C105AAAccomplish Annual Inspection and Certification existing fire extinguishers, 20 lbs. or less200EA$0.00
C105ABRe-charge existing fire extinguishers, 20 lbs. or less100EA$0.00
C105ACInstall new dry chemical fire extinguishers, 20 lbs.50EA$0.00
C105ADAccomplish Annual Inspection and Certification of Gaylord Hood system25EA$0.00
C105AEAccomplish Annual Inspection and Certification of Range Guard (Deep Fat Fryer extinguishing) systems25EA$0.00
C105AFAccomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for legacy IC/SM Systems.5EA$0.00
C105AGAccomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for Siemens Systems.10EA$0.00
C105AHAccomplish Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment Notifier Systems.10EA$0.00
C105AJCalibrate and Certify H2S System10EA$0.00
C105AKCalibrate Gage and submit report.100EA$0.00
C106Repair Galley/Messing Equipment and Fixtures
C106AAProvide commercial type garbage disposal, remove existing, replace and operational test6EA$0.00
C106ABProvide household type garbage disposal, remove existing, replace and operational test10EA$0.00
C106ACReplace disposable filters (industrial fire retardant) for galley systems30EA$0.00
C106ADSteam clean permanent filters40EA$0.00
C106AEReplace permanent filters25EA$0.00
C107Laundry Equipment, Replace
C107AARemove existing, provide and install new single function clothes washer, commercial style, accomplish operational test20EA$0.00
C107ABRemove existing, provide and install new single function clothes dryer, commercial style, accomplish operational test20EA$0.00
C108Habitability Repairs
C108AAReplace urinal20EA$0.00
C108ABReplace toilet40EA$0.00
C108ACReplace sink40EA$0.00
C108ADReplace shower head250EA$0.00
C108AEReplace shower mixing valve200EA$0.00
C108AFReplace flushometer200EA$0.00
C108AGReplace sink mixing valve200EA$0.00
C108AHDeck Drain - Clean free of obstructions to include piping100EA$0.00
C108AJReplace composition ceiling panel (2 ft. x 4 ft.) vinyl coated1500EA$0.00
C108AKReplace ceiling tile T-Rail1000LF$0.00
C108ALReplace towel rack50EA$0.00
C108AMReplace soap dish50EA$0.00
C108ANReplace shower curtain including hooks500EA$0.00
C108APReplace shower mat500EA$0.00
C108AQReplace toilet paper holder (frame and spool)100EA$0.00
C108ARReplace water fountain30EA$0.00
C108ASReplace mini blind1000EA$0.00
C108ATReplace flushometer hoses100EA$0.00
C108AUFabricate replacement key as per sample500EA$0.00
C108AVFabricate replacement keys (4 EACH) from existing doorknob. Label and place 2 EACH in BOTH Keyboxes10EA$0.00
C108AWOpen and reset pin type lock sets to include 2 replacement keys100EA$0.00
C108AXProvide and install new locking doorknob set100EA$0.00
C108AYOpen and reset combination on high security/classified lock on door and/or safe (Cypher Lock or Sargeant & Greenleaf mechanical type)100EA$0.00
C108AZOpen and reset combination on high security X-09 or X10 lock5EA$0.00
C108BAOpen and install new lock set and reset combinations on high security/classified lock on doors and/or safe (Cypher Lock or Sargeant & Greenleaf mechanical type)50EA$0.00
C108BBOpen and install new lock set and reset combination on high security X-09 or X-10 lock5EA$0.00
C108BCOpen Class 5 Security Container (SIPR Safe)5EA$0.00
C108BDReplace automatic door closures100EA$0.00
C108BEReplace bulkhead insulation (2" thick)3000SF$0.00
C108BFReplace bulkhead insulation (1" thick)3000SF$0.00
C108BGReplace deck drains up to 4" to include piping100EA$0.00
C109Electrical Repairs
C109AAReplace fluorescent tubes in closed fixtures: 12 inch300EA$0.00
C109ABReplace fluorescent tubes with LED bulb in closed fixtures: 12 inch200EA$0.00
C109ACReplace fluorescent tubes in closed fixtures: 24 inch300EA$0.00
C109ADReplace fluorescent tubes with LED bulb in closed fixtures: 24 inch200EA$0.00
C109AEReplace fluorescent tubes in closed fixtures: 48 inch300EA$0.00
C109AFReplace fluorescent tubes in with LED bulb closed fixtures: 48 inch200EA$0.00
C109AGReplace bulbs in closed incandescent fixtures150EA$0.00
C109AHReplace bulbs with screw-in LED bulb in closed incandescent fixtures100EA$0.00
C109AJReplace bulbs in spotlight fixtures100EA$0.00
C109AKReplace bulbs with LED bulb in spotlight fixtures20EA$0.00
C109ALReplace starters200EA$0.00
C109AMReplace Ballast on Fluorescent light fixture100EA$0.00
C109ANReplace bulb and battery in emergency light fixtures150EA$0.00
C109APInstall new nickel cadmium rechargeable emergency light fixtures200EA$0.00
C109AQReplace fuses150EA$0.00
C109ARInstall new exit light fixtures50EA$0.00
C110Piping Replacement
C110AAReplace valves up to 2 inches in diameter (CU-NI)30EA$0.00
C110ABReplace piping up to 2 inches in diameter (CU-NI)600LF$0.00
C110ACReplace piping 2 inches to 4 inches in diameter (CU-NI)800LF$0.00
C110ADReplace valves 2 inches to 4 inches in diameter (CU-NI)20EA$0.00
C110AEReplace flanges and fittings up to 4 inches in diameter (CU- NI)60EA$0.00
C110AFReplace and preserve pipe lagging up to 4 inches in diameter800LF$0.00
C110AGReplace and preserve lagging pads200SF$0.00
C110AHInstall in-line potable water filters100EA$0.00
C110AJReplace in-line potable water filters200EA$0.00
C111Heating Ventilation and Air Condition Repairs
C111AAAccomplish repairs to A/C and refrigeration equipment1000HR$0.00
C111ABMaterial (in support of ELIN 111) to accomplish repairs to A/C and refrigeration equipment (for bidding purposes only)25000US Dollars$1.00$25,000.00
C111ACMaterial G&A/Handling (in support of ELIN 111) (Contractor to submit a percentage)25000%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
C111ADReplace ventilation duct (12 in. x 20 in.)300LF$0.00
C111AEReplace ventilation duct diffusers (12 in. x 12 in.)75EA$0.00
C111AFReplace ventilation and duct inspection covers50EA$0.00
C111AGReplace thermostats100EA$0.00
C111AHReplace thermostat on Mitsubishi system20EA$0.00
C111AJClean, Inspect and Preserve all HVAC Condenser Coils - APL-611EA$0.00
C111AKClean, Inspect and Preserveall HVAC Condenser Coils - APL-661EA$0.00
C111ALClean, Inspect and Preserveall HVAC Condenser Coils - APL-421EA$0.00
C111AMClean, Inspect and Preserve HVAC Condenser Coils - Residential Type Condensing Unit (old APLs)90EA$0.00
C111ANClean, Inspect and Preserveall HVAC Condenser Coils - MITSUBISHI YRBM(L)6EA$0.00
C111APClean, Inspect and Preserve Condensing Coil for Walk-in Reefer/Freezer10EA$0.00
C111AQReplace disposable filters (up to 25 in. x 25 in.), 1 inch thick2500EA$0.00
C111ARReplace disposable filters (up to 25 in. x 25 in.), 2 inches thick1000EA$0.00
C111ASReplace disposable filters (up to 25 in. x 25 in.), 4 inches thick1,000EA$0.00
C111ATFabricate and install vent screens (24 in. x 30 in.)25EA$0.00
C111AUSteam clean permanent filters40EA$0.00
C111AVReplace permanent filters25EA$0.00
C111AWInsulate and preserve vent duct with 1" closed cell foam1500LF$0.00
C112Miscellaneous Repairs
C112AAReplace decking or bulkhead plating (15.3# O.S.)300SF$0.00
C112ABReplace hull plating (20.4# O.S.)800SF$0.00
C112ACReplace support structure (6" x 4" x 1/4" tee bar, O.S.)500LF$0.00
C112ADReplace hand rail200LF$0.00
C112AEReplace handrail safety chain (3/8” chain to include shackle on each end)200LF$0.00
C112AFSand and reseal PRC (using compatible sealant)75000SF$0.00
C112AGSand, colorcoat, re-flake and reseal PRC decking50000SF$0.00
C112AHReplace rubber based PRC, including underlayment1,000SF$0.00
C112AJSand and reseal terrazzo decking15,000SF$0.00
C112AKReplace terrazzo decking2,500SF$0.00
C112ALOverlay 1/4 in. thick PRC over existing terrazzo30,000SF$0.00
C112AMReplace vinyl tile, including underlayment2,500SF$0.00
C112ANOvercoat Exterior non-skid with TRAX Coat50,000SF$0.00
C112APReplace non-skid50,000SF$0.00
C112AQReplace "Peel-and-stick" non-skid strips in sets of 3 strips (box of 50 each)20EA$0.00
C113Preservation
C113AAExterior preservation up to 1,000 sq. ft.10,000SF$0.00
C113ABExterior preservation greater than 1,000 sq. ft.120,000SF$0.00
C113ACInterior preservation (90% Interior Compartments, 10% Wet Spaces)50000SF$0.00
C114Maintenance - Maintenance support to the ship's crew occupying the craft
CE114AAMaintenance - Straight Time (in support of ELIN 114)20,000HR$0.00
C114ABMaintenance - Material (in support of ELIN 114)200,000US Dollars$1.00$200,000.00
C114ACMaintenance - Material G&A/Handling (in support of ELIN 114) (Contractor to submit a percentage)200,000%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
C115Undisclosed Work (Correct Discrepancies)
C115AAUndisclosed Work (Correct Discrepancies) - Straight Time (in support of ELIN 115)16,000HR$0.00
C115ABUndisclosed Work (Correct Discrepancies) - Material (in support of ELIN 115) (for bidding purposes only)100,000US Dollars$1.00$100,000.00
C115ACUndisclosed Work (Correct Discrepancies) - Material G&A/Handling (in support of ELIN 115) (Contractor to submit a percentage)100,000%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
C116Undisclosed Work (Statement of Work)
C116AAUndisclosed Work (Statement of Work) - Straight Time (in support of ELIN 116)12,000HR$0.00
C116ABUndisclosed Work (Statement of Work) - Material (in support of ELIN 116) (for bidding purposes only)175,000US Dollars$1.00$175,000.00
C116ACUndisclosed Work (Statement of Work) - Material G&A/Handling (in support of ELIN 116) (Contractor to submit a percentage)175,000%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
C117Travel
C117AATravel/Per Diem (for bidding purposes only)25,000US Dollars$1.00$25,000.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .