J-12_Attachment_B-WINTERIZATION.pdf

PDF 101 KB Posted

Attached to
Messing & Berthing Barges Support Federal contract opportunity
Solicitation number
N5005419R0017
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document provides guidance on winterizing unmanned barges and includes an inspection checklist. It outlines procedures for disconnecting water lines and steam lines, blowing out remaining water from pipes, adding antifreeze to toilets, removing and attaching plugs and drains from low points, and inspecting piping systems weekly. The inspection checklist covers winterizing various areas of the barge such as galleys, sculleries, wardroom pantries, hot water heaters, scuttlebutts, washrooms, staterooms, firemain, CHT, steam, salt water, and fresh water piping systems as well as sump pumps, air conditioning, refrigerators, laundry machines, and other components to remove water and protect against freezing. It recommends maintaining compartments above 40 degrees Fahrenheit using heating facilities during long storage periods to prevent damage from expansion and contraction of steel bulkheads.

J-12 - NAVSEAINST 11101.1, Attachment B, Winterizing Barges for Tow or Storage

View the file

Other files for this federal contract opportunity

Other files attached to Messing & Berthing Barges Support, newest first.
File Type Posted
Exhibit_A-E.xlsx XLSX spreadsheet
Bidder's_Questions_and_Answers_(022-025).pdf PDF
Amendment_0001_SF-30_RFP_N5005419R0017.pdf PDF
Bidder's_Questions_and_Answers_(002-021).pdf PDF
Bidder's_Questions_and_Answers_(001).pdf PDF
RFP_N5005419R0017.docx DOCX document
Exhibit_A-E.xlsx XLSX spreadsheet
J-15_Past_Performance_Assessment_Questionnaire.docx DOCX document
J-9_SWT_042-005.pdf PDF
J-8_LWT_042-037.pdf PDF
J-7_LWT_042-038.pdf PDF
J-11_BSEC-Barge_Systems_and_Equipment_Check_List.pdf PDF
J-13_Capacity_Evaluation_Form.xlsx XLSX spreadsheet
J-5_LWT_042-005.pdf PDF
J-3_LWT_042-009.pdf PDF
J-4_LWT_042-006.pdf PDF
J-16_Request_for_Specification_Clarification.docx DOCX document
J-2_LWT_042-005.pdf PDF
J-10_SWT_077-001.pdf PDF
J-14_Past_Performance_Reference_List.docx DOCX document
J-6_LWT_042-007.pdf PDF
J-1_CDRLs.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHIP:

SSP: __ of __ ITEM NO: 992-11-_____

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

ATTACHMENT B

NAVSEAINST 11101.1 8

DEC 1986

WINTERIZING BARGES FOR TOW OR STORAGE

1. Winterizing of Unmanned Barges . When craft are unmanned and unattended or being prepared for tow during freezing weather periods, the following actions shall be accomplished by the barge custodian:

a. Disconnect all water lines from dockside.

b. Disconnect shore steam lines.

c. Blow air through all lines to clear and remove the remaining water from low points.

d. Remove all water or pour anti-freeze into all toilets to obtain a 50/50 mixture with residue water.

e. Remove plugs and drains from all low points and attach these plugs and drains to the piping and fixtures from which they were removed.

f. Weekly, inspect piping systems for damage.

2. Inspection check list. Barges stored for long periods of time in below freezing conditions without heat will damage paint in compartments and passageways due to expansion and contraction of steel bulkheads.

It is recommended to maintain compartments above 40 degrees Fahrenheit if heating facilities are available during long periods of storage. Use the check list on page 2 to inspect and protect systems that will freeze if not winterized.

SHIP:

SSP: __ of __ ITEM NO: 992-11-_____

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

ATTACHMENT B (CONTINUED)

BARGE WINTERIZING CHECK LIST

BARGE

DATE

1. Check list for winterizing barges, and barges being prepared for tow during freezing weather periods.

Ensure the removal of water from piping and fresh water traps and low points, plugs and drains in use in the following areas:

BARGE CHECK LIST

1. GALLEY- sinks, coffee pot, steam table

2. SCULLERY- dishwasher and sinks

3. WARDROOM PANTRY- sinks

4. HOT WATER HEATER(S)- tanks, piping and heating coils

5. SCUTTLEBUTTS- piping and drains

6. CPO WASHROOM- sinks, showers, and toilets

7. OFFICERS WASHROOM- sinks, showers, and toilets

8. ENLISTED WASHROOM- sinks, showers, and toilets

9. OFFICERS STATEROOMS- sinks

10. FIREMAIN- piping and pumps where applicable

11. CHT SYSTEM- piping, pumps and holding tanks

12. STEAM PIPING SYSTEMS- associated equipment including steam traps, and heating coils

13. SALT WATER PIPING SYSTEMS- associated equipment

14. FRESH WATER PIPING SYSTEMS- associated equipment

15. SUMP PUMPS AND SUMPS

16. AIR CONDITIONING- chill water piping and components

17. REFRIGERATOR/FREEZER- cooling system piping

18. GAYLORD HOOD- washdown piping

19. LAUNDRY- washing machine

INSPECTION MADE BY: ________________________________

SHIPYARD: ___________________________________________