BQ_010_077-10-001_vs_solicitation_-_Answered_1-11-18_Redacted.pdf

PDF 22 KB Posted

Attached to
USS SAMPSON 8C1 DSRA
Solicitation number
N4523A-18-R-0550
Issued by

View the file

Other files

File Type Posted
N4523A-18-R-0550_Amendment_0019.pdf PDF
N4523A-18-R-0550_Amendment_0018.pdf PDF
N4523A-18-R-0550_Amendment_0017.pdf PDF
N4523A-18-R-0550_Amendment_0016.pdf PDF
BQ_029_-_J-14_Section_B_Note_A_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0015.pdf PDF
N4523A-18-R-0550_Amendment_0014.pdf PDF
N4523A-18-R-0550_Amendment_0013.pdf PDF
DDG-102_SA_288K_HAZMINCEN_POAM.PDF PDF
SA_82710K_HED_Notional_POAM_from_DDG_101_-_HED_MSProj_19Jan16.pdf PDF
USS_Sampson_IMO_IMS_J._Fagnant_2017-12-12.pdf PDF
J-18_Access_and_User_Agreement_rev_003_02122018.pdf PDF
N4523A-18-R-0550_Amendment_0012.pdf PDF
N4523A-18-R-0550_Amendment_0011.pdf PDF
BQ_028_PPT_HED_Informational_Brief_for_DDG_102.pptx PPTX presentation
262-8749116_Rev_A,_HYBRID_ELEC_DRIVE_PIPING_-_OIL_SYS_MODS_&_ML.pdf PDF
235-8749114_Rev_A,_HYBRID_ELEC_DRIVE_CONSOLIDATED_ELEC_MODS_&_ML.pdf PDF
182-8749113_Rev_A,_HYBRID_ELEC_DRIVE_HULL_OUTFIT,_STRUCT_&_FDN_MODS_&_ML.pdf PDF
555-8749121_Rev_A,_HYBRID_ELEC_DRIVE_PIPING_-_FIRE_PROTN_MODS_&_ML.pdf PDF
551-8749120_Rev_A,_HYBRID_ELEC_DRIVE_PIPING_-AIR_SYS_MODS_&_ML.pdf PDF
BQ_028_980-90-007_clarification_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0010.pdf PDF
N4523A-18-R-0550_Amendment_0009.pdf PDF
DDG_102_DSRA_A-7_4720_Report_dtd_18_DEC_17.pdf PDF
BQ_027_4720_request_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0008.pdf PDF
N4523A-18-R-0550_J-12_PPI_Q_010_Redacted.pdf PDF
J-1_Work_Package_ERRATA_6.pdf PDF
644-8718346-ARR03_REV-A_SANITARY_ARR_MODS.pdf PDF
BQ_026_Missing_Refs-Answered_Redacted.pdf PDF
BQ_025_Missing_Refs-Answered_Redacted.pdf PDF
505-8718348-PIPE20_REV-A_SANITARY_PIPE_MODS.pdf PDF
512-8718350-VENT52_REV-A_VENTILATION_MANUFACTURING_DETAILS.pdf PDF
512-8718344-VENT10_REV-A_BERTHING_VENT_MODS.pdf PDF
331-8718345-ELEC30_REV-A_BERTHING_ELEC_MODS.pdf PDF
640-8718343-ARR01_REV-A_BERTHING_ARR_MODS.pdf PDF
512-8718347-VENT12_REV-A_SANITARY_VENT_MODS.pdf PDF
331-8718349-ELEC32_REV-A_SANITARY_ELEC_MODS.pdf PDF
BQ_024_Missing_Ref_-_Redacted.pdf PDF
BQ_007_437-012-001_Para_3.2_-_Redacted.pdf PDF
BQ_022_980-90-007_References-Redacted.pdf PDF
BQ_21_123-21-001_-_Redacted.pdf PDF
BQ_005_437-012-001_Missing_Drawings_-_Redacted.pdf PDF
BQ_023_Missing_Refs_-_Redacted.pdf PDF
BQ_018_123-10-001_-_Redacted.pdf PDF
BQ_016_588-21-001_-_Redacted.pdf PDF
BQ_019_123-10-001_-_Redacted.pdf PDF
BQ_009_Clarification_-_Redacted.pdf PDF
BQ_015_588-21-001_-_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0007.pdf PDF
Show 40 more

Latest 50 of 183 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-12 eric.c.niemann2@navy.mil jason.herrera@navy.mil

N4523A-18-R-0550 Pre-Proposal Information (PPI) Form

One question per form

DATE OF REQUEST: 1/10/18 QUESTION NO: 010

SHIP/HULL NO: 102 WORK ITEM/CSWT NO: Solicitation

CONTRACTOR: CONTRACTOR POC & PHONE:

PARA. NO: 2.0 PAGE NO: 012 ATTACH. NO: N4523A-18-R-0550

CONTRACTOR QUESTION:

The Solicitation in Section 2 titled Location states : The ship will transit from Naval Station Everett to the docking facility on the first day of the availability. The Government has contracted with Vigor Shipyard under a separate Docking and Support Contract for the LMA’s use of AFDM 10 RESOLUTE. This is a Navy leased dry-dock currently leased to Vigor Marine, LLC, Seattle, WA, and shall be for the LMA to execute the requirements of this contract in support of the USS SAMPSON (DDG 102) DSRA. Vigor Shipyard will de-fuel the ship in order to develop the docking posture. Upon completion of Undocking, the ship will be immediately towed by the LMA back to Naval Station Everett for the completion of the remaining work and Key Events.

The specification in item # 077-10-001, describes Hazardous waste management in Naval Station Everett and in section 4.1 States the period of performance is Jul 16 – 30 of 2018 at the naval station before the ship departs.

Please amend the item of solicitation so that both have the correct dates for this activity.

DO NOT WRITE BELOW THIS LINE

(FOR GOVERNMENT USE ONLY)

Work Item will be corrected by Errata.

PLANNER

REVIEW

N/A DATE: N/A SUPERVISOR REVIEW: D Richey DATE: 1/11/18

CODE 230

REVIEW: N/A DATE: N/A ADV PLAN REVIEW: N/A DATE: N/A

SPEC CHG: Y/N Yes DWG/REF CHG. Y/N N/A RQMTS CHG: Y/N N/A MAT'L CHG: Y/N N/A

RESPONSE TO SEA 02:

File details come from the government source that posted it.