BQ_028_PPT_HED_Informational_Brief_for_DDG_102.pptx

PPTX presentation 4 MB Posted

Attached to
USS SAMPSON 8C1 DSRA Federal contract opportunity
Solicitation number
N4523A-18-R-0550
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to USS SAMPSON 8C1 DSRA, newest first.
File Type Posted
N4523A-18-R-0550_Amendment_0019.pdf PDF
N4523A-18-R-0550_Amendment_0018.pdf PDF
DDG-102_SA_288K_HAZMINCEN_POAM.PDF PDF
N4523A-18-R-0550_Amendment_0012.pdf PDF
N4523A-18-R-0550_Amendment_0011.pdf PDF
551-8749120_Rev_A,_HYBRID_ELEC_DRIVE_PIPING_-AIR_SYS_MODS_&_ML.pdf PDF
J-1_Work_Package_ERRATA_6.pdf PDF
BQ_026_Missing_Refs-Answered_Redacted.pdf PDF
BQ_025_Missing_Refs-Answered_Redacted.pdf PDF
BQ_020_077-10-001_-_Answered_1-16-18_Redacted.pdf PDF
J-14_Pricing_Workbook_111517_rev001_(ECN).xlsx XLSX spreadsheet
BQ_010_077-10-001_vs_solicitation_-_Answered_1-11-18_Redacted.pdf PDF
BQ_013_53711-5808784M.PDF PDF
BQ_013_462-11-001_Missing_Ref_-_Answered_1-12-18_Redacted.pdf PDF
BQ_006_437-012-001_Possible_Source_-_Answered_1-5-18_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_009_-_Answered_09JAN18_Redacted.pdf PDF
BQ_004_Bearing_Staves_-_Answered_1-5-18_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0004.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_003_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_001_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_014_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_005_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0003.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_002_Redacted.pdf PDF
BQ_001_Extension_Request.pdf PDF
J-11_8010_Manual_19April2016_REV_00_ACN_1A.PDF PDF
J-16_CDRL_A006_Request_for_Technical_Deviation.pdf PDF
J-16_CDRL_A031_Demand_Only_Transactions.pdf PDF
J-17_Integrated_Schedule_&_Testing_-_Rev_1.docx DOCX document
MIL_STD_777F.pdf PDF
J-16_CDRL_B002_Logistics_Mgmt_-_EDFP.pdf PDF
MIL-STD-2191.pdf PDF
J-16_CDRL_A018_Critically_Coated_Surfaces_Rprt.pdf PDF
N4523A-18-R-0550_Solicitation.pdf PDF
J-16_CDRL_A013_Process_Control_Procedure.pdf PDF
J-16_CDRL_A019_Incident_Report.pdf PDF
J-16_CDRL_A010_Tank_Report.pdf PDF
J-12_Pre-Proposal_Information_(PPI)_Form.doc DOC document
J-16_CDRL_A035_Progress,_Status_and_Mgmt_Rprt.pdf PDF
J-16_CDRL_A030_Weight_and_Stability_Rprt.pdf PDF
J-16_CDRL_A026_Comp_Closeout_Insp_Rprt.pdf PDF
J-3_Key_Events_and_Milestone_Listing.pdf PDF
MIL-STD-3026.pdf PDF
J-20_Open_and_Inspect_Reports.xlsx XLSX spreadsheet
29_CFR_1915_Occupational_Safety_and_Health_Admin.,_Labor.pdf PDF
J-16_CDRL_A037_Contractor's_Training_Plan.pdf PDF
J-16_CDRL_A005_Purchase_Order.pdf PDF
J-16_CDRL_A021_Heavy_Weather_Plan.pdf PDF
MIL-STD-1310.pdf PDF
J-16_CDRL_A004_CFM_Report.pdf PDF
Show all 50

USS SAMPSON 8C1 DSRA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DDG 51 Hybrid Electric Drive (HED) Backfit Program Informational Brief

DDG 101, 50% IPTD

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

DDG 51 HED Solution

(2) Active Front End Drives HED Switchboard

2550 HP Induction Motor

Reduces fuel consumption in DDG 51 FLT IIA by 4,739 – 5,822 bbls/ship/year

Increases mission effectiveness through longer time on station, fuel efficiency and longer ship range

Improves engineering plant efficiency for DDG 51 class

Significantly reduced GTMs operating hours

Operational Benefits Provides propulsion at 10kts or less without the need for LM2500 main engines

Design is based upon fielded/mature technologies

Technical Details

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Major Components

Motor Motor Drive

Motor General Characteristics
Motor TypeSquirrel Cage Induction Motor
Rated Motor Output Power2550 Horsepower
Motor Configuration6 Pole /2 x 3 Phase/ Star Connected
Full Power Motor Efficiency96.00%
Full Power Motor Power Factor0.80
Motor Voltage480V
Motor Speed0-600 RPM
Motor Frequency0-30.2 Hz (at rated speed)
Over Speed125%
InsulationClass H with Class F Temperature Rise
Direction of RotationCCW (Viewing Clutch mounted End)
Load Rating51-continuous
Load CharacteristicsTorque = N2
Full Loan Line Current3080A
Overload110% Torque for 60 seconds
Stator Coil ConfigurationForm Would Coils using Vacuum Impregnation
Ingress ProtectionIP54
Additional FeaturesChilled Water Cooled

SSS Type 120T automatic operating clutch at motor non-drive-end with servo actuated lock-out feature Kop-Flex drive-end flexible disc pack/ quill shaft/shear pin assembly Output shaft speed sensor assembly Grounding brush assembly at drive end

Drive General Characteristics
Drive TypePWM Voltage Source Inverter
Rated Converter Output Power1.9MW
Converter ConfigurationAFE+PWM Inverter (2 Cabinet Arrangement)
Brake Chopper/Resistor81kW average braking power and 10 seconds of deceleration
Full Power Converter Efficiency96.5%
Converter Voltage0-480V
Input Power Voltage1PF
Converter Output Frequency0-30.1Hz (Nominal Speed Range) up to 120Hz
Converter Input Power InterfaceMIL-STD-1399B
Converter EMI SpecificationMIL-STD-461F
Full Load Line Current3080A
Overload3390A
Ingress ProtectionIPS4 (Frame and Terminal Box)
Additional FeaturesA drive configuration utilizing two similar drive suites

Rugged Enclosure with door mounted HMI Chilled Water Cooled Each of the two (2) frequency converter(s) offered comprises the following assembled modules:

IGBT rectifier (active front end) EMI filter on drive input DC link, pre-charge and braking chopper IGBT inverter Cooling System Control unit(s)

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Drive Cabinet dimensions

6,834 LBS Dry (Each)

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Motor dimensions 28,500 LBS Dry

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Switchboard dimensions

4,000 LBS

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Ship Location

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Structural – 3 Hull & 1 Interior Blkhd Access Cuts, Removes/Modifies 20 existing foundations, Installs 15 each new Foundations Assemblies, 305SqFt of new Steel Plate, 16Ft of new T-Beams, 320Ft of new Angle Bar & Flat Steel, 94Ft of new Wide Flange Steel Beam

Electrical - Installs 6,391 feet of New Cable (130ft of Fiber) with 76 Electrical Connection points on 38 Cable Assemblies

Piping – Installs new and Modifies existing piping system with 650ft of Cres PPG, 1,147ft of Gage Tubing and 38 valve assemblies. Impacts & Modifies the following Piping Systems: FW & CONT AIR, CHW, FDE. MDW, LP AIR, SW & HYD, FWC & MDW, HYD & HWTR, PROP CONT, LUBO, HALON, BLEED AIR & DRAIN, CCS & DCC WASTE DRAIN, SWC, VCHT, FUEL OIL, FIRE MAIN, AFFF & MDS, PDW, GFA & HYD, GFH & CWD, CAL & CAE, VENT & GAGE BOARD.

HVAC – Removes Existing Vent Duct, Manufactures & Installs 23 New Vent Duck Assemblies

Mechanical – Critical alignment of the HED Motor to the MRG SID Scope of Work

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Material HED Hardware T400 Cables Remaining HED Cables Foundations Max PreFab Kits

LLTM

Balance of Incidental Material for Installation Supplier

HSC

HSC

HSC and/or BIW PY

BIW PY

BIW PY

BIW PY

Installing Yard Material Responsibility

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

1st Plat Highlight

Motor Drive A Install Path Motor Drive A Location

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

2nd Plat Highlight

Motor Drive B and 2SC Switchboard Install Path HED Motor Location Motor Drive B Location 2SC SWBD Location

Motor Install Path

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

2 Shell Cuts on Starboard Side

1st Plan and 2nd Plat

Between Frame 292 and Frame 300

Motor Drive A through 1st Plat Cut

Motor Drive B and Switchboard through 2nd Plat Cut Starboard Shell Cut

FWD

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Starboard Shell Cut

Structural SID 8670349

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

1 Shell Cut on Port Side into SD Storeroom #1

2nd Plat

Between Frame 234 and Frame 245

Motor and Foundations through Shell Cut Port Shell Cut

FWD

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Port Side Rip Out List HED Motor Installation has the following impacts to existing equipment:

Hydraulic Oil Line

Lubricating Oil Line

Oil Motor Controller

Decking around FWD corner of MRG

Terminal Box

Ltg Distro Box

Flow Meter

FWD Bulkhead boxes

2/1/2018 **List is highlights, not exhaustive list of impacts, which are contained in the SIDs

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Structural SID 8670349

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

FIREMAIN

FWD CL

BULKHEAD CUT LOCATION

ANTICIPATED SHELL CUT LOCATION

VIEW ORIENTATION

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Technical Highlights : MRG Spool Piece One time-saving suggestion Install the MRG adapter spool piece at beginning of Avail

HED Motor connects to the MRG through a spool piece

MRG

Spool Piece

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Lubricating oil is required to install PTO

Work isolated to Inboard Lower Intermediate Shaft Forward MRG End Cover. Akin to protecting the gear for an inspection

Once the spool piece is installed, MRG may be buttoned up, and lube oil system secured

HED Motor connects to MRG through a spool piece 2/1/2018

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Installation Side View of Mechanical Interface Post Installation Cut-Shot of Complete Mechanical Interface

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Piping will go under, through, and around new HED Motor foundation

Work must be phased between laying some LO piping, installing the HED Motor foundation, and finishing the remaining LO lines

After spool piece is installed, HED does not require LO during installation

Recommend securing LO, blanking off and flanging existing piping after spool piece installation

Will ensure both MRG and LO systems are secured for remainder of Avail 2/1/2018

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Technical Highlight : MRG Spool Piece Spool Piece gets installed in MRG, and then the Motor is installed

Once Spool Piece is installed, the MRG can remain sealed

Recommend to install at the start of the Avail

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Motor Foundation

Foundation Prefabricated by BIW Installed on MRG sub-base Machined in place Bolt holes sighted off of MRG reference and drilled Motor installed and aligned Eccentric bushings inserted to allow for tolerance NSWCPD Alignment Procedure by Code 422

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Motor Foundation

Eccentric Bushings – BIW PreFab

Superbolt – HSC Thick washer – BIW PreFab

Foundation – BIW PreFab Surface Machining - MSR Holes Drilled – MSR

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Electrical Portion

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Electrical Cabling Highlight

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Electrical Cabling Highlight Roll back and reuse New T400 8 new T400 4 each Drive 5 new 2kv Cables 5 new 2kv Cables

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Motor Drives have

4 x T400 cable inputs (each drive has 4)

5 x LS2KV cable outputs (each drive has 5)

Motor Drive – Roxtec Interface

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Motor Drive – Roxtec Interface

Roxtec parts are provided by HSC

Each Motor Drive has 4 input and 5 output cables

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Motor Drive – Electrical Connections

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Major Cables

10 x LS2KV power cables

Minor Cables

Aux power

Serial interface

Encoder signal Motor – Electrical Connections

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Motor – Electrical Connections

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Electrical Switchboard Cabling

2SC HED SWBD

Retain existing cables 12 new T400 cables 2/1/2018

Remove and replace short end of existing 2SA-3SA Bus Tie cables from the 2SA SWBD.

NSWCPD Switchboard Installation Procedure by Code 429

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Pre-Availability

Configuration checks

Establish baseline

Dockside

Validate installation

At-Sea

Post Avail performance measures Hybrid Electric Drive – Testing Plan

3 Phases of Testing

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

HED – Availability Dockside Testing

HED Test POC – (Gianfranco) John Buonamici

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Extra Slides - Backup

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

LS2KVTSGSG-400 Cable Spec

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Concern:

Potential damage to MRG isolators due to the preheat mounting surface of the MRG subbase adjacent to existing Inbd/Fwd Isolator to prepare HY-80 plating for rip-out of existing adjacent items & weldment of HED-EPS foundation.

It is not recommended to remove a vertical isolator from the MRG as a welding heat prevention. Removing the isolator will impact MRG, shaft bearing alignment, and MRG snubber installation. Reestablishing isolator compression values, thermal offsets, and snubber clearances, can turn into a long tedious process. It is expected that weld pre-heat and in-process welding temperature can be managed to avoid removing an isolator.

MRG Work Concern

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407

Acronyms

ABLAbove BaselineHEDHybrid Electric Drive
AFEActive Front EndHPHorse Power
CCWCounter ClockwiseiENCONIncentivized Energy Conservation
CNOChief of Naval OperationsIGBTInsulated Gate Bipolar Transistor
DCDirect CurrentMCSMachinery Control System
DONDepartment of NavyMITMassachusetts Institute of Technology
DSRADry-docking Selected Restricted AvailabilityPFPower Factor
EMIElectro Magnetic InterferencePWMPulse Width Modulation
EPSElectric Propulsion SystemRPMRevolutions per Minute
FYFiscal YearSECNAVThe Secretary of the Navy
GTMGas Turbine MainSWBDSwitchboard

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407 image1.png image3.png image4.png image5.jpeg image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.jpeg image20.png image21.png image22.png image23.png image24.png image25.png image26.emf image27.gif image28.png image29.png image30.png image31.png image32.png image33.png image34.png image35.png image36.png image37.png image38.png image39.png image40.png image41.png image42.png image43.png image44.png image45.png

File details come from the government source that posted it.