BQ_028_PPT_HED_Informational_Brief_for_DDG_102.pptx
PPTX presentation 4 MB Posted
- Attached to
- USS SAMPSON 8C1 DSRA Federal contract opportunity
- Solicitation number
- N4523A-18-R-0550
View the file
Other files for this federal contract opportunity
Show all 50
USS SAMPSON 8C1 DSRA has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DDG 51 Hybrid Electric Drive (HED) Backfit Program Informational Brief
DDG 101, 50% IPTD
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
DDG 51 HED Solution
(2) Active Front End Drives HED Switchboard
2550 HP Induction Motor
Reduces fuel consumption in DDG 51 FLT IIA by 4,739 – 5,822 bbls/ship/year
Increases mission effectiveness through longer time on station, fuel efficiency and longer ship range
Improves engineering plant efficiency for DDG 51 class
Significantly reduced GTMs operating hours
Operational Benefits Provides propulsion at 10kts or less without the need for LM2500 main engines
Design is based upon fielded/mature technologies
Technical Details
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Major Components
Motor Motor Drive
| Motor General Characteristics | |
| Motor Type | Squirrel Cage Induction Motor |
| Rated Motor Output Power | 2550 Horsepower |
| Motor Configuration | 6 Pole /2 x 3 Phase/ Star Connected |
| Full Power Motor Efficiency | 96.00% |
| Full Power Motor Power Factor | 0.80 |
| Motor Voltage | 480V |
| Motor Speed | 0-600 RPM |
| Motor Frequency | 0-30.2 Hz (at rated speed) |
| Over Speed | 125% |
| Insulation | Class H with Class F Temperature Rise |
| Direction of Rotation | CCW (Viewing Clutch mounted End) |
| Load Rating | 51-continuous |
| Load Characteristics | Torque = N2 |
| Full Loan Line Current | 3080A |
| Overload | 110% Torque for 60 seconds |
| Stator Coil Configuration | Form Would Coils using Vacuum Impregnation |
| Ingress Protection | IP54 |
| Additional Features | Chilled Water Cooled |
SSS Type 120T automatic operating clutch at motor non-drive-end with servo actuated lock-out feature Kop-Flex drive-end flexible disc pack/ quill shaft/shear pin assembly Output shaft speed sensor assembly Grounding brush assembly at drive end
| Drive General Characteristics | |
| Drive Type | PWM Voltage Source Inverter |
| Rated Converter Output Power | 1.9MW |
| Converter Configuration | AFE+PWM Inverter (2 Cabinet Arrangement) |
| Brake Chopper/Resistor | 81kW average braking power and 10 seconds of deceleration |
| Full Power Converter Efficiency | 96.5% |
| Converter Voltage | 0-480V |
| Input Power Voltage | 1PF |
| Converter Output Frequency | 0-30.1Hz (Nominal Speed Range) up to 120Hz |
| Converter Input Power Interface | MIL-STD-1399B |
| Converter EMI Specification | MIL-STD-461F |
| Full Load Line Current | 3080A |
| Overload | 3390A |
| Ingress Protection | IPS4 (Frame and Terminal Box) |
| Additional Features | A drive configuration utilizing two similar drive suites |
Rugged Enclosure with door mounted HMI Chilled Water Cooled Each of the two (2) frequency converter(s) offered comprises the following assembled modules:
IGBT rectifier (active front end) EMI filter on drive input DC link, pre-charge and braking chopper IGBT inverter Cooling System Control unit(s)
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Drive Cabinet dimensions
6,834 LBS Dry (Each)
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Motor dimensions 28,500 LBS Dry
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Switchboard dimensions
4,000 LBS
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Ship Location
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Structural – 3 Hull & 1 Interior Blkhd Access Cuts, Removes/Modifies 20 existing foundations, Installs 15 each new Foundations Assemblies, 305SqFt of new Steel Plate, 16Ft of new T-Beams, 320Ft of new Angle Bar & Flat Steel, 94Ft of new Wide Flange Steel Beam
Electrical - Installs 6,391 feet of New Cable (130ft of Fiber) with 76 Electrical Connection points on 38 Cable Assemblies
Piping – Installs new and Modifies existing piping system with 650ft of Cres PPG, 1,147ft of Gage Tubing and 38 valve assemblies. Impacts & Modifies the following Piping Systems: FW & CONT AIR, CHW, FDE. MDW, LP AIR, SW & HYD, FWC & MDW, HYD & HWTR, PROP CONT, LUBO, HALON, BLEED AIR & DRAIN, CCS & DCC WASTE DRAIN, SWC, VCHT, FUEL OIL, FIRE MAIN, AFFF & MDS, PDW, GFA & HYD, GFH & CWD, CAL & CAE, VENT & GAGE BOARD.
HVAC – Removes Existing Vent Duct, Manufactures & Installs 23 New Vent Duck Assemblies
Mechanical – Critical alignment of the HED Motor to the MRG SID Scope of Work
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Material HED Hardware T400 Cables Remaining HED Cables Foundations Max PreFab Kits
LLTM
Balance of Incidental Material for Installation Supplier
HSC
HSC
HSC and/or BIW PY
BIW PY
BIW PY
BIW PY
Installing Yard Material Responsibility
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
1st Plat Highlight
Motor Drive A Install Path Motor Drive A Location
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
2nd Plat Highlight
Motor Drive B and 2SC Switchboard Install Path HED Motor Location Motor Drive B Location 2SC SWBD Location
Motor Install Path
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
2 Shell Cuts on Starboard Side
1st Plan and 2nd Plat
Between Frame 292 and Frame 300
Motor Drive A through 1st Plat Cut
Motor Drive B and Switchboard through 2nd Plat Cut Starboard Shell Cut
FWD
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Starboard Shell Cut
Structural SID 8670349
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
1 Shell Cut on Port Side into SD Storeroom #1
2nd Plat
Between Frame 234 and Frame 245
Motor and Foundations through Shell Cut Port Shell Cut
FWD
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Port Side Rip Out List HED Motor Installation has the following impacts to existing equipment:
Hydraulic Oil Line
Lubricating Oil Line
Oil Motor Controller
Decking around FWD corner of MRG
Terminal Box
Ltg Distro Box
Flow Meter
FWD Bulkhead boxes
2/1/2018 **List is highlights, not exhaustive list of impacts, which are contained in the SIDs
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Structural SID 8670349
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
FIREMAIN
FWD CL
BULKHEAD CUT LOCATION
ANTICIPATED SHELL CUT LOCATION
VIEW ORIENTATION
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Technical Highlights : MRG Spool Piece One time-saving suggestion Install the MRG adapter spool piece at beginning of Avail
HED Motor connects to the MRG through a spool piece
MRG
Spool Piece
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Lubricating oil is required to install PTO
Work isolated to Inboard Lower Intermediate Shaft Forward MRG End Cover. Akin to protecting the gear for an inspection
Once the spool piece is installed, MRG may be buttoned up, and lube oil system secured
HED Motor connects to MRG through a spool piece 2/1/2018
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Installation Side View of Mechanical Interface Post Installation Cut-Shot of Complete Mechanical Interface
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Piping will go under, through, and around new HED Motor foundation
Work must be phased between laying some LO piping, installing the HED Motor foundation, and finishing the remaining LO lines
After spool piece is installed, HED does not require LO during installation
Recommend securing LO, blanking off and flanging existing piping after spool piece installation
Will ensure both MRG and LO systems are secured for remainder of Avail 2/1/2018
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Technical Highlight : MRG Spool Piece Spool Piece gets installed in MRG, and then the Motor is installed
Once Spool Piece is installed, the MRG can remain sealed
Recommend to install at the start of the Avail
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Motor Foundation
Foundation Prefabricated by BIW Installed on MRG sub-base Machined in place Bolt holes sighted off of MRG reference and drilled Motor installed and aligned Eccentric bushings inserted to allow for tolerance NSWCPD Alignment Procedure by Code 422
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Motor Foundation
Eccentric Bushings – BIW PreFab
Superbolt – HSC Thick washer – BIW PreFab
Foundation – BIW PreFab Surface Machining - MSR Holes Drilled – MSR
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Electrical Portion
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Electrical Cabling Highlight
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Electrical Cabling Highlight Roll back and reuse New T400 8 new T400 4 each Drive 5 new 2kv Cables 5 new 2kv Cables
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Motor Drives have
4 x T400 cable inputs (each drive has 4)
5 x LS2KV cable outputs (each drive has 5)
Motor Drive – Roxtec Interface
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Motor Drive – Roxtec Interface
Roxtec parts are provided by HSC
Each Motor Drive has 4 input and 5 output cables
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Motor Drive – Electrical Connections
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Major Cables
10 x LS2KV power cables
Minor Cables
Aux power
Serial interface
Encoder signal Motor – Electrical Connections
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Motor – Electrical Connections
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Electrical Switchboard Cabling
2SC HED SWBD
Retain existing cables 12 new T400 cables 2/1/2018
Remove and replace short end of existing 2SA-3SA Bus Tie cables from the 2SA SWBD.
NSWCPD Switchboard Installation Procedure by Code 429
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Pre-Availability
Configuration checks
Establish baseline
Dockside
Validate installation
At-Sea
Post Avail performance measures Hybrid Electric Drive – Testing Plan
3 Phases of Testing
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
HED – Availability Dockside Testing
HED Test POC – (Gianfranco) John Buonamici
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Extra Slides - Backup
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
LS2KVTSGSG-400 Cable Spec
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Concern:
Potential damage to MRG isolators due to the preheat mounting surface of the MRG subbase adjacent to existing Inbd/Fwd Isolator to prepare HY-80 plating for rip-out of existing adjacent items & weldment of HED-EPS foundation.
It is not recommended to remove a vertical isolator from the MRG as a welding heat prevention. Removing the isolator will impact MRG, shaft bearing alignment, and MRG snubber installation. Reestablishing isolator compression values, thermal offsets, and snubber clearances, can turn into a long tedious process. It is expected that weld pre-heat and in-process welding temperature can be managed to avoid removing an isolator.
MRG Work Concern
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407
Acronyms
| ABL | Above Baseline | HED | Hybrid Electric Drive |
| AFE | Active Front End | HP | Horse Power |
| CCW | Counter Clockwise | iENCON | Incentivized Energy Conservation |
| CNO | Chief of Naval Operations | IGBT | Insulated Gate Bipolar Transistor |
| DC | Direct Current | MCS | Machinery Control System |
| DON | Department of Navy | MIT | Massachusetts Institute of Technology |
| DSRA | Dry-docking Selected Restricted Availability | PF | Power Factor |
| EMI | Electro Magnetic Interference | PWM | Pulse Width Modulation |
| EPS | Electric Propulsion System | RPM | Revolutions per Minute |
| FY | Fiscal Year | SECNAV | The Secretary of the Navy |
| GTM | Gas Turbine Main | SWBD | Switchboard |
Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative Use) (01/07/2016). Other requests shall be referred to SEA21 PMS 407 image1.png image3.png image4.png image5.jpeg image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.jpeg image20.png image21.png image22.png image23.png image24.png image25.png image26.emf image27.gif image28.png image29.png image30.png image31.png image32.png image33.png image34.png image35.png image36.png image37.png image38.png image39.png image40.png image41.png image42.png image43.png image44.png image45.png