Attachment J-12
N4523A-18-R-0550 Pre-Proposal Information (PPI) Form
One question per form
DATE OF REQUEST: 12/20/17 QUESTION NO: 007
SHIP/HULL NO: USS Samson DDG 102 WORK ITEM/CSWT NO: 437-21-001
CONTRACTOR: CONTRACTOR POC & PHONE:
PARA. NO: 3.2 PAGE NO: 1 ATTACH. NO:
CONTRACTOR QUESTION:
The Item directs the contractor to accomplish an operational test of disturbed TLI cables using Chapter 4 of 2.4 for guidance (2.4 SN572-AL- MMA-010, Tank Level Indicators). The contractor located Chapter 4 of 2.4 and it states “4-1. INTRODUCTION. Scheduled Maintenance procedures are furnished in the Planned Maintenance System (PMS). For information concerning maintenance procedures refer to those Maintenance Index Pages (MIP) containing Expanded Ship’s Work Breakdown Structure (ESWBS) number 4372.”
The contractor is unable to find the PMS or ESWBS. Please advise how NAVSEA would like the contractor to accomplish an operational test of disturbed TLI cables.
DO NOT WRITE BELOW THIS LINE
(FOR GOVERNMENT USE ONLY)
Reference 2.4 corrected by Errata. SN572-AH-MMA-010, Tank Level Indicators
PLANNER
REVIEW
N/A DATE: N/A SUPERVISOR REVIEW: D Richey DATE: 1/8/18
CODE 230
REVIEW: N/A DATE: N/A ADV PLAN REVIEW: N/A DATE: N/A
SPEC CHG: Y/N N/A DWG/REF CHG. Y/N Yes RQMTS CHG: Y/N N/A MAT'L CHG: Y/N N/A
RESPONSE TO SEA 02: