BQ_018_123-10-001_-_Redacted.pdf

PDF 19 KB Posted

Attached to
USS SAMPSON 8C1 DSRA Federal contract opportunity
Solicitation number
N4523A-18-R-0550
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to USS SAMPSON 8C1 DSRA, newest first.
File Type Posted
N4523A-18-R-0550_Amendment_0019.pdf PDF
N4523A-18-R-0550_Amendment_0015.pdf PDF
N4523A-18-R-0550_Amendment_0013.pdf PDF
USS_Sampson_IMO_IMS_J._Fagnant_2017-12-12.pdf PDF
N4523A-18-R-0550_Amendment_0012.pdf PDF
N4523A-18-R-0550_Amendment_0011.pdf PDF
BQ_028_PPT_HED_Informational_Brief_for_DDG_102.pptx PPTX presentation
N4523A-18-R-0550_Amendment_0010.pdf PDF
182-8749113_Rev_A,_HYBRID_ELEC_DRIVE_HULL_OUTFIT,_STRUCT_&_FDN_MODS_&_ML.pdf PDF
N4523A-18-R-0550_Amendment_0009.pdf PDF
644-8718346-ARR03_REV-A_SANITARY_ARR_MODS.pdf PDF
512-8718344-VENT10_REV-A_BERTHING_VENT_MODS.pdf PDF
331-8718345-ELEC30_REV-A_BERTHING_ELEC_MODS.pdf PDF
BQ_005_437-012-001_Missing_Drawings_-_Redacted.pdf PDF
BQ_016_588-21-001_-_Redacted.pdf PDF
BQ_019_123-10-001_-_Redacted.pdf PDF
BQ_009_Clarification_-_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0006.pdf PDF
N4523A-18-R-0550_Amendment_0005.pdf PDF
BQ_012_123-00-001_-_Answered_1-11-18_Redacted.pdf PDF
BQ_013_462-11-001_Missing_Ref_-_Answered_1-12-18_Redacted.pdf PDF
BQ_002_J-2_Drawings_-_Answered_1-5-18_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0004.pdf PDF
J-18_Access_and_User_Agreement_rev_002_01102018.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_015_Map_2.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_013_Map.pdf PDF
N4523A-18-R-0550_Amendment_0003.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_002_Redacted.pdf PDF
J-16_CDRL_A025_Compt_Closeout_Sched_Rprt.pdf PDF
Resource_Conservation_and_Recovery_Act,_(RCRA).pdf PDF
NFPA_30,_Flammable_and_Combustible_Liquids_Code.pdf PDF
J-15_PPQ.doc DOC document
J-16_CDRL_A007_Quality_System_Plan.pdf PDF
NFPA_701_Rev_15,_Fire_Tests_for_Flame_Propagation_of_Textiles_and_Films.pdf PDF
J-16_CDRL_A002_Condition_Found_Report.pdf PDF
59312-3-010A_VCHT_System_Operational_Test.pdf PDF
J-16_CDRL_A001_Production_or_Delivery_Problem(s).pdf PDF
J-16_CDRL_A017_Accountability_of_Temp_Blanks.pdf PDF
J-16_CDRL_A003_GFM_CFR.pdf PDF
NAVMED_P-5010-1_Manual_of_Naval_Preventive_Medicine,_Chapter_1,_Food_Safety.pdf PDF
UFC-4-152-01,_Unified_Facilities_Criteria_(UFC),_Design_Piers_and_Wharves.pdf PDF
DDG_102_SRA_3-2015_Final.pdf PDF
J-18_Access_and_User_Agreement.docx DOCX document
J-16_CDRL_A033_Logistics_Mgmt_-_Process_Memo.pdf PDF
MIL-STD-419E.pdf PDF
J-16_CDRL_A021_Heavy_Weather_Plan.pdf PDF
MIL-STD-1310.pdf PDF
J-16_CDRL_A004_CFM_Report.pdf PDF
J-13_NSE_Pier_Load_Limit_Summary.pdf PDF
J-1_Work_Package_ERRATA_3.pdf PDF
Show all 50

USS SAMPSON 8C1 DSRA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-12

TPPC-DDG102-NWRMC

Pre-Proposal Information (PPI) Form

One question per form

DATE OF REQUEST: QUESTION NO: 018

SHIP/HULL NO: USS SAMPSON (DDG 102) WORK ITEM/CSWT NO: 123-10-001

CONTRACTOR: CONTRACTOR POC & PHONE:

PARA. NO 3.1.2 PAGE NO: ATTACH. NO:

CONTRACTOR QUESTION: This paragraph directs Contractor to remove compensating water from compensating fuel tanks.

Since these tanks will be emptied down to the dewatering lines under another contract, may contractor assume this will be the only liquids left to remove?

DO NOT WRITE BELOW THIS LINE

(FOR GOVERNMENT USE ONLY)

Fuel service tanks and compensating fuel tanks are expected to be emptied under docking support contract work item 992-31-001. Residual fluid amounts should be minimal and cannot be defined by government.

PLANNER

REVIEW

DATE: SUPERVISOR REVIEW: D Richey DATE: 1/18/19

CODE 230

REVIEW: DATE: ADV PLAN REVIEW: DATE:

SPEC CHG: Y/N No DWG/REF CHG. Y/N No RQMTS CHG: Y/N No MAT'L CHG: Y/N No

RESPONSE TO SEA 02:

File details come from the government source that posted it.