Amendment 0008_FINAL.pdf

PDF 114 KB Posted

Attached to
Amendment 0009
Solicitation number
N44255-20-R-5002
Issued by

About this file

This document provides an amendment to a solicitation for the design-build construction of a military construction project at Naval Base Kitsap in Puget Sound, Washington. The project involves constructing new electrical substations and altering dry dock and pier electrical distribution systems to prevent flooding and improve nuclear ship power. The estimated total contract value is between $25 million and $100 million. The North American Industry Classification Standard code is 237130 and the annual size standard is $39.5 million. The solicitation uses lowest-priced technically acceptable source selection and seeks a firm-fixed-price construction contract with the Navy as the awarding agency. The proposal due date is not extended by this amendment. Revised drawings and as-built documents are provided for reference.

View the file

Other files

File Type Posted
SF 30 Amendment 0009.pdf PDF
Amednemt 0009.pdf PDF
037_Sub3B_AsBuilt.pdf PDF
041_86722_E305.pdf PDF
055_Sub_E_As-Builts.pdf PDF
015 PSNS P447 - S-502.pdf PDF
SF30 Amendment 0008_FINAL.pdf PDF
038_Sub45_104A_As-Builts.pdf PDF
210__ED414_SUBSTA3B.pdf PDF
055_Sub36_SWG_AsBuilt.pdf PDF
107_QuayWall694.JPG JPG image
070_CD105_CS105.pdf PDF
181_PSNSP447DD4_S-504 S-504.pdf PDF
055_Sub36_Cubicle_AsBuilt.pdf PDF
106_Pier3 AsBuilt.pdf PDF
PPIs Attachment_FINAL.pdf PDF
WA12 Mod 03 3-13-20.pdf PDF
142_146_86702_ES101-ELECTRICAL PLAN DD4 - AREA A.pdf PDF
Amendment 0007 Final.pdf PDF
112_166_167_P3_As-Builts.pdf PDF
142_86869_E785-MANHOLE FOLDOUT - MH293.pdf PDF
142_87026_E789-MANHOLE FOLDOUT - MH295.pdf PDF
146_86703_ES102-ELECTRICAL PLAN DD4 - AREA B.pdf PDF
161_164_DD4_Civil PPIs_2.25.20.pdf PDF
144_86705_ES104-ELECTRICAL PLAN DD4 - AREA D.pdf PDF
Amendment 0007.pdf PDF
142_87043_E806-MANHOLE FOLDOUT - MH332.pdf PDF
142_86871_E787-MANHOLE FOLDOUT - MH294.pdf PDF
E303-SECTION DETAILS.pdf PDF
142_87045_E808-MANHOLE FOLDOUT - MH333.pdf PDF
142_86772_E527-ELECTRICAL ONE-LINE DIAGRAM - SUB 3A.pdf PDF
146_86719_E302-SECTION DETAILS.pdf PDF
139_26 11 16.pdf PDF
041_86721_E304-SECTION DETAILS.pdf PDF
179_180_33 11 00.pdf PDF
041_86704_ES103-ELECTRICAL PLAN DD4 - AREA C.pdf PDF
156_M-601.pdf PDF
131_P447_PPI131_CS503.pdf PDF
041_86707_ES106-ELECTRICAL PLAN DD4 - AREA F.pdf PDF
145_01 30 00.pdf PDF
205_26 27 14.00 20.pdf PDF
153_22 00 00.pdf PDF
041_86706_ES105-ELECTRICAL PLAN DD4 - AREA E.pdf PDF
156_179_M-502.pdf PDF
041_86722_E305-SECTION DETAILS.pdf PDF
041_26 27 29.pdf PDF
151_156_179_M-501.pdf PDF
099_PSNS DD4 and Pier 3 EWS.pdf PDF
207_208_26 24 13.pdf PDF
041_86720_E303-SECTION DETAILS.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

a. Section 00100, Instructions to Offerors/Proposers, add the following:

“The capacity of each email cannot exceed nine (9) megabytes. The subject line is the Solicitation

Number “N44255-20-R-5002 and state “Technical Proposal email 1 of X.” Similarly, for the price proposal, the subject line is “Price Proposal email 1 of X.” Submit your Financial Responsibility electronically with the price proposal. Do not include or imbed pictures in the technical or price proposal.

An electronic copy of your firm’s bid bond shall be included with the price proposal. Mailing of the original bid bond shall be dated (postmarked) no later than five (5) days after electronic proposal due date. Ensure that your firm retains proof of mailing in the event original bid bonds are not received.

If a large business, firms have the option to submit their Small Business Subcontracting Plan two (2) days after proposal due date via email at grace.montero@navy.mil. Submission of a hardcopy original is not required.”

b. All available “as-built” drawings were provided via Amendment 0007 and Amendment 0008. If a question is answered in Amendment 0008, the as-built drawing may have been provided in Amendment

0007, review Amendment 0007.

c. Pre-proposal Inquiry Responses are attached.

d. Proposal due date is not extended.

e. The following revised drawings and As-Builts are contained within:

015 PSNS P447 - S-502

037_Sub3B_AsBuilt

038_Sub45_104A_As-Builts

055_Sub_E_As-Builts

055_Sub36_Cubicle_AsBuilt

055_Sub36_SWG_AsBuilt

106_Pier3 AsBuilt

107_QuayWall694

f. The following revised drawing referenced in amendment 0006 are contained within:

041_86722_E305-SECTION DETAILS

181_PSNSP447DD4_S-504 S-504

g. The following revised drawing referenced in amendment 0007 are contained within:

070_CD105_CS105

210_ED414_SUBSTA3B

h. All other terms and conditions remain unchanged. Offerors are reminded to acknowledge receipt of this amendment in Block 19 of the SF 1442 submitted in response to the subject solicitation.

File details come from the government source that posted it. Updated .