This document provides specifications for an electrical metering system project. The project involves installing new electricity meters and associated equipment at Naval Base Kitsap in Bremerton, Washington to upgrade metering capabilities and integrate with the existing advanced metering infrastructure system. Meters must be compatible with the ION 8650C meters currently used and communicate consumption data to the data acquisition system. Specified meter requirements include three-phase four-quadrant metering, power quality monitoring, internal data logging and storage, integrated communications ports utilizing multiple protocols, and web interface capabilities. The contractor must submit equipment cut sheets, test reports, and configuration files per the documentation requirements and integrate the new meters according to the provided schedules and diagrams upon project completion.

The related federal contract opportunity is a solicitation for design and construction services for Military Construction Project P447 to modernize Dry Dock 4, Pier 3, and associated electrical distribution systems at Naval Base Kitsap in Puget Sound, Washington. The project aims to construct new electrical substations and alter existing systems serving nuclear ship shore power and industrial power needs. The low-bid source selection process will award a firm-fixed-price construction contract between $25-100 million to the responsible offeror deemed technically acceptable per the evaluation criteria. The North American Industry Classification code is 237130 and annual size standard is $39.5 million for this design-build contract serving the Department of the Navy.

View the file

Other files

File Type Posted
SF 30 Amendment 0009.pdf PDF
Amednemt 0009.pdf PDF
037_Sub3B_AsBuilt.pdf PDF
Amendment 0008_FINAL.pdf PDF
041_86722_E305.pdf PDF
055_Sub_E_As-Builts.pdf PDF
015 PSNS P447 - S-502.pdf PDF
SF30 Amendment 0008_FINAL.pdf PDF
038_Sub45_104A_As-Builts.pdf PDF
210__ED414_SUBSTA3B.pdf PDF
055_Sub36_SWG_AsBuilt.pdf PDF
107_QuayWall694.JPG JPG image
070_CD105_CS105.pdf PDF
181_PSNSP447DD4_S-504 S-504.pdf PDF
055_Sub36_Cubicle_AsBuilt.pdf PDF
106_Pier3 AsBuilt.pdf PDF
PPIs Attachment_FINAL.pdf PDF
WA12 Mod 03 3-13-20.pdf PDF
142_146_86702_ES101-ELECTRICAL PLAN DD4 - AREA A.pdf PDF
Amendment 0007 Final.pdf PDF
112_166_167_P3_As-Builts.pdf PDF
142_86869_E785-MANHOLE FOLDOUT - MH293.pdf PDF
142_87026_E789-MANHOLE FOLDOUT - MH295.pdf PDF
146_86703_ES102-ELECTRICAL PLAN DD4 - AREA B.pdf PDF
161_164_DD4_Civil PPIs_2.25.20.pdf PDF
144_86705_ES104-ELECTRICAL PLAN DD4 - AREA D.pdf PDF
Amendment 0007.pdf PDF
142_87043_E806-MANHOLE FOLDOUT - MH332.pdf PDF
142_86871_E787-MANHOLE FOLDOUT - MH294.pdf PDF
E303-SECTION DETAILS.pdf PDF
142_87045_E808-MANHOLE FOLDOUT - MH333.pdf PDF
142_86772_E527-ELECTRICAL ONE-LINE DIAGRAM - SUB 3A.pdf PDF
146_86719_E302-SECTION DETAILS.pdf PDF
139_26 11 16.pdf PDF
041_86721_E304-SECTION DETAILS.pdf PDF
179_180_33 11 00.pdf PDF
041_86704_ES103-ELECTRICAL PLAN DD4 - AREA C.pdf PDF
156_M-601.pdf PDF
131_P447_PPI131_CS503.pdf PDF
041_86707_ES106-ELECTRICAL PLAN DD4 - AREA F.pdf PDF
145_01 30 00.pdf PDF
153_22 00 00.pdf PDF
041_86706_ES105-ELECTRICAL PLAN DD4 - AREA E.pdf PDF
156_179_M-502.pdf PDF
041_86722_E305-SECTION DETAILS.pdf PDF
041_26 27 29.pdf PDF
151_156_179_M-501.pdf PDF
099_PSNS DD4 and Pier 3 EWS.pdf PDF
207_208_26 24 13.pdf PDF
041_86720_E303-SECTION DETAILS.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-447 DD4 & Pier 3 Moderinization 204820999

SECTION 26 27 14.00 20

ELECTRICITY METERING

02/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code

IEEE C37.90.1 (2013) Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus

IEEE C57.13 (2016) Requirements for Instrument Transformers

IEEE Stds Dictionary (2009) IEEE Standards Dictionary: Glossary of Terms & Definitions

INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)

NETA ATS (2017; Errata 2017) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14; TIA 17-15; TIA 17-16; TIA 17-17 )

National Electrical Code

1.2 DEFINITIONS

Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, shall be as defined in IEEE Stds Dictionary.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval.

SD-02 Shop Drawings

SECTION 26 27 14.00 20 Page 1

Installation Drawings; G

CIO Asset Registration Form; G

SD-03 Product Data

Electricity meters; G

Current transformer; G

Potential transformer; G

External communications devices; G

Configuration Software; G

The most recent version of the configuration software for each type (manufacturer and model) shall be submitted as a Technical Data Package and shall be licensed to the project site. Software shall be submitted on CD-ROM and 6 hard copies of the software user manual shall be submitted for each piece of software provided.

SD-06 Test Reports

Acceptance checks and tests; G

System functional verification; G

Building meter installation sheet, per building; G

Completed meter installation schedule; G

Completed meter data schedule; G

Meter configuration template; G

Contractor shall fill in the meter configuration template and submit to the Activity for concurrence.

Meter configuration report; G

The meter configuration report shall be submitted as a Technical Data Package.

SD-10 Operation and Maintenance Data

Electricity Meters and Accessories, Data Package 5; G

Submit operation and maintenance data in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA and as specified herein.

SD-11 Closeout Submittals

System functional verification; G

SECTION 26 27 14.00 20 Page 2

1.4 QUALITY ASSURANCE

1.4.1 Installation Drawings

Drawings shall be provided in hard-copy and both PDF and AutoCAD 2010 electronic format, and shall include but not be limited to the following:

a. Wiring diagrams with terminals identified of kilowatt advanced meter, current transformers, potential transformers, protocol modules, communications interfaces, and Ethernet connections. For each typical meter installation, provide a diagram.

b. One-line diagram, including meters, switch(es), current transformers, potential transformers, protocol modules, communications interfaces, Ethernet connections, and fuses. For each typical meter installation, provide a diagram.

c. Coordinate with the Contracting Officer and provide the CIO Asset Registration Form for approval prior to connecting meters to the existing AMI System. Provide form with submittal of the AMI Network Diagram that indicates connections to the existing system.

1.4.2 Standard Products

Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 1 year prior to bid opening. The 1-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product, or an earlier release of the product, shall have been on sale on the commercial market through advertisements, manufacturers catalogs, or brochures during the prior 1-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.

1.4.3 Material and Equipment Manufacturing Data

Products manufactured more than 1 year prior to date of delivery to site shall not be used, unless specified otherwise.

1.5 MAINTENANCE

1.5.1 Additions to Operation and Maintenance Data

In addition to requirements of Data Package 5, include the following on the actual electricity meters and accessories provided:

a. A condensed description of how the system operates

b. Block diagram indicating major assemblies

c. Troubleshooting information

d. Preventive maintenance

e. Prices for spare parts and supply list

SECTION 26 27 14.00 20 Page 3

1.6 WARRANTY

The equipment items and software shall be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment and software on a regular and emergency basis during the warranty period of the contract.

1.7 SYSTEM DESCRIPTION

1.7.1 System Requirements

Electricity metering, consisting of meters and associated equipment, will be used to record the electricity consumption and other values as described in the requirements that follow and as shown on the drawings. Communication system requirements are contained in a separate specification section as identified in paragraph entitled "Communications Interfaces".

1.7.2 Selection Criteria

Metering components and software are part of a system that includes the physical meter, data recorder function and communications method. Every building site identified shall include sufficient metering components to measure the electrical parameters identified and to store and communicate the values as required. Contractor shall program all meters per section "Meter Requirements".

Contractor shall verify that the electricity meter installed on any building site is compatible with the base-wide metering system with respect to the types of meters selected and the method used to program the meters for initial use. Software and meter programming tools are necessary to set up the meters described by this specification. New software tools different from the meter programming methods currently used by base personnel will require separate approval for use.

Contractor shall verify that the metering system installed on any building site is compatible with the facility-wide or base-wide communication and meter reading protocol system.

PART 2 PRODUCTS

2.1 ELECTRICITY METERS AND ACCESSORIES

Provide meter(s) and connect the meter(s) to the existing AMI DAS. The contractor shall use the existing government laptop computers to configure the meter using existing software loaded on the computer. The contractor will not be allowed to modify any software or add any additional software to the computer. Alternatively, the government will configure the meter(s), which must be compatible with the existing system, using existing software. Contract shall insure that the meter(s) will transmit the specified data to the DAS. The current meters being used by Naval Base Kitsap Bremerton are: ION 8650C, versions 9S and 36S meters.

2.1.1 Physical and Common Requirements

a. Provide metering system components in accordance with the Metering System Schedule shown in this specification. Provide Meter configuration template.

b. For socket arrangements, provide meter and base form of 9S unless

SECTION 26 27 14.00 20 Page 4 installation-specific limitations require the use of a different form type. For panelboards, switchboards, and switchgear, match the existing installation with the new meter base.If use of a socket adaptor arrangement has been approved by the activity, contractor shall verify that all clearances are met and doors are able to be properly closed.

c. Meter shall have NEMA 3R stainless steel enclosure for surface mounting with bottom or rear penetrations.

d. Surge withstand capability shall conform to IEEE C37.90.1.

e. Use #12 SIS (XHHW, or equivalent) wiring with ring lugs for all meter connections. Color code and mark the conductors as follows:

(1) Red - Phase A CT - C1

(2) Orange - Phase B CT - C2

(3) Brown - Phase C CT - C3

(4) Gray with white stripe - neutral current return - C0

(5) Black - Phase A voltage - V1

(6) Yellow - Phase B voltage - V2

(7) Blue - Phase C voltage - V3

(8) White - Neutral voltage

2.1.2 Potential Transformer Requirements

a. Meter shall be capable of connection to the service voltage phases and magnitude being monitored. If the meter is not rated for the service voltage, provide suitable potential transformers to send an acceptable voltage to the meter.

b. Voltage input shall be optically isolated to 2500 volts DC from signal and communications outputs. Components shall meet or exceed

IEEE C37.90.1.

c. Provide a pull-out type fuse block containing one fuse per phase, Class RK type, to protect the voltage input to the meter. Size fuses as recommended by the meter manufacturer. Fusing shall either be inside the secondary compartment of the transformer or inside the same enclosure as the CT shorting device.

d. Potential transformers will be used to convert 480 volt inputs to 120 volts for the locations shown on the metering schedule. Potential transformers shall be rated indoor or outdoor, as required for the specific application. Voltage rating shall provide 120 volts, wye-connected, 3 phase, 4 wire, 60 Hz, insulation class, 600 volts.

Potential transformers BIL shall be 10 kV and shall have an accuracy class of 0.3 at burdens w, x, and y. Thermal rating shall be 500 VA.

e. The Contractor shall be responsible for determining the actual voltage ratio of each potential transformer for medium voltage applications.

Transformer shall conform to IEEE C57.13 and the following requirements.

(1) Type: Dry type, of two-winding construction.

(2) Weather: Outdoor or indoor rated for the application.

(3) Frequency: Nominal 60 Hz.

(4) Accuracy: Plus or minus 0.3 percent at 60 Hz.

SECTION 26 27 14.00 20 Page 5

f. Potential transformers installed inside switchgear and panels shall be rated for interior use. Voltage rating shall provide 120 volts, wye-connected, 3 phase, 4 wire, 60 Hz, insulation class, 600 volts.

Potential transformers BIL shall be a minimum of 10 kV, and have an insulation class and BIL rating that equals or exceeds the ratings of the associated switchgear. Potential transformers shall have an accuracy class of 0.3 at burdens w, x, and y. Thermal rating shall be 500 VA. Potential transformers shall be accessed from the front and mounted in a metering section. For shore power metering, isolation Potential transformers shall be 1:1 delta/delta connected for.

2.1.3 Current Transformer Requirements

a. Current transformer shall be installed with a rating as shown in the schedule.

b. Current transformers shall have an Accuracy Class of 0.3 (with a maximum error of plus/minus 0.3 percent at 5.0 amperes) when operating within the specified rating factor.

c. Current transformers shall be solid-core, bracket-mounted for new installations using ring-tongue lugs for electrical connections.

Current transformers shall be accessible and the associated wiring shall be installed in an organized and neat workmanship arrangement.

Current transformers that are retrofitted onto existing switchgear busbar can be a busbar split-core design.

d. Current transformers shall have:

(1) Insulation Class: All 600 volt and below current transformers shall be rated 10 KV BIL. Current transformers for 2400 and 4160 volt service shall be rated 25 KV BIL.

(2) Frequency: Nominal 60 Hz.

(3) Burden: Burden class shall be selected for the load.

(4) Phase Angle Range: 0 to 60 degrees.

e. Meter shall accept current input from current transformers.

f. Current inputs shall have a continuous rating in accordance with

IEEE C57.13.

g. Provide one single-ratio current transformer for each phase per power transformer with characteristics listed in the following table.

Single-Ratio Current Transformer Characteristics kVA Sec. Volt CT Ratio RF Meter Acc. Class

300 240/120 1200/5 1.33 0.3 thru B0.05

1000 480Y/277 1200/5 1.33 0.3 thru B0.05

SECTION 26 27 14.00 20 Page 6

2.1.4 Meter Requirements

Electricity Meters shall be energy and power quality type meters, for utility networks and in general, shall include the following: event and min/max logging, 800-channel historical logging, dip/swell monitoring, harmonics and symmetrical component measurement, set points, digital and analogue input/output, and Internet-enabled multi-port communications.

Provide a switchboard mounted style electronic programmable watthour meter, semi-drawout, semi-flush mounted, with customizable LCD display, as indicated. Meter shall either be programmed at the factory or shall be programmed in the field.

When field programming is performed, provide field programming device to the Contracting Officer at completion of project. Meter shall be coordinated to system requirements. Utility Operations and Maintenance personnel at Naval Base Kitsap Bremerton have existing software with licenses for programming and interface with Square D ION 8650 meters.

Provide copies of licensed software for these purposes if new energy and power quality meters provided under this contract are not compatible with the existing base software.

a. Design: Provide meter designed for use on a 3-phase, 4-wire, 12470/480Y/277V volt system with three current transformers. Include necessary KYZ pulse initiation hardware for Energy Monitoring and Control System (EMCS).

b. Meter Characteristics

1. 3-phase, 4-quadrant metering, class 0.2 accuracy (IEC, ANSI)

2. Voltage, current, power, frequency, power factor, demand, energy, and time-of-use metering

3. Instrument transformer correction and transformer/line loss compensation

4. Power quality compliance monitoring (IEEE 519/1159, EN50160, and

IEC 61000-4-7/4-15)

5. 256 samples/cycle waveform capture, transient capture (78/65 ?s @ 50/60 Hz), dip/swell monitoring, harmonics measurement (up to 127th), symmetrical components, percent uptime ("number of nines")

6. Sequence-of-events, coincident minimum/maximum, historical trends, and high-speed snapshot recording, 1 ms resolution time stamping, GPS time synchronization

7. 4 analog outputs, 11 digital status/counter inputs, 12 digital control/pulse outputs

8. 25 set points for alarms and control, 1/2 cycle response, multi-condition, call out on alarm

9. 5 communication ports which shall include Ethernet, modem, RS-232/485, RS-485, front panel optical. Protocols shall include Modbus RTU slave/master, Modbus TCP slave/master, DNP 3.0, MV-90, Ethernet and modem gateways, a minimum 31 devices on RS-485 port

10. On-board web server data logs

SECTION 26 27 14.00 20 Page 7

PPI#205

kmdavis Rectangle kmdavis Rectangle

11. Metering potential transformers (PTs) shall not be required on installations of 600 volts or less for industrial power substations. Potential transformers are required for shore power substations. Meter potential transformers shall be delta-delta design

12. Current Transformers with short-circuiting terminal block and Test Block switches

2.2 COMMUNICATIONS INTERFACES

Meter shall have two-way communication with the existing data acquisition system (DAS).

Provide interfacing software if a meter is used that is different than the existing meters at the Activity to ensure compatibility within the metering system.

Connect to the AMI network utilizing fiber optic cables.

Provide all fiber optic cables, switches, patch panels and connections required to connect AMI meters to existing AMI system infrastructure.

PART 3 EXECUTION

3.1 INSTALLATION

Electrical installations shall conform to IEEE C2, NFPA 70 (National Electrical Code), and to the requirements specified herein. Provide new equipment and materials unless indicated or specified otherwise.

3.1.1 Existing Condition Survey

The Contractor shall perform a field survey of existing metering devices to be relocated as indicated, including inspection of all existing equipment, resulting clearances, and new equipment locations intended to be incorporated into the system and furnish an existing conditions report to the Government. The report shall identify those items that are non-workable as defined in the contract documents. The Contractor shall be held responsible for repairs and modifications necessary to make the system perform as required.

3.1.1.1 Existing Meter Sockets

In some cases, the existing meter sockets will have to be replaced to accommodate the new electrical meters. An existing socket is considered unacceptable for any of the following conditions:

a. It is a non-ANSI form factor meter socket.

b. It is weathered beyond the point of being safe to reuse.

c. It is installed incorrectly, such as a non-weather resistant enclosure installed outdoors.

d. It is not the correct form factor for the existing electrical service.

SECTION 26 27 14.00 20 Page 8

3.1.1.2 Existing Installations

As part of the existing condition survey, the following applies for installations with existing meters:

a. Replace any meters that do not comply with this section.

b. If CTs are installed, verify that they comply with this section. If they do not comply, replace them with CTs that comply with this section. One CT per phase is required for wye-connected systems.

c. Install disconnect switches as specified in this section.

3.1.2 Scheduling of Work and Outages

The Contract Clauses shall govern regarding permission for power outages, scheduling of work, coordination with Government personnel, and special working conditions.

3.1.3 Configuration Software

The standard meter shall include the latest available version of firmware and software. Meter shall either be programmed at the factory or shall be programmed in the field. Meters shall have a password that shall be provided to the contracting officer upon project completion. When field programming is performed, turn field programming device over to the Contracting Officer at completion of project. When interfacing software is used for a meter that is different than the existing meters in use at the Activity, turn the software over to the Contracting Officer at completion of the project.

3.2 FIELD QUALITY CONTROL

Perform the following acceptance checks and tests on all installed meters.

3.2.1 Performance of Acceptance Checks and Tests

Perform in accordance with the manufacturer's recommendations and include the following visual and mechanical inspections and electrical tests, performed in accordance with NETA ATS.

a. Meter Assembly

(1) Visual and mechanical inspection.

(a) Compare equipment nameplate data with specifications and approved shop drawings.

(b) Inspect physical and mechanical condition. Confirm the meter is firmly seated in the socket, the socket is not abnormally heated, the display is visible, and the ring and seal on the cover are intact.

(c) Inspect all electrical connections to ensure they are tight.

For Class 200 services, verify tightness of the service conductor terminations for high resistance using low-resistance ohmmeter, or by verifying tightness of accessible bolted electrical connections by calibrated torque-wrench method.

SECTION 26 27 14.00 20 Page 9

(d) Record model number, serial number, firmware revision, software revision, and rated control voltage.

(e) Verify operation of display and indicating devices.

(f) Record password and user log-in for each meter.

(g) Verify grounding of metering enclosure.

(h) Set all required parameters including instrument transformer ratios, system type, frequency, power demand methods/intervals, and communications requirements. Verify that the CT ratio and the PT ratio are properly included in the meter multiplier or the programming of the meter. Confirm that the multiplier is provided on the meter face or on the meter.

(i) Provide building meter installation sheet, per building for each facility. See example Graphic E-S1.

(j) Provide the completed meter installation schedule for the installation. See example Graphic E-S2

(k) Provide the completed meter data schedule for the installation. See example Graphic E-S3.

(2) Electrical tests.

(a) Apply voltage or current as appropriate to each analog input and verify correct measurement and indication.

(b) Confirm correct operation and setting of each auxiliary input/output feature including mechanical relay, digital, and analog.

(c) After initial system energization, confirm measurements and indications are consistent with loads present.

(d) Make note of, and report, any "Error-Code" or "Caution-Code" on the meter's display.

(3) Provide meter configuration report.

b. Current Transformers

(1) Visual and mechanical inspection.

(a) Compare equipment nameplate data with specification and approved shop drawings.

(b) Inspect physical and mechanical condition.

(c) Verify correct connection, including polarity.

(d) Inspect all electrical connections to ensure they are tight.

(e) Verify that required grounding and shorting connections provide good contact.

SECTION 26 27 14.00 20 Page 10

(2) Electrical Tests.

Verify proper operation by reviewing the meter configuration report.

c. Potential Transformers

(1) Visual and mechanical inspection.

(a) Verify potential transformers are rigidly mounted.

(b) Verify potential transformers are the correct voltage.

(c) Verify that adequate clearances exist between the primary and secondary circuit.

(2) Electrical Tests.

(a) Verify by the meter configuration report that the polarity and phasing are correct.

3.2.2 System Functional Verification

Verify that the installed meters are working correctly in accordance with the meter configuration report:

a. The correct meter form is installed.

b. All voltage phases are present.

c. Phase rotation is correct.

d. Phase angles are correct.

e. The new meter accurately measures power magnitude and direction, and can communicate as required by paragraph entitled "Communications Interfaces".

-- End of Section --