This document contains an encountered waste summary sheet and federal contract opportunity solicitation for a construction project at Naval Base Kitsap in Bremerton, Washington. The construction project involves modernizing Dry Dock 4 and Pier 3, including building new electrical substations, altering electrical distribution systems, enclosing utility galleries, and repairing piles. The encountered waste summary sheet identifies various types of waste that may be encountered during the project such as contaminated soil, electrical transformers containing PCBs, asbestos debris and components. The federal contract opportunity solicitation provides additional details about the project and procurement. Specifically, the solicitation is for a design-bid-build construction contract with an estimated value between $25-100 million to be awarded using lowest-priced technically acceptable procedures. The North American Industry Classification for this opportunity is 237130.

View the file

Other files

File Type Posted
SF 30 Amendment 0009.pdf PDF
Amednemt 0009.pdf PDF
037_Sub3B_AsBuilt.pdf PDF
Amendment 0008_FINAL.pdf PDF
041_86722_E305.pdf PDF
055_Sub_E_As-Builts.pdf PDF
015 PSNS P447 - S-502.pdf PDF
SF30 Amendment 0008_FINAL.pdf PDF
038_Sub45_104A_As-Builts.pdf PDF
210__ED414_SUBSTA3B.pdf PDF
055_Sub36_SWG_AsBuilt.pdf PDF
107_QuayWall694.JPG JPG image
070_CD105_CS105.pdf PDF
181_PSNSP447DD4_S-504 S-504.pdf PDF
055_Sub36_Cubicle_AsBuilt.pdf PDF
106_Pier3 AsBuilt.pdf PDF
PPIs Attachment_FINAL.pdf PDF
WA12 Mod 03 3-13-20.pdf PDF
142_146_86702_ES101-ELECTRICAL PLAN DD4 - AREA A.pdf PDF
Amendment 0007 Final.pdf PDF
112_166_167_P3_As-Builts.pdf PDF
142_86869_E785-MANHOLE FOLDOUT - MH293.pdf PDF
142_87026_E789-MANHOLE FOLDOUT - MH295.pdf PDF
146_86703_ES102-ELECTRICAL PLAN DD4 - AREA B.pdf PDF
161_164_DD4_Civil PPIs_2.25.20.pdf PDF
144_86705_ES104-ELECTRICAL PLAN DD4 - AREA D.pdf PDF
Amendment 0007.pdf PDF
142_87043_E806-MANHOLE FOLDOUT - MH332.pdf PDF
142_86871_E787-MANHOLE FOLDOUT - MH294.pdf PDF
E303-SECTION DETAILS.pdf PDF
142_87045_E808-MANHOLE FOLDOUT - MH333.pdf PDF
142_86772_E527-ELECTRICAL ONE-LINE DIAGRAM - SUB 3A.pdf PDF
146_86719_E302-SECTION DETAILS.pdf PDF
139_26 11 16.pdf PDF
041_86721_E304-SECTION DETAILS.pdf PDF
179_180_33 11 00.pdf PDF
041_86704_ES103-ELECTRICAL PLAN DD4 - AREA C.pdf PDF
156_M-601.pdf PDF
131_P447_PPI131_CS503.pdf PDF
041_86707_ES106-ELECTRICAL PLAN DD4 - AREA F.pdf PDF
145_01 30 00.pdf PDF
205_26 27 14.00 20.pdf PDF
153_22 00 00.pdf PDF
041_86706_ES105-ELECTRICAL PLAN DD4 - AREA E.pdf PDF
156_179_M-502.pdf PDF
041_86722_E305-SECTION DETAILS.pdf PDF
041_26 27 29.pdf PDF
151_156_179_M-501.pdf PDF
207_208_26 24 13.pdf PDF
041_86720_E303-SECTION DETAILS.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-447 DRY DOCK 4 & PIER 3 MODERNIZATION, NBK PSNS & IMF

ENCOUNTERED WASTE SUMMARY SHEET

100% SUBMITTAL

No. ITEM YES/NO EST. QTY. LOCATION

1 Excess Excavated Soil NO

2 Storm water Discharges NO

3 Industrial Wastewater Discharges NO

4 Painted Debris NO

5 Paint Removal Wastes* NO

6 UST Removal NO

7 CFC's NO

8 PCB Transformers YES 3 EA – Electrical Transformer with assumed - PCB-containing oil

DD4 and Pier 3

9 PCB Capacitors/Ballasts NO

10 PCB Removal Wastes NO

11 Creosote Piles NO

12 Creosote Soaked Cloth NO

13 Contaminated Soil Disposal YES 1,500 CY - DD4 and Surrounding Area DD4 and Surrounding Area

14 Thermostats NO

15 Fluorescent Light Bulbs NO

16 Switches NO

17 Treatment Plant Sledges NO

18 Asbestos Debris NO

Asbestos Removal Waste

YES

15 LF - ACM gray cement pipe (6” OD

FW pipe) East utility tunnels

15 LF - ACM gray cement pipe (8” OD

FW pipe) West utility tunnel

(Cont.)

25 SF - ACM brown and white debris on

(floor of utility tunnel floor) [sample

#11224-26, 11224-29, and 11224-30]

Between SG 5W and 6W, South of

SG 2E and between SG 3E and 4 E

24 EA - Assumed ACM 4” OD gasket on 2

½” fresh water service connection

SG 1W through 6W and 1E through

6E

48 EA - Assumed ACM 6” OD gasket on

4” OD fresh water service connection

SG 1W through 6W and 1E through

6 E

1 EA - 7 ½”x12” Electrical connection box w/ assumed ACM internal components

SG 1E

3 EA - 8”x12” Electrical switch w/ assumed ACM internal components

SG 1E, 3W, 3E

20 EA - 10”x21” Electrical panel w/ assumed ACM internal components

SG 1E, 2W,2 E, 3W, 3E, 4W, 4E,

5W, 5E, 6W, 6E

20 EA - 11”x21” Electrical switch w/ assumed ACM internal components

SG 1E, 2W, 2E, 3W, 3 E, 4W, 4E,

5W, 5E, 6W, 6E

1 EA - 1 ¼’x2 ¼’ Electrical panel w/ assumed ACM internal components 2E

2 EA - 1 ½’x 1 ½’x1 ½’ Electrical connection box w/ assumed ACM internal components

1E, 6E

6 EA - 2’x2½’ Large electrical switch w/ assumed ACM internal components

On platform mounted to side of drydock wall, north of SG 2W and

3W

2 EA - 3’x2½’ 2’ Electrical connection box w/ assumed ACM internal components

Mounted to side of drydock wall, north of SG 1E

1 EA - 4’x5’x3’ Electrical connection box w/ assumed ACM internal components

On platform mounted to side of drydock wall, north of SG 2W

2 EA - 5’x 1 ½’x1 ½ Electrical connection box w/ assumed ACM internal components 2E, 4E

1 EA - 8’x3 ½’ x3’ Electrical connection box w/ assumed ACM internal components 5W

(Cont.)

1 EA - 14’x2 ½’x2 ½’ Electrical connection box w/ assumed ACM internal components

On platform mounted to side of drydock wall, north of SG 2W

745 LF - Assumed ACM black cloth conductor wrap/insulation on 4” OD electrical conductor bundle

EMH 251, 252, 260, 266, 267, 268,

270, 271, 272, 282

1,045 LF - Assumed ACM black cloth conductor wrap/insulation on 2” OD electrical conductor bundle

EMH 251, 252, 260, 266, 267, 268,

270, 271, 272, 282

290 LF - Assumed ACM white/gray lagging on 2 ½” OD electrical conductor

EMH 252, 267, 268, 269, 272

240 LF - Assumed ACM white/gray lagging on 1 ½” OD electrical conductor

EMH 267, 268

375 LF - Assumed ACM white fibrous conductor wrap on 1” OD conductor

EMH 270,271, 336

250 LF - Assumed ACM white fibrous conductor wrap on 2” OD cable

EMH 336

5 LF - Assumed ACM black fibrous conductor wrap on 2” OD cable

EMH 269

19 EA - Assumed ACM black cloth wrap around 2” OD lead splice on conductor

EMH 252

11 EA - Assumed ACM black cloth wrap around 4” OD lead splice on conductor

EMH 252, 260, 336

12 SF - Assumed ACM black asphaltic tar around manhole wall penetration

EMH 252, 268

500 SF - Assumed ACM debris on concrete manhole floor

EMH 252, 267, 268

1 EA – Assumed ACM switchgear internal components associated w/ Substation 45 B431 Roof

20 SF – Assumed ACM roofing material B431 Roof

55 LF - Assumed ACM black cloth cable wrap on 1” OD cable

EMH 350,353, 354, 364, 365, 368

2 EA - Assumed ACM black cloth wrap around 2” OD lead splice on conductor

EMH 366

2 EA – Assumed ACM internal components associated w/ Substation 3A Pier 3, Substation 3A

1 EA – Assumed ACM components associated w/ shore power switchboard Pier 3, Substation 3B

20 Asbestos Other NO

21 Concrete NO

22 Asphalt NO

23 Steel NO

24 Non-Painted Wood NO

25 Creosote Timber NO

26 Lead-acid batteries NO

Lead conductor splice/wrap on conductors

YES

239 EA – 2” OD lead splice EMH 251, EMH 252, EMH 260, EMH 266, EMH 267, EMH 268, EMH 269, EMH 270, EMH 271, EMH 272, EMH 282, EMH 336, EMH 366

136 EA – 4” OD lead splice EMH 251, EMH 252, EMH 260, EMH 266, EMH 267, EMH 268, EMH 269, EMH 270, EMH 271, EMH 272, EMH 282

150 LF - 2” OD lead wrapped conductor EMH 269, EMH 270, EMH 271, EMH 272, EMH 354

28 Other NO

* Quantities of Paint Removal Waste are dependent on what materials the Contractor will disturb for this project and what percentage of total waste is actually hazardous metals-containing paint. This will be determined via TCLP testing. The total waste stream quantity and actual percentages of hazardous metals-containing and non-hazardous metals-containing building materials will be determined by the Contractor.