041_86722_E305.pdf

PDF 251 KB Posted

Attached to
Amendment 0009
Solicitation number
N44255-20-R-5002
Issued by

About this file

This document outlines a federal solicitation for construction services. The Naval Facilities Engineering Command is seeking proposals for the design and construction of Military Construction Project P447 to modernize Dry Dock 4 and Pier 3 at the Puget Sound Naval Shipyard in Bremerton, Washington. The project aims to construct new electrical substations and alter existing electrical distribution systems serving nuclear ships, while enclosing utility galleries and repairing piles to prevent flooding. The contract will be awarded using lowest-priced, technically acceptable procedures. Proposals are due by Amendment 0009 with a project value between $25-100 million. The work involves controlled industrial areas with security protocols and must be completed at the Naval Base Kitsap facility.

View the file

Other files

File Type Posted
SF 30 Amendment 0009.pdf PDF
Amednemt 0009.pdf PDF
037_Sub3B_AsBuilt.pdf PDF
Amendment 0008_FINAL.pdf PDF
055_Sub_E_As-Builts.pdf PDF
015 PSNS P447 - S-502.pdf PDF
SF30 Amendment 0008_FINAL.pdf PDF
038_Sub45_104A_As-Builts.pdf PDF
210__ED414_SUBSTA3B.pdf PDF
055_Sub36_SWG_AsBuilt.pdf PDF
107_QuayWall694.JPG JPG image
070_CD105_CS105.pdf PDF
181_PSNSP447DD4_S-504 S-504.pdf PDF
055_Sub36_Cubicle_AsBuilt.pdf PDF
106_Pier3 AsBuilt.pdf PDF
PPIs Attachment_FINAL.pdf PDF
WA12 Mod 03 3-13-20.pdf PDF
142_146_86702_ES101-ELECTRICAL PLAN DD4 - AREA A.pdf PDF
Amendment 0007 Final.pdf PDF
112_166_167_P3_As-Builts.pdf PDF
142_86869_E785-MANHOLE FOLDOUT - MH293.pdf PDF
142_87026_E789-MANHOLE FOLDOUT - MH295.pdf PDF
146_86703_ES102-ELECTRICAL PLAN DD4 - AREA B.pdf PDF
161_164_DD4_Civil PPIs_2.25.20.pdf PDF
144_86705_ES104-ELECTRICAL PLAN DD4 - AREA D.pdf PDF
Amendment 0007.pdf PDF
142_87043_E806-MANHOLE FOLDOUT - MH332.pdf PDF
142_86871_E787-MANHOLE FOLDOUT - MH294.pdf PDF
E303-SECTION DETAILS.pdf PDF
142_87045_E808-MANHOLE FOLDOUT - MH333.pdf PDF
142_86772_E527-ELECTRICAL ONE-LINE DIAGRAM - SUB 3A.pdf PDF
146_86719_E302-SECTION DETAILS.pdf PDF
139_26 11 16.pdf PDF
041_86721_E304-SECTION DETAILS.pdf PDF
179_180_33 11 00.pdf PDF
041_86704_ES103-ELECTRICAL PLAN DD4 - AREA C.pdf PDF
156_M-601.pdf PDF
131_P447_PPI131_CS503.pdf PDF
041_86707_ES106-ELECTRICAL PLAN DD4 - AREA F.pdf PDF
145_01 30 00.pdf PDF
205_26 27 14.00 20.pdf PDF
153_22 00 00.pdf PDF
041_86706_ES105-ELECTRICAL PLAN DD4 - AREA E.pdf PDF
156_179_M-502.pdf PDF
041_86722_E305-SECTION DETAILS.pdf PDF
041_26 27 29.pdf PDF
151_156_179_M-501.pdf PDF
099_PSNS DD4 and Pier 3 EWS.pdf PDF
207_208_26 24 13.pdf PDF
041_86720_E303-SECTION DETAILS.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES:

CONDUIT SUPPORT SECTION - 6 CONDUITSC1 CONDUIT SUPPORT SECTION - 5 CONDUITSC2 CONDUIT SUPPORT SECTION - 4 CONDUITSC4

E-305

4100 194th Street SW Suite 400 Lynnwood Washington 98036-4613

(206) 667-0555

P -4

D

D

P

IE

R

M

O D

E R

N

IZ

A

TI

O N

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D N

O R

TH

W

E S

T

JO

HN

J. PARRY

File details come from the government source that posted it. Updated .