070_CD105_CS105.pdf
PDF 2 MB Posted
- Attached to
- Amendment 0009
- Solicitation number
- N44255-20-R-5002
About this file
This solicitation document is for the design-bid-build construction of a Military Construction project at Naval Base Kitsap in Bremerton, Washington. The project will construct new electrical substations, alter electrical distribution systems serving dry dock 4 and pier 3, demolish existing substations, and repair existing piles. The estimated total contract price range is between $25 million and $100 million. The North American Industry Classification Standard is 237130 and the annual size standard is $39.5 million. The procurement will use unrestricted full and open competition in accordance with FAR Part 6.1 and source selection procedures in FAR Part 15, with the intent to award a firm-fixed-price construction contract to the responsible offeror with the lowest priced technically acceptable proposal using the Lowest Priced Technically Acceptable source selection process. A subcontracting plan is required prior to award from the Department of the Navy Naval Facilities Engineering Command. The project location has heightened security as it is within a controlled industrial area at Naval Base Kitsap in Bremerton, Washington.
View the file
Other files
Show 40 more
Latest 50 of 90 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D N
O R
TH
W
E S
T
1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com
P -4
D
D
P
IE
R
M
O D
E R
N
IZ
A
TI
O N
N
A1
UTILITY AND PAVEMENT DEMOLITION PLAN PIER 3 - AREA E KEY PLAN
CD105
A
PIER 3
DD4B
C
D
E
F
PIER NO. 3
DR
YD
OC
K
NO
. 5
SUBSTATION 3A
SUBSTATION 3C
GENERAL NOTES:
SHEET LEGEND:
5+00
B980
SHEET KEYNOTES:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D N
O R
TH
W
E S
T
1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com
P -4
D
D
P
IE
R
M
O D
E R
N
IZ
A
TI
O N
N
A1
UTILITY, PAVEMENT AND HORIZONTAL CONTROL PLAN PIER 3 - AREA E KEY PLAN
PIER NO. 3
DR
YD
OC
K
NO
. 5
SUBSTATION 3A
SUBSTATION 3C
CS105
A
PIER 3
DD4B
C
D
E
F
GENERAL NOTES:
SHEET LEGEND:
1+00
SEE PARTIAL
PLAN
SEE PARTIAL
PLAN
B980
SHEET KEYNOTES:
File details come from the government source that posted it. Updated .