PPI_Log_Amd_0003.pdf
PDF 488 KB Posted
- Attached to
- Navy Region Northwest Security Guard Services Federal contract opportunity
- Solicitation number
- N44255-19-R-6007
About this file
This document contains pre-proposal questions and answers regarding solicitation N44255-19-R-6007 for security guard services at Navy installations in the Pacific Northwest. The services required include stationary and mobile security guarding, dispatching, and management and administration across Naval Base Kitsap Bangor, Naval Magazine Indian Island, and the Atlantic Research Detachment facility in Bayview, Idaho. Incumbent guards may need additional training to meet new requirements. The solicitation seeks a single contractor to provide approximately 688,000 hours of guard services annually under fixed-price contract line items by location, with additional non-recurring hours available. Submission of safety data is required for joint ventures and major subcontractors. The closing date is July 15, 2019 and award is anticipated by October 1, 2019.
The document clarifies requirements, locations, and hours of operation for over 20 security guard posts. It also provides maps, standard operating procedures, jurisdiction areas, and lists of government furnished equipment and weapons by location. Questions regarding collective bargaining agreements, insurance, vehicles, and office space are answered. The pre-proposal period resulted in modifications to safety plan due dates, deletion of some furnished equipment, and corrections to post data and hours.
A.1_PPI Log Amendment 0003
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPI No. Page Section Para. QUESTION (Attachment A Pre-Proposal Inquiry Form) GOVERNMENT RESPONSE Amend
No.
1 47 On page 47 of the RFP, it states that the technical approach to safety narrative shall be limited to two single-sided pages. Please clarify whether data for EMR, DART, and TRC is included in the two-page limit.
Submission of EMR, DART, and TRC data is not included in the two page limit.
2 47 On page 47 of the RFP, it states that EMR, DART, and TRC data should be submitted for each offeror who is part of a partnership or joint venture. Please clarify whether data is required for major subcontractors (performing 20% or more of the contract value).
Submission of EMR, DART, and TRC data is required for each offeror who is part of the joint venture or partnership.
3 46 On page 46 of the RFP, it states that the offeror or joint venture/mentor protégé partners should demonstrate experience in
Factor 2. If the offeror’s team includes a major subcontractor performing 20% or more of the contract’s value, can corporate experience information be included for that subcontractor?
No, subcontractor experience will not be excepted. Factor 2 states "The offeror (or joint venture/mentor protégé partners that make up the offeror) shall demonstrate experience as a prime contractor…"
4 0401000 2.2.10 PWS 2.2.10 lists training requirements. Please clarify whether incumbent personnel (guards) meet these standards or should additional training, PQS documentation, oral qualification board be anticipated for transitioning incumbents to the new contract.
Most incumbent guards have equivalent training that fulfills most of the new training courses. Incumbent guards will have 6 months after the start of the contract to be 100% trained on any missed new training per CNICINST 3502.2
NSF TRAMAN.
5 71 Page 71 of the PWS states that a weapons list is available upon request. It also says, “see separate file named J-0200000-5 GFP.xlsx.”
We request the weapons list, as well as the named spreadsheet file if different than the list.
J-0200000-5 GFP.xlsx has been posted to www.fbo.gov with Amendment 0001.
This attachment lists all weapons.
6 81 Page 81 of the PWS states that standard operating procedures are available as a separate file on disc. We request a copy of the disc be sent to the firm, in care of the POC, listed above.
Files will be transferred to Offerors providing a valid email address via
AMRDEC at https://safe.amrdec.army.mil/safe/Welco me.aspx.
7 82 Page 82 of the PWS states that jurisdiction geographic areas are available as a separate file on disc. We request a copy of the disc be sent to the firm, in care of the POC, listed above.
J-0401000-09 has been posted to www.fbo.gov with Amendment 0001.
8 42 Page 42 of the RFP states that font size should be no smaller than 11 points. Would the government allow 10 point font for figures, tables, and graphics?
Font size has been updated to no smaller than 10 Point font.
9 CBA Local 5 between HSSI/SPFPA. The current expiration date of this
CBA is Sept. 30, 2019. Does the government prefer bidders to use current wages as defined in CBA for 2019, or revert to wage determination since the bargaining agreement will be expired at the start of services?
Offerors shall use the current CBA wage rates.
10 69 J-0200000-05 RFP PWS Attachment J-0200000-05, page 69 of 89. Government
Furnished Equipment includes Gate/Sentry Houses in each installation. Do the Government Gate/Sentry Houses have potable water supplies that can be accessed by sentries during their shift? If not, does the Government have information on a suitable water source for security personnel on duty?
Post 1 & 2 - water is available 80 feet away
Post 3 - water is available 800 feet away
Post 4a-b and Post 5 are motorized
Post 6 - same building
Post 7 water is available 80 feet away
Post 8 - located in guard shack
Post 9 - located 400 feet away
Post 10 - none nearby
Post 11 - water is available 80 feet away
Post 12 - located in guard shack
Post 13 - located in various buildings 400 feet away
Post 14 - located in building
Post 15 and 16 - located 1,000 feet away
Post 17 - located in various building while escorting
Post 18 and 19 - motorized patrol
Post 20 - located in adjoining building 80 feet away
*All distances are approximate.
All post must be manned during hours posted and gates cannot be closed or under manned.
11 69 J-0200000-05 RFP PWS Attachment J-0200000-05, page 69 of 89. Government
Furnished Equipment includes NMCI Computers. Will the
Government permit contractor furnished computers to be used for contract support functions such as timekeeping, record keeping, and training? If so, will the Government provide internet access, or is the contractor expected to furnish internet access?
The Government will not permit the contractor to install contractor owned computer software on NMCI computers.
Per Annex 2, Spec Item 2.8.8, Contractor security personnel are required to have access to Government NMCI computers to perform training. Internet access provided by Government is for official use only, not for routine contractor business.
The Contractor may supply Contractor
Furnished Computers for contact support funtions. The contractor is expected to furnish internet access for routine contractor business conducted on
Contractor Furnished Computers.
12 69 J-0200000-05 RFP PWS Attachment J-0200000-05, page 69 of 89. Government
Furnished Equipment includes CISCO IP Phones for Bay View, ID location. Does the customer require additional land line telephones for the Security Office and guard shack communications in Bangor and Indian Island, and are these land line telephones and user accounts expected to be furnished by the contractor?
The Government provides two means of communication from each guard shack post, including radio or telephone. The contractor is required to provide telephone service for security offices at
NBK Bangor (Bldg. 1200) and NAVMAG
Indian Island (Bldg. 848).
13 0401000 2.3.3 RFP PWS Spec Item 2.3.3 describes Contractor provided Security
Vehicles. Can the customer provide information on the number of contractor-furnished vehicles currently used in each location? If not, can the government provide a map of guard mount and post locations to determine how many vehicles are required for to transport personnel from guard mount to post?
The Government cannot provide the number of contractor furnished vehicles.
The Government provided scaled installation maps in Amendment 0001 along with building numbers for all stationary posts on J-0401000-13.
14 J-0401000-05 PWS Attachment J-0401000-05 Post Orders indicates the official Post
Orders can only be available on disc by request. Will the
Government provide access to post orders as part of procurement?
Files will be transferred to Offerors providing a valid email address via
AMRDEC at https://safe.amrdec.army.mil/safe/Welco me.aspx.
15 J-0401000-13 RFP PWS Attachment J-0401000-13 Post Manning Requirements -
Post 1 allocation is 10 hours per day Monday – Friday. Can the
Government define the hours of operation (ex. 0600-1600)?
Post 1 hours are 0600 - 1600 plus guard mount times.
16 J-0401000-13 RFP PWS Attachment J-0401000-13 Post Manning Requirements -
Post 8: 0530-2000. Can the Government clarify calculation of a total of 8,040 hours per year with guard mount? Given a 14.5-hour shift did the Government allocate for two shift guard mount? There is also conflict with minimum staff column (M-F) and days of operation column restating Sat/Sun holiday on page 87 for 12.5 HPD. Is this four (4) personnel working post 8 on weekends for 12.5 hours?
Total hours have been deleted from J-
0401000-13. Conflicting requirements have been corrected.
17 J-0401000-13 RFP PWS Attachment J-0401000-13 Post Manning Requirements -
Post 8 0530-0730 Can the Government clarify conflict between minimum staff column and days of operation column in hours of operation?
Total hours have been deleted from J-
0401000-13. Conflicting requirements have been corrected.
18 J-0401000-13 RFP PWS Attachment J-0401000-13 Post Manning Requirements -
Post 8 0730-2000. There is a conflict between the minimum staff column (Sat- Sun) and the days of operation column Sat, Sun, Hol).
Total calculated hours appear to be without holiday. Can the
Government confirm?
Total hours have been deleted from J-
0401000-13. Conflicting requirements have been corrected.
19 J-0401000-13 RFP PWS Attachment J-0401000-13 Post Manning Requirements -
Post 10 – Can the Government provide hours of operation for this post requirement (ex 0630-0930)?
The hours vary during the school year for early release and after hour programs.
The total time does not exceed hours posted on J-0401000-13.
20 J-0401000-13 RFP PWS Attachment J-0401000-13 Post Manning Requirements -
Post 14 and 17. Do post requirements that state an annual requirement include guard mount?
Post 14 & 17 guard mount time are included in the hours on J-0401000-13.
21 0200000 2.9.1 Spec Item 2.9.1, Accident Prevention Plan (APP) lists the date of submission as: “No later than 30 days prior to contract start and as updated.”
Question: With an anticipated contract start date of 1 October, 2019, is it NAVFAC’s intent to issue the award with sufficient time to allow the awardee to meet this delivery? Or, are bidders to proceed “at risk” to remain compliant with this PWS requirement?
Spec Item 2.9.1 is revised in Amendment
0002 to reflect 15 days instead of 30 days.
22 0200000 2.9.4.2 Spec Item 2.9.4.2, Alcohol and Drug Abuse Prevention Plan, lists the date of submission as: “No later than 30 days prior to contract start and as updated.”
Question: With an anticipated contract start date of 1 October, 2019, is it NAVFAC’s intent to issue the award with sufficient time to allow the awardee to meet this delivery? Or, are bidders to proceed “at risk” to remain compliant with this PWS requirement?
Spec Item 2.9.4.2 is revised in
Amendment 0002 to reflect 15 days instead of 30 days.
23 0200000 2.9.4.3 Spec Item 2.9.4.3, Emergency Response Plan, lists the date of submission as: “No later than 30 days prior to contract start and as updated.”
Question: With an anticipated contract start date of 1 October, 2019, is it NAVFAC’s intent to issue the award with sufficient time to allow the awardee to meet this delivery? Or, are bidders to proceed “at risk” to remain compliant with this PWS requirement?
Spec Item 2.9.4.3 is revised in
Amendment 0002 to reflect 15 days instead of 30 days.
24 0200000 2.10.2 Spec Item 2.10.2 Environmental Protection Plan, lists the date of submission as: “No later than 30 days prior to contract start and as updated.”
Question: With an anticipated contract start date of 1 October, 2019, is it NAVFAC’s intent to issue the award with sufficient time to allow the awardee to meet this delivery? Or, are bidders to proceed “at risk” to remain compliant with this PWS requirement?
Spec Item 2.10.2 is revised in
Amendment 0002 to reflect 15 days instead of 30 days.
25 0200000 2.11 Spec Item 2.11Contingency Plan/Disaster Preparedness, lists the date of submission as: “No later than 30 days prior to contract start and within seven calendar days of changes”
Question: With an anticipated contract start date of 1 October, 2019, is it NAVFAC’s intent to issue the award with sufficient time to allow the awardee to meet this delivery? Or, are bidders to proceed “at risk” to remain compliant with this PWS requirement?
Spec Item 2.11 is revised in Amendment
0002 to reflect 15 days instead of 30 days.
26 L L.6 RFP Section: L.6 EVALUATION FACTORS, page number 44 of 52, paragraph 4 states the following, Note 1: A narrative limited to one double-sided page (or two single-sided pages), shall be submitted under Factor 2, Corporate Experience, as further discussed below:
RFP Section: Factor 2 Corporate Experience, Solicitation Submittal
Requirements: page 46 of 52 states the following, the offeror shall provide at least three (3), and no more than five (5) examples of recent relevant projects that the offer has completed or substantially completed utilizing Attachment C.
Question: Is the one double-sided page (or two single-sided pages) referenced above in addition to the Attachment C required for each
The narrative for Factor 2, Corporate
Experience is limited to one double-sided page, however the requirement for at least 3 and no more than 5 recent relevant projects (to be completed using
Attachment C) is not included in the page limitation for the narrative.
27 86-89 J-0401000-13 Performance Work Statement, Section J-0401000-13 Post Manning
Requirements Summary, Page 86-89
Question: Post 15 has Min Staff of 2 (24 x 7), but the Days of
Operation calls for one armed sentry 24 hrs a day 7 days per/week.
Can the Government please clarify if one or two guards are required for Post 15?
The PWS is revised in Amendment 0003 to state: "Two armed sentry 24 hrs. a day
7 days per/week when a submarine is present. (Gov’t will provide 24 hrs.
advanced notification). 150 days per year."
28 86-89 J-0401000-13 RFP Reference: Performance Work Statement, Section J-0401000-13
Post Manning Requirements Summary, Page 86-89
Question: Can the Government please specify which CBA or Wage
Determination should be utilized for each post?
Wage Determinations for services at NBK
Bangor use Kitsap County, WA. Services at NAVMAG Indian Island use Jefferson
County, WA. Services at ARD Bayview use
Kootenei County, ID. For more information on CBA and Wage
Determinations see the attachment
Section H_Wage Determinations posted with the solicitation on 10 May, 2019.
29 86-89 J-0401000-13 RFP Reference: Performance Work Statement, Section J-0401000-13
Post Manning Requirements Summary, Page 86-89
Question: The total number of hours on page 89 of 89 do not match the total number of hours on pages 86-88. Can the government please clarify the total number of hours required?
Total hours have been deleted from J-
0401000-13. Conflicting requirements have been corrected.
30 0401000 2.2.11 PWS 2.2.11 states, “The Shift Supervisor may be able to assist the motorized patrol guards listed in 0401000.” We are assuming this is limited to motorized patrols defined in J-0401000-13, Post Manning
Requirements Summary. Please clarify whether the Shift Supervisor is allowed to fulfill dual roles of guard on post and supervisor while on duty.
The PWS is revised in Amendment 0002 to state the following: "The Shift
Supervisor may be able to assist the motorized/stationary guards listed in
0401000 J-13 attachment.
31 0401000 3.4 PWS 3.4 states that the contractor will provide dispatching services at NAVMAG and ARD Bayview. Please explain dispatching for posts at
NBK Bangor.
The PWS is revised in Amendment 0002 to state the following: "The Contractor shall provide dispatching service for security operations at ARD Bayview to ensure calls are received, responded to, logged, and notifications completed in a timely manner." NBK Bangor and NMII dispatching services are done by the
Regional Dispatch Center and not the contractor.
32 RFP PWS, General for Insurance: Under current scope of this RFP are any guards required to transit on a marine vessel when performing work duties or transiting between posts?
There is no requirement for contractor personnel to transit on marine vessels under recurring work.
The contractor may have to transit via waterborne craft at ARD Bayview, if
Nonrecurring Work hours are purchased for an outlying post.
33 RFP PWS, J-0401000-11, Safety Requirements, page 84. The section mandates guards at Bayview wear anti-exposure suits in certain weather conditions. Are these government provided, or contractor provided?
In accordance with Annex 2, Spec Item
2.5, "Except for items identified as
Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract." Anti-exposure suits are not listed as Government furnished.
34 J-1 – Wage Determinations and CBAs – Does the Government have seniority lists for each base location to accurately calculate CBA or
WD benefits?
The Government does not maintain a list of contractor personnel seniority.
35 RFP PWS, J-0401000-13, Post Manning Requirements – Are the post types “Motorized Patrol” utilizing Government Furnished or
Contractor Furnished Vehicles?
The Government does not provide vehicles for use on this contract.
36 J-0200000-05 – Government Furnished Property…, P. 69-70 – PWS, Amendment 001 deleted a significant portion of the GFE, to include office equipment and supplies. Is the contractor expected to supply this equipment?
In accordance with Annex 2, Spec Item
2.5, "Except for items identified as
Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract." Office equipment and supplies are not listed as Government furnished, and shall be provided by the contractor.
37 Performance Work Statement Page 14 – J.C-1 – 0200000 –
Management and Administration - Does the client require a roll call, and if so, how long is it?
Roll call is not a requirement of this PWS.
Contractor personnel are require to conduct guard mount as specified in
0401000.
38 Performance Work Statement Page 32 – J.C-1 0200000 –
Management and Administration - Can the Government please provide the number of Non-Recurring work hours performed in each of the last three years?
39 Q&A # 34 - Since the Government does not have Seniority Lists, please confirm that the Contractor will be entitled to submit an
Equitable Adjustment due to CBA Benefits variances such as vacation, sick leave, pension, etc.
The Contractor is entitled to submit a
Request for Equitable Adjustment for variances in annual wage and fringe increases. The contractor is not entitled to submit a Request for Equitable
Adjustment for changes in seniority.
40 Noticed in the collective bargaining agreement there is constant reference to pairing with the union. Is it a requirement if awarded this contract is it required to work with the union?
Do we turn in All documentation for contract upon award or with bid?
Yes, the successful contractor must coordinate with the union.
Any documentation regarding the CBAs shall be turned in after award of the contract, see J.F-1 Deliverables. Refer to
Section L for instructions regarding documentation to be turned in with the proposal.
41 RFP J.C-1 (PWS) Page 19, Section 2.7.1.1 indicates CSM is located at
Bangor Building 1200. Does that indicate the Government provides office space for the CSM at this location? Does the Government provide office space for other administrative personnel at Bangor or at Indian Island or ARD Bayview, Idaho locations?
Yes. J-0200000-05 GFP indicates all government furnished facilities and spaces. Administrative spaces are indicated at NBK Bangor and NAVMAG
Indian Island, not at ARD Bayview.
42 RFP J.B-1 and J-0401000-13 POST MANNING REQUIREMENTS
SUMMARY
Can the Government identify the post locations with the applicable
CLIN and SUB CLIN numbers?
Yes, J-0401000-13 has been updated with
Sub-ELINs in Amendment 0003.
43 PWS Section J- 0200000-05 GOVERNMENT FURNISHED PROPERTY, MATERIALS, AND SERVICES says…”WEAPONS AND AMMO WILL BE
PROVIDED BY THE GOVERNMENT EXCEPT FOR ARD BAYVIEW.”
PWS Section J-0401000-12 WEAPONS indicates Sidearms and
Shotguns are Contractor owned.
Please clarify which weapons are Government provided and which are Contractor provided?
Anned 0401000, Spec Item 2.3.13, specifies weapons requirements. The
Government furnishes weapons at NBK and NAVMAG Indian Island. The contractor is required to furnish weapons at ARD Bayview. J- 0200000-05 indicates the type and number of weapons provided by location. J-0401000-12
WEAPONS specifies the requirement for the sidearms and shotguns that are contractor provided.
"Additional weapons and ammunition needed by the Contractor to support weapons training and surge requirements shall be provided by the Contractor."
File details come from the government source that posted it. Updated .