N4425519R0002_Amendment_0002.pdf

PDF 833 KB Posted

Attached to
P-834: SEAWOLF CLASS SERVICE PIER EXTENSION, NAVAL BASE KITSAP BANGOR
Solicitation number
N4425519R0002
Issued by

About this file

This document is an amendment to a solicitation for the P-834: SEAWOLF CLASS SERVICE PIER EXTENSION project at Naval Base Kitsap Bangor. The amendment provides responses to pre-proposal inquiries, updates specifications and attachments, and includes project photographs. Technical proposals are due by June 18, 2019 and price proposals by August 19, 2019. The work includes site work, pier construction, building modifications, relocating compressors and generators. Wage determinations for heavy construction and building construction in Kitsap County, Washington apply. The contractor must use an electronic payroll system compliant with Department of Labor requirements to process certified payrolls for the duration of the contract.

N4425519R0002_Amendment_0002.pdf

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 02 provides Government response to pre-proposal inquiries.

Description continues on the Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-May-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4425519R0002

X 9B. DATED (SEE ITEM 11)

18-Mar-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-May-2019

CODE

NAVFAC NORTHWEST

1101 TAUTOG CIRCLE

SILVERDALE WA 98315-1101

N44255 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4425519R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES (REV.)

The following have been added by full text:

SUMMARY OF CHANGES AMENDMENT 0002

1. This amendment provides updates to Section 00805, Section 00806, and Attachment J. This amendment also provides Attachment K – Project Photographs in response to PPI 012.

2. The technical proposal due date and the price proposal due date are not changed with this amendment.

3. This amendment answers the following Pre-Proposal Inquiries (PPIs):

PPI 009: The re-issued SF 1442 included with Amendment 01 dated 4/14/19 indicates a page count change after block 3 from 1 of 69 to 1 of 71. Were two additional pages added to the RFP documents, and if so, please provide them.

Govt Response: The SF1442 included with Amendment 0001 indicates a page count of 71 pages because it is conformed through/includes Amendment 0001. The extra pages account for Amendment 0001 PPI responses and any changes associated with Amendment 0001. The entire SF1442 (conformed through Amendment 0001) is provided with this Amendment; see Enclosure #01- SF1442 conformed to Amendment 0001.

PPI 010: The single-line diagram (drawing #E-601) indicates that the rating for the generators is 2.25MW; however, specification section 263212.0020, paragraph 2.1.1.4 “Load profile” indicates that the generator load is 1800KW + 2 each 400HP motors which is equal to 597KW, i.e. a total load of almost 2.40MW. Please advise which rating should be quoted for the project

Govt Response: The single-line diagram on Sheet E-601 shows the correct size of the generator. The load profile under 263213.00 20 2.1.1.4 is the anticipated load seen by both the new generator and the existing generator. The existing generator is a 2.25 mW Cummins.

PPI 011: Under specifications 01 14 00 1.2 – e (page 33 of 1879) Pile driving shall only occur between 16 July 2019 and 15 January 2020.See section 01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS for further restrictions. We believe this part has been left from the previous projects since the new project Award date will be end of 2019.

Govt Response: See Amendment 0001. Years have been removed only the 16 July and 15 January restriction remains.

PPI 012: Per the discussion at the Site Visit, here is our list for the request of Photographs: Multiple shots of the existing piles; The existing wave attenuation barrier; The top and bottom of the connection to the existing pier; The Utilidor lids, esp. at the trestle angle point where the lid appears to have failed and “sunken in”; Inside and outside of the existing building(s) to be modified; The existing compressors to be relocated; The existing generator.

Govt Response: Photos provided with this amendment, see Attachment K – Project Photographs 001-041.

PPI 013: Referencing Amendment 001, revised SF1442: a. The revised SF1442 indicates 1 of 71 Pages of Pages in the upper right corner of the form. The original SF1442 of the Solicitation, Offer and Award documents indicates 1 of 69 Pages of Pages in the upper right corner. Is the revised SF1442 issued with Amendment 001 correct? If yes, please provide the entire revised RFP document with the two additional pages and correct page numbers on each page.

Govt Response: See response to PPI 009.

PPI 014: Referencing Amendment 001, revised SF1442: b. Line A of Box 13 of the revised SF1442 states that sealed offers are due 18Jun 2019 while section 4.1 of the Solicitation, Offer and Award documents state that Price Proposals are due August 19, 2019. Please clarify.

Govt Response: The technical and proposal due dates are staggered. Technical proposals are due no later than 2 P.M. on 18 June 2019; Price proposals are due no later than 2 P.M. on 19 August 2019.

PPI 015: Section 00100, Par 5.3 Factor 1 – Experience Requirements Scope and Complexity requires: “(3) Fabrication and installation of portal style cranes, with a minimum 25-ton capacity. Project description(s) shall demonstrate the crane supplier’s ability to perform all of the following: design, fabrication, equipment electrification, assembly, crane installation, crane testing, and operational testing.” Please confirm that NO exceptions will be made for the portal crane supplier experience requirements. On the previous solicitation for this project in 2018, Ace World Crane provided unrealistically low bid pricing relative to qualified crane suppliers but had no experience in portal crane supply and therefore did not meet the proposal experience requirements.

Govt Response: Confirmed, no exceptions will be made for any requirement under Section 00100, Par. 5.3 Factor 1 – Experience Requirements.

PPI 016: Section 00100, Par 5.3 Factor 1 – Experience Requirements Scope and Complexity requires: “(3) Fabrication and installation of portal style cranes, with a minimum 25-ton capacity. Project description(s) shall demonstrate the crane supplier’s ability to perform all of the following: design, fabrication, equipment electrification, assembly, crane installation, crane testing, and operational testing.” Does the crane supplier have to self-perform the design to meet the experience requirement?

Govt Response: Section 00100, Par. 5.3 Factor 1 – Experience requires the crane supplier demonstrate the ability to perform the design, fabrication, equipment electrification, assembly, crane installation, crane testing, and operational testing.

PPI 017: Section 00100, Par 5.3 Factor 1 – Experience Requirements Factor 1-Experience requires a minimum of two and a maximum of five construction projects that best demonstrate experience on relevant projects that are similar in size, scope, and complexity to the RFP.(b) Additional Construction Experience Submittal Requirements also states “A minimum of one project must be submitted by the Offeror (matching the company name, address, and/or DUNS number on the SF1442 and/or Cover Letter, or otherwise demonstrating how the experience is attributable to the Offeror itself).” With the requirement for a minimum of one project by the Offeror, we interpret this statement to allow the use of subcontractor experience along with the Offeror’s experience to meet the specialized size, scope and complexity requirements. Please confirm that subcontractor experience is allowed to be used, along with the Offeror (Prime) Experience to collectively meet all RFP experience requirements.

Govt Response: Refer to Section 00100, Par. 5.3 (a) (1) Factor 1 -Experience (i) Solicitation Submittal Requirements, (b) Additional Construction Experience Submittal Requirements, Bullet point #7: “If the Offeror is utilizing experience information of any other entity (name/address/DUNS is not exactly as stated on the SF1442 and/or cover letter), the proposal shall clearly demonstrate that the other entity will have meaningful involvement in the performance of the contract. The proposal shall establish a nexus or connection between itself and the entity and state specific commitments of technical resources (personnel or equipment) from the entity that will be utilized in performance of this contract. This information shall be included in box 10 of Attachment C.”

PPI 018: Referencing Section 5.3.a.(1).(i).(a) – Construction Experience on page 11 of 69 of the RFP.

Part 3 of the above referenced section requires that the Offeror demonstrate the crane supplier’s ability to perform the following: design, fabrication, equipment electrification, assembly, crane installation, crane testing and operational testing. This requirement causes the Offeror to select the crane manufacturer at the time of submitting the Technical Proposal, due June 18, 2019, for use in its Price Proposal, due August 19, 2019. The effect of this requirement is the potential of precluding other qualified crane manufacturers from being considered at time of the Price Proposal due date because they were not submitted in the Technical Proposal. This would prevent the Government from receiving the best value available in the market. Some potential solutions to this issue are:

A. Extend the due date for the Technical Proposal to the same date as the Price Proposal.

B. Allow the Offeror to submit Construction Experience sheets for multiple crane manufactures with the Technical Proposal. This would result in the Offeror submitting more than the five (5) construction projects data sheets but not more than ten (10) along with the required Factor 2 - Past Performance documentation. The Offeror will then determine the crane manufacturer to be used during the pricing period and submit its project page (previously submitted with the Technical Proposal) as an appendix to the Price Proposal.

Govt Response: The Government recognizes limitations associated with staggered technical and price proposal due dates; however, the staggered due dates are necessary due to requirements related to project value. The Price Proposal due date is determined by the previously approved price proposal validity time-frame of 120 days. The Technical Proposal due date accounts for the additional time needed to meet requirements for higher level reviews and multiple review boards.

The current Solicitation requirements remain unchanged.

PPI 019: Section 00100 – Bidding Schedule/Instructions to Bidders. In paragraph 3 of Item 10 – Federal Contract Program of the Instructions to Bidders on page 20 of 69 the bidder is instructed to submit with the Proposal a confirmation of the VETS-4212 Report. Is this document to be submitted with the Technical Proposal or the Price Proposal?

Govt Response: You may submit the confirmation of the VETS-4212 Report with either the Price Proposal or the Technical Proposal.

4. All other terms and conditions remain unchanged. Offerors are reminded to acknowledge receipt of this amendment when submitting proposals in accordance with the RFP instructions.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

CONTRACT ADMINISTRATION

SECTION 00805

CONSTRUCTION WAGE REQUIREMENT AND EPAYROLL

1. Wage Rate Requirements (Construction) Wage Determinations

The following Department of Labor, Wage Rate Requirements (Construction) are applicable to this solicitation. This list of wage determinations is based on the primary locations of work anticipated under this contract. Updated Wage Determinations during the solicitation process shall be incorporated by amendment to the solicitation.

Wage Rate Requirements (Construction) Wage Determinations:

State County Construction

Type WD # Mod # Publication

Date

Washington Kitsap Heavy WA190071 1 05/03/2019

Washington Kitsap Building WA190012 5 05/03/2019

Wage Determination WA190071, Mod 1, 05/03/2019, Heavy Construction, Kitsap County shall be used for the construction involving site work and pier work. *

Wage Determination WA190012, Mod 5, 05/03/2019, Building Construction, Kitsap County shall be used for the building construction work. *

* Note: The full-text of each Wage Determination is provided as Attachment J and also may be found at the following website: https://wwwdol.gov/ .

SPECIAL CONTRACT REQUIREMENT FOR CONTRACTOR TO SUPPLY AND USE AN ELECTRONIC

SOFTWARE FOR PROCESSING WAGE RATE REQUIREMENTS (CONSTRUCTION) ACT CERTIFIED PAYROLLS

INCOMPLIANCE WITH FAR 52.222-8, PAYROLLS AND BASIC RECORDS AND FAR 52.222-13,

COMPLIANCE WITH WAGE RATE REQUIREMENTS (CONSTRUCTION) AND RELATED ACT REGULATIONS.

The US Department of Labor accepts the electronic submission of certified payrolls and the “electronic signature” is accepted for the purposes of “certifying the payroll”. There are several electronic systems currently commercially available to contractors for payroll processing in compliance with the Wage Rate Requirements (Construction) and Related Acts.

The contractor shall use a supplemental electronic Wage Rate Requirements (Construction) Act payroll processing system to process and submit certified payrolls electronically to the Government that are compliant with appropriate Wage Rate Requirements (Construction) Act payroll provisions in the FAR.

The contractor shall be responsible for obtaining and providing all access, licenses, and other services required for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Wage Rate Requirements (Construction) and Related Act Regulations. The electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion, and providing a durable record copy of all payrolls and other documentation to the government at contract closeout.

The contractor shall obtain and provide access to the Government via the internet with login authorization, as required to comply with the Wage Rate Requirements (Construction) and Related Act Regulations over the duration of this construction contract. The access shall include electronic review access via the internet by the Government contract administrative office to the electronic payroll processing system used by the contractor.

The supplemental electronic payroll processing service shall meet the following basic functional criteria:

commercially available; compliant with appropriate Wage Rate Requirements (Construction) Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data; ability to identify erroneous entries and track the data/time of all versions of the certified Wage Rate Requirements (Construction) payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Wage Rate Requirements (Construction) payroll processing system shall be provided to the Government during contract closeout.

All contractor-incurred costs related to the contractor’s provision and use of an electronic payroll processing service shall be included in the contractor’s price for the overall work under the contract. The costs for Wage Rate Requirements (Construction) Act compliance using electronic payroll processing services shall not be a separately bid or reimbursed item under this contract.

SECTION 00806 -- SOLICITATION ATTACHMENTS

ATTACHMENTS FOR SUBMISSION ARE PROVIDED IN SEPARATE DOCUMENTS LOCATED ON THE

ELECTRONIC SOLICITATION WEBSITE

List of Attachments:

Attachment A – Pre-Proposal Inquiry Form Attachment B – Individual Subcontracting Plan Attachment C – Experience Project Data Sheet Attachment D – Past Performance Questionnaire Attachment E – Past Performance Worksheet for Safety Attachment F – Small Business Subcontracting Record Attachment G – Small Business Participation and Commitment Strategy Attachment H – Schedule of Prices Attachment I – Change Order Markup Rates Attachment J – Wage Determinations (full-text) (updated) Attachment K – Project Photographs 001-041

(End of Summary of Changes)