This document is an amendment to a solicitation for the P-834: SEAWOLF Class Service Pier Extension project at Naval Base Kitsap Bangor. The amendment provides responses to contractor questions, revises specifications and drawings, and updates wage determinations. Key changes include clarifying abbreviations on plumbing drawings, correcting references on fire protection drawings, and revising piping material transitions. The generator specification is updated to specify a Seismic Zone D classification with an importance factor of 1.5. Manufacturers and contact information are provided for existing switchgear and generator components. Wage determinations for heavy and building construction in Kitsap County, Washington are replaced with updated rates.
N4425519R0002_Amend_0004.pdf
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
P-834 SEAWOLF CLASS SERVICE PIER EXTENSION, NAVAL BASE KITSAP - BANGOR, SILVERDALE, WASHINGTON.
SEE THE CONTINUATION PAFE FOR MORE INFORMATION.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4425519R0002
X 9B. DATED (SEE ITEM 11)
18-Mar-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jul-2019
CODE
NAVFAC NORTHWEST
1101 TAUTOG CIRCLE
SILVERDALE WA 98315-1101
N44255 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4425519R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES (REV)
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES AMEND 004
a. Section 00700, Contract Clauses, remove 5252.209- 9300, ORGANIZATIONAL CONFLICTS OF INTEREST, in its entirety.
b. Section 00804, NAVFAC REQUIREMENTS, make the following changes:
1) Add “ORGANIZATIONAL CONFLICTS OF INTEREST”
“ The restrictions described herein shall apply to the Contractor and its affiliates, consultants and subcontracts under this contract. If the Contractor under this contract prepares or assists in preparing a statement of work, specifications and plans, the Contractor and its affiliates shall be ineligible to bid or participate, in any capacity, in any contractual effort which is based on such statement of work or specifications and plans as a prime contractor, subcontractor, consultant or in any similar capacity. The Contractor shall not incorporate its products or services in such statement of work or specification unless so directed in writing by the Contracting Officer, in which case the restriction shall not apply. This contract shall include this clause in its subcontractor's or consultants' agreements concerning the performance of this contract.”
2) Construction Wages are updated, remove wage table and replace with revised wage table below:
State County Construction Type WD # Mod # Publication Date
Washington Kitsap Heavy WA190071 3 06/27/2019
Washington Kitsap Building WA190012 6 06/27/2019
c. Specification Section 00 01 15, List of Drawings, the following drawings are revised:
1) F-102, PIER FIRE PROTECTION PLAN, changes are indicated in bubbled note.
2) P-002, PLUMBING & PIPING ABBREVIATIONS AND & GENERAL NOTES – 1, changes are indicated in bubbled note.
3) P-407, ENLARGED PLAN – PIER PLUMBING & PIPING PLAN, changes are indicated in bubbled note.
4) P-409, B7042 UNDERSLAB PLUMBING, changes are indicated in bubbled note.
5) P-501, PLUMBING/PIPING DETAILS AND SECTIONS, changes are indicated in bubbled note.
d. Specification Section 26 32 13.00 20, SINGLE OPERATION GENERATOR SETS, remove pages 1, 2, 8 and 9 and replace with revised pages 1, 2, 8 and 9 contained herein.
e. This amendment provides Government response and applicable attachments to the following Pre-Proposal Inquiries (PPIs):
PPI 040: See Detail B2 – “B7042 Underslab Plumbing – Plan” on Drawing P-409. In the upper right corner of the detail there is a 1 ¼” water line shown with the callout “1 ¼”W UP TO RPBP”. The initials “RPBP” are not listed on the list of abbreviations shown on drawing P-002. Please clarify what the abbreviation “RPBP” stands for.
Govt Response: RPBP stands for Reduced Pressure Backflow Preventer; however, it should have read RPBA, which stands for Reduced Pressure Backflow Assembly. Follow continuation of piping on sheet P-
403. See revised sheets P-002 and P-409 provided with this Amendment; changes are indicated in bubbled note.
PPI 041: See Detail C1 – Fire Protection Plan - B7112 – on Drawing F-103. This detail is referenced twice on drawing F-102 – Pier Fire Protection Plan. One of the references on F-102 is used in relation to B7042 and the other is used in relation to the B7111. Detail A3 – Below Deck Fire Protection Plan - B7042 – on drawing F-103, however, is not called out on drawing F-102. Please clarify the callouts on F-102 for building B7042.
Govt Response: Confirmed. References to Bldg 7042 should be A1 and A3 on drawing F-103. For B7042, change C1 to A3. See revised drawing F-102 provided with this Amendment; changes are indicated in bubbled note.
PPI 042: See Detail C3 – Pier Utility Station - West End Grid 53 – on Drawing P-407. In the center of the detail at Grid Line 53, there is a material callout for the 6”W. When you follow this line to the right of the detail, there is a callout to transition from SS to DI and then as you continue to follow the pipe and after the elbow there is another transition called out from SS to DI One transition callout says the elbow pipe is stainless steel and the other says the elbow pipe is ductile iron. Please clarify the material callouts on Detail C3 on P-407.
Govt Response: 6"W pipe transitions from Ductile Iron (DI) to stainless steel (SS) for the branch connections to the pier utility station (and then back to DI). The callout in the project north-south run should be reversed. See revised sheet P-407 provided with this Amendment; changes are indicated in bubbled note.
PPI 043: See Detail A1 – Thermal Expansion Loops - BA, CA, PW – on Drawing P-501. The Pure Water (PW) called out on this detail is shown as 3”. On P-103, the PW pipe leading up to the thermal expansion loop is called out as 2”PW. Please clarify on the diameter of the PW pipe in the thermal expansion loop.
Govt Response: 2" PW piping. See revised sheet P-501 provided with this Amendment; changes are indicated in bubbled note.
PPI 044: There are areas in and around Seattle that require reduced engine emissions and call for Tier 4 (or equal) engine exhaust controls. Is this project within a containment zone that requires decreased emissions?
Govt Response: No, project is not within a containment zone that requires decreased emissions. The generator needs to meet the emissions rating specified in 26 32 13.00 20 paragraph 2.1.1.2. See addition to this paragraph describing the generator usage: revised Spec section 26 32 13.00 20 (Amendment 0004) provided with this Amendment.
PPI 045: Specification Section 26 32 13.00 20 “Single Operation Generator Sets”, Paragraph 1.7, Section “e” designates a seismic zone of “Zone 4 as defined by ICC UBC”. This is an obsolete seismic rating. The new ratings go by importance factors. Please provide the importance factor for this site. {Referring to: 1.7 Site Conditions, e.
Seismic Zone: Zone 4 as defined by ICC UBC}
Govt Response: Generator should be Seismic Zone D with an importance factor of 1.5. See revised Spec section 26 32 13.00 20 (Amendment 0004) provided with this Amendment.
PPI 046: It appears this generator (No. 2) is the alternate called out on G104 and we will not need to supply any switchgear, Generator 1, or the master controls. Please confirm, and if this is the case, can the Government please provide the manufacturer information (name, model, etc.) for the original equipment?
Govt Response: The switchgear, Generator 1 and the master controls are existing. Below is the contact information for the electrician and manufacturers of the different components of the P-876 gear.
Electrical Contractor EC Company Neil Stadeli 206-356-0762
Generator Size, manufacture, options etc. for the generator installed or a contact information from vendor.
Cummins, 2.25k, 12.47kV 1030 SW 34th St. Suite A Renton WA 98057-2944 United States Dan Lanske, Cummins Sales and Service (PowerGen) 206-450-2383 Project Name: P-876
Generator Enclosure AlumTek Industries, Aldergrove, British Columbia Project number 3791
Switchgear manufacturer contact
Stoneway Electric Supply
PO# S102278566
Square D Switchgear Factory Order Number: 40350011-003 Nolan Day, Key Account Sales Manager North American Operations
(206) 295-6973
Walk-in Enclosure Myers Power Products, Inc Job No: SW73012
Switchgear controls contact Power Con Engineering Eric Kilates, Project Engineer
(909) 215-0087
PPI 047: Regarding solicitation N4425519R0002 - Amendment 003, Summary of Changes Item 4, the section 01 57 19.01 20 - Supplemental Temporary Environmental Controls is replaced with a revised section located in “P834ESA”. We currently have the document “Attachments_E704_E711_S560_P834ESA” and when going through this document, I have been unable to find revised section 01 57 19.01 20 in the “P834ESA” portion of the 244 page document. Can you assist with locating the revised section 01 57 19.01 20? I apologize in advance if I am mistaken.
Govt Response: Section 01 57 19.01 20 was not replaced by Amendment 003, only the Attachment to that specification section was replaced. Replaced was Attachment A "Endangered Species Act (ESA)/Marine Mammal Protection Act (MMPA) Monitoring and Construction Restrictions Requirements".
f. All other solicitation terms and conditions remain unchanged. Offerors are reminded to acknowledge receipt of this amendment when submitting proposals in accordance with the RFP instructions.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following has been added to Section 00804 – NAVFAC Requirements:
ORGANIZATIONAL CONFLICTS OF INTEREST
The restrictions described herein shall apply to the Contractor and its affiliates, consultants and subcontracts under this contract. If the Contractor under this contract prepares or assists in preparing a statement of work, specifications and plans, the Contractor and its affiliates shall be ineligible to bid or participate, in any capacity, in any contractual effort which is based on such statement of work or specifications and plans as a prime contractor, subcontractor, consultant or in any similar capacity. The Contractor shall not incorporate its products or services in such statement of work or specification unless so directed in writing by the Contracting Officer, in which case the restriction shall not apply. This contract shall include this clause in its subcontractor's or consultants' agreements concerning the performance of this contract.
(End of language)
SECTION 00805
CONSTRUCTION WAGE REQUIREMENT AND EPAYROLL
1. Wage Rate Requirements (Construction) Wage Determinations, wages are revised
The following Department of Labor, Wage Rate Requirements (Construction) are applicable to this solicitation. This list of wage determinations is based on the primary locations of work anticipated under this contract. Updated Wage Determinations during the solicitation process shall be incorporated by amendment to the solicitation.
Wage Rate Requirements (Construction) Wage Determinations:
State County Construction Type WD # Mod # Publication Date
Washington Kitsap Heavy WA190071 3 06/27/2019
Washington Kitsap Building WA190012 6 06/27/2019
Wage Determination WA190071, Mod 3, 06/27/2019, Heavy Construction, Kitsap County shall be used for the construction involving site work and pier work. *
Wage Determination WA190012, Mod 6, 06/27/2019, Building Construction, Kitsap County shall be used for the building construction work. *
* Note: The full-text of each Wage Determination is provided as Attachment J and also may be found at the following website: https://wwwdol.gov/ .
(End of Summary of Changes)