About this file

This document appears to be a Performance Work Statement (PWS) for the Facility Management (Annex 1501) and Facility Investment (Annex 1502) Services contract at Marine Corps Base Camp Blaz (MCBCB) in Guam. The PWS outlines the contractor's responsibilities, which include developing and implementing a Preventive Maintenance (PM) program for facilities, equipment, systems, and other assets to ensure proper operation, minimize breakdowns, and maximize useful life. The contractor shall perform required PM and recurring work, with the option to negotiate a reasonable price adjustment if the actual labor effort is not comparable to the bidder's modeled effort. The document also references a related federal contract opportunity, Solicitation Number N4019224R6000, which is for the provision of these Facility Management and Facility Investment services at MCBCB and other locations on the island of Guam, as well as other islands in the Marianas chain.

View the file

Other files

File Type Posted
N4019224R6000_0003.pdf PDF
PWS Note - Next Gen Intent.docx DOCX document
CBA Wages.xlsx XLSX spreadsheet
1501000 C Facility Management_V7 rev1.docx DOCX document
N4019224R6000_0002.pdf PDF
0200000 J Management and Administration.docx DOCX document
PIEE_Registration.pdf PDF
B40011 weld rm exhaust PPI 35.pdf PDF
Posting_Offer_PIEE-Training.pdf PDF
B40000 Hangar door motor PPI 30.pdf PDF
B40000 Mech Rm PPI 32.pdf PDF
CBA-2019-12614 Rev 5.pdf PDF
N4019224R6000_0001.pdf PDF
B40011 Mech rooms PPI 33.pdf PDF
1501000 F Facility Management_V2.docx DOCX document
J-0200000-07 - Asset Information.xlsx XLSX spreadsheet
J-1501000-12.D (PMG Appendix D) Asset Names_Abbrv.xlsx XLSX spreadsheet
J-1501000-12 Planned Maintenance Guide.docx DOCX document
J-1501000-08 MCBCB Work Classification Playbook_V2.xlsx XLSX spreadsheet
1501000 J Facility Management_V4.docx DOCX document
Attachment J-0200000-02-SCA WD_2015-5693 Rev20.pdf PDF
N4019224R6000_JM1_CorporateExperience.docx DOCX document
N4019224R6000_JL3_Site_Visit_Itinerary.docx DOCX document
J-1502000-07F Electrical Demarcation E6.pdf PDF
N4019224R6000.pdf PDF
Attachment J-0200000-05 Contractor Significant Incident Report.pdf PDF
J-1502000-07C Electrical Demarcation E3.pdf PDF
1502000 F MCCB R1.docx DOCX document
1501000 C Facility Management_V7.docx DOCX document
J-1502000-07G Electrical Demarcation E7.pdf PDF
J-1501000-17 Dynamic Assets Requiring Condition Assessment_V7.xlsx XLSX spreadsheet
J-1502000-07A Electrical Demarcation E1.pdf PDF
N4019224R6000_JL4_Directions.pdf PDF
J-1501000-23 Sample Energy and Water Evaluation Report.xlsx XLSX spreadsheet
J-0200000-09 - Characteristic Meter Reading Information.xlsx XLSX spreadsheet
J-1502000-07D Electrical Demarcation E4.pdf PDF
N4019224R6000_JL2_PPI.xls XLS spreadsheet
0200000 F Management and Administration.docx DOCX document
0100000 C General Information.docx DOCX document
N4019224R6000_JM2_PPQ.doc DOC document
N4019224R6000_JL1_Labor_Hours.xlsx XLSX spreadsheet
J-1502000-07J Electrical Demarcation E9.pdf PDF
J-1501000-21 Non-Dynamic Assets Requiring Condition Assessment_V7.xlsx XLSX spreadsheet
J-1502000-05 Planned Maintenance (PM) Program Services Matrix .xlsx XLSX spreadsheet
J-1502000-07L Gas Demarcation G2.pdf PDF
J-1502000-07B Electrical Demarcation E2.pdf PDF
J-1501000-13 (PMG Appendix E) Prescriptive UNIFORMAT List.xlsx XLSX spreadsheet
J-0200000-13 ELINs 6_01_2023_V9_ Auto (with Ext).xlsx XLSX spreadsheet
J-1502000-07H Electrical Demarcation E8.pdf PDF
1502000 C Facility Investment MCBCB.docx DOCX document
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Future Building Enrollment Process – Concept At and Post-BODPre-BOD

PWS Requirment 1502-3. generally, and 3.2 inparticular: “The Contractor shall develop and implement a

PM program for facilities, equipment, systems, structures, and other assets to ensure proper operation, minimize breakdowns, and maximize useful life.”.

MILCON/Future Bldg PM & Recurring Bid

Prices

Facility List (e.g. J-

1501000-02)

Authoritative Cost Data

Determine Price to Perform PM and

Recurring Requirements

Contractor knowledge, experience, environmental, and market cost considerations

Facility component / equipment inventory data (Modeled / Unverified)

(e.g. J-1502000-05.#)

Bldg Type and Size (SF)

Square Foot (SF) PM & Recurring Costs

Issue Non-Recurring WO ELIN X702 for

BOD Facility Inventory Data

Collection

Conduct Asset Inventory and Input to Maximo

Incorporate Asset Inventory into PM Program, Maximo PMs w/ Job Plans, Schedule, etc.

Is actual PM & Recurring LOE Comparable to

Bidder’s Modeled

LOE?

Perform at Bid Price

Negotiate Reasonable Price

Adjustment to Perform PM &

Recurring Work Required

Perform at Negotiated Price

Note: Modeled facility component/equipment inventory is to assist with determining skills likely required and anticipating the breadth of post-BOD facility inventory data collection

File details come from the government source that posted it. Updated .