This document package includes an energy and water evaluation report template and a federal contract solicitation notice.
The energy and water evaluation report template provides instructions and fields for contractors to record energy conservation measures and efficiencies identified during energy audits of federal facilities. Contractors will input data on existing equipment and energy usage as well as estimated impacts and costs of proposed energy conservation measures. The template includes pick lists to standardize input values.
The federal contract solicitation notice seeks proposals for facility management and investment services at Marine Corps Base Camp Blaz in Guam, including facilities at multiple locations on Guam and nearby islands. The contractor will provide all labor, management, supervision, tools, materials and equipment to perform facility management and investment activities. Proposals are due by the date specified in the request for proposal. The contracting agency is the Naval Facilities Engineering Command.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Purpose: |
| This workbook should be used to record energy conservation measures or efficiencies resulting from energy audits. |
| The workbook contains three worksheets: |
| 1. Instructions - Sample data |
| 2. Pick Lists - Pick list values for Site ID, Service Provider Reference Code, Audit Category, Audit Level, M&V Option, commissioning, and Installation fields |
| 3. Original Data - Template for recording energy and water evaluation results |
| Instructions: |
| 1. Beginning in Row 2 of the Original Data worksheet (third tab) enter Energy Conservation Measurement data received from energy audits. |
•Each Energy Conservation Measure should be listed separately and by facility.
•Pick lists values for Site ID, Installation Name, Service Provider Reference Code, Audit Category, Audit Level, Commissioining, and M&V Option may be found in the Pick Lists worksheet (second tab).
•Values for certain fields (Work Type, Sub Work Type, Business Line, PS Deliverable, NAVFAC Work Category, and Classification) are predefined. Refer to the Sample Template below for predefined values.
•For fields with no value (e.g. 0) fields should be left blank.
•Units of Measure are defined for some fields and should not be changed. Refer to the Sample Template below for predefined units of measure.
• Do not insert hard breaks (alt+enter) in cells. Word wrap is acceptable but hard breaks will interfere with data conversion in subsequent steps.
| 3. Save Excel file to computer. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Yellow fields indicate Contractor responsibility | |||||||||||||||||||||||||||||||||||||||||||||||||
| Column Name | SITE ID | SUMMARY DESCRIPTION | LONG DESCRIPTION | LOCATION | ADD'L LOC INFO | WORKTYPE | SUBWORKTYPE | BUSINESS LINE | PS DELIVERABLE | NAVFAC WORK CATEGORY | REPORTED BY | CUSTOMER ID | CUSTOMER NAME | CUSTOMER PHONE | CUSTOMER EMAIL | CUSTOMER REF # | PRIORITY SCORE | PRIORITY YEAR | ASSET | EXPECTED COST | GL ACCOUNT | SERVICE PROVIDER REF CODE | CLASSIFICATION | INTERNAL PRIORITY | AUDIT_COMP_DATE | CONTRACTOR_NAME | AUDIT_CATEGORY | OTHER | AUDIT_LEVEL | ECM | EVAL_AREA | EXISTING_COUNT | WEEKS_PER_YEAR_OP | DAYS_PER_WEEK_OP | HOURS_PER_DAY_OP | EXISTING_LOAD_FACTOR | EXISTING_ELEC_CONSUMPTION | EXISTING_GAS_CONSUMPTION | CONVERTED_EXISTING_CONSUMPTION | EXISTING_WATER_CONSUMPTION | ESTIMATE_COMMODITY_RATE | PROPOSED_COUNT | PROPOSED_EQUIPMENT_SERVICE_LIFE | ELECTRIC_CAPACITY | NON_ELECTRIC CAPACITY | ANNUAL_ENERGY PRODUCTION | ESTIMATE_ELEC_CONSUMPTION | ESTIMATE_GAS_CONSUMPTION | CONVERTED_ESTIMATE_CONSUMPTION |
| Column Description | FEC ID (from Maximo) (select from pick list) | Title of ECM (150 character limit) | Additional Description/Comments (1024 character limit) | Building Number (from Maximo) | Leave Blank | Type of Work: REQUIREMENT | Sub Work Type: ENERGY AUDIT | NAVFAC Business Line: PW | Product and Services Code: H74 | Category of Work: 3 | Maximo ID of the Installation Energy Manager | Maximo ID of the Installation Energy Manager | Leave Blank | Leave Blank | Leave Blank | Leave Blank | Leave Blank | Leave Blank | Leave Blank | Leave Blank | Leave Blank | Unique identifier for each ECM to include NFAID fiscal year ECM category or subcategory and a unique number for each ECM (e.g. NFA200000347634-FY13-ECM5.1-001). NAVFAC should provide guidance on the criteria of the Service Provider Ref Code and the Contractor should assign identifiers to each ECM. | Work Classification: 160727 | Leave Blank | Audit Completion Date (yyyy-mm-dd) | Energy Audit Contractor Name: ENTAUDIT: enterprise audit |
In-House: audits performed by in-house personnel ESPCAUDIT: ESPC audit UESCAUDIT: UESC audit Other MUIC: Audit performed by other MUIC holders BOSC: Base Operating Support Contract
| Department of Energy Audit Categories (select from pick list) | Other ECM Category if not listed in Pick List | Energy Audit Level (select from pick list) | ECM Description (250 character limit) | Description of ECM Location (250 character limit) | Existing Equipment Count | Weeks per Year Equipment is Operational | Days per Week Equipment is Operational | Hours per Day Equipment is Operational | Existing Load Factor (% operational) | Annual Electricity Consumption of Existing Equipment in KWH | Annual Gas Consumption of Existing Equipment in Therms | Annual Energy Consumption of Existing Equipment in Million BTU (KWH + Therms converted in MBTU) | Annual Water Consumption of Existing Equipment in KGAL | Estimated Commodity Rate in $ per KWH or $ per KGAL | New Equipment Count | Estimated Service Life of Proposed Equipment | Estimated Renewable Electric Capacity | Estimated Renewable Non Electric Capacity (Million BTU) | Estimated Renewable Annual Energy Production (Million BTU) | Estimated Annual Electricity Consumption of ECM in KWH | Estimated Annual Gas Consumption of ECM in Therms | Estimted Annual Energy Consumption of ECM in Million BTU (KWH + Therms converted in MBTU) | Estimated Annual Water Consumption of ECM in KGAL | Estimated Annual Electricity Savings in KWH | Estimated Annual Gas Savings in Therms | Estimated Annual Energy Savings in Million BTU (KWH + Therms converted in MBTU) | Estimated Annual Water Savings in KGAL | Estimated Demand Savings of ECM | Estimated Annual Energy Cost Savings | Estimated Annual Water Cost Savings | Estimated Annual Recurring Non-Energy Cost Savings | Estimated Non-Recurring Non-Energy Cost Savings | Estimated Rebate/Incentives | Estimate Lifecycle Energy Savings in Million BTU | Estimated Lifecycle Water Savings | Estimated Lifecycle Energy Cost Savings | Estiamted Lifecycle Water Cost Savings | Estimated Lifecycle Non-Energy Savings | Estimated Total Material Cost | Estimated Total Labor Cost | Estimated Total Design Cost | Estimated Total Misc Cost | Location Cost Factor Note: Leave blank if there is no increased cost factor | Estimated Total ECM Cost | Estimated Simple Payback | Estimated Savings to Investment Ratio (SIR) | Recommend Building/System Re- or Retro-Commissioning (YES/NO) | Recommended Measurement & Verification Option Note: Current NAVFAC M&V policy allows options A B or C (select from pick list) | Installation Name (select from pick list) |
| Unit of Measure | PERCENT | KWH | THERMS | MBTU | KGAL | USD | YR | MW | MBTU | MBTU | KWH | THERMS | MBTU | ||||||||||||||||||||||||||||||||||||
| Sample 1 | 10501 | Fluourescent Lighting Upgrade | T8s to LED | CAMSMI-700 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | NFA200000347634-FY13-ECM5.1-001 | 160727 | 2012-10-01 | ENTAUDIT: Name of Company | Lighting Improvements | Level 2 | Replace T8s with LED | Whole Building | 7163 | 52 | 7 | 24 | 90 | 1864874 | 6363 | 0.204 | 7163 | 15 | 1389024 | 4739 | ||||||||||||||||||||
| Sample 2 | 10501 | No ECMs Found | No ECMs found. Facility unoccupied or abandoned | MAKALA-346 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | NFA200000347634-FY13-ECM13.2-002 | 160727 | 2012-10-01 | IN-HOUSE: Installation Energy Manager | Other | Non-Viable ECM | level 1 | No ECMs Found | Whole Building | 122 | 52 | 7 | 24 | |||||||||||||||||||||||||||
| Sample 3 | 10501 | Lighting Retrofit | T8s to LED | MAKALA-258 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | NFA200000347634-FY13-ECM13.2-002 | 160727 | 2012-10-01 | UESCAUDIT: Name of Utility Company | Lighting Improvements | Level 2 | Replace T8s with LED | Whole Building | 122 | 52 | 7 | 24 | 100 | 59227 | 202 | 1553 | 122 | 20 | 23691 | 80 | ||||||||||||||||||||
| Sample 4 | 10501 | Lighting Retrofit | T8s to LED | MAKALA-258 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | NFA200000347634-FY13-ECM13.2-002 | 160727 | 2012-10-01 | ENTAUDIT: Name of Company | Lighting Improvements | Level 2 | Replace T8s with LED | Whole Building | 122 | 52 | 7 | 24 | 100 | 59227 | 202 | 1553 | 122 | 20 | 23691 | 80 | ||||||||||||||||||||
| Sample 5 | 10501 | Lighting Retrofit | T8s to LED | MAKALA-258 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | NFA200000347634-FY13-ECM13.2-002 | 160727 | 2012-10-01 | Other MUIC:BUMED | Lighting Improvements | Level 2 | Replace T8s with LED | Whole Building | 122 | 52 | 7 | 24 | 100 | 59227 | 202 | 1553 | 122 | 20 | 23691 | 80 | ||||||||||||||||||||
| Sample 6 | 10501 | Lighting Retrofit | T8s to LED | MAKALA-258 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | NFA200000347634-FY13-ECM13.2-002 | 160727 | 2012-10-01 | ESPCAUDIT: Name of Company | Lighting Improvements | Level 2 | Replace T8s with LED | Whole Building | 122 | 52 | 7 | 24 | 100 | 59227 | 202 | 1553 | 122 | 20 | 23691 | 80 | ||||||||||||||||||||
| Sample 7 | 10501 | Lighting Retrofit | T8s to LED | MAKALA-258 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | NFA200000347634-FY13-ECM13.2-002 | 160727 | 2012-10-01 | BOSC: Name of Company | Lighting Improvements | Level 2 | Replace T8s with LED | Whole Building | 122 | 52 | 7 | 24 | 100 | 59227 | 202 | 1553 | 122 | 20 | 23691 | 80 |
Pick Lists
| Seven fields have pick lists from which values should be selected (Site ID, Service Provider Reference Code, Audit Category, Audit Level, M&V Option, Commissioning, and Installation Name). | ||
| SIX FIELDS HAVE PREDETERMINED VALUES (Work type, sub work type, Business line, P/S code, category and classification) | ||
| Pick list values are listed below. | ||
| SITE ID | WORKTYPE | |
| 10101 | Washington | REQUIREMENT |
| 10201 | Midlant | |
| 10301 | Hawaii | SUBWORKTYPE |
| 10401 | Midwest | ENERGY AUDIT |
| 10501 | Marianas | |
| 10601 | Southwest | Business line |
| 10701 | Southeast | PW |
| 10801 | Far East | |
| 10901 | Northwest | P/S Code |
| 11001 | EURAFSWA | H74 |
| SERVICE PROVIDER REF CODE (NFAID-FYXX-Audit Category/Subcategory-ECM NO.) | Category | |
| Description | Category/Subcategory | 3 |
| Boiler Plant Improvements | ECM-1 | |
| Boiler control including new controls and retrofits to existing controls | ECM1.1 | |
| Replacement of existing boilers with high efficiency boilers | ECM1.2 | |
| Boiler decentralization | ECM1.3 | Work Classification |
| Chiller Plant Improvements | ECM-2 | 160727 |
| Chiller retrofits or replacements | ECM2.1 | |
| Chiller plant pumping piping and controls retrofits and replacements | ECM2.2 | |
| Building Automation Systems (BAS) / Energy Management Control Systems (EMCS) | ECM-3 | |
| Upgrade HVAC from pneumatics to Direct Digital Control | ECM3.1 | |
| Upgrade or replacement of existing EMCS systems | ECM3.2 | |
| Heating Ventilating and Air Conditioning (HVAC) | ECM-4 | |
| Packaged air conditioning unit replacements | ECM4.1 | |
| HVAC damper and controller repair or replacement | ECM4.2 | |
| Window air conditioning replacement with high efficiency units | ECM4.3 | |
| Cooling tower retrofits or replacements | ECM4.4 | |
| Economizer installation | ECM4.5 | |
| Fans and pump replacement or impeller trimming | ECM4.6 | |
| Thermal energy storage | ECM4.7 | |
| Variable air volume retrofit | ECM4.8 | |
| Lighting Improvements | ECM-5 | |
| Interior and exterior lighting retrofits and replacements | ECM5.1 | |
| Intelligent lighting controls | ECM5.2 | |
| Occupancy sensors | ECM5.3 | |
| Light Emitting Diode technologies | ECM5.4 | |
| Daylighting | ECM5.5 | |
| Spectrally enhanced lighting | ECM5.6 | |
| Fiber optic lighting technologies | ECM5.7 | |
| Building Envelope Modifications | ECM-6 | |
| Insulation installation | ECM6.1 | |
| Weatherization | ECM6.2 | |
| Window replacement | ECM6.3 | |
| Reflective solar window tinting | ECM6.4 | |
| Roofing | ECM6.5 | |
| Chilled Water Hot Water and Steam Distribution Systems | ECM-7 | |
| Piping insulation installation | ECM7.1 | |
| Hot water heater repair and replacement | ECM7.2 | |
| Steam trap repair and replacement | ECM7.3 | |
| Repair or replace existing condensate return systems and installation of new condensate return systems | ECM7.4 | |
| Electric Motors and Drives | ECM-8 | |
| Motor replacement with high efficiency motors | ECM8.1 | |
| Variable speed motors or drives | ECM8.2 | |
| Refrigeration | ECM-9 | |
| Replacement of ice/refrigeration equipment with high efficiency units | ECM9.1 | |
| Distributed Generation | ECM-10 | |
| Cogeneration systems installation | ECM10.1 | |
| Microturbines installation | ECM10.2 | |
| Fuel cells installation | ECM10.3 | |
| Renewable Energy Systems | ECM-11 | |
| Photovoltaic system installation | ECM11.1 | |
| Solar hot water system installation | ECM11.2 | |
| Solar ventilation preheating system installation | ECM11.3 | |
| Wind energy system installation | ECM11.4 | |
| Passive solar heating installation | ECM11.5 | |
| Landfill gas waste water treatment plant digester gas and coalbed methane power plants | ECM11.6 | |
| Wood waste and other organic waste stream heating or power plant installation | ECM11.7 | |
| Replacement of air conditioning and heating units with ground coupled heat pump systems | ECM11.8 | |
| Energy/Utility Distribution Systems | ECM-12 | |
| Transformers installation | ECM12.1 | |
| Power quality upgrades | ECM12.2 | |
| Power factor correction | ECM12.3 | |
| Gas distribution systems installation | ECM12.4 | |
| Water and Sewer Conservation Systems | ECM-13 | |
| Low-flow faucets and showerheads | ECM13.1 | |
| Low-flow plumbing equipment | ECM13.2 | |
| Water efficient irrigation | ECM13.3 | |
| On-site sewer treatment systems | ECM13.4 | |
| Electrical Peak Shaving/Load Shifting | ECM-14 | |
| Thermal energy storage | ECM14.1 | |
| Gas cooling | ECM14.2 | |
| Energy Cost Reduction Through Rate Adjustments | ECM-15 | |
| Change to more favorable rate schedule | ECM15.1 | |
| Lower energy cost supplier(s) (where applicable) | ECM15.2 | |
| Energy service billing and meter auditing recommendations | ECM15.3 | |
| Energy Related Process Improvements | ECM-16 | |
| Production and/or manufacturing improvements | ECM16.1 | |
| Recycling and other waste stream reductions | ECM16.2 | |
| Industrial process improvement | ECM16.3 | |
| Advanced Metering Systems | ECM-17 | |
| Advanced Metering Systems | ECM17.1 | |
| Appliance/Plug-Load Reductions | ECM-18 | |
| Replace air-cooled ice/refrigeration equipment | ECM18.1 | |
| Replace refrigerators | ECM18.2 | |
| Vending machines (de-lamping Vend Misers) | ECM18.3 | |
| Plug timers | ECM18.4 | |
| Energy Star® products | ECM18.5 | |
| Commissioning Measures | ECM-19 | |
| Commissioning Measures | ECM19.1 | |
| Other | ECM-20 | |
| Other – Efficiency measures that cannot be included in any of the above categories | ECM20.1 |
| AUDIT CATEGORY |
| Boiler Plant Improvement |
| Chiller Plant Improvements |
| Building Automation Systems |
| Other HVAC |
| Lighting Improvements |
| Building Envelope Modifications |
| CW HW Steam Distribution Systems |
| Electric Motors |
| Refrigeration |
| Distributed Generation |
| Renewable Energy Systems |
| Energy Distribution Systems |
| Water and Sewer Conservation Systems |
| Electrical Peak Shaving or Load Shifting |
| Rate Adjustments |
| Energy Related Process Improvements |
| Advanced Metering Systems |
| Appliance or Plug Load Reductions |
| Commissioning Measures |
| Other |
| AUDIT LEVEL |
| Energy Audit Update |
| Level 1 |
| Level 2 |
| M&V OPTION |
| A |
| B |
| C |
| D |
| INSTALLATION NAME |
| Andersen Air Force Base |
| Camp Lemonnier, Djibouti |
| Commander Fleet Activities Chinhae |
| Commander Fleet Activities Okinawa |
| Commander Fleet Activities Sasebo |
| Commander Fleet Activities Yokosuka |
| Joint Base Anacostia Bolling |
| Joint Base Pearl Harbor-Hickam |
| Joint Expeditionary Base Little Creek-Fort Story |
| Naval Air Facility Atsugi |
| Naval Air Facility El Centro |
| Naval Air Facility Misawa |
| Naval Air Station Corpus Christi |
| Naval Air Station Fallon |
| Naval Air Station Jacksonville |
| Naval Air Station Joint Reserve Base Fort Worth |
| Naval Air Station Joint Reserve Base New Orleans |
| Naval Air Station Key West |
| Naval Air Station Kingsville |
| Naval Air Station Lemoore |
| Naval Air Station Meridian |
| Naval Air Station Oceana |
| Naval Air Station Patuxent River |
| Naval Air Station Pensacola |
| Naval Air Station Sigonella |
| Naval Air Station Whidbey Island |
| Naval Air Station Whiting Field |
| Naval Air Weapons Station China Lake |
| Naval Base Coronado |
| Naval Base Guam |
| Naval Base Kitsap |
| Naval Base Point Loma |
| Naval Base San Diego |
| Naval Base Ventura County |
| Naval Construction Battalion Center Gulfport |
| Naval Magazine Indian Island |
| Naval Station Everett |
| Naval Station Great Lakes |
| Naval Station Guantanamo Bay |
| Naval Station Mayport |
| Naval Station Newport |
| Naval Station Norfolk |
| Naval Station Rota |
| Naval Submarine Base Kings Bay |
| Naval Submarine Base New London |
| Naval Support Activity Annapolis |
| Naval Support Activity Bahrain |
| Naval Support Activity Bethesda |
| Naval Support Activity Crane |
| Naval Support Activity Hampton Roads |
| Naval Support Activity Mechanicsburg |
| Naval Support Activity Mid-South |
| Naval Support Activity Monterey |
| Naval Support Activity Naples |
| Naval Support Activity Orlando |
| Naval Support Activity Panama City |
| Naval Support Activity Saratoga Springs |
| Naval Support Activity Souda Bay |
| Naval Support Activity South Potomac |
| Naval Support Activity Washington |
| Naval Support Facility Beaufort |
| Naval Support Facility Dahlgren |
| Naval Support Facility Indian Head |
| Naval Weapons Station Earle |
| Naval Weapons Station Seal Beach |
| Naval Weapons Station Yorktown |
| Navy Support Facility Diego Garcia |
| Norfolk Naval Shipyard |
| Pacific Missile Range Facility Barking Sands |
| Portsmouth Naval Shipyard |
| Singapore Area Coordinator |
| Commissioning |
| Yes |
| No |
http://cnic.navy.mil/ANNAPOLIS/index.htmhttp://cnic.navy.mil/DIEGOGARCIA/index.htmhttp://cnic.navy.mil/EARLE/index.htmhttp://cnic.navy.mil/ELCENTRO/index.htmhttp://cnic.navy.mil/EVERETT/index.htmhttp://cnic.navy.mil/FALLON/index.htmhttp://cnic.navy.mil/FORTWORTH/index.htmhttp://cnic.navy.mil/GREATLAKES/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUANTANAMO/index.htmhttp://cnic.navy.mil/GULFPORT/index.htmhttp://cnic.navy.mil/ATSUGI/index.htmhttp://cnic.navy.mil/INDIAN_ISLAND/index.htmhttp://cnic.navy.mil/JACKSONVILLE/index.htmhttp://cnic.navy.mil/JBAB/index.htmhttp://cnic.navy.mil/JEBLCFS/index.htmhttp://cnic.navy.mil/JRBORLEANS/index.htmhttp://cnic.navy.mil/KEYWEST/index.htmhttp://cnic.navy.mil/KINGSBAY/index.htmhttp://cnic.navy.mil/KINGSVILLE/index.htmhttp://cnic.navy.mil/KITSAP/index.htmhttp://cnic.navy.mil/LEMOORE/index.htmhttp://cnic.navy.mil/BAHRAIN/index.htmhttp://cnic.navy.mil/Monterey/index.htmhttp://cnic.navy.mil/MAYPORT/index.htmhttp://cnic.navy.mil/MECHANICSBURG/index.htmhttp://cnic.navy.mil/MERIDIAN/index.htmhttp://cnic.navy.mil/MidSouth/index.htmhttp://cnic.navy.mil/MISAWA/index.htmhttp://cnic.navy.mil/NAPLES/index.htmhttp://cnic.navy.mil/NEWLONDON/index.htmhttp://cnic.navy.mil/NEWPORT/index.htmhttp://cnic.navy.mil/Norfolk/index.htmhttp://cnic.navy.mil/Bethesda/index.htmhttp://cnic.navy.mil/NNSY/index.htmhttp://cnic.navy.mil/NORFOLKSTA/index.htmhttp://cnic.navy.mil/NSAW/index.htmhttp://cnic.navy.mil/OCEANA/index.htmhttp://cnic.navy.mil/OKINAWA/index.htmhttp://cnic.navy.mil/ORLANDO/index.htmhttp://cnic.navy.mil/PMRF/index.htmhttp://cnic.navy.mil/PANAMACITY/index.htmhttp://cnic.navy.mil/PATUXENT/index.htmhttp://cnic.navy.mil/PEARLHARBOR-HICKAM/index.htmhttp://cnic.navy.mil/CHINALAKE/index.htmhttp://cnic.navy.mil/PENSACOLA/index.htmhttp://cnic.navy.mil/PNSY/index.htmhttp://cnic.navy.mil/POINTLOMA/index.htmhttp://cnic.navy.mil/ROTA/index.htmhttp://cnic.navy.mil/SANDIEGO/index.htmhttp://cnic.navy.mil/SARATOGA/index.htmhttp://cnic.navy.mil/SASEBO/index.htmhttp://cnic.navy.mil/SEALBEACH/index.htmhttp://cnic.navy.mil/SIGONELLA/index.htmhttp://cnic.navy.mil/SINGAPORE/index.htmhttp://cnic.navy.mil/CHINHAE/index.htmhttp://cnic.navy.mil/SOUDABAY/index.htmhttp://cnic.navy.mil/SPOTOMAC/index.htmhttp://cnic.navy.mil/VENTURA/index.htmhttp://cnic.navy.mil/WHIDBEY/index.htmhttp://cnic.navy.mil/WHITINGFIELD/index.htmhttp://cnic.navy.mil/YOKOSUKA/index.htmhttp://cnic.navy.mil/YORKTOWN/index.htmhttp://cnic.navy.mil/CorpusChristi/index.htmhttp://cnic.navy.mil/CORONADO/index.htmhttp://cnic.navy.mil/CRANE/index.htm Original Data
| SITE ID | SUMMARY DESCRIPTION | LONG DESCRIPTION | LOCATION | ADD'L LOC INFO | WORKTYPE | SUBWORKTYPE | BUSINESS LINE | PS DELIVERABLE | NAVFAC WORK CATEGORY | MAXIMO REPORTED BY | MAXIMO CUSTOMER ID | CUSTOMER NAME | CUSTOMER PHONE | CUSTOMER EMAIL | CUSTOMER REF # | PRIORITY SCORE | PRIORITY YEAR | ASSET | EXPECTED COST | GL ACCOUNT | SERVICE PROVIDER REF CODE | CLASSIFICATION | INTERNAL PRIORITY | AUDIT_COMP_DATE | CONTRACTOR_NAME | AUDIT_CATEGORY | OTHER | AUDIT_LEVEL | ECM | EVAL_AREA | EXISTING_COUNT | WEEKS_PER_YEAR_OP | DAYS_PER_WEEK_OP | HOURS_PER_DAY_OP | EXISTING_LOAD_FACTOR | EXISTING_ELEC_CONSUMPTION | EXISTING_GAS_CONSUMPTION | CONVERTED_EXISTING_CONSUMPTION | EXISTING_WATER_CONSUMPTION | ESTIMATE_COMMODITY_RATE | PROPOSED_COUNT | PROPOSED_EQUIPMENT_SERVICE_LIFE | ELECTRIC_CAPACITY | NON_ELECTRIC CAPACITY | ANNUAL_ENERGY PRODUCTION | ESTIMATE_ELEC_CONSUMPTION | ESTIMATE_GAS_CONSUMPTION | CONVERTED_ESTIMATE_CONSUMPTION | ESTIMATE_WATER_CONSUMPTION |
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 | |||||||||||||||||||||||||||||||||||||||||||
| 10501 | REQUIREMENT | ENERGY AUDIT | PW | H74 | 3 | 160727 |
http://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htmhttp://cnic.navy.mil/GUAM/index.htm
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .