Updated Bid Sheet.pdf
PDF 52 KB Posted
- Attached to
- Flooring Repairs Buildings 24 and 8
- Solicitation number
- N4008526R9028
About this file
This is a pricing sheet for a federal construction solicitation for multiple building flooring repairs at MCB Camp Lejeune, North Carolina under Solicitation No. N40085-26-R-9028, Project No. 24-0419, dated 3/27/2026.
Offerors must submit prices for two Exhibit Line Items (ELINs): ELIN 0001 covers all flooring repair work for Building 24 in accordance with provided drawings and specifications, excluding work in ELINs 0002 and 0003; ELIN 0002 covers all flooring repair work for Building 8 under the same conditions, excluding work in ELINs 0001 and 0003. Each price must include all applicable costs, overhead, labor burden, and profit. Offerors are required to submit prices on all line items, and failure to do so will result in rejection of the offer as non-responsive. The Government will evaluate offers for award by adding prices for ELINs 0001 through 0003; however, evaluation of options does not obligate the Government to exercise any options. A total pricing line is provided for the combined ELIN 0001-0002 submission.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Multiple Building Flooring Repairs Solicitation No. N40085-26-R-9028 MCB Camp Lejeune, North Carolina Project No. 24-0419
3/27/2026
PRICING SHEET
Under the line items furnished, the offers shall state prices for each Exhibit Line Item Number (ELIN) given hereinafter:
ELIN 0001
Price includes completing all work associated with building 24 in accordance with the drawings and specifications provided, but excluding work described in ELIN 0002 and ELIN 0003. The price for this line item should include all applicable costs, overhead and profit for this work.
ELIN 0002
Price includes completing all work associated with building 8 in accordance with the drawings and specifications provided, but excluding work described in ELIN 0001 and ELIN 0003. The price for this line item should include all applicable costs, overhead and profit for this work.
TOTAL ELIN 0001-0002: $______________________________________
Notes A. Offers must be submitted on all line items. Failure to propose on all line items may result in the offer being rejected as non-responsive.
B. ELINs shall include all markups (overhead, labor burden, and profit).
C. Evaluation of Options (NOV 2025). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for ELINs 0001 through 0003. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
File details come from the government source that posted it. Updated .