This is Amendment 0003 to Solicitation N40085-26-R-9028 for flooring repairs at Camp Lejeune, North Carolina, issued by NAVFAC Mid-Atlantic on April 21, 2026. The amendment addresses five requests for information received from prospective contractors and clarifies scope requirements without extending the proposal submission deadline.

The key scope clarifications are: (1) Building 24 flooring repairs now include both connected rooms 209 and 210, not just room 210 as originally specified; (2) Building 1011 is omitted entirely from the project scope due to floor covering already having been replaced; (3) tenants are responsible for moving computers and personal items, with all associated work to be coordinated with each building's point of contact; (4) contractors are responsible for moving furniture while tenants move personal items; and (5) no special scheduling, night work, or weekend work is required. All other terms and conditions of the original solicitation remain unchanged. Offerors must acknowledge receipt of this amendment prior to proposal submission, with failure to do so potentially resulting in proposal rejection.

View the file

Other files

File Type Posted
Amend 0006 24-0419.pdf PDF
Amend 0005 250419.pdf PDF
240419 RFP.pdf PDF
Amend 0004.pdf PDF
Updated Bid Sheet.pdf PDF
Amend 0004.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
24-0419 RFP.pdf PDF
Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
24M052CN Mutliple Building Flooring Project PD.pdf PDF
24M052CN Mutliple Building Flooring Project SOW.pdf PDF
Building 1011 ACM Report.pdf PDF
Building 8 ACM Report.pdf PDF
Combined DIV 01 SPECS.pdf PDF
24M052CN Mutliple Building Flooring Project SR.pdf PDF
Building 24 ACM Report.pdf PDF
09 68 00 CARPETING SPECS.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 2

AMENDMENT NO. 0003 04/21/26 24-0419

N40085

NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521

See Item 6

✘ N40085-26-R-9028

03/27/26

24-0419, Flooring Repairs Buildings 24,1011,and 8 Amendment 0003, Answer Requests for information

The time and date for receipt of proposals remains unchanged.

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.

See Continuation Page(s)

N40085-26-R-9028 Amendment 0003

CONTINUATION SHEET

1. QUESTION: Bldg. 24: There is a connecting door between Room 210 & 209. Only 210 is referenced in scope. It was indicated at the site visit that the intention was to replace carpet in both offices. Should both offices be included or only 210?

ANSWER: Include rooms 209 and 210.

2. QUESTION: Bldg. 1011: Upon arrival at this location, the individual listed as the POC indicated the floor covering had already been replaced. Will this be removed from the scope?

ANSWER: Yes, please omit building 1011 from the scope of the project.

3. QUESTION: Please confirm the gov't will be removing all equipment i.e., computers, printers etc.

ANSWER: The moving of the computers and all personal items will be the responsibility of the tenant.

All associated work will be discussed with the POC of each building.

4. QUESTION: Will the contractor be responsible for moving furniture?

ANSWER: Yes, the contractor will be responsible for moving furniture. The tenants will move all personal items.

5. QUESTION: Will there be any special scheduling, nights or weekend work required?

ANSWER: No

6. All other terms and conditions remain unchanged.

Amend 0003