24M052CN Mutliple Building Flooring Project PD.pdf

PDF 134 KB Posted

Attached to
Flooring Repairs Buildings 24 and 8
Solicitation number
N4008526R9028
Issued by

About this file

This document is a Project Description and Scope of Work for a carpet removal and replacement project at Camp Lejeune, North Carolina.

The scope of work involves removing carpet in specified areas and replacing it along with any baseboard for those areas across five buildings: Buildings 24, 111, 1011, 60, and 8. The contractor is responsible for moving furniture and other objects in the project areas as required. Work must be conducted while the facility remains operational, with the contractor required to minimize interference with normal facility operations. Supervision requirements allow for one qualified individual to serve in the combined roles of Superintendent, Quality Control Manager, and Safety & Health Officer, provided that person meets all qualifications as defined in the project specification.

View the file

Other files

File Type Posted
Amend 0006 24-0419.pdf PDF
240419 RFP.pdf PDF
Amend 0005 250419.pdf PDF
Amend 0004.pdf PDF
Updated Bid Sheet.pdf PDF
Amend 0004.pdf PDF
Amend 0003 and continuation sheet.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
Combined DIV 01 SPECS.pdf PDF
24M052CN Mutliple Building Flooring Project SR.pdf PDF
Building 24 ACM Report.pdf PDF
09 68 00 CARPETING SPECS.pdf PDF
Building 8 ACM Report.pdf PDF
24-0419 RFP.pdf PDF
Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
24M052CN Mutliple Building Flooring Project SOW.pdf PDF
Building 1011 ACM Report.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DESCRIPTION

This scope of work is to be accomplished at Buildings 24, 111, 1011, 60 and 8 at Camp Lejeune, North Carolina. The contractor shall remove carpet in specified areas and replace along with any baseboard for those said areas as noted in the project area descriptions.

SPECIAL SCHEDULING

The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity. The furniture and other objects in the project area are to be moved by the contractor if required.

SUPERVISION

One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.

File details come from the government source that posted it. Updated .