Amend 0006 24-0419.pdf
PDF 144 KB Posted
- Attached to
- Flooring Repairs Buildings 24 and 8
- Solicitation number
- N4008526R9028
About this file
This document is Amendment 0006 to Solicitation N40085-26-R-9028, issued by NAVFAC Mid-Atlantic on May 27, 2026, for flooring repairs in Buildings 24 and 8 at Camp Lejeune, NC (Requisition 24-0419). The amendment is administered by the Resident Officer in Charge of Construction at 1107A Birch Street, Camp Lejeune, NC 28547-2521.
The amendment addresses a Request for Information (RFI) regarding a discrepancy between the 26,000 square feet of flooring specified in the Statement of Work and the actual areas requiring replacement. The government confirms that flooring replacement is limited to the following areas in Building 8: Command Deck, Meeting Room, All Offices, and S4 Wing. Offerors must acknowledge receipt of this amendment prior to proposal submission; failure to acknowledge may result in proposal rejection. All other terms and conditions of the solicitation remain unchanged and in full force and effect.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1
1 . CONTRACT ID CODE
I
PAG
OF PAGES
I 1
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicble)
AMENDMENT NO. 0006 24-0419
6. ISSUED BY CODE
05/27/26
N40085 7. ADMINISTERED BY (If other than Item 6) CODE I
NAVFAC Mid-Atlantic See Item 6 Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) IX) gA. AMENDMENT OF SOLICIATION NO.
,c N40085-26-R-9028 gB. DATED (SEE ITEM 11)
3/27/26
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
CODE I FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[RI The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, [JX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning _l __ copies of the amendment; (bl By acknowledging receipt of this amendment on each copy of the offer submitted;
or (cl By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 1 OA.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor D is not, D is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
24-0419, Flooring Repairs Buildings 24 and 8 Amendment 0006, RFI Answered.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
Efupt as'provfdedi'lereih, "alt ter�-amtt:6ndltions of the document referenced in Item gA or 1 OA, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
1 5B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
NSN 7540-01-1 52-8070
Previous edition unusable
1 6A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-831
Prescribed by GSA FAR (48 CFR) 53.243
N40085-26-R-9028 Amendment 0006
CONTINUATION SHEET
Question 1: There appears to be a disparity in the quantity of flooring in the SOW (26,000sf) and the actual areas called for to be replaced (Command Deck, Meeting Room, Offices and S4 wing).
Can the government confirm the only areas of flooring to be replaced are what is listed in the SOW for building 8, as mentioned above?
Answer: Yes, Command Deck, Meeting Room, All Offices and S4 Wing.
2. All other terms and conditions remain unchanged.