This is an Asbestos Inspection Report for Building #24 at MCB Camp Lejeune, dated July 23, 2024.
Building #24 is occupied by the Communications and Electronics Office and was constructed in 1942. The facility has a hazard ranking of 0/BLUE with no asbestos-containing materials (ACM) currently identified. Historical inspection records indicate that previous ACM, including pipe insulation and fittings, as well as 9" and 12" tile and mastic, were removed during prior renovations (most recently in May 1996). The building underwent major renovations and expansion in October 2002 with no ACM identified post-renovation. Additional sampling conducted in June 2008 and August 2010 confirmed removal of previous ACM and exterior transite debris. The Camp Lejeune Asbestos Program Manager (phone: 910-451-5837) maintains the survey documentation and coordinates periodic inspections to evaluate any changes in material condition.
The inspection identified multiple tested and non-ACM or removed materials documented from June 25, 2008, including floor tile and adhesive, roofing material, interior and exterior caulking, drywall joint material, duct sealant, carpet adhesive, residual mastic, and transite panel material. Laboratory testing confirmed zero percent asbestos content (chrysotile, amosite, and other asbestos types) across all 33 samples collected. The facility maintains protocols requiring occupants to avoid disturbing any remaining materials, report any damage or debris to the Asbestos Program Manager, and adhere to conditions preventing sanding, grinding, or abrading of materials. Corrective actions are initiated as needed to minimize fiber release and protect personnel.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS INSPECTION REPORT of:
Building # 24
MCB CAMP LEJEUNE
Tuesday, July 23, 2024
Print Date
Tuesday, July 23, 2024 Page 1 of 6Print Date:
INSPECTION SUMMARY
BLDG #:
OCCUPANT:
YEAR BUILT:
BUILDING COMMENTS:
COMMUNICATIONS AND
ELECTRONICS OFFICE
HAZ RANK 0/BLUE [AH AUG2010]
NO ACM IDENTIFIED, PREVIOUS EXTERIOR TRANSITE DEBRIS REMOVED BY INSPECTOR.
AUG2010
PVS. ACM REMOVED BY INSPECTOR, NO ACM IDENTIFIED
JUN08
ADDL SAMPLING, ACM INCLUDES:
TRANSITE PANEL DEBRIS
OCT02
PVS. ACM REMOVED, MAJOR RENOVATIONS, BLDG. EXPANSION, NO ACM IDENTIFIED
MAY96 [DATA X FILED]
ACM INCLUDES:
PIPE INSULATION AND FITTINGS
9" and 12" TILE AND MASTIC
ASBESTOS MANAGER: 910-451-5837
Friable ACM(s) identified
Non-friable ACM(s) identified
Tested Non ACM or REMOVED Materials
DESCRIPTION LOCATION Date
NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.
DESCRIPTION LOCATION Date Quantity
DESCRIPTION LOCATION Date Quantity
No friable ACM records found in database
No non friable ACM records found in database
NOTIFICATION OF ACM IN BUILDING
12" WHITE w/ GRAY FLOOR TILE AND
ADHESIVE
EASTSIDE ADDITION OFFICE AREAS 6/25/2008
ROOFING MATERIAL, SOUTH CENTER EXTERIOR GROUND 6/25/2008
INTERIOR CAULKING, INTERIOR WALL JOINT FILLER AT WEST
ADDITIONS
6/25/2008
Tuesday, July 23, 2024 Page 2 of 6Print Date:
ACM only presents a health hazard when asbestos fibers are airborne and inhaled.
Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.
HEALTH ASPECTS:
Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.
CONDITIONS TO AVOID:
Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos
Program Manager.
REPORTS OF DAMAGE:
Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:
ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:
CAULKING MATERIAL EXTERIOR GROUND DEBRIS, CENTER
ALLEY
6/25/2008
EXTERIOR CAULKING, WEST CENTER PORCH AWNING ROOF 6/25/2008
DRYWALL AND JOINT MATERIAL CENTRAL ORIGINAL SECTCION AND
WES5T ADDITION OFFICE AREAS
6/25/2008
INTERIOR CAULKING, BASEMENT AREA CONCRETE CEILINGS
(HOLE PATCHINGS)
6/25/2008
DUCT SEALANT, GRAY BASEMENT AREA MECHANICAL
OVERHEAD HVAC DUCTS
6/25/2008
MISCELLANEOUS SEALANT CENTER ORIGINAL SECTION, SOUTH
CENTRAL MECHANICAL SPACE
GROUND
6/25/2008
DUCT SEALANT, BROWN EAST ADDITION, OVERHEAD HVAC
DUCTS
6/25/2008
12" GRAY FLOOR TILE AND ADHESIVE CENTER ORIGINAL SECTION HALL AND
OFFICE, BASEMENT MAIN AREAS;
NORTHWEST ADDITION MAIN AREA
6/25/2008
CARPET ADHESIVE ORIGINAL CENTER SECTION ROOMS;
EAST ADDITION SOUTHWEST ROOM;
WEST WING ADDITION, NORTHEAST
AND SOUTH CENTER ROOMS
6/25/2008
RESIDUAL MASTIC MIXED w/HM23 CARPET ADHESIVE
(SAME LOCATIONS); CENTER SECTION
SOUTH CENTER MECHANICAL ROOM
6/25/2008
TRANSITE PANEL MATERIAL EXTERIOR GROUND DEBRIS, WEST AND
SOUTH CENTER (SOURCE UNKNOWN)
6/25/2008
PIPE INSULATION 10/21/2002
PLASTER CEILING 12/10/1999
TSI-fittings. 12/10/1999
PIPE INSULATION 10/21/2002
TRANSITE PANEL MATERIAL EXTERIOR GROUND DEBRIS, WEST AND
SOUTH CENTER (SOURCE UNKNOWN)
8/4/2010
RESIDUAL MASTIC MIXED w/HM23 CARPET ADHESIVE
(SAME LOCATIONS); CENTER SECTION
SOUTH CENTER MECHANICAL ROOM
8/4/2010
EXTERIOR CAULKING, WEST CENTER PORCH AWNING ROOF;
NEW METAL DOORS AND WINDOW
8/4/2010
Tuesday, July 23, 2024 Page 3 of 6Print Date:
ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:
The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.
RECORDKEEPING:
CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837
Tuesday, July 23, 2024 Page 4 of 6Print Date:
SAMPLES COLLECTED
Sample Sample
Date
HA Sample Location Chr
Amo
Oth
Description
24-20-20 6/25/200820 EAST ADDITION, CNTR 0 0 012" WHITE w/ GRAY
FLOOR TILE AND
ADHESIVE
24-20-20tem 6/25/200820 EAST ADDITION, CNTR 0 0 012" WHITE w/ GRAY
FLOOR TILE AND
ADHESIVE
24-20-21 6/25/200820 EAST ADDITION, CNTR 0 0 012" WHITE w/ GRAY
FLOOR TILE AND
ADHESIVE
24-20-22 6/25/200820 EAST ADDITION, SW LOBBY 0 0 012" WHITE w/ GRAY
FLOOR TILE AND
ADHESIVE
24-21-20 6/25/200821 EAST ADDITION, CNTR OVHD 0 0 0DUCT SEALANT, BROWN
24-22-20 6/25/200822 CNTR HALL, SE 0 0 012" GRAY FLOOR TILE
AND ADHESIVE
w/WHITE
24-22-21 6/25/200822 SOUTH END OF BLDG 0 0 012" GRAY FLOOR TILE
AND ADHESIVE
w/WHITE
24-22-22 6/25/200822 WEST SIDE OF BLDG 0 0 012" GRAY FLOOR TILE
AND ADHESIVE
w/WHITE
24-22-23 6/25/200822 CNTR BASEMENT, SE 0 0 012" GRAY FLOOR TILE
AND ADHESIVE
w/WHITE
24-22-24 6/25/200822 CNTR BASEMENT, CNTR 0 0 012" GRAY FLOOR TILE
AND ADHESIVE
w/WHITE
24-23-20 6/25/200823 CNTR SECTION, SOUTH 0 0 0CARPET ADHESIVE YELLOW w/RESIDUAL
BLACK
24-23-21 6/25/200823 CNTR SECTION, EAST CNTR 0 0 0CARPET ADHESIVE YELLOW w/RESIDUAL
BLACK
24-23-22 6/25/200823 CNTR HALL, NORTH 0 0 0CARPET ADHESIVE YELLOW w/RESIDUAL
BLACK
24-23-23 6/25/200823 CNTR SECTION, NW OFFICE 0 0 0CARPET ADHESIVE YELLOW w/RESIDUAL
BLACK
24-23-24 6/25/200823 WEST WING, SW OFFICE 0 0 0CARPET ADHESIVE YELLOW w/RESIDUAL
BLACK
24-24-20 6/25/200824 CNTR SECTION, SOUTH CNTR
MECH RM
0 0 0RESIDUAL MASTIC BLACK
24-24-21 6/25/200824 CNTR SECTION, SOUTH CNTR
MECH RM
0 0 0RESIDUAL MASTIC BLACK
24-24-30 8/4/201024 CNTR SECTION, NE OFFICE 0 0 0RESIDUAL MASTIC BLACK
Tuesday, July 23, 2024 Page 5 of 6Print Date:
Sample Sample
Date
HA Sample Location Chr
Amo
Oth
Description
24-24-31 8/4/201024 CNTR SECTION, WEST CNTR
OFFICE
0 0 0RESIDUAL MASTIC BLACK
24-24-32 8/4/201024 BASEMENT, NW MAIN ROOM 0 0 0RESIDUAL MASTIC BLACK
24-24-33 8/4/201024 BASEMENT, SE MAIN ROOM 0 0 0RESIDUAL MASTIC BLACK
24-25-20 6/25/200825 CNTR SECTION, SOUTH CNTR
MECH RM
0 0 0MISCELLANEOUS
SEALANT
BLACK
24-26-20 6/25/200826 CNTR HALL, SOUTH WALL 0 0 0DRYWALL AND JOINT
MATERIAL
24-27-20 6/25/200827 BASEMENT, NE CLOSET 0 0 0INTERIOR CAULKING, WHITE
24-27-21 6/25/200827 BASEMENT, EAST CNTR
OFFICE
0 0 0INTERIOR CAULKING, WHITE
24-27-22 6/25/200827 BASEMENT, EAST CNTR
OFFICE
0 0 0INTERIOR CAULKING, WHITE
24-27-23 6/25/200827 BASEMENT, CNTR WEST 0 0 0INTERIOR CAULKING, WHITE
24-28-20 6/25/200828 BASEMENT, CNTR NORTH 0 0 0DUCT SEALANT, GRAY
24-28-21 6/25/200828 BASEMENT, SE 0 0 0DUCT SEALANT, GRAY
24-28-22 6/25/200828 BASEMENT, CNTR 0 0 0DUCT SEALANT, GRAY
24-29-20 6/25/200829 SOUTH CNTR EXT. GROUND 15 0 0TRANSITE PANEL
MATERIAL
DEBRIS
24-29-21 6/25/200829 WEST CNTR EXT. GROUND 15 0 0TRANSITE PANEL
MATERIAL
DEBRIS
24-30-20 6/25/200830 SOUTH CNTR EXT. GROUND 0 0 0ROOFING MATERIAL, TAR DEBRIS
24-31-20 6/25/200831 WEST CNTR MECH RM, EAST
WALL SOUTH
0 0 0INTERIOR CAULKING, GRAY
24-31-21 6/25/200831 WEST CNTR MECH RM, EAST
WALL NORTH
0 0 0INTERIOR CAULKING, GRAY
24-32-20 6/25/200832 NORTH CNTR ALLEY, SOUTH 0 0 0CAULKING MATERIAL WHITE
24-33-20 6/25/200833 CNTR SECTION, SE WINDOW 0 0 0EXTERIOR CAULKING, WHITE
24-33-30 8/4/201033 WEST CNTR METAL DOOR 0 0 0EXTERIOR CAULKING, WHITE
Tuesday, July 23, 2024 Page 6 of 6Print Date: