This is an Asbestos Inspection Report for Building #FC574 (a Barracks/Enlisted Quarters facility) at MCB Camp Lejeune, printed March 19, 2026. The building was constructed in 1986 and holds a Hazard Rank 0/BLUE classification as of September 2019. The report documents a comprehensive history of asbestos-containing materials (ACM) assessments dating back to July 2002, with major renovations conducted in 2014-2015 during which all known ACM was removed and the roofing system was stripped and replaced.

The inspection identifies one non-friable ACM currently present in the building: membrane-type roofing material located in the main roofing system at the perimeter flashings, measuring approximately 800 square feet and identified on 9/17/2019. No friable ACM records are found in the current database. The report documents extensive historical sampling data from multiple inspection dates (2002, 2005, 2008, 2012, 2013, and 2019) identifying previously tested and removed materials including 12-inch beige floor tile with adhesive, textured ceiling materials, various roofing sealants, duct sealants, and transite panel debris. Key guidance provided includes avoiding disturbance of remaining ACM materials and reporting any damage or changes in condition to the Camp Lejeune Asbestos Program Manager at 910-451-5837. The building is subject to periodic inspections to monitor changes in ACM condition.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS INSPECTION REPORT of:

Building # FC574

MCB CAMP LEJEUNE

Thursday, March 19, 2026

Print Date

Thursday, March 19, 2026 Page 1 of 9Print Date:

INSPECTION SUMMARY

BLDG #:

OCCUPANT:

YEAR BUILT:

BUILDING COMMENTS:

FC574

BEQ

HAZ RANK 0/BLUE [AH SEPT2019]

NO KNOWN ACM ID'D

SEPT2019

NO CHANGES, NO ACM ID'D

JUN2016

MAJOR RENOVATIONS 2014/15, ALL KNOWN ACM REMOVED; ROOFING SYSTEM STRIPPED AND REPLACED

DEC2013

TPM DEBRIS REMOVED/ NOT ID'D, ACM ROOFING MATERIALS REMAIN

SEPT2012

MAJOR RENOVATIONS, ACM ROOFING MATL'S REMAIN, ADDL ACM ID'D INCLUDES:

TRANSITE PANEL MATERIAL DEBRIS

NOV08:

PVS. ACM REMAINS, ADDL ACM INCLUDES:

THRESHOLD MASTIC

ROOFING SEALANTS, GRAY, BLACK

SEPT05:

PVS. ACM REMAINS, NO SAMPLING

INSPECT JUL02 AES

NON FRIABLE ACM INCLUDES:

12" BEIGE FLOOR TILE AND ADHESIVE (VARIOUS TYPES)

ASBESTOS MANAGER: 910-451-5837

Friable ACM(s) identified

Non-friable ACM(s) identified

Tested Non ACM or REMOVED Materials

DESCRIPTION LOCATION Date

NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

No friable ACM records found in database

NOTIFICATION OF ACM IN BUILDING

MEMBRANE-TYPE ROOFING 800 SFMAIN ROOFING SYSTEM AT PERIMETER

FLASHINGS (SEE ALSO HM32, 34, 38)

9/17/2019

Thursday, March 19, 2026 Page 2 of 9Print Date:

ROOFING SEALANT, BLACK ROOF VENTS AND PERIMETER

FLASHINGS (SEE ALSO HM34, 36, 38)

11/5/2008

TEXTURED CEILING MATERIAL THROUGHOUT HOMOGENOUS

BUILDINGS

9/20/2005

MISCELLANEOUS SEALANT MECHANICAL ROOMS AND CHASES ON

HVAC DUCTS

11/5/2008

DUCT SEALANT, GRAY MECHANICAL ROOMS AND CHASES ON

HVAC DUCTS

11/5/2008

ROOFING MATERIAL, ROOF SYSTEM EXPANSION JOINT

SEAMS

11/5/2008

MEMBRANE-TYPE ROOFING MAIN ROOFING SYSTEM AT PERIMETER

FLASHINGS (SEE ALSO HM32, 34, 38)

11/5/2008

JOINT MATERIAL WALLS THROUGHOUT 11/5/2008

12" BEIGE FLOOR TILE AND ADHESIVE THIRD FLOOR LOUNGE 7/18/2002

DUCT SEALANT, RED MECHANICAL ROOMS, PIPE CHASES 7/18/2002

PITCH POCKET TAR ROOF CONDUIT PENETRATIONS 11/5/2008

HVAC DUCT INSULATION DORM ROOMS HVAC HEAT-AC UNITS

INTERNAL INSULATION

11/5/2008

FLOOR TILE PIPE CHASE ENTRANCE 11/5/2008

CONCRETE EXPANSION JOINT MATERIAL AROUND EXTERIOR DECKING OF

HOMOGENOUS BUILDINGS

9/20/2005

EXTERIOR CAULKING, DOORS TO CHASES THROUGHOUT 9/20/2005

DUCT SEALANT, GRAY CHASES AND ATTIC/OLD ROOF DUCTS

THROUGHOUT HOMOGENOUS

BUILDINGS

9/20/2005

MISCELLANEOUS SEALANT MECHANICAL ROOMS AND CHASES AT

CABLE/ PIPE PENETRATIONS

11/5/2008

FIBROUS DEBRIS THIRD FLOOR NORTH PIPE CHASE 11/5/2008

INTERIOR CAULKING, DORM ROOMS 11/5/2008

FIBROUS DEBRIS FIRST FLOOR SOUTH PIPE CHASE 11/5/2008

MISCELLANEOUS FLOOR COVERINGS, DORM ROOMS 11/5/2008

DUCT SEALANT, BROWN MECHANICAL ROOMS AND CHASES ON

HVAC DUCTS

11/5/2008

ROOFING SEALANT, GRAY ROOF SYSTEM EXPANSION JOINT

SEAMS PATCHING (SEE ALSO HM32, 34,

36)

11/5/2008

CONCRETE EXPANSION JOINT MATERIAL EXTERIOR BRICK JOINTS 11/5/2008

TEXTURED CEILING MATERIAL OFFICES AND LIVING QUARTERS

THROUGHOUT

7/18/2002

ROOFING SEALANT, BLACK ROOFING WALK PADS 11/5/2008

VINYL THRESHOLD MATERIAL CENTER CORRIDORS AT LAUNDRY/

UTILITY

11/5/2008

ROOFING SEALANT, GRAY ROOF PARAPET WALL PATCHING (SEE

ALSO HM32, 36, 38)

11/5/2008

MUDDED FITTING(S) MECH ROOMS, PIPE CHASES 7/18/2002

Thursday, March 19, 2026 Page 3 of 9Print Date:

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

HEALTH ASPECTS:

Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.

CONDITIONS TO AVOID:

CLOTH LAGGING MATERIAL THROUGHOUT THIS AND

HOMOGENOUS BUILDINGS IN CHASE

9/20/2005

TRANSITE PANEL MATERIAL NORTHWEST EXTERIOR GROUND

DEBRIS UNCOVERED DURING

RENOVATION EXCAVATIONS;

ADDITIONAL DEBRIS MAY BE PRESENT

AROUND EXTERIOR

9/5/2012

12" BLACK FLOOR TILE AND ADHESIVE CENTRAL LOUNGES 7/18/2002

12" WHITE FLOOR TILE AND ADHESIVE CENTRAL LOUNGES 7/18/2002

12" BEIGE FLOOR TILE AND ADHESIVE THROUGHOUT OFFICES, LIVING

QUARTERS, AND LOUNGES (UNDER

OTHER)

7/18/2002

2'x2' CEILING TILE, OFFICES, LOUNGES 7/18/2002

12" BEIGE FLOOR TILE AND ADHESIVE SECOND FLOOR LOUNGE (UNDER

CARPET/ TILE)

7/18/2002

12" BEIGE FLOOR TILE AND ADHESIVE THROUGHOUT OFFICES, LIVING

QUARTERS, AND LOUNGES (UNDER

OTHER)

9/21/2005

12" BEIGE FLOOR TILE AND ADHESIVE 2ND FLOOR LOUNGE (UNDER

CARPET/TILE)

11/5/2008

12" BEIGE FLOOR TILE AND ADHESIVE 3RD FLOOR LOUNGE 11/5/2008

12" BEIGE FLOOR TILE AND ADHESIVE 2ND FLOOR LOUNGE (UNDER

CARPET/TILE)

9/21/2005

12" BEIGE FLOOR TILE AND ADHESIVE 3RD FLOOR LOUNGE 9/21/2005

12" BEIGE FLOOR TILE AND ADHESIVE THROUGHOUT OFFICES, LIVING

QUARTERS, AND LOUNGES (UNDER

OTHER)

11/5/2008

ROOFING SEALANT, GRAY ROOF SYSTEM EXPANSION JOINT

SEAMS PATCHING (SEE ALSO HM32, 34,

36)

12/9/2013

ROOFING SEALANT, BLACK ROOF VENTS AND PERIMETER

FLASHINGS (SEE ALSO HM34, 36, 38)

9/5/2012

ROOFING SEALANT, GRAY ROOF PARAPET WALL PATCHING (SEE

ALSO HM32, 36, 38)

9/5/2012

MEMBRANE-TYPE ROOFING MAIN ROOFING SYSTEM AT PERIMETER

FLASHINGS (SEE ALSO HM32, 34, 38)

9/5/2012

ROOFING SEALANT, BLACK ROOF VENTS AND PERIMETER

FLASHINGS (SEE ALSO HM34, 36, 38)

12/9/2013

ROOFING SEALANT, GRAY ROOF PARAPET WALL PATCHING (SEE

ALSO HM32, 36, 38)

12/9/2013

MEMBRANE-TYPE ROOFING MAIN ROOFING SYSTEM AT PERIMETER

FLASHINGS (SEE ALSO HM32, 34, 38)

12/9/2013

ROOFING SEALANT, GRAY ROOF SYSTEM EXPANSION JOINT

SEAMS PATCHING (SEE ALSO HM32, 34,

36)

9/5/2012

Thursday, March 19, 2026 Page 4 of 9Print Date:

Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.

CONDITIONS TO AVOID:

Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos

Program Manager.

REPORTS OF DAMAGE:

Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:

ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:

The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.

RECORDKEEPING:

CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837

Thursday, March 19, 2026 Page 5 of 9Print Date:

SAMPLES COLLECTED

Sample Sample

Date

HA Sample Location Chr

Amo

Oth

Description

FC574-01-01 7/18/200201 1ST FL LOUNGE 0 0 012" BLACK FLOOR TILE

AND ADHESIVE

FC574-01-02 7/18/200201 1ST FL LOUNGE 0 0 012" BLACK FLOOR TILE

AND ADHESIVE

FC574-02-03 7/18/200202 1ST FL LOUNGE 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

FC574-02-04 7/18/200202 1ST FL LOUNGE 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

FC574-03-00ri05 9/21/200503 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

TYPE I

FC574-03-00ri07 11/5/200803 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

TYPE I

FC574-03-05 7/18/200203 1ST FL LOUNGE 8 0 012" BEIGE FLOOR TILE

AND ADHESIVE

TYPE I

FC574-03-06 7/18/200203 1ST FL LOUNGE 8 0 012" BEIGE FLOOR TILE

AND ADHESIVE

TYPE I

FC574-04-07 7/18/200204 1ST FL LOUNGE 0 0 02'x2' CEILING TILE, FC574-04-08 7/18/200204 1ST FL LOUNGE 0 0 02'x2' CEILING TILE, FC574-05-00ri05 9/21/200505 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

TYPE II

FC574-05-00ri07 11/5/200805 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

TYPE II

FC574-05-09 7/18/200205 2ND FL LOUNGE (UNDER

CARPET)

10 0 012" BEIGE FLOOR TILE

AND ADHESIVE

TYPE II

FC574-06-00ri05 9/21/200506 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

TYPE III

FC574-06-00ri07 11/5/200806 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

TYPE III

FC574-06-10 7/18/200206 3RD FL LOUNGE 10 0 012" BEIGE FLOOR TILE

AND ADHESIVE

TYPE III

FC574-07-11 7/18/200207 1ST FL MR 0 0 0DUCT SEALANT, RED

FC574-08-12 7/18/200208 1ST FL MR 0 0 0MUDDED FITTING(S)

FC574-08-13 7/18/200208 3RD FL MR 0 0 0MUDDED FITTING(S)

Thursday, March 19, 2026 Page 6 of 9Print Date:

HA Sample Location Chr

Amo

Oth

Description

FC574-09-14 7/18/200209 1ST FL OFFICE 0 0 0TEXTURED CEILING

MATERIAL

FC574-09-15 7/18/200209 1ST FL OFFICE 0 0 0TEXTURED CEILING

MATERIAL

FC574-10-10 9/20/200510 1ST FLOOR TOILET 0 0 0CLOTH LAGGING

MATERIAL

BLUE/ WHITE RUBBERY

FC574-11-10 9/20/200511 SW RESTROOM WALL 0 0 0EXTERIOR CAULKING, GRAY

FC574-12-10 9/20/200512 PIPE CHASE 0 0 0DUCT SEALANT, GRAY

FC574-13-10 9/20/200513 1ST FL OFFICE 0 0 0TEXTURED CEILING

MATERIAL

FC574-14-10 9/20/200514 1ST FL CENTER OFFICE 0 0 0CONCRETE EXPANSION

JOINT MATERIAL

GRAY

FC574-20-20 11/5/200820 1ST FL NORTH CHASE 0 0 0FLOOR TILE BLACK

FC574-21-20 11/5/200821 1ST FL NORTH WING, SW

ROOM

0 0 0INTERIOR CAULKING, WHITE

FC574-21-21 11/5/200821 1ST FL SOUTH WING, CNTR

ROOM

0 0 0INTERIOR CAULKING, WHITE

FC574-21-22 11/5/200821 1ST FL NORTH WING, NE

ROOM

0 0 0INTERIOR CAULKING, WHITE

FC574-22-20 11/5/200822 1ST FL SOUTH CHASE 0 0 0FIBROUS DEBRIS

FC574-23-20 11/5/200823 1ST FLOOR 0 0 0MISCELLANEOUS

FLOOR COVERINGS,

BROWN w/ADHESIVE

FC574-24-20 11/5/200824 1ST FL CNTR OFFICES 0 0 0JOINT MATERIAL

FC574-24-21 11/5/200824 1ST FL SE ROOM 0 0 0JOINT MATERIAL

FC574-24-22 11/5/200824 1ST FL NE ROOM 0 0 0JOINT MATERIAL

FC574-24-23 11/5/200824 2ND FL NW ROOM 0 0 0JOINT MATERIAL

FC574-24-24 11/5/200824 2ND FL SW ROOM 0 0 0JOINT MATERIAL

FC574-24-25 11/5/200824 2ND FL SE ROOM 0 0 0JOINT MATERIAL

FC574-24-26 11/5/200824 3RD FL CNTR OFFICE 0 0 0JOINT MATERIAL

FC574-24-27 11/5/200824 3RD FL NW ROOM 0 0 0JOINT MATERIAL

FC574-24-28 11/5/200824 3RD FL SE ROOM 0 0 0JOINT MATERIAL

Thursday, March 19, 2026 Page 7 of 9Print Date:

HA Sample Location Chr

Amo

Oth

Description

FC574-25-20 11/5/200825 1ST FL SOUTH MR 0 0 0DUCT SEALANT, BROWN

FC574-25-21 11/5/200825 2ND FL NORTH MR 0 0 0DUCT SEALANT, BROWN

FC574-26-20 11/5/200826 1ST FL SOUTH MR 0 0 0MISCELLANEOUS

SEALANT

WHITE

FC574-26-21 11/5/200826 2ND FL NORTH MR 0 0 0MISCELLANEOUS

SEALANT

WHITE

FC574-27-20 11/5/200827 1ST FL SW MR 0 0 0DUCT SEALANT, GRAY

FC574-28-20 11/5/200828 1ST FL SE ROOM 0 0 0HVAC DUCT

INSULATION

INTERNAL

FC574-29-20 11/5/200829 2ND FL UTILITY 2 0 0VINYL THRESHOLD

MATERIAL

BROWN

FC574-30-20 11/5/200830 3RD FL NORTH MR 0 0 0MISCELLANEOUS

SEALANT

GRAY

FC574-31-20 11/5/200831 3RD FL NORTH CHASE,

SOUTH

0 0 0FIBROUS DEBRIS

FC574-32-00ri12 9/5/201232 N/A 9 9 9ROOFING SEALANT, BLACK

METAL VENTS

FC574-32-00ri13 12/9/201332 N/A 9 9 9ROOFING SEALANT, BLACK

METAL VENTS

FC574-32-20 11/5/200832 NORTH STAIR ROOF

PERIMETER

0 0 0ROOFING SEALANT,

BLACK

METAL VENTS

FC574-32-21 11/5/200832 CENTER ROOF VENT 6 0 0ROOFING SEALANT,

BLACK

METAL VENTS

FC574-33-20 11/5/200833 SOUTH CENTER PAD 0 0 0ROOFING SEALANT,

BLACK

FC574-34-00ri12 9/5/201234 N/A 9 9 9ROOFING SEALANT, GRAY

FC574-34-00ri13 12/9/201334 N/A 9 9 9ROOFING SEALANT, GRAY

FC574-34-20 11/5/200834 NW PARAPET, CNTR 4 0 0ROOFING SEALANT,

GRAY

FC574-35-20 11/5/200835 FLAT ROOF,NORTH 0 0 0PITCH POCKET TAR

FC574-36-00ri12 9/5/201236 N/A 9 9 9MEMBRANE-TYPE

ROOFING

BLACK

FC574-36-00ri13 12/9/201336 N/A 9 9 9MEMBRANE-TYPE

ROOFING

BLACK

Thursday, March 19, 2026 Page 8 of 9Print Date:

HA Sample Location Chr

Amo

Oth

Description

FC574-36-20 11/5/200836 SOUTH STAIR ROOF 0 0 0MEMBRANE-TYPE

ROOFING

BLACK

FC574-36-21 11/5/200836 WEST CENTER ROOF 2 0 0MEMBRANE-TYPE

ROOFING

BLACK

FC574-36-40 9/17/201936 ATTIC, SOUTH CNTR 0 0 0MEMBRANE-TYPE

ROOFING

BLACK

FC574-37-20 11/5/200837 ROOF EAST CENTER 0 0 0ROOFING MATERIAL, BLACK

FC574-38-00ri12 9/5/201238 N/A 9 9 9ROOFING SEALANT, GRAY

FC574-38-00ri13 12/9/201338 N/A 9 9 9ROOFING SEALANT, GRAY

FC574-38-20 11/5/200838 ROOF EAST CENTER 10 0 0ROOFING SEALANT,

GRAY

FC574-39-20 11/5/200839 3RD FL WEST CNTR 0 0 0CONCRETE EXPANSION

JOINT MATERIAL

GRAY

FC574-40-00ri12 9/5/201240 N/A 9 9 9TRANSITE PANEL

MATERIAL

GRAY

Thursday, March 19, 2026 Page 9 of 9Print Date:

File details come from the government source that posted it. Updated .