This is an Asbestos Inspection Report for Building FC525 (BEQ-2ND Supply), a 1978-constructed barracks facility at MCB Camp Lejeune, dated March 19, 2026. The building is classified as Hazard Rank 3/Green with asbestos-containing materials (ACM) identified through multiple surveys conducted between 2002 and 2022. Two non-friable ACM materials remain present: miscellaneous sealant under shower stalls in mechanical room conversions (332 square feet, identified November 4, 2008) and roofing material along the roofing perimeter under existing decking and sidewalls (identified May 10, 2022). No friable ACM has been identified in the building. Historical testing documented numerous ACM materials that have since been removed or tested as non-ACM, including 12-inch beige floor tile and adhesive, roofing sealants, textured ceiling material, duct sealants, caulking materials, pipe insulation, and joint materials throughout offices, living quarters, lounges, mechanical rooms, and pipe chases.
The report emphasizes that intact, undisturbed ACM does not constitute a significant health hazard to occupants; however, the building is subject to periodic inspections to monitor material condition. The Camp Lejeune Asbestos Program Manager (phone: 910-451-5837) maintains the survey record and must be notified of any damage, dust, debris, or changes in ACM condition. Personnel are instructed to avoid disturbance of ACM and refrain from sanding, grinding, abrading, or damaging materials with any equipment. Corrective action protocols are in place to minimize fiber release and protect personnel in response to any identified damage. The report includes detailed documentation of 56 samples collected between July 2002 and May 2022, with chrysotile percentages ranging from 0 to 60 percent for identified ACM materials.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS INSPECTION REPORT of:
Building # FC525
MCB CAMP LEJEUNE
Thursday, March 19, 2026
Print Date
Thursday, March 19, 2026 Page 1 of 10Print Date:
INSPECTION SUMMARY
BLDG #:
OCCUPANT:
YEAR BUILT:
BUILDING COMMENTS:
FC525
BEQ- 2ND SUPPLY
HAZ RANK 3/GREEN [AH MAY2022]
ACM SEALANT AT OLD SHOWER PANS IN MECHANICAL SPACES
SEPT2019
LIMITED ACM REMAINS
JUN2016
ACM REMAINS, ADDL SAMPLING, NO ADDL ACM I'D
DEC2013
ACM TILE AND MASTIC REMAIN, ADDL SAMPLING, ACM INCLUDES:
LIGHT HEAT SHIELDING
NOV2011
PVS. ACM REMAINS
NOV08/ APR09
PVS. ACM TILE REMAINS, VERIFIED TEM, ADDL SAMPLING, ACM INCLUDES:
MISCELLANEOUS SEALANT, BLACK
ROOFING SEALANTS, BLACK
SEP05
PVS. ACM TILE AND MASTIC REMAIN
JUL02 AES
ACM INCLUDES:
12" BEIGE FLOOR TILE AND MASTIC
ASBESTOS MANAGER: 910-451-5837
Friable ACM(s) identified
Non-friable ACM(s) identified
NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.
DESCRIPTION LOCATION Date Quantity
DESCRIPTION LOCATION Date Quantity
No friable ACM records found in database
NOTIFICATION OF ACM IN BUILDING
MISCELLANEOUS SEALANT 332 SFUNDER SHOWER STALLS, ACCESSIBLE
AT MECHANICAL ROOM CONVERSIONS,
LIKELY PRESENT AT ALL SHOWER
UNITS
11/4/2008
ROOFING MATERIAL, ROOFING PERIMETER, UNDER EXISTING
ON DECK AND SIDEWALL
5/10/2022
Thursday, March 19, 2026 Page 2 of 10Print Date:
Tested Non ACM or REMOVED Materials
DESCRIPTION LOCATION Date
MISCELLANEOUS SEALANT 18 SFUNDER SHOWER STALLS AT
MECHANICAL ROOMS ONLY
9/17/2019
MISCELLANEOUS SEALANT 332 SFUNDER SHOWER STALLS, ACCESSIBLE
AT MECHANICAL ROOM CONVERSIONS,
LIKELY PRESENT AT ALL SHOWER
UNITS
11/8/2011
MISCELLANEOUS SEALANT 332 SFUNDER SHOWER STALLS, ACCESSIBLE
AT MECHANICAL ROOM CONVERSIONS,
LIKELY PRESENT AT ALL SHOWER
UNITS
12/2/2013
MISCELLANEOUS SEALANT 332 SFUNDER SHOWER STALLS, ACCESSIBLE
AT MECHANICAL ROOM CONVERSIONS,
LIKELY PRESENT AT ALL SHOWER
UNITS
6/9/2016
ROOFING SEALANT, BLACK ROOF, BUCKET OF USED ROOF
SEALANT, CENTER SOUTH (SEE ALSO
HM28)
11/4/2008
12" BEIGE FLOOR TILE AND ADHESIVE THIRD FLOOR LOUNGE (SEE ALSO
HM03)
7/18/2002
12" BEIGE FLOOR TILE AND ADHESIVE PRIMARY TILE THROUGHOUT OFFICES,
LIVING QUARTERS, AND LOUNGES
(UNDER HM01, 02)
7/18/2002
12" WHITE FLOOR TILE AND ADHESIVE CENTRAL LOUNGES w/HM01 7/18/2002
JOINT MATERIAL WALLS AND CEILINGS AT HEAD AREAS
THROUGHOUT
11/4/2008
MUDDED FITTING(S) MECHANICAL ROOMS AND PIPE
CHASES, END CAPPING ON FIBERGLASS
LINES
7/18/2002
PIPE INSULATION DORM ROOM HEADS AND PIPE CHASES 11/4/2008
MISCELLANEOUS SEALANT MECHANICAL ROOMS AND PIPE
CHASES AT PIPE AND CONDUIT
PENETRATIONS
4/15/2009
BUILT-UP ROOFING ROOFING SYSTEM, PERIMETER
PARAPET WALLS
11/4/2008
DUCT SEALANT, RED MECHANICAL ROOMS AND PIPE CHASES 7/18/2002
GASKET MATERIAL PIPE CHASES AND MECHANICAL ROOMS 9/20/2005
INTERIOR CAULKING, CEILINGS AT PERIMETER AND CENTER
JOINTS; BLOCK WALL JOINTS
11/4/2008
CONCRETE EXPANSION JOINT MATERIAL AROUND EXTERIOR DECKING,
HOMOGENOUS BUILDING GROUP
9/20/2005
12" BEIGE FLOOR TILE AND ADHESIVE SECOND FLOOR LOUNGE UNDER
CARPETING (SEE ALSO HM03)
7/18/2002
INTERIOR CAULKING, METAL DOORS 11/4/2008
Thursday, March 19, 2026 Page 3 of 10Print Date:
2'x2' CEILING TILE, CENTRAL OFFICES, LOUNGES 7/18/2002
ROOFING SEALANT, BLACK ROOF, CENTER VENT FLASHINGS 11/4/2008
BUILT-UP ROOFING ROOFING SYSTEM MAIN MEMBRANE 11/4/2008
TEXTURED CEILING MATERIAL OFFICES AND LIVING QUARTERS
THROUGHOUT
7/18/2002
12" BLACK FLOOR TILE AND ADHESIVE CENTRAL LOUNGES w/HM02 7/18/2002
EXTERIOR CAULKING, EXTERIOR BRICK WALL EXPANSION
JOINTS (w/HM25)
11/4/2008
DUCT SEALANT, GRAY CHASES AND ATTIC/ OLD ROOF DUCTS
THROUGHOUT HOMOGENOUS
BUILDING GROUPS
9/20/2005
EXTERIOR CAULKING, BRICK EXPANSION JOINTS AND BLOCK
CORNER JOINTS THROUGHOUT (SEE
ALSO HM24, 25)
4/15/2009
CLOTH LAGGING MATERIAL PIPE CHASES AND MECHANICAL ROOMS 9/20/2005
EXTERIOR CAULKING, METAL DOORS TO MECHANICAL ROMS
AND CHASES THROUGHOUT
9/20/2005
LIGHT FIXTURE HEAT SHIELD CENTER HALL GEAR LOCKERS, ALL
THREE FLOORS
12/2/2013
ROOFING SEALANT, GRAY [NEW] ROLLED ROOF SEAMS AT
PARAPET WALL AND CENTER VENT
FLASHINGS
11/8/2011
DUCT SEALANT, RED PIPE CHASE AND HEAD VENT DUCTS 11/8/2011
CLOTH LAGGING MATERIAL DOMESTIC HOT LINE PATCHING IN PIPE
CHASES
11/8/2011
EXTERIOR CAULKING, EXTERIOR BRICK WALL EXPANSION
JOINTS (w/HM24)
11/4/2008
ADHESIVE ROOM HEADS, TILE WALLS 11/4/2008
ROOFING SEALANT, BLACK ROOF, NORTH END DEBRIS AND
PATCHING PILE (SEE ALSO HM31)
11/4/2008
FIBERGLASS INSULATION SEALANT ATTIC, NEW EQUIPMENT 5/10/2022
TEXTURED CEILING MATERIAL MECHANICAL ROOMS 5/10/2022
CAULKING MATERIAL MECHANICAL ROOMS AT FORMER
WALL LOCATIONS
5/10/2022
MISCELLANEOUS SEALANT MECHANICAL CENTER CHASES 5/10/2022
ROPE PACKING MATERIAL CENTRAL CHASES AT DRAIN LINES 6/9/2016
DUCT SEALANT, RED CENTRAL CHASES ON BATH EXHAUST
FAN DUCTING
6/9/2016
12" BEIGE FLOOR TILE AND ADHESIVE 3RD FLOOR LOUNGE 11/4/2008
12" BEIGE FLOOR TILE AND ADHESIVE THIRD FLOOR LOUNGE (SEE ALSO
HM03)
9/20/2005
12" BEIGE FLOOR TILE AND ADHESIVE PRIMARY TILE THROUGHOUT OFFICES,
LIVING QUARTERS, AND LOUNGES
(UNDER HM01, 02)
11/8/2011
12" BEIGE FLOOR TILE AND ADHESIVE SECOND FLOOR LOUNGE UNDER
CARPETING (SEE ALSO HM03)
11/4/2008
Thursday, March 19, 2026 Page 4 of 10Print Date:
ACM only presents a health hazard when asbestos fibers are airborne and inhaled.
Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.
HEALTH ASPECTS:
Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.
CONDITIONS TO AVOID:
Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos
Program Manager.
REPORTS OF DAMAGE:
Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:
ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:
The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.
RECORDKEEPING:
CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837
12" BEIGE FLOOR TILE AND ADHESIVE THROUGHOUT OFFICES, LIVING
QUARTERS, AND LOUNGES (UNDER
OTHER)
11/4/2008
12" BEIGE FLOOR TILE AND ADHESIVE PRIMARY TILE THROUGHOUT OFFICES,
LIVING QUARTERS, AND LOUNGES
(UNDER HM01, 02)
9/20/2005
12" BEIGE FLOOR TILE AND ADHESIVE PRIMARY TILE THROUGHOUT OFFICES,
LIVING QUARTERS, AND LOUNGES
(UNDER HM01, 02)
12/2/2013
ROOFING SEALANT, BLACK ROOF, CENTER VENT FLASHINGS 12/2/2013
12" BEIGE FLOOR TILE AND ADHESIVE SECOND FLOOR LOUNGE UNDER
CARPETING (SEE ALSO HM03)
9/20/2005
LIGHT FIXTURE HEAT SHIELD CENTER HALL GEAR LOCKERS, ALL
THREE FLOORS
6/9/2016
12" BEIGE FLOOR TILE AND ADHESIVE PRIMARY TILE THROUGHOUT OFFICES,
LIVING QUARTERS, AND LOUNGES
(UNDER HM01, 02)
6/9/2016
Thursday, March 19, 2026 Page 5 of 10Print Date:
SAMPLES COLLECTED
Sample Sample
Date
HA Sample Location Chr
Amo
Oth
Description
FC525-01-01 7/18/200201 1ST FL LOUNGE 0 0 012" BLACK FLOOR TILE
AND ADHESIVE
FC525-01-02 7/18/200201 1ST FL LOUNGE 0 0 012" BLACK FLOOR TILE
AND ADHESIVE
FC525-02-03 7/18/200202 1ST FL LOUNGE 0 0 012" WHITE FLOOR TILE
AND ADHESIVE
FC525-02-04 7/18/200202 1ST FL LOUNGE 0 0 012" WHITE FLOOR TILE
AND ADHESIVE
FC252-03-30tem 11/8/201103 1ST FL WEST CNTR OFFICE 9.1 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-00ri05 9/21/200503 N/A 9 9 912" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-00ri13 12/2/201303 N/A 9 9 912" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-00ri16 6/9/201603 N/A 9 9 912" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-05 7/18/200203 1ST FL LOUNGE 8 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-06 7/18/200203 1ST FL LOUNGE 8 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-20 4/15/200903 SE DORM ROOM 2 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-21 4/15/200903 NW DORM RM 2 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-21tem 4/15/200903 NW DORM RM 6.2 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-22 4/15/200903 2ND FL, NW DORM RM 2 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-23 4/15/200903 2ND FL EAST, CNTR DORM
RM
5 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-23tem 4/15/200903 2ND FL EAST, CNTR DORM
RM
34.5 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-24 4/15/200903 3RD FL, NW DORM RM 33.4 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-24 4/15/200903 3RD FL, NW DORM RM 5 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
Thursday, March 19, 2026 Page 6 of 10Print Date:
HA Sample Location Chr
Amo
Oth
Description
FC525-03-25 4/15/200903 3RD FL NE DORM RM 5 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-03-30 11/8/201103 1ST FL WEST CNTR OFFICE 3 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE I
FC525-04-07 7/18/200204 1ST FL LOUNGE 0 0 02'x2' CEILING TILE, FC525-04-08 7/18/200204 1ST FL LOUNGE 0 0 02'x2' CEILING TILE, FC525-05-00ri05 9/21/200505 N/A 9 9 912" BEIGE FLOOR TILE
AND ADHESIVE
TYPE II
FC525-05-00ri07 11/4/200805 N/A 9 9 912" BEIGE FLOOR TILE
AND ADHESIVE
TYPE II
FC525-05-09 7/18/200205 2ND FL LOUNGE UNDER
CARPET
10 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE II
FC525-06-00ri05 9/21/200506 N/A 9 9 912" BEIGE FLOOR TILE
AND ADHESIVE
TYPE III
FC525-06-00ri07 11/4/200806 N/A 9 9 912" BEIGE FLOOR TILE
AND ADHESIVE
TYPE III
FC525-06-10 7/18/200206 THIRD FLOOR LOUNGE 10 0 012" BEIGE FLOOR TILE
AND ADHESIVE
TYPE III
FC525-07-11 7/18/200207 1ST FL NORTH MECH RM 0 0 0DUCT SEALANT, RED
FC525-07-12 7/18/200207 1ST FL NORTH MECH RM 0 0 0DUCT SEALANT, RED
FC525-08-12 7/18/200208 1ST FL MECH RM 0 0 0MUDDED FITTING(S)
FC525-08-12 7/18/200208 1ST FL MECH RM 0 0 0MUDDED FITTING(S)
FC525-08-13 7/18/200208 3RD FL NORTH CHASE 0 0 0MUDDED FITTING(S)
FC525-09-14 7/18/200209 1ST FL SOUTH, NE OFFICE 0 0 0TEXTURED CEILING
MATERIAL
FC525-09-15 7/18/200209 1ST FL SOUTH, NE OFFICE 0 0 0TEXTURED CEILING
MATERIAL
FC525-10-00 9/20/200510 1ST FL HEAD, FC555 0 0 0CLOTH LAGGING
MATERIAL
BLUE/WHITE RUBBERY
FC525-11-00 9/20/200511 SW, FC555 0 0 0EXTERIOR CAULKING, GRAY
FC525-12-00 9/20/200512 CHASE, FC555 0 0 0DUCT SEALANT, GRAY
FC525-13-00 9/20/200513 FC565 0 0 0GASKET MATERIAL
Thursday, March 19, 2026 Page 7 of 10Print Date:
HA Sample Location Chr
Amo
Oth
Description
FC525-14-00 9/20/200514 CENTER OFFICE, FC555 0 0 0CONCRETE EXPANSION
JOINT MATERIAL
GRAY
FC525-14-10 9/20/200514 ROOM 216, BUILDING 565 0 0 0CONCRETE EXPANSION
JOINT MATERIAL
GRAY
FC525-20-20 11/4/200820 1ST FL SOUTH, NW OFFICE
DOOR
0 0 0INTERIOR CAULKING, GRAY
FC525-20-21 11/4/200820 2ND FL SOUTH CHASE,
SOUTH DOOR
0 0 0INTERIOR CAULKING, GRAY
FC525-21-00ri11 11/8/201121 N/A 9 9 9MISCELLANEOUS
SEALANT
BLACK
FC525-21-00ri13 12/2/201321 N/A 9 9 9MISCELLANEOUS
SEALANT
BLACK
FC525-21-00ri16 6/9/201621 N/A 9 9 9MISCELLANEOUS
SEALANT
BLACK
FC525-21-00ri19 9/17/201921 N/A 9 9 9MISCELLANEOUS
SEALANT
BLACK
FC525-21-20 11/4/200821 1ST FL SOUTH, EAST MECH
RM
5 0 0MISCELLANEOUS
SEALANT
BLACK
FC525-22-20 11/4/200822 1ST FL SOUTH, EAST MECH
RM
0 0 0INTERIOR CAULKING, WHITE
FC525-22-21 11/4/200822 2ND FL SOUTH CHASE 0 0 0INTERIOR CAULKING, WHITE
FC525-22-22 11/4/200822 3RD FL SOUTH, EAST MECH
RM
0 0 0INTERIOR CAULKING, WHITE
FC525-23-20 11/4/200823 1ST FL SOUTH, SE RM 0 0 0JOINT MATERIAL
FC525-23-21 11/4/200823 1ST FL NORTH, NE RM 0 0 0JOINT MATERIAL
FC525-23-22 11/4/200823 2ND FL NORTH, NW RM 0 0 0JOINT MATERIAL
FC525-23-23 11/4/200823 2ND FL SOUTH, SW RM 0 0 0JOINT MATERIAL
FC525-23-24 11/4/200823 2ND FL SOUTH, NE RM 0 0 0JOINT MATERIAL
FC525-23-25 11/4/200823 3RD FL NORTH, NW RM 0 0 0JOINT MATERIAL
FC525-23-26 11/4/200823 3RD FL SOUTH, SW RM 0 0 0JOINT MATERIAL
FC525-23-27 11/4/200823 3RD FL SOUTH, NE RM 0 0 0JOINT MATERIAL
FC525-23-28 11/4/200823 3RD FL NORTH, NE RM 0 0 0JOINT MATERIAL
FC525-24-20 11/4/200824 2ND FL EAST CNTR 0 0 0EXTERIOR CAULKING, GRAY
Thursday, March 19, 2026 Page 8 of 10Print Date:
HA Sample Location Chr
Amo
Oth
Description
FC525-25-20 11/4/200825 2ND FL EAST CNTR 0 0 0EXTERIOR CAULKING, WHITE
FC525-26-20 11/4/200826 3RD FL NORTH WING, NW 0 0 0PIPE INSULATION
FC525-27-20 11/4/200827 3RD FL NORTH, EAST MR 0 0 0ADHESIVE BEIGE
FC525-28-20 11/4/200828 ROOF, NORTH CNTR 10 0 0ROOFING SEALANT,
BLACK
FC525-29-20 11/4/200829 ROOF, CNTR NORTH VENT 10 0 0ROOFING SEALANT,
BLACK
FC525-29-40 12/2/201329 SOUTH ROOF 0 0 0ROOFING SEALANT,
BLACK
FC525-29-41 12/2/201329 NORTH ROOF 0 0 0ROOFING SEALANT,
BLACK
FC525-30-20 11/4/200830 ROOF, CNTR SOUTH 0 0 0BUILT-UP ROOFING
FC525-31-20 11/4/200831 ROOF, CNTR SOUTH 10 0 0ROOFING SEALANT,
BLACK
FC525-32-20 11/4/200832 ROOF, EAST CNTR 0 0 0BUILT-UP ROOFING
FC525-33-20 4/15/200933 3RD FLR, NE MECH ROOM 0 0 0MISCELLANEOUS
SEALANT
RED
FC525-34-20 4/15/200934 2ND FLR CNTR STAIRS 0 0 0EXTERIOR CAULKING, BEIGE
FC525-34-21 4/15/200934 1ST FLR, EAST CENTER 0 0 0EXTERIOR CAULKING, BEIGE
FC525-40-30 11/8/201140 ROOF, PARAPET NW 0 0 0ROOFING SEALANT,
GRAY
FC525-41-30 11/8/201141 3RD FL NORTH CHASE 0 0 0DUCT SEALANT, RED
FC525-41-31 11/8/201141 2ND FL SOUTH CHASE 0 0 0DUCT SEALANT, RED
FC525-42-30 11/8/201142 3RD FL NORTH CHASE 0 0 0CLOTH LAGGING
MATERIAL
THIN
FC525-42-31 11/8/201142 2ND FL SOUTH CHASE 0 0 0CLOTH LAGGING
MATERIAL
THIN
FC525-50-00ri16 6/9/201650 N/A 9 9 9LIGHT FIXTURE HEAT
SHIELD
SILVER
FC525-50-40 12/2/201350 1ST FL CNTR HALL GEAR
LOCKER
60 0 0LIGHT FIXTURE HEAT
SHIELD
SILVER
FC525-50-41 12/2/201350 3RD FL CNTR HALL GEAR
LOCKER
60 0 0LIGHT FIXTURE HEAT
SHIELD
SILVER
Thursday, March 19, 2026 Page 9 of 10Print Date:
HA Sample Location Chr
Amo
Oth
Description
FC525-51-60 5/10/202251 ATTIC, NORTH CNTR 0 0 0FIBERGLASS
INSULATION SEALANT
BEIGE
FC525-52-60 5/10/202252 MECH RM, 1 SOUTH 0 0 0TEXTURED CEILING
MATERIAL
FC525-52-61 5/10/202252 MECH RM, 2 SOUTH 0 0 0TEXTURED CEILING
MATERIAL
FC525-53-60 5/10/202253 MECH RM, 1 NORTH 0 0 0CAULKING MATERIAL BEIGE
FC525-54-60 5/10/202254 CHASE, 3 NORTH 0 0 0MISCELLANEOUS
SEALANT
FIRESTOP, BROWN
FC525-55-50 6/9/201655 1ST FL SOUTH CHASE 0 0 0ROPE PACKING
MATERIAL
FC525-55b-60 5/10/202255b ROOF, NORTH CNTR 10 0 0ROOFING MATERIAL, UNDERLAYMENT
FC525-56-50 6/9/201656 1ST FL SOUTH CNTR CHASE 0 0 0DUCT SEALANT, RED
Thursday, March 19, 2026 Page 10 of 10Print Date: