This is an Asbestos Inspection Report for Building HP55 at MCB Camp Lejeune, dated November 4, 2025. The building, constructed in 1976 and occupied by Base Exchange Quarters (BEQ), received a hazard ranking of 0/BLUE with no asbestos-containing materials (ACM) identified during the initial inspection. No further action is required. The Asbestos Program Manager can be contacted at 910-451-5837 for additional information.

The report documents that although no friable or non-friable ACM was found in current database records, eleven material types were tested and confirmed negative for asbestos content during sampling conducted on June 28, 2006. These materials included textured ceiling materials, white and tan floor tiles with adhesive, base cove/mastic, wallboard, pipe insulation, window caulking, and miscellaneous sealants located throughout various rooms and mechanical areas of the building. All 32 samples collected across multiple locations tested negative for chrysotile, amosite, and other asbestos compounds (0% across all categories). The report emphasizes that building occupants should avoid disturbance of any materials, report any damage or changes in condition, and that the Camp Lejeune Asbestos Program Manager maintains a copy of the complete survey for the building.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS INSPECTION REPORT of:

Building # HP55

MCB CAMP LEJEUNE

Tuesday, November 4, 2025

Print Date

Tuesday, November 4, 2025 Page 1 of 5Print Date:

INSPECTION SUMMARY

BLDG #:

OCCUPANT:

YEAR BUILT:

BUILDING COMMENTS:

HP55

BEQ

HP55 HAZARD RANKING 0/ BLUE; NO ACM IDENTIFIED [AH JUN06]

NO ASBESTOS WAS IDENTIFIED DURING THE INITIAL ASBESTOS INSPECTION.NO FURTHER ACTION REQUIRED

ASBESTOS MANAGER: 910-451-5837

Friable ACM(s) identified

Non-friable ACM(s) identified

Tested Non ACM or REMOVED Materials

DESCRIPTION LOCATION Date

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

HEALTH ASPECTS:

NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

No friable ACM records found in database

No non friable ACM records found in database

NOTIFICATION OF ACM IN BUILDING

12" TAN FLOOR TILE AND ADHESIVE LOUNGE AREA 6/28/2006

2'x2' CEILING TILE, LOUNGE AREA 6/28/2006

BASE COVE/MASTIC, HALLWAY 6/28/2006

PIPING INSULATION ON MECHANICAL ROOM 6/28/2006

BASE COVE/MASTIC, DORM ROOMS 6/28/2006

WALLBOARD DORM ROOMS 6/28/2006

12" WHITE FLOOR TILE AND ADHESIVE DORM ROOMS 6/28/2006

WINDOW CAULKING DECK 6/28/2006

MISCELLANEOUS SEALANT MECHANICAL ROOM 6/28/2006

TEXTURED CEILING MATERIAL DORM ROOMS 6/28/2006

PIPE INSULATION LAUNDRY ROOMS 6/28/2006

Tuesday, November 4, 2025 Page 2 of 5Print Date:

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.

CONDITIONS TO AVOID:

Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos

Program Manager.

REPORTS OF DAMAGE:

Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:

ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:

The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.

RECORDKEEPING:

CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837

Tuesday, November 4, 2025 Page 3 of 5Print Date:

SAMPLES COLLECTED

Sample Sample

Date

HA Sample Location Chr

Amo

Oth

Description

HP55-01-01 6/28/200601 ROOM 100 0 0 0TEXTURED CEILING

MATERIAL

HP55-01-02 6/28/200601 ROOM 110 0 0 0TEXTURED CEILING

MATERIAL

HP55-01-03 6/28/200601 ROOM 108 0 0 0TEXTURED CEILING

MATERIAL

HP55-01-04 6/28/200601 ROOM 224 0 0 0TEXTURED CEILING

MATERIAL

HP55-01-05 6/28/200601 ROOM 223 0 0 0TEXTURED CEILING

MATERIAL

HP55-01-06 6/28/200601 ROOM 327 0 0 0TEXTURED CEILING

MATERIAL

HP55-01-07 6/28/200601 ROOM 323 0 0 0TEXTURED CEILING

MATERIAL

HP55-02-01 6/28/200602 ROOM 100 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

W/ BROWN

HP55-02-02 6/28/200602 ROOM 108 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

W/ BROWN

HP55-02-03 6/28/200602 ROOM 224 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

W/ BROWN

HP55-03-01 6/28/200603 ROOM 100 0 0 0BASE COVE/MASTIC, BROWN

HP55-03-02 6/28/200603 ROOM 108 0 0 0BASE COVE/MASTIC, BROWN

HP55-04-01 6/28/200604 ROOM 100 0 0 0WALLBOARD

HP55-04-02 6/28/200604 ROOM 108 0 0 0WALLBOARD

HP55-04-03 6/28/200604 ROOM 224 0 0 0WALLBOARD

HP55-04-04 6/28/200604 ROOM 223 0 0 0WALLBOARD

HP55-04-05 6/28/200604 ROOM 327 0 0 0WALLBOARD

HP55-05-01 6/28/200605 3RD DECK 0 0 0PIPE INSULATION

HP55-05-02 6/28/200605 1ST DECK 0 0 0PIPE INSULATION

HP55-06-01 6/28/200606 3RD FLOOR 0 0 012" TAN FLOOR TILE

AND ADHESIVE

W/ WHITE

Tuesday, November 4, 2025 Page 4 of 5Print Date:

Sample Sample

Date

HA Sample Location Chr

Amo

Oth

Description

HP55-06-02 6/28/200606 2ND FLOOR 0 0 012" TAN FLOOR TILE

AND ADHESIVE

W/ WHITE

HP55-07-01 6/28/200607 3RD FLOOR 0 0 02'x2' CEILING TILE, HP55-07-02 6/28/200607 2ND FLOOR 0 0 02'x2' CEILING TILE, HP55-08-01 6/28/200608 2ND FLOOR 0 0 0BASE COVE/MASTIC, BROWN

HP55-08-02 6/28/200608 1ST FLOOR 0 0 0BASE COVE/MASTIC, BROWN

HP55-09-01 6/28/200609 1ST DECK 0 0 0PIPING INSULATION ON SUPPLY AND RETURN

HP55-09-02 6/28/200609 2ND DECK 0 0 0PIPING INSULATION ON SUPPLY AND RETURN

HP55-10-01 6/28/200610 3RD FLOOR 0 0 0WINDOW CAULKING

HP55-10-02 6/28/200610 3RD FLOOR 0 0 0WINDOW CAULKING

HP55-11-01 6/28/200611 ROOM # 3 0 0 0MISCELLANEOUS

SEALANT

RED

HP55-11-02 6/28/200611 ROOM # 4 0 0 0MISCELLANEOUS

SEALANT

RED

Tuesday, November 4, 2025 Page 5 of 5Print Date: