HP53 ACM REPORT.pdf
PDF 41 KB Posted
- Solicitation number
- N4008526R9016
About this file
This is an Asbestos Inspection Report for Building HP53 at MCB Camp Lejeune, dated November 4, 2025. The building, constructed in 1976 and occupied as a Bachelor Enlisted Quarters (BEQ), received a hazard ranking of 0/BLUE with no asbestos-containing materials (ACM) identified during the initial inspection. The report explicitly states that asbestos was not identified during the inspection and no further action is required.
The inspection included comprehensive sampling of 32 material samples collected on March 29, 2006, covering textured ceiling materials, drywall, floor tiles and adhesives, base cove/mastic, ceiling tiles, roofing materials, window caulking, duct sealants, plaster ceilings, and miscellaneous sealants from various locations throughout the building including dorm rooms, offices, lounges, mechanical rooms, hallways, and the attic. All tested samples showed zero percent content for chrysotile, amosite, and other asbestos fibers. The report documents that while certain materials were identified as potentially containing asbestos, they have been tested and either removed or maintained under the Camp Lejeune Asbestos Program. The Asbestos Program Manager at Camp Lejeune maintains records and can be contacted at 910-451-5837 for any reports of damage, changes in material condition, or accidental disturbance to ACM.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS INSPECTION REPORT of:
Building # HP53
MCB CAMP LEJEUNE
Tuesday, November 4, 2025
Print Date
Tuesday, November 4, 2025 Page 1 of 5Print Date:
INSPECTION SUMMARY
BLDG #:
OCCUPANT:
YEAR BUILT:
BUILDING COMMENTS:
HP53
BEQ
HP53 HAZARD RANKING 0/ BLUE; NO ACM IDENTIFIED [AH MAR06]
ASBESTOS WAS NOT IDENTIFIED DURING THE INITIAL ASBESTOS INSPECTION.NO FURTHER ACTION REQUIRED
ASBESTOS MANAGER: 910-451-5837
Friable ACM(s) identified
Non-friable ACM(s) identified
Tested Non ACM or REMOVED Materials
DESCRIPTION LOCATION Date
NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.
DESCRIPTION LOCATION Date Quantity
DESCRIPTION LOCATION Date Quantity
No friable ACM records found in database
No non friable ACM records found in database
NOTIFICATION OF ACM IN BUILDING
EXTERIOR SURFACING MATERIAL, STUCCO EXTERIOR 3/29/2006
TEXTURED CEILING MATERIAL DORM ROOMS/OFFICES 3/29/2006
MISCELLANEOUS SEALANT THROUGHOUT 3/29/2006
PLASTER CEILING HALLWAYS 3/29/2006
WINDOW CAULKING EXTERIOR 3/29/2006
DUCT SEALANT, RED MECHANICAL ROOM 3/29/2006
DRYWALL DORM ROOMS 3/29/2006
12" TAN FLOOR TILE AND ADHESIVE DORM ROOMS 3/29/2006
BASE COVE/MASTIC, DORM ROOMS 3/29/2006
2'x2' CEILING TILE, OFFICES/LOUNGES 3/29/2006
12" WHITE FLOOR TILE AND ADHESIVE LOUNGES 3/29/2006
ROOFING MATERIAL, ATTIC 3/29/2006
MISCELLANEOUS SEALANT MECHANICAL ROOM 3/29/2006
Tuesday, November 4, 2025 Page 2 of 5Print Date:
ACM only presents a health hazard when asbestos fibers are airborne and inhaled.
Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.
HEALTH ASPECTS:
Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.
CONDITIONS TO AVOID:
Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos
Program Manager.
REPORTS OF DAMAGE:
Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:
ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:
The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.
RECORDKEEPING:
CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837
Tuesday, November 4, 2025 Page 3 of 5Print Date:
SAMPLES COLLECTED
Sample Sample
Date
HA Sample Location Chr
Amo
Oth
Description
HP53-01-01 3/29/200601 ROOM 109 0 0 0TEXTURED CEILING
MATERIAL
HP53-01-02 3/29/200601 ROOM 110 0 0 0TEXTURED CEILING
MATERIAL
HP53-01-03 3/29/200601 ROOM 219 0 0 0TEXTURED CEILING
MATERIAL
HP53-01-04 3/29/200601 ROOM 218 0 0 0TEXTURED CEILING
MATERIAL
HP53-01-05 3/29/200601 ROOM 319 0 0 0TEXTURED CEILING
MATERIAL
HP53-01-06 3/29/200601 ROOM 318 0 0 0TEXTURED CEILING
MATERIAL
HP53-01-07 3/29/200601 ALPHA COMPANY 0 0 0TEXTURED CEILING
MATERIAL
HP53-02-01 3/29/200602 ROOM 109 0 0 0DRYWALL
HP53-02-02 3/29/200602 ROOM 110 0 0 0DRYWALL
HP53-02-03 3/29/200602 ROOM 219 0 0 0DRYWALL
HP53-02-04 3/29/200602 ROOM 218 0 0 0DRYWALL
HP53-02-05 3/29/200602 ROOM 319 0 0 0DRYWALL
HP53-03-01 3/29/200603 ROOM 109 0 0 012" TAN FLOOR TILE
AND ADHESIVE
HP53-03-02 3/29/200603 ROOM 219 0 0 012" TAN FLOOR TILE
AND ADHESIVE
HP53-04-01 3/29/200604 ROOM 110 0 0 0BASE COVE/MASTIC,
HP53-04-02 3/29/200604 ROOM 219 0 0 0BASE COVE/MASTIC,
HP53-05-01 3/29/200605 ALPHA COMPANY 0 0 02'x2' CEILING TILE, HP53-05-02 3/29/200605 ALPHA COMPANY 0 0 02'x2' CEILING TILE, HP53-05-03 3/29/200605 1ST FLOOR 0 0 02'x2' CEILING TILE, HP53-06-01 3/29/200606 1ST FLOOR 0 0 012" WHITE FLOOR TILE
AND ADHESIVE
W/BROWN
Tuesday, November 4, 2025 Page 4 of 5Print Date:
Sample Sample
Date
HA Sample Location Chr
Amo
Oth
Description
HP53-06-02 3/29/200606 1ST FLOOR 0 0 012" WHITE FLOOR TILE
AND ADHESIVE
W/BROWN
HP53-07-01 3/29/200607 ATTIC 0 0 0ROOFING MATERIAL,
HP53-07-02 3/29/200607 ATTIC 0 0 0ROOFING MATERIAL,
HP53-08-01 3/29/200608 1ST FLOOR 0 0 0MISCELLANEOUS
SEALANT
GRAY
HP53-08-02 3/29/200608 3RD FLOOR 0 0 0MISCELLANEOUS
SEALANT
GRAY
HP53-08-03 3/29/200608 3RD FLOOR 0 0 0MISCELLANEOUS
SEALANT
GRAY
HP53-09-01 3/29/200609 1ST FLOOR 0 0 0PLASTER CEILING
HP53-09-02 3/29/200609 2ND FLOOR 0 0 0PLASTER CEILING
HP53-09-03 3/29/200609 3RD FLOOR 0 0 0PLASTER CEILING
HP53-10-01 3/29/200610 EXTERIOR 0 0 0WINDOW CAULKING
HP53-10-02 3/29/200610 EXTERIOR 0 0 0WINDOW CAULKING
HP53-11-01 3/29/200611 1ST FLOOR 0 0 0DUCT SEALANT, RED
HP53-11-02 3/29/200611 2ND FLOOR 0 0 0DUCT SEALANT, RED
HP53-12-01 3/29/200612 1ST FLOOR 0 0 0MISCELLANEOUS
SEALANT
HP53-12-02 3/29/200612 1ST FLOOR 0 0 0MISCELLANEOUS
SEALANT
HP53-13-01 3/29/200613 3RD FLOOR 0 0 0EXTERIOR SURFACING
MATERIAL, STUCCO
HP53-13-02 3/29/200613 3RD FLOOR 0 0 0EXTERIOR SURFACING
MATERIAL, STUCCO
Tuesday, November 4, 2025 Page 5 of 5Print Date:
File details come from the government source that posted it. Updated .