26R0169 AMENDMENT 0010.pdf

PDF 201 KB Posted

Attached to
CONVERT INTEL SPACES TO CONTROLLED AREA, BLDG 145, NAS OCEANA, VIRGINIA BEACH, VA
Solicitation number
N4008526R0169
Issued by

About this file

This is Amendment 0010 to Solicitation N4008526R0169 for a construction project to convert intelligence spaces to a controlled area in Building 145 at Naval Air Station Oceana, Virginia Beach, Virginia. The amendment was issued on July 13, 2026, by the Naval Facilities Engineering and Acquisition Division (N4008). The purpose of this amendment is to issue Pre-Proposal Inquiry (PPI) responses to questions submitted by potential offerors.

The amendment extends the receipt of proposal due date to July 15, 2026, at 2:00 PM EDT. Offerors must acknowledge receipt of the amendment prior to proposal submission using one of three methods: completing and returning the amendment form, acknowledging receipt on each copy of the offer submitted, or sending a separate letter or telegram referencing the solicitation and amendment numbers. The attachment includes a PPI spreadsheet containing government responses to four inquiries (PPIs 274-277) submitted prior to the May 29, 2026 cutoff date. Key responses clarify that Furniture, Fixtures, and Equipment (FF&E) is not part of the project scope; cybersecurity specialists must hold either CISSP or CISM certifications; the Discipline of Record (DOR) may also serve as the cybersecurity specialist if qualified; and the contractor will be required to relocate circuits and conduit, though detailed information regarding circuit specifications is unavailable from the government.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

J

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. P ROJECT NO.(If applicable)

6. ISSUED BY CODE N4008 7. ADMINISTERED BY (If other than item 6) CODE

See Item 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

X 9B. DATED (SEE ITEM 11)

10A. MOD. OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.

IT MODIFIES T HE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. T HIS CHANGE ORDER IS ISSUED PURSUANT T O: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO T HE AUT HORIT Y OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT : Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

0010 13-Jul-2026 AMS00725177

N4008526R0169

13-Jul-2026

SOLICITATION N4008526R0169, CONVERT INTEL SPACES TO CONTROLLED AREA, BLDG 145, NAS OCEANA

The purpose of this amendment is to issue PPI responses.

***Receipt of Proposal due date is 15 July 2026 at 2:00PM EDT.***

SEE CONTINUATION PAGE.

13-Jul-2026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

(End of Summary of Changes)

N4008526R0169

AMENDMENT 0010

SOLICITATION N4008526R0169, CONVERT INTEL SPACES TO CONTROLLED AREA, BLDG 145, NAS

OCEANA

The purpose of this amendment is to issue PPI responses.

Attachment:

1. pdf: AMEND 0010 PPI Spreadsheet

Page Para. Dwg #

274 07/07/26 3 Addendum 6

Please refer to Q&A 33. Please note that the answer is that the FF&E is not part of this project. Please refer to the revised scope of work section 013300.05 20.

Please verify that the required SID submittal maybe waived for this project as this is typically completed by the

FF&E designer.

Follow the RFP

275 07/07/26 4 Addendum 6

Please refer to Q&A 59. Please provide the required qualifications of the cybersecurity specialist required for this project.

CISSP - Certified Information System

Security Professional, CISM - Certified

Information Security Manager

276 07/07/26 4 Addendum 6

Please refer to Q&A 59. Please verify that the DOR may also serve cybersecurity specialist for this project.

DOR can be cyber security specialist if he/she has credential specified in item 2

(CISSP OR CISM) 0010

277 07/07/26 7 Addendum 6

Please refer to Q&A 106. Please note that the existing drawings do not show the routes of circuits that are currently routed through the area of work. As the contractor will be required to relocate any circuits that are currently routed through the area of work, please verify that the contractor will not be required to relocate any circuits/conduit. If the contractor will be required to relocate circuits, please provide the size of conduit, number of feeders and size of feeders for each circuit that will need to be relocated, for bidding purposes.

The contractor will be required to relocate circuits/conduit. The information requested is not available and cannot be verified by the government.

Project Title: CONVERT INTEL SPACES TO CONTROLLED AREA, BLDG

145, NAS OCEANA

Solicitation / RFP#: N4008526R0169 - PPI Cut Off Date: 29-MAY-2026

Amend No.

GOVERNMENT RESPONSE

PPI No.

Offeror

Date

Submitted

REFERENCE

QUESTION

Page Para. Dwg #

274 07/07/26 3 Addendum 6

Please refer to Q&A 33. Please note that the answer is that the FF&E is not part of this project. Please refer to the revised scope of work section 013300.05 20.

Please verify that the required SID submittal maybe waived for this project as this is typically completed by the

FF&E designer.

Follow the RFP

275 07/07/26 4 Addendum 6

Please refer to Q&A 59. Please provide the required qualifications of the cybersecurity specialist required for this project.

CISSP - Certified Information System

Security Professional, CISM - Certified

Information Security Manager

276 07/07/26 4 Addendum 6

Please refer to Q&A 59. Please verify that the DOR may also serve cybersecurity specialist for this project.

DOR can be cyber security specialist if he/she has credential specified in item 2

(CISSP OR CISM) 0010

277 07/07/26 7 Addendum 6

Please refer to Q&A 106. Please note that the existing drawings do not show the routes of circuits that are currently routed through the area of work. As the contractor will be required to relocate any circuits that are currently routed through the area of work, please verify that the contractor will not be required to relocate any circuits/conduit. If the contractor will be required to relocate circuits, please provide the size of conduit, number of feeders and size of feeders for each circuit that will need to be relocated, for bidding purposes.

The contractor will be required to relocate circuits/conduit. The information requested is not available and cannot be verified by the government.

Project Title: CONVERT INTEL SPACES TO CONTROLLED AREA, BLDG

145, NAS OCEANA

Solicitation / RFP#: N4008526R0169 - PPI Cut Off Date: 29-MAY-2026

Amend No.

GOVERNMENT RESPONSE

PPI No.

Offeror

Date

Submitted

REFERENCE

QUESTION

File details come from the government source that posted it. Updated .