Attachment D - P1476U Price Proposal Form REV2.docx
DOCX document 38 KB Posted
- Attached to
- DESIGN-BUILD (DB), P-1476U NEW FIRE APPARATUS BAY CHEATHAM ANNEX, NAVAL WEAPONS STATION YORKTOWN, VIRGINIA
- Solicitation number
- N40085-26-R-0131
About this file
This is a Price Proposal Form for a Design-Build contract to construct a new Fire Apparatus Bay (P-1476U) at Cheatham Annex Naval Weapons Station in Yorktown, Virginia under solicitation N40085-26-R-0131, work order 1832581, with an 800-day contract completion date. Bidders must provide firm fixed prices for the base bid (Line Item 0001) and three optional items (Line Items 0002-0004). The base price is subdivided into six components: the primary facility construction (0001A), supporting facilities (0001B), excavation and disposal of impacted soil including PFAS contamination at 1,500 estimated tons (0001C), treatment and discharge of construction dewatering effluent at 25,000 estimated gallons (0001D), undercut and replacement of geotechnically unsuitable subgrade soils at 1,500 cubic yards (0001E), and demolition and disposal of buried concrete and debris greater than 0.5 cubic yards at 75 estimated tons (0001F). Optional items include two additional overhead doors with associated site work (0002), a CMU exterior wall backup system as an alternative to insulated metal panels (0003), and Furniture, Fixtures, and Equipment with a Government estimated price of $28,836.00 plus a Contractor-proposed Handling and Administration Rate not to exceed 5 percent (0004).
All estimated quantities are subject to equitable adjustment if actual quantities vary more than 15 percent from estimates, with unit prices held firm. The Government reserves the right to award options within 365 calendar days of contract award without extending the completion date. Additional bonding and surety consent are required if options are exercised. The solicitation is restricted to MACC holders (N4008524D0030-38, 0069) under the Department of Navy's Design-Build/Design-Bid-Build Multiple Award Construction Contract for general construction in the Hampton Roads, Virginia area. Award evaluation will include the base bid plus all option prices unless the Government determines exercising options is not in its best interest. Bidders must provide prices for all line items; failure to do so will result in rejection of the proposal.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Design-Build (DB), P-1476U New Fire Apparatus Bay | Solicitation No.: N40085-26-R-0131 |
| Cheatham Annex Naval Weapons Station Yorktown, Virginia | Work Order No.: 1832581 |
BID PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
| Line Item |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Sub-Total |
| Total Price |
| 0001 |
| BASE PRICE: Total Price (subtotals of Line Items 0001A through 0001F) for the entire work for P1476U New Fire Apparatus Bay, in accordance with the RFP requirements, complete, but excluding work provided as Option Items. |
| 1 |
| EA |
| 0001A |
| Price for the entire work for the Primary Facility/P-1476U New Fire Apparatus Bay complete to the 5-foot line outside of the building in accordance with the RFP, but excluding work provided in another Line Item. |
| 1 |
| EA |
| 0001B |
| Price for the entire Supporting Facilities for the Project, complete to the 5-foot line outside of the building in accordance with the RFP requirements, but excluding work provided in another Line Item. |
| 1 |
| EA |
0001C
Unit Price for excavation, handling, hauling, temporary stockpiling, sampling, analysis and disposal of impacted soil media (including, but not limited to, PFAS, petroleum, and metals) at a licensed facility for the P1476U Project, complete in accordance with the RFP requirements, but excluding work provided in another Line Item. Quantities removed in Tons must be certified and approved by the Contracting Officer.
| *1500 |
| TONS |
0001D
Unit price for handling, testing, management (including operation and oversight), and treatment of contaminant impacted (including, but not limited to, metals, petroleum, and PFAS) construction dewatering effluent. Price for providing work in connection with labor, material, equipment, transportation, spent treatment media characterization, transport, disposal, and supervision for the P1476U Project, complete in accordance with the RFP requirements, but excluding work provided in another Line Item. Discharge quantities in gallons must be certified and approved by the Contracting Officer.
| *25,000 |
| GAL |
For Line Items 0001C & 0001D: Unit price for providing all work in connection with excavation, handling, storage, sampling, analysis, transportation, any necessary treatment and disposal of PFAS impacted soil media at a permitted licensed facility. Sampling shall be performed in accordance with Specification Section 01 57 19, plus any other analytes required by the treatment/disposal facility. Unit price shall include all work in connection with removal, testing, treatment and disposal of PFAS impacted soils encountered within planned excavations, at a permitted licensed treatment/disposal facility and backfilling the excavation with compacted clean imported structural backfill. Unit price shall include all work in connection with evaluation and handling, any necessary storage, stockpiling and related storage maintenance and transportation, and all that entails. The volume of contaminated soil removed will be based on approved truck scale measurement and the quantity will be approved by the Contracting Officer. Any work under this Line Item shall not proceed without prior written approval and field verification from the Contracting Officer. Removal and disposal of all surplus non-contaminated soil media encountered within the planned excavations is covered under the Line Item 0001C and 0001D. The Contractor is not entitled to any additional compensation for proper disposal of soil media at a properly licensed receiving facility off Government property as required per the specifications.
0001E
| Unit Price for undercut and temporary stockpiling of geotechnically unsuitable subgrade soils and replacement with imported structural fill material or with #57 crushed stone for the P1476U Project, complete in accordance with the RFP requirements, but excluding work provided in another Line Item. Disposal of impacted surplus soil media will be covered under a separate Line Item. |
| *1,500 |
| CY |
For Line Item 0001E: Geotechnically Unsuitable Subgrade Soil Removal, temporary stockpiling, and Replacement: Unit price for all work in connection with the removal, disposal, and replacement of geotechnically unsuitable subgrade soil (i.e. soft subgrade soils) with imported structural backfill or imported #57 crushed stone as specified. Unsuitable subgrade soil determinations shall be made by the Government Geotechnical Engineer and approved by the Contracting Officer. The price shall include removal of geotechnically unsuitable soils encountered at the planned footing subgrades or identified during proof rolling of planned subgrades, disposal at the specified disposal facility, and backfilling the excavation with compacted imported structural backfill or imported aggregate. Soils disturbed by the contractor’s construction activities, or that are excessively wet and soft due to lack of proper site maintenance and protection measures, and lack of specified drainage or excavation dewatering will not be considered unsuitable. Unit price shall include all handling and transportation. The volume of material removed and imported backfill required shall be neat quantities determined based on field measurements (length x width x depth) of the completed excavation to remove the unsuitable soil as approved by the Contracting Officer. Any work under this Line Item shall not proceed without prior written approval of the Contracting Officer and direction of the Government Geotechnical Engineer.
0001F
Unit Price for demolition, excavation and disposal of buried concrete and debris greater than 1/2 cubic yard in size, encountered within planned excavation limits and not identified in the Contract Documents for the P1476U Project, complete in accordance with the RFP requirements, but excluding work provided in another line item. (Note: Pieces of buried concrete and debris encountered within the planned excavation limits smaller than 1/2 cubic yard in size shall be considered to be incidental to the work)
*75
TON
For Line Item 0001F: Unit price for providing all work in connection with demolition, removal and disposal of unknown buried concrete, pipes and debris (including creosote treated timber) within planned excavation limits and not identified on the in the Contract Documents. Buried concrete and debris meeting the specified criteria must be field verified by the Contracting Officer prior to removal and must be segregated from the surrounding soil during demolition and excavation operations. Buried concrete and debris encountered within the planned excavation limits smaller than 1/2 cubic yard in size shall be considered to be incidental to the work (i.e., at no cost to the Government). Unit price shall include all work in connection with buried concrete and debris removal and disposal and replacement with clean imported structural backfill or other material specified. Unit price shall include removal and disposal of buried concrete and debris encountered within planned excavations at a permitted licensed disposal facility and backfilling the excavation with compacted clean imported structural backfill or other material specified. Unit price shall include handling and transportation. The volume of buried concrete and debris removed will be based on approved truck scale measurement and the quantity must be approved by the Contracting Officer. Any work under this Line Item shall not proceed without prior written approval and field verification from the Contracting Officer.
| 0002 |
| Bid Option Item No. 1: Provide 2 Additional Overhead Doors as shown on Conceptual Floor Plan Bubble Diagram and required power and data connections in accordance with the RFP requirements; additional Drive Thru Concrete Apron for new doors, additional LID feature to satisfy requirements of UFC 3-210-10, and new full depth heavy duty asphalt pavement replacement of existing asphalt pavement up to concrete apron in accordance with RFP requirements, but excluding work provided in another Line Item. |
LS
| 0003 |
| Option Item No. 2: Provide 10’ High CMU Exterior Wall Back-up Construction System in lieu of insulated metal panels at the exterior walls in accordance with the RFP requirements, but excluding work provided in another Line Item. |
LS
| 0004 |
| Option Item No. 3: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E) Equipment for P1476U Facility, complete in accordance with the RFP requirements, but excluding work provided in another Priced line item. |
| Government Estimated Price: |
$28,836.00 HAR Percent (NTE 5%)
HAR Subtotal
Total FF&E Estimated Price (Government Estimate + HAR Subtotal)
TOTAL
Line Items 0001- 0004
GENERAL BID NOTES
a. Award will be evaluated on the total proposed price for Line Items 0001 – 0004, Base Price and the sum of all Option Item prices. The subtotal of Line Item 0001A-0001F is included in Line Item 0001.
b. The Government reserves the unilateral right to award Line Items 0002 through 0004 to the Contractor at the proposed price within 365 calendar days after the contract award and in accordance with all bid notes. A firm fixed proposed price is required for Line Items 0001-0004. No provision is made for economic price adjustment. If Line Items 0002 through 0004 are exercised, the contract completion date (CCD) remains 800 days after contract award.
c. Quantities on the bid schedule that are followed by an asterisk (*) are estimated quantities. Contractor shall only be paid for quantities/units of work actually performed. If the estimated quantity used in the bid schedule is not reached, a deductive modification shall be taken at the end of contract for quantities/units not performed. If the estimated quantity is exceeded, an equitable adjustment shall be made to the contract price for work performed over the estimated quantity. If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
d. Evaluations of Options (JUL 1990). Except when it is determined in accordance with FAR 17.202 (b) (DEVIATION 2026-O0027) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for Line Items 0002 through 0004 to the total price for the Base Bid, (Line Item 0001). Evaluation of options will not obligate the Government to exercise the Option(s). (FAR 52.217-5 DEVIATION 2026-O0038).
e. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
f. Failure to enter a price for any Line Item will result in a proposal being rejected.
g. For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
h. If Line Item 0002 through 0004 is exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.
BID NOTES FOR FF&E (LINE ITEM 0004)
a. The estimated amount for FF&E has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E including freight and installation charges. The Government FF&E is only an estimated amount.
b. If awarded, line items will be funded separately, after completion of FF&E design package review by the Government and receipt of appropriate funding by the Government. Requirements and details are provided in Chapter 3 ESR E20 and Chapter 4 PTS E20.
c. Bonding
1) Bonding is not required for the design, procurement and installation of FF&E at time of Construction Contract Award.
FAR 28.102-1(a) (DEVIATION 2026-O0005) requires that performance and payment bonds be included in all construction contracts exceeding the SAT, except under the conditions listed. Since the FF&E Option Item is not part of the original contract award, the Construction Contractor must not be required to secure bond for the FF&E at the time the basic contract is awarded.
2) Additional Bond at FF&E Option Item Award
FAR 28.102-2(d) (DEVIATION 2026-O0005) requires the Government to secure additional bond from the Construction Contractor for any contract price increases. Therefore, an increase to the original contract bond is required at the time of the FF&E Option Items award, to protect the Government against the Construction Contractor not providing FF&E ordered and to ensure that the vendor(s) receive payment if the Construction Contractor goes out of business. The increased cost of the bond must come from the FF&E funding source and is not a part of the Construction Contractor’s HAR.
3) Bonds Required by the Construction Contractor
If the Construction Contractor requires bonding from the FF&E subcontractor(s), the cost must be covered in the Construction Contractor’s HAR.
d. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The Contractor’s proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E.
e. The Government is not obligated to award the Option line item. Should the Government choose to award Line Item 0004 (Option Item 3), the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E.
f. If awarded, the FF&E option will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the FF&E without impacting on the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E as an option. No schedule extensions will be granted if the option is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E package was submitted within the approved schedule deadlines and sufficient lead time for the FF&E is not available and the Government's award of the modification is in the last six months of the contract.