This is a NAVFAC High Performance and Sustainable Building Checklist – Goals form used to document compliance with guiding principles for sustainable development in federal military construction projects.

The form covers FY 26 project P1476U New Fire Apparatus Bay located at Cheatham Annex, NWS Yorktown, with a project design level of PDA. The solicitation documents are complete with an award date of 06/03/26 and BOD of 06/03/26. The checklist documents design goals across six primary sustainability categories: (1) Employ Integrated Design Principles, including integrated design and commissioning; (2) Optimize Energy Performance, targeting 36.80% energy savings below baseline with a Total Design Energy Use Intensity of 399.8 kBTU/Sq Ft/Year and compliance with ASHRAE 90.1-2019 Addendum C; (3) Protect and Conserve Water, addressing indoor and outdoor water use, metering, water-efficient landscaping, and alternative water sources; (4) Enhance Indoor Environmental Quality, covering ventilation, thermal comfort, daylighting, automatic dimming controls, moisture control, low-emitting materials, and indoor air quality during construction; (5) Reduce Environmental Impact of Materials, including recycled content, biobased content, waste management, and a 60% waste diversion target; and (6) Assess and Consider Climate Change Risks. The project is not pursuing third-party certification, with N/A marked due to mission preclusion. The form allows respondents to mark "Yes" for compliance or "N/A" with specified justifications including mission preclusion, building/site issues, cost-effectiveness concerns, or scope limitations.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT INFORMATION

Work Order No.: FY MILCON P No. / Customer Reference No.:

Project Title:

Location UIC/Name:

NAVFAC Project Manager: Project Design Level:

Facility Area: U/M: Category Code: Facility #:

AE Contract # & T.O. AE Firm Sustainability Coordinator:

AE Firm Name:

Project Phase: Design Start / PDA Solicitation Documents Complete Construction Contract Award Date (P): BOD (P):

SUSTAINABILITY DATA - GUIDING PRINCIPLES for SUSTAINABLE DEVELOPMENT Use this form to collect Design Goals information to be recorded on the Sustainable and Energy Tab in eProjects

NOTE: 1. Mark "N/A" only when at least one of the listed justifications is applicable, and mark those justifications. Otherwise, mark "Yes."

2. If project is for more than one building for which tracking is required, complete a separate form for each building.

DESIGN DEVELOPMENT - DOCUMENTATION OF COMPLIANCE WITH GUIDING PRINCIPLES

I. Employ Integrated Design Principles 1 Integrated Design

Goals In Compliance Yes N/A N/A due to

Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

2 Commissioning Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

(i) Systems commissioned

II. Optimize Energy Performance

3. Energy Efficiency

Goals In Compliance Yes N/A N/A due to

Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

(i) Energy Savings Below Baseline %

NAVFAC HIGH PERFORMANCE AND SUSTAINABLE BUILDING CHECKLIST -- GOALS

No

PRELIMINARY PROJECT INFORMATION

1 How many buildings are included in this project?

2 New building or stand-alone addition >/=10,000 GSF

-OR-

Existing building renovation (including additions) >/=10,000 GSF, and with a cost >$3M and 50% Estimated Replacement Cost (ERC)?

3 Identify the building to be tracked in this tab:

Yes

(ii) Energy Standard

IECC

OTHER:

ASHRAE 90.1-2013 (06NOV16+)

ASHRAE 90.1-2016

C. Energy Efficient Products Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

4. Renewable Energy Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

A. Renewable energy technology types Geothermal Daylighting (quantified passive) Ground Source Heat Pumps Mechanical (i.e., direct water pumping) Solar Photovoltaic Micro-hydro Solar Thermal - domestic hot water Concentrating (sterling) Solar Thermal - space conditioning Wind

(i) Annual % of total load

(ii) System size (kwatts)

B. Solar Hot Water Percentage - 30% target Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

(i) Annual % of total load

(ii) System size (kBTU/Year)

5. Meter (Energy) Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

6. Energy Use Intensity kBTU/Sq Ft/Year

(i) Total Design Energy Use Intensity (EUI): kBTU/Sq Ft/Year

III. Protect and Conserve Water

7. Indoor Water Use

A. Water-Efficient Products Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

(i) Total Design Indoor Water Use Intensity (WUI): Gallons/Sq Ft/Year

B. Indoor Water Meter Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

8. Outdoor Water Use A. Outdoor Water Meter (for 25,000 SF of irrigation)

(i) Is there a permanent irrigation system serving more than 25,000 SF of landscaping?

Yes No

(ii) Water Meter Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

B. Water-efficient landscape Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

9. Alternative Water Use (indoor or outdoor water) Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Methods Proposed: Air Handler Condensate Capture Reclaimed Water Grey Water Treated Wastewater Harvested Rainwater OTHER:

IV. Enhance Indoor Environmental Quality

11. Ventilation and Thermal Comfort

A. Ventilation Goals In Compliance Yes N/A

N/A due to Building/site issue Renovation only: not part of scope

Mission preclusion Not LCCE Installation/region issue

10. Stormwater Management - update the LID Data tab

B. Thermal Comfort Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

12. Daylighting and Lighting Controls A. Daylight

Goals In Compliance Yes N/A N/A due to

Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

B. Automatic dimming controls Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

13. Indoor Air Quality A. Moisture Control

Goals In Compliance Yes N/A N/A due to

Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

B. Low-Emitting Materials Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

C. Indoor Air Quality during Construction Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

14. Occupant Health and Wellness Goals In Compliance Yes N/A

N/A due to Building/site issue Renovation only: not part of scope

Mission preclusion Not LCCE Installation/region issue

V. Reduce the Environmental Impact of Materials

15. Material Content and Performance

A. Resource Conservation and Recovery Act (RCRA) Section 6002 (recycled content) Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

B. Farm Security and Rural Investment Act (FSRIA) section 9002 (Biobased content) Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

16. Waste Management Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

17. Waste Diversion - 60% target Goals In Compliance Yes N/A

N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

(i) Percent diverted

VI. Assess and Consider Climate Change Risks

18. Address Climate Change Risk

Goals In Compliance Yes N/A N/A due to

Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue

Yes No

Sustainability Third Party Certification Rating

Third Party Certification Rating System and Level GBI Green Globes 1 Globe GBI Green Globes 2 Globe GBI Green Globes 3 Globe GBI Green Globes 4 Globe GBI "Guiding Principles Compliance"

USGBC LEED Certified USGBC LEED Silver USGBC LEED Gold USGBC LEED Platinum USGBC "Guiding Principles Assessment"

OTHER

i. Third Party Certification Rating system - Other

THIRD PARTY CERTIFICATION INFORMATION

Is this building pursuing Third Party Certification?

N/A due to Installation/region issue Mission preclusion Renovation only: not part of scope

Goals

Check Box1: Off
Check Box2: Yes
OTHER energy standard: ASHRAE 90.1-2019 ADDENDUM CH.
OTHER methods:
WORKORDER_NUMBER: 1832581
FISCAL_YEAR: 26
CUSTOMER_REFERENCE_NBR:
PROJECT_TITLE: P1476U New Fire Apparatus Bay
LOCATION_UIC: Cheatham Annex, NWS Yorktown
PROJECT_MANAGER: Ra Youen
DESIGN_LEVEL: PDA
FACILITY_AREA:
UM:
CATEGORY_CODE:
FACILITY:
AE_FIRM:
AE_CONTRACT_NBR:
IH_DESIGN_MANAGER: N\A
AWARD_DATE: 06/03/26
BOD_DATE: 06/03/26
NUM_BUILDINGS: 1
NEW_CONSTRUCTION_Y: Off
NEW_CONSTRUCTION_N: Off
TRACKED_BUILDING: P1476U
INTEGRATED_DESIGN_GOAL_N_A: Off
SYSTEMS_COMMISSIONED:
ENERGY_REDUCTION_PCT: 36.8
EFFICIENCY_STANDARD_IECC: Off
EFFICIENCY_STANDARD_OTHER: Yes
COMMISSIONING_GOAL_N_A: Off
ENERGY_EFF_GOAL_N_A: Off
ENERGY_EFF_PROD_GOAL_N_A: Off
RENEW_TECH_GOAL_N_A: Yes
RENEW_TECH_TYPE_GEO: Off
RENEW_TECH_TYPE_DAY: Off
RENEW_TECH_TYPE_WIND: Off
RENEW_TECH_TYPE_GROUND: Off
RENEW_TECH_TYPE_MECH: Off
RENEW_TECH_TYPE_PHOTO: Off
RENEW_TECH_TYPE_DOM: Off
RENEW_TECH_TYPE_SPACE: Off
RENEW_TECH_TYPE_MICRO: Off
RENEW_TECH_TYPE_STER: Off
RENEW_ANNUAL_PCT:
RENEW_SYSTEM_SIZE:
SOLAR_HOT_WATER_GOAL_N_A: Yes
SOLAR_HOT_WATER_PCT:
SOLAR_HOT_WATER_SYSTEM_SIZE:
ENERGY_BUILD_METER_GOAL_N_A: Off
ENERGY_USE_INTENSITY: 399.77
WATER_EFF_PROD_GOAL_N_A: Off
WATER_USE_INTENSITY:
WATER_BUILD_METER_GOAL_Yes: Yes
WATER_BUILD_METER_GOAL_N_A: Off
PERM_IRRIGATION_YES: Off
PERM_IRRIGATION_NO: Yes
WATER_OUTDOOR_METER_GOAL_N_A: Yes
WATER_EFF_LAND_GOAL_N_A: Off
ALT_WATER_USE_GOAL_N_A: Yes
ALT_WATER_USE_HARVEST: Off
ALT_WATER_USE_TREAT: Off
ALT_WATER_USE_AIR: Off
ALT_WATER_USE_GREY: Off
ALT_WATER_USE_RECLAIM: Off
ALT_WATER_USE_OTHER: Off
THERMAL_CONDITIONS_GOAL_N_A: Off
MINIMUM_DAYLIGHT_GOAL_N_A: Off
AUTO_DIMMING_GOAL_N_A: Off
MOISTURE_CONTROL_GOAL_N_A: Off
LOW_EMITTING_MAT_GOAL_N_A: Off
INDOOR_AIR_QUAL_GOAL_N_A: Off
RECYCLED_CONTENT_GOAL_N_A: Off
BIOBASED_PRODUCTS_GOAL_N_A: Off
WASTE_MANAGEMENT_GOAL_N_A: Off
WASTE_DIVERSION_GOAL_N_A: Off
WASTE_DIVERSION_PCT:
CLIMATE_CHNG_RSK_GOAL_N_A: Off
RENEW_TECH_GOAL_NA_Installatio: Off
ALT_WATER_USE_GOAL_NA_Installa: Off
INTEGRATED_DESIGN_GOAL_YES: Yes
INTEGRATED_DESIGN_GOAL_NA_MISS: Off
INTEGRATED_DESIGN_GOAL_NA_BUIL: Off
INTEGRATED_DESIGN_GOAL_NA_NOT: Off
INTEGRATED_DESIGN_GOAL_NA_RENO: Off
INTEGRATED_DESIGN_GOAL_NA_INST: Off
COMMISSIONING_GOAL_YES: Yes
COMMISSIONING_GOAL_NA_MISSION: Off
COMMISSIONING_GOAL_NA_BUILDING: Off
COMMISSIONING_GOAL_NA_NOT: Off
COMMISSIONING_GOAL_NA_RENOVATI: Off
COMMISSIONING_GOAL_NA_INSTALLA: Off
ENERGY_EFF_GOAL_YES: Yes
ENERGY_EFF_GOAL_NA_MISSION: Off
ENERGY_EFF_GOAL_NA_BUILDING: Off
ENERGY_EFF_GOAL_NA_NOT: Off
ENERGY_EFF_GOAL_NA_RENOVATION: Off
ENERGY_EFF_GOAL_NA_INSTALLATIO: Off
ENERGY_EFF_PROD_GOAL_YES: Yes
ENERGY_EFF_PROD_GOAL_NA_MISSIO: Off
ENERGY_EFF_PROD_GOAL_NA_BUILDI: Off
ENERGY_EFF_PROD_GOAL_NA_NOT: Off
ENERGY_EFF_PROD_GOAL_NA_RENOVA: Off
ENERGY_EFF_PROD_GOAL_NA_INSTAL: Off
RENEW_TECH_GOAL_YES: Off
RENEW_TECH_GOAL_NA_MISSION: Off
RENEW_TECH_GOAL_NA_BUILDING: Off
RENEW_TECH_GOAL_NA_NOT: Yes
RENEW_TECH_GOAL_NA_RENOVATION: Off
SOLAR_HOT_WATER_GOAL_YES: Off
SOLAR_HOT_WATER_GOAL_NA_MISSIO: Off
SOLAR_HOT_WATER_GOAL_NA_BUILDI: Off
SOLAR_HOT_WATER_GOAL_NA_NOT: Yes
SOLAR_HOT_WATER_GOAL_NA_RENOVA: Off
SOLAR_HOT_WATER_GOAL_NA_INSTAL: Off
ENERGY_BUILD_METER_GOAL_YES: Yes
ENERGY_BUILD_METER_GOAL_NA_MIS: Off
ENERGY_BUILD_METER_GOAL_NA_BUI: Off
ENERGY_BUILD_METER_GOAL_NA_NOT: Off
ENERGY_BUILD_METER_GOAL_NA_REN: Off
ENERGY_BUILD_METER_GOAL_NA_INS: Off
WATER_EFF_PROD_GOAL_YES: Yes
WATER_EFF_PROD_GOAL_NA_MISSION: Off
WATER_EFF_PROD_GOAL_NA_BUILDIN: Off
WATER_EFF_PROD_GOAL_NA_NOT: Off
WATER_EFF_PROD_GOAL_NA_RENOVAT: Off
WATER_EFF_PROD_GOAL_NA_INSTALL: Off
WATER_BUILD_METER_GOAL_NA_MISS: Off
WATER_BUILD_METER_GOAL_NA_BUIL: Off
WATER_BUILD_METER_GOAL_NA_NOT: Off
WATER_BUILD_METER_GOAL_NA_RENO: Off
WATER_BUILD_METER_GOAL_NA_INST: Off
WATER_OUTDOOR_METER_GOAL_YES: Off
WATER_OUTDOOR_METER_GOAL_NA_MI: Off
WATER_OUTDOOR_METER_GOAL_NA_BU: Off
WATER_OUTDOOR_METER_GOAL_NA_NO: Off
WATER_OUTDOOR_METER_GOAL_NA_RE: Off
WATER_OUTDOOR_METER_GOAL_NA_IN: Off
WATER_EFF_LAND_GOAL_YES: Yes
WATER_EFF_LAND_GOAL_NA_MISSION: Off
WATER_EFF_LAND_GOAL_NA_BUILDIN: Off
WATER_EFF_LAND_GOAL_NA_NOT: Off
WATER_EFF_LAND_GOAL_NA_RENOVAT: Off
WATER_EFF_LAND_GOAL_NA_INSTALL: Off
ALT_WATER_USE_GOAL_YES: Off
ALT_WATER_USE_GOAL_NA_MISSION: Off
ALT_WATER_USE_GOAL_NA_BUILDING: Yes
ALT_WATER_USE_GOAL_NA_NOT: Off
ALT_WATER_USE_GOAL_NA_RENOVATI: Off
THERMAL_CONDITIONS_GOAL_YES: Yes
THERMAL_CONDITIONS_GOAL_NA_MIS: Off
THERMAL_CONDITIONS_GOAL_NA_BUI: Off
THERMAL_CONDITIONS_GOAL_NA_NOT: Off
THERMAL_CONDITIONS_GOAL_NA_REN: Off
THERMAL_CONDITIONS_GOAL_NA_INS: Off
MINIMUM_DAYLIGHT_GOAL_YES: Yes
MINIMUM_DAYLIGHT_GOAL_NA_MISSI: Off
MINIMUM_DAYLIGHT_GOAL_NA_BUILD: Off
MINIMUM_DAYLIGHT_GOAL_NA_NOT: Off
MINIMUM_DAYLIGHT_GOAL_NA_RENOV: Off
MINIMUM_DAYLIGHT_GOAL_NA_INSTA: Off
AUTO_DIMMING_GOAL_YES: Yes
AUTO_DIMMING_GOAL_NA_MISSION: Off
AUTO_DIMMING_GOAL_NA_BUILDING: Off
AUTO_DIMMING_GOAL_NA_NOT: Off
AUTO_DIMMING_GOAL_NA_RENOVATIO: Off
AUTO_DIMMING_GOAL_NA_INSTALLAT: Off
MOISTURE_CONTROL_GOAL_YES: Yes
MOISTURE_CONTROL_GOAL_NA_MISSI: Off
MOISTURE_CONTROL_GOAL_NA_BUILD: Off
MOISTURE_CONTROL_GOAL_NA_NOT: Off
MOISTURE_CONTROL_GOAL_NA_RENOV: Off
MOISTURE_CONTROL_GOAL_NA_INSTA: Off
LOW_EMITTING_MAT_GOAL_YES: Yes
LOW_EMITTING_MAT_GOAL_NA_MISSI: Off
LOW_EMITTING_MAT_GOAL_NA_BUILD: Off
LOW_EMITTING_MAT_GOAL_NA_NOT: Off
LOW_EMITTING_MAT_GOAL_NA_RENOV: Off
LOW_EMITTING_MAT_GOAL_NA_INSTA: Off
INDOOR_AIR_QUAL_GOAL_YES: Yes
INDOOR_AIR_QUAL_GOAL_NA_MISSIO: Off
INDOOR_AIR_QUAL_GOAL_NA_BUILDI: Off
INDOOR_AIR_QUAL_GOAL_NA_NOT: Off
INDOOR_AIR_QUAL_GOAL_NA_RENOVA: Off
INDOOR_AIR_QUAL_GOAL_NA_INSTAL: Off
RECYCLED_CONTENT_GOAL_YES: Yes
RECYCLED_CONTENT_GOAL_NA_MISSI: Off
RECYCLED_CONTENT_GOAL_NA_BUILD: Off
RECYCLED_CONTENT_GOAL_NA_NOT: Off
RECYCLED_CONTENT_GOAL_NA_RENOV: Off
RECYCLED_CONTENT_GOAL_NA_INSTA: Off
BIOBASED_PRODUCTS_GOAL_YES: Yes
BIOBASED_PRODUCTS_GOAL_NA_MISS: Off
BIOBASED_PRODUCTS_GOAL_NA_BUIL: Off
BIOBASED_PRODUCTS_GOAL_NA_NOT: Off
BIOBASED_PRODUCTS_GOAL_NA_RENO: Off
BIOBASED_PRODUCTS_GOAL_NA_INST: Off
WASTE_MANAGEMENT_GOAL_YES: Yes
WASTE_MANAGEMENT_GOAL_NA_MISSI: Off
WASTE_MANAGEMENT_GOAL_NA_BUILD: Off
WASTE_MANAGEMENT_GOAL_NA_NOT: Off
WASTE_MANAGEMENT_GOAL_NA_RENOV: Off
WASTE_MANAGEMENT_GOAL_NA_INSTA: Off
WASTE_DIVERSION_GOAL_YES: Yes
WASTE_DIVERSION_GOAL_NA_MISSIO: Off
WASTE_DIVERSION_GOAL_NA_BUILDI: Off
WASTE_DIVERSION_GOAL_NA_NOT: Off
WASTE_DIVERSION_GOAL_NA_RENOVA: Off
WASTE_DIVERSION_GOAL_NA_INSTAL: Off
CLIMATE_CHNG_RSK_GOAL_YES: Yes
CLIMATE_CHNG_RSK_GOAL_NA_MISSI: Off
CLIMATE_CHNG_RSK_GOAL_NA_BUILD: Off
CLIMATE_CHNG_RSK_GOAL_NA_NOT: Off
CLIMATE_CHNG_RSK_GOAL_NA_RENOV: Off
CLIMATE_CHNG_RSK_GOAL_NA_INSTA: Off
EFFICIENCY_STANDARD_ASH2013: Off
EFFICIENCY_STANDARD_ASH2016: Off
VENTILATION_GOAL_YES: Yes
VENTILATION_GOAL_N_A: Off
VENTILATION_GOAL_NA_MISSION: Off
VENTILATION_GOAL_NA_BUILDING: Off
VENTILATION_GOAL_NA_NOT: Off
VENTILATION_GOAL_NA_RENOVATION: Off
VENTILATION_GOAL_NA_INSTALLATI: Off
OCCUPANT_HEALTH_GOAL_YES: Yes
OCCUPANT_HEALTH_GOAL_N_A: Off
OCCUPANT_HEALTH_GOAL_NA_MISSIO: Off
OCCUPANT_HEALTH_GOAL_NA_BUILDI: Off
OCCUPANT_HEALTH_GOAL_NA_NOT: Off
OCCUPANT_HEALTH_GOAL_NA_RENOVA: Off
OCCUPANT_HEALTH_GOAL_NA_INSTAL: Off
THIRD_PARTY_REQ_NO: Yes
CERT_LEVEL_USGBC_CERT: Off
CERT_LEVEL_GBI1: Off
CERT_LEVEL_USGBC_SILVER: Off
CERT_LEVEL_GBI2: Off
CERT_LEVEL_USGBC_GOLD: Off
CERT_LEVEL_GBI3: Off
CERT_LEVEL_USGBC_PLAT: Off
CERT_LEVEL_GBI4: Off
CERT_LEVEL_USGBC_GUID: Off
CERT_LEVEL_GBI_GUID: Off
CERT_LEVEL_OTHER: Off
CERT_LEVEL_SYSTEM_OTHER:
THIRD_PARTY_REQ_YES: Off
THIRD_PARTY_NA_INSTAL: Off
THIRD_PARTY_NA_MISS: Yes
THIRD_PARTY_NA_RENO: Off

File details come from the government source that posted it. Updated .