ATT (19) NAVFAC HIGH PERFORMANCE AND SUSTAINABLE BUILDING CHECKLIST GOALS REV 1.pdf
PDF 457 KB Posted
- Attached to
- DESIGN-BUILD (DB), P-1476U NEW FIRE APPARATUS BAY CHEATHAM ANNEX, NAVAL WEAPONS STATION YORKTOWN, VIRGINIA
- Solicitation number
- N40085-26-R-0131
About this file
This is a NAVFAC High Performance and Sustainable Building Checklist – Goals form used to document compliance with guiding principles for sustainable development in federal military construction projects.
The form covers FY 26 project P1476U New Fire Apparatus Bay located at Cheatham Annex, NWS Yorktown, with a project design level of PDA. The solicitation documents are complete with an award date of 06/03/26 and BOD of 06/03/26. The checklist documents design goals across six primary sustainability categories: (1) Employ Integrated Design Principles, including integrated design and commissioning; (2) Optimize Energy Performance, targeting 36.80% energy savings below baseline with a Total Design Energy Use Intensity of 399.8 kBTU/Sq Ft/Year and compliance with ASHRAE 90.1-2019 Addendum C; (3) Protect and Conserve Water, addressing indoor and outdoor water use, metering, water-efficient landscaping, and alternative water sources; (4) Enhance Indoor Environmental Quality, covering ventilation, thermal comfort, daylighting, automatic dimming controls, moisture control, low-emitting materials, and indoor air quality during construction; (5) Reduce Environmental Impact of Materials, including recycled content, biobased content, waste management, and a 60% waste diversion target; and (6) Assess and Consider Climate Change Risks. The project is not pursuing third-party certification, with N/A marked due to mission preclusion. The form allows respondents to mark "Yes" for compliance or "N/A" with specified justifications including mission preclusion, building/site issues, cost-effectiveness concerns, or scope limitations.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT INFORMATION
Work Order No.: FY MILCON P No. / Customer Reference No.:
Project Title:
Location UIC/Name:
NAVFAC Project Manager: Project Design Level:
Facility Area: U/M: Category Code: Facility #:
AE Contract # & T.O. AE Firm Sustainability Coordinator:
AE Firm Name:
Project Phase: Design Start / PDA Solicitation Documents Complete Construction Contract Award Date (P): BOD (P):
SUSTAINABILITY DATA - GUIDING PRINCIPLES for SUSTAINABLE DEVELOPMENT Use this form to collect Design Goals information to be recorded on the Sustainable and Energy Tab in eProjects
NOTE: 1. Mark "N/A" only when at least one of the listed justifications is applicable, and mark those justifications. Otherwise, mark "Yes."
2. If project is for more than one building for which tracking is required, complete a separate form for each building.
DESIGN DEVELOPMENT - DOCUMENTATION OF COMPLIANCE WITH GUIDING PRINCIPLES
I. Employ Integrated Design Principles 1 Integrated Design
Goals In Compliance Yes N/A N/A due to
Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
2 Commissioning Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
(i) Systems commissioned
II. Optimize Energy Performance
3. Energy Efficiency
Goals In Compliance Yes N/A N/A due to
Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
(i) Energy Savings Below Baseline %
NAVFAC HIGH PERFORMANCE AND SUSTAINABLE BUILDING CHECKLIST -- GOALS
No
PRELIMINARY PROJECT INFORMATION
1 How many buildings are included in this project?
2 New building or stand-alone addition >/=10,000 GSF
-OR-
Existing building renovation (including additions) >/=10,000 GSF, and with a cost >$3M and 50% Estimated Replacement Cost (ERC)?
3 Identify the building to be tracked in this tab:
Yes
(ii) Energy Standard
IECC
OTHER:
ASHRAE 90.1-2013 (06NOV16+)
ASHRAE 90.1-2016
C. Energy Efficient Products Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
4. Renewable Energy Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
A. Renewable energy technology types Geothermal Daylighting (quantified passive) Ground Source Heat Pumps Mechanical (i.e., direct water pumping) Solar Photovoltaic Micro-hydro Solar Thermal - domestic hot water Concentrating (sterling) Solar Thermal - space conditioning Wind
(i) Annual % of total load
(ii) System size (kwatts)
B. Solar Hot Water Percentage - 30% target Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
(i) Annual % of total load
(ii) System size (kBTU/Year)
5. Meter (Energy) Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
6. Energy Use Intensity kBTU/Sq Ft/Year
(i) Total Design Energy Use Intensity (EUI): kBTU/Sq Ft/Year
III. Protect and Conserve Water
7. Indoor Water Use
A. Water-Efficient Products Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
(i) Total Design Indoor Water Use Intensity (WUI): Gallons/Sq Ft/Year
B. Indoor Water Meter Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
8. Outdoor Water Use A. Outdoor Water Meter (for 25,000 SF of irrigation)
(i) Is there a permanent irrigation system serving more than 25,000 SF of landscaping?
Yes No
(ii) Water Meter Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
B. Water-efficient landscape Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
9. Alternative Water Use (indoor or outdoor water) Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
Methods Proposed: Air Handler Condensate Capture Reclaimed Water Grey Water Treated Wastewater Harvested Rainwater OTHER:
IV. Enhance Indoor Environmental Quality
11. Ventilation and Thermal Comfort
A. Ventilation Goals In Compliance Yes N/A
N/A due to Building/site issue Renovation only: not part of scope
Mission preclusion Not LCCE Installation/region issue
10. Stormwater Management - update the LID Data tab
B. Thermal Comfort Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
12. Daylighting and Lighting Controls A. Daylight
Goals In Compliance Yes N/A N/A due to
Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
B. Automatic dimming controls Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
13. Indoor Air Quality A. Moisture Control
Goals In Compliance Yes N/A N/A due to
Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
B. Low-Emitting Materials Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
C. Indoor Air Quality during Construction Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
14. Occupant Health and Wellness Goals In Compliance Yes N/A
N/A due to Building/site issue Renovation only: not part of scope
Mission preclusion Not LCCE Installation/region issue
V. Reduce the Environmental Impact of Materials
15. Material Content and Performance
A. Resource Conservation and Recovery Act (RCRA) Section 6002 (recycled content) Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
B. Farm Security and Rural Investment Act (FSRIA) section 9002 (Biobased content) Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
16. Waste Management Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
17. Waste Diversion - 60% target Goals In Compliance Yes N/A
N/A due to Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
(i) Percent diverted
VI. Assess and Consider Climate Change Risks
18. Address Climate Change Risk
Goals In Compliance Yes N/A N/A due to
Mission preclusion Building/site issue Not LCCE Renovation only: not part of scope Installation/region issue
Yes No
Sustainability Third Party Certification Rating
Third Party Certification Rating System and Level GBI Green Globes 1 Globe GBI Green Globes 2 Globe GBI Green Globes 3 Globe GBI Green Globes 4 Globe GBI "Guiding Principles Compliance"
USGBC LEED Certified USGBC LEED Silver USGBC LEED Gold USGBC LEED Platinum USGBC "Guiding Principles Assessment"
OTHER
i. Third Party Certification Rating system - Other
THIRD PARTY CERTIFICATION INFORMATION
Is this building pursuing Third Party Certification?
N/A due to Installation/region issue Mission preclusion Renovation only: not part of scope
Goals
| Check Box1: Off |
| Check Box2: Yes |
| OTHER energy standard: ASHRAE 90.1-2019 ADDENDUM CH. |
| OTHER methods: |
| WORKORDER_NUMBER: 1832581 |
| FISCAL_YEAR: 26 |
| CUSTOMER_REFERENCE_NBR: |
| PROJECT_TITLE: P1476U New Fire Apparatus Bay |
| LOCATION_UIC: Cheatham Annex, NWS Yorktown |
| PROJECT_MANAGER: Ra Youen |
| DESIGN_LEVEL: PDA |
| FACILITY_AREA: |
| UM: |
| CATEGORY_CODE: |
| FACILITY: |
| AE_FIRM: |
| AE_CONTRACT_NBR: |
| IH_DESIGN_MANAGER: N\A |
| AWARD_DATE: 06/03/26 |
| BOD_DATE: 06/03/26 |
| NUM_BUILDINGS: 1 |
| NEW_CONSTRUCTION_Y: Off |
| NEW_CONSTRUCTION_N: Off |
| TRACKED_BUILDING: P1476U |
| INTEGRATED_DESIGN_GOAL_N_A: Off |
| SYSTEMS_COMMISSIONED: |
| ENERGY_REDUCTION_PCT: 36.8 |
| EFFICIENCY_STANDARD_IECC: Off |
| EFFICIENCY_STANDARD_OTHER: Yes |
| COMMISSIONING_GOAL_N_A: Off |
| ENERGY_EFF_GOAL_N_A: Off |
| ENERGY_EFF_PROD_GOAL_N_A: Off |
| RENEW_TECH_GOAL_N_A: Yes |
| RENEW_TECH_TYPE_GEO: Off |
| RENEW_TECH_TYPE_DAY: Off |
| RENEW_TECH_TYPE_WIND: Off |
| RENEW_TECH_TYPE_GROUND: Off |
| RENEW_TECH_TYPE_MECH: Off |
| RENEW_TECH_TYPE_PHOTO: Off |
| RENEW_TECH_TYPE_DOM: Off |
| RENEW_TECH_TYPE_SPACE: Off |
| RENEW_TECH_TYPE_MICRO: Off |
| RENEW_TECH_TYPE_STER: Off |
| RENEW_ANNUAL_PCT: |
| RENEW_SYSTEM_SIZE: |
| SOLAR_HOT_WATER_GOAL_N_A: Yes |
| SOLAR_HOT_WATER_PCT: |
| SOLAR_HOT_WATER_SYSTEM_SIZE: |
| ENERGY_BUILD_METER_GOAL_N_A: Off |
| ENERGY_USE_INTENSITY: 399.77 |
| WATER_EFF_PROD_GOAL_N_A: Off |
| WATER_USE_INTENSITY: |
| WATER_BUILD_METER_GOAL_Yes: Yes |
| WATER_BUILD_METER_GOAL_N_A: Off |
| PERM_IRRIGATION_YES: Off |
| PERM_IRRIGATION_NO: Yes |
| WATER_OUTDOOR_METER_GOAL_N_A: Yes |
| WATER_EFF_LAND_GOAL_N_A: Off |
| ALT_WATER_USE_GOAL_N_A: Yes |
| ALT_WATER_USE_HARVEST: Off |
| ALT_WATER_USE_TREAT: Off |
| ALT_WATER_USE_AIR: Off |
| ALT_WATER_USE_GREY: Off |
| ALT_WATER_USE_RECLAIM: Off |
| ALT_WATER_USE_OTHER: Off |
| THERMAL_CONDITIONS_GOAL_N_A: Off |
| MINIMUM_DAYLIGHT_GOAL_N_A: Off |
| AUTO_DIMMING_GOAL_N_A: Off |
| MOISTURE_CONTROL_GOAL_N_A: Off |
| LOW_EMITTING_MAT_GOAL_N_A: Off |
| INDOOR_AIR_QUAL_GOAL_N_A: Off |
| RECYCLED_CONTENT_GOAL_N_A: Off |
| BIOBASED_PRODUCTS_GOAL_N_A: Off |
| WASTE_MANAGEMENT_GOAL_N_A: Off |
| WASTE_DIVERSION_GOAL_N_A: Off |
| WASTE_DIVERSION_PCT: |
| CLIMATE_CHNG_RSK_GOAL_N_A: Off |
| RENEW_TECH_GOAL_NA_Installatio: Off |
| ALT_WATER_USE_GOAL_NA_Installa: Off |
| INTEGRATED_DESIGN_GOAL_YES: Yes |
| INTEGRATED_DESIGN_GOAL_NA_MISS: Off |
| INTEGRATED_DESIGN_GOAL_NA_BUIL: Off |
| INTEGRATED_DESIGN_GOAL_NA_NOT: Off |
| INTEGRATED_DESIGN_GOAL_NA_RENO: Off |
| INTEGRATED_DESIGN_GOAL_NA_INST: Off |
| COMMISSIONING_GOAL_YES: Yes |
| COMMISSIONING_GOAL_NA_MISSION: Off |
| COMMISSIONING_GOAL_NA_BUILDING: Off |
| COMMISSIONING_GOAL_NA_NOT: Off |
| COMMISSIONING_GOAL_NA_RENOVATI: Off |
| COMMISSIONING_GOAL_NA_INSTALLA: Off |
| ENERGY_EFF_GOAL_YES: Yes |
| ENERGY_EFF_GOAL_NA_MISSION: Off |
| ENERGY_EFF_GOAL_NA_BUILDING: Off |
| ENERGY_EFF_GOAL_NA_NOT: Off |
| ENERGY_EFF_GOAL_NA_RENOVATION: Off |
| ENERGY_EFF_GOAL_NA_INSTALLATIO: Off |
| ENERGY_EFF_PROD_GOAL_YES: Yes |
| ENERGY_EFF_PROD_GOAL_NA_MISSIO: Off |
| ENERGY_EFF_PROD_GOAL_NA_BUILDI: Off |
| ENERGY_EFF_PROD_GOAL_NA_NOT: Off |
| ENERGY_EFF_PROD_GOAL_NA_RENOVA: Off |
| ENERGY_EFF_PROD_GOAL_NA_INSTAL: Off |
| RENEW_TECH_GOAL_YES: Off |
| RENEW_TECH_GOAL_NA_MISSION: Off |
| RENEW_TECH_GOAL_NA_BUILDING: Off |
| RENEW_TECH_GOAL_NA_NOT: Yes |
| RENEW_TECH_GOAL_NA_RENOVATION: Off |
| SOLAR_HOT_WATER_GOAL_YES: Off |
| SOLAR_HOT_WATER_GOAL_NA_MISSIO: Off |
| SOLAR_HOT_WATER_GOAL_NA_BUILDI: Off |
| SOLAR_HOT_WATER_GOAL_NA_NOT: Yes |
| SOLAR_HOT_WATER_GOAL_NA_RENOVA: Off |
| SOLAR_HOT_WATER_GOAL_NA_INSTAL: Off |
| ENERGY_BUILD_METER_GOAL_YES: Yes |
| ENERGY_BUILD_METER_GOAL_NA_MIS: Off |
| ENERGY_BUILD_METER_GOAL_NA_BUI: Off |
| ENERGY_BUILD_METER_GOAL_NA_NOT: Off |
| ENERGY_BUILD_METER_GOAL_NA_REN: Off |
| ENERGY_BUILD_METER_GOAL_NA_INS: Off |
| WATER_EFF_PROD_GOAL_YES: Yes |
| WATER_EFF_PROD_GOAL_NA_MISSION: Off |
| WATER_EFF_PROD_GOAL_NA_BUILDIN: Off |
| WATER_EFF_PROD_GOAL_NA_NOT: Off |
| WATER_EFF_PROD_GOAL_NA_RENOVAT: Off |
| WATER_EFF_PROD_GOAL_NA_INSTALL: Off |
| WATER_BUILD_METER_GOAL_NA_MISS: Off |
| WATER_BUILD_METER_GOAL_NA_BUIL: Off |
| WATER_BUILD_METER_GOAL_NA_NOT: Off |
| WATER_BUILD_METER_GOAL_NA_RENO: Off |
| WATER_BUILD_METER_GOAL_NA_INST: Off |
| WATER_OUTDOOR_METER_GOAL_YES: Off |
| WATER_OUTDOOR_METER_GOAL_NA_MI: Off |
| WATER_OUTDOOR_METER_GOAL_NA_BU: Off |
| WATER_OUTDOOR_METER_GOAL_NA_NO: Off |
| WATER_OUTDOOR_METER_GOAL_NA_RE: Off |
| WATER_OUTDOOR_METER_GOAL_NA_IN: Off |
| WATER_EFF_LAND_GOAL_YES: Yes |
| WATER_EFF_LAND_GOAL_NA_MISSION: Off |
| WATER_EFF_LAND_GOAL_NA_BUILDIN: Off |
| WATER_EFF_LAND_GOAL_NA_NOT: Off |
| WATER_EFF_LAND_GOAL_NA_RENOVAT: Off |
| WATER_EFF_LAND_GOAL_NA_INSTALL: Off |
| ALT_WATER_USE_GOAL_YES: Off |
| ALT_WATER_USE_GOAL_NA_MISSION: Off |
| ALT_WATER_USE_GOAL_NA_BUILDING: Yes |
| ALT_WATER_USE_GOAL_NA_NOT: Off |
| ALT_WATER_USE_GOAL_NA_RENOVATI: Off |
| THERMAL_CONDITIONS_GOAL_YES: Yes |
| THERMAL_CONDITIONS_GOAL_NA_MIS: Off |
| THERMAL_CONDITIONS_GOAL_NA_BUI: Off |
| THERMAL_CONDITIONS_GOAL_NA_NOT: Off |
| THERMAL_CONDITIONS_GOAL_NA_REN: Off |
| THERMAL_CONDITIONS_GOAL_NA_INS: Off |
| MINIMUM_DAYLIGHT_GOAL_YES: Yes |
| MINIMUM_DAYLIGHT_GOAL_NA_MISSI: Off |
| MINIMUM_DAYLIGHT_GOAL_NA_BUILD: Off |
| MINIMUM_DAYLIGHT_GOAL_NA_NOT: Off |
| MINIMUM_DAYLIGHT_GOAL_NA_RENOV: Off |
| MINIMUM_DAYLIGHT_GOAL_NA_INSTA: Off |
| AUTO_DIMMING_GOAL_YES: Yes |
| AUTO_DIMMING_GOAL_NA_MISSION: Off |
| AUTO_DIMMING_GOAL_NA_BUILDING: Off |
| AUTO_DIMMING_GOAL_NA_NOT: Off |
| AUTO_DIMMING_GOAL_NA_RENOVATIO: Off |
| AUTO_DIMMING_GOAL_NA_INSTALLAT: Off |
| MOISTURE_CONTROL_GOAL_YES: Yes |
| MOISTURE_CONTROL_GOAL_NA_MISSI: Off |
| MOISTURE_CONTROL_GOAL_NA_BUILD: Off |
| MOISTURE_CONTROL_GOAL_NA_NOT: Off |
| MOISTURE_CONTROL_GOAL_NA_RENOV: Off |
| MOISTURE_CONTROL_GOAL_NA_INSTA: Off |
| LOW_EMITTING_MAT_GOAL_YES: Yes |
| LOW_EMITTING_MAT_GOAL_NA_MISSI: Off |
| LOW_EMITTING_MAT_GOAL_NA_BUILD: Off |
| LOW_EMITTING_MAT_GOAL_NA_NOT: Off |
| LOW_EMITTING_MAT_GOAL_NA_RENOV: Off |
| LOW_EMITTING_MAT_GOAL_NA_INSTA: Off |
| INDOOR_AIR_QUAL_GOAL_YES: Yes |
| INDOOR_AIR_QUAL_GOAL_NA_MISSIO: Off |
| INDOOR_AIR_QUAL_GOAL_NA_BUILDI: Off |
| INDOOR_AIR_QUAL_GOAL_NA_NOT: Off |
| INDOOR_AIR_QUAL_GOAL_NA_RENOVA: Off |
| INDOOR_AIR_QUAL_GOAL_NA_INSTAL: Off |
| RECYCLED_CONTENT_GOAL_YES: Yes |
| RECYCLED_CONTENT_GOAL_NA_MISSI: Off |
| RECYCLED_CONTENT_GOAL_NA_BUILD: Off |
| RECYCLED_CONTENT_GOAL_NA_NOT: Off |
| RECYCLED_CONTENT_GOAL_NA_RENOV: Off |
| RECYCLED_CONTENT_GOAL_NA_INSTA: Off |
| BIOBASED_PRODUCTS_GOAL_YES: Yes |
| BIOBASED_PRODUCTS_GOAL_NA_MISS: Off |
| BIOBASED_PRODUCTS_GOAL_NA_BUIL: Off |
| BIOBASED_PRODUCTS_GOAL_NA_NOT: Off |
| BIOBASED_PRODUCTS_GOAL_NA_RENO: Off |
| BIOBASED_PRODUCTS_GOAL_NA_INST: Off |
| WASTE_MANAGEMENT_GOAL_YES: Yes |
| WASTE_MANAGEMENT_GOAL_NA_MISSI: Off |
| WASTE_MANAGEMENT_GOAL_NA_BUILD: Off |
| WASTE_MANAGEMENT_GOAL_NA_NOT: Off |
| WASTE_MANAGEMENT_GOAL_NA_RENOV: Off |
| WASTE_MANAGEMENT_GOAL_NA_INSTA: Off |
| WASTE_DIVERSION_GOAL_YES: Yes |
| WASTE_DIVERSION_GOAL_NA_MISSIO: Off |
| WASTE_DIVERSION_GOAL_NA_BUILDI: Off |
| WASTE_DIVERSION_GOAL_NA_NOT: Off |
| WASTE_DIVERSION_GOAL_NA_RENOVA: Off |
| WASTE_DIVERSION_GOAL_NA_INSTAL: Off |
| CLIMATE_CHNG_RSK_GOAL_YES: Yes |
| CLIMATE_CHNG_RSK_GOAL_NA_MISSI: Off |
| CLIMATE_CHNG_RSK_GOAL_NA_BUILD: Off |
| CLIMATE_CHNG_RSK_GOAL_NA_NOT: Off |
| CLIMATE_CHNG_RSK_GOAL_NA_RENOV: Off |
| CLIMATE_CHNG_RSK_GOAL_NA_INSTA: Off |
| EFFICIENCY_STANDARD_ASH2013: Off |
| EFFICIENCY_STANDARD_ASH2016: Off |
| VENTILATION_GOAL_YES: Yes |
| VENTILATION_GOAL_N_A: Off |
| VENTILATION_GOAL_NA_MISSION: Off |
| VENTILATION_GOAL_NA_BUILDING: Off |
| VENTILATION_GOAL_NA_NOT: Off |
| VENTILATION_GOAL_NA_RENOVATION: Off |
| VENTILATION_GOAL_NA_INSTALLATI: Off |
| OCCUPANT_HEALTH_GOAL_YES: Yes |
| OCCUPANT_HEALTH_GOAL_N_A: Off |
| OCCUPANT_HEALTH_GOAL_NA_MISSIO: Off |
| OCCUPANT_HEALTH_GOAL_NA_BUILDI: Off |
| OCCUPANT_HEALTH_GOAL_NA_NOT: Off |
| OCCUPANT_HEALTH_GOAL_NA_RENOVA: Off |
| OCCUPANT_HEALTH_GOAL_NA_INSTAL: Off |
| THIRD_PARTY_REQ_NO: Yes |
| CERT_LEVEL_USGBC_CERT: Off |
| CERT_LEVEL_GBI1: Off |
| CERT_LEVEL_USGBC_SILVER: Off |
| CERT_LEVEL_GBI2: Off |
| CERT_LEVEL_USGBC_GOLD: Off |
| CERT_LEVEL_GBI3: Off |
| CERT_LEVEL_USGBC_PLAT: Off |
| CERT_LEVEL_GBI4: Off |
| CERT_LEVEL_USGBC_GUID: Off |
| CERT_LEVEL_GBI_GUID: Off |
| CERT_LEVEL_OTHER: Off |
| CERT_LEVEL_SYSTEM_OTHER: |
| THIRD_PARTY_REQ_YES: Off |
| THIRD_PARTY_NA_INSTAL: Off |
| THIRD_PARTY_NA_MISS: Yes |
| THIRD_PARTY_NA_RENO: Off |
File details come from the government source that posted it. Updated .