8. Price Sheet_B532 Add 02_3.5.26.pdf
PDF 133 KB Posted
- Solicitation number
- N4008526R0090
About this file
This is a Price Schedule for a demolition contract requiring bidders to provide line item pricing for the complete demolition of vacant BEQ Building 532. The schedule consists of six line items with specific quantities and units of measure that must be priced by the contractor.
Line Item 1 requests a base price for the entire demolition work as a lump sum. Line Items 2 through 6 specify unit pricing for asbestos-containing materials removal and disposal, including: 850 each mudded pipe fittings, 500 linear feet of thermal system insulation (TSI), 2 each fire doors, 50 square feet of debris, and 1,500 linear feet of subgrade and utility piping. Contractors must calculate subtotals for each unit-priced line item and provide a combined total price for all line items 1-6, which must also be entered on line item 0001 of the Standard Form 1449 (SF 1449). The pricing template does not specify response dates, award dates, or other contract terms beyond the pricing structure required for this demolition and hazardous material removal project.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
Please provide total price for line items 1-6. $________________________
(This total should also be placed on line item 0001 of SF 1449)
Line Item
Description Quantity Unit Unit Price
Sub- Total
1 BASE PRICE: Total Price for the entire work for
DEMOLISHING VACANT
BEQ BUILDING 532 in accordance with the RFP.
1 EA $_____
2 Unit Price for removal and disposal of asbestos containing mudded pipe fittings.
850 EA $_____ $_____
3 Unit Price for removal and disposal of asbestos containing
TSI.
500 LF $_____ $_____
4 Unit Price for removal and disposal of asbestos containing fire doors.
2 EA $_____ $_____
5 Unit Price for removal and disposal of asbestos containing debris.
50 SF $_____ $_____
6 Unit Price for removal and disposal of asbestos containing subgrade and utility piping.
1,500 LF $_____ $_____
File details come from the government source that posted it. Updated .