10. Offline_Steam Map.pdf
PDF 779 KB Posted
- Solicitation number
- N4008526R0090
About this file
This is a facility engineering schematic and distribution map for the Naval Training Center in Great Lakes, Illinois. The document illustrates the steam and condensate distribution system infrastructure across the installation, showing the layout of underground steam runs, aboveground steam runs, high-temperature hot water runs, low-pressure hot water runs, and pressure regulating valves throughout the facility. The map includes detailed piping routes, building connections, and system components with specific identification labels and reference details. Two detailed sections (Detail A and Detail B) provide close-up views of specific system components and connections. The document includes a legend identifying the various types of steam and water distribution lines, a revision history table, and standard engineering notation with dimensions and scale references. This type of schematic would be essential for facility maintenance, repair, upgrade, or modernization projects involving the steam and condensate systems at the installation.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
belinda.trout Polygon belinda.trout Polygon
File details come from the government source that posted it. Updated .