1a. DRAWINGS DB_DEMO BEQ 532.pdf
PDF 31 MB Posted
- Solicitation number
- N4008526R0090
About this file
This file is a collection of attachments and supporting documentation for a federal demolition contract at Naval Station Great Lakes, Illinois. The primary deliverable is the complete demolition of Building 532, a vacant 3-story student barracks with a partial basement, and Building 132H, a vacant 4-story student barracks. The contractor must furnish all labor, tools, transportation, supervision, materials, inspections, equipment, and safety compliance necessary to perform total demolition including all foundation walls, footings, column footings, and associated utilities for both structures. The solicitation number is N4008526R0090, issued by the Department of the Navy Naval Facilities Engineering Command.
The supporting documentation includes comprehensive environmental and technical specifications. Key attachments include architectural and mechanical drawings (floor plans, electrical schematics, fire alarm riser diagrams), a Permits Record of Decision (PROD) template addressing air quality, water pollution, discharge, drinking water, fuel tanks, hazardous waste, coastal management, and other permits; base access registration forms and installation access request procedures; a Construction Stormwater Management Contractor Guidance Manual detailing NPDES permit compliance, erosion and sediment control requirements, materials management practices, and inspection procedures; a Refrigerant Compliance Plan addressing Clean Air Act Section 608 requirements for stationary HVAC&R equipment including technician certification, venting prohibitions, leak repair procedures, and record-keeping; and environmental survey reports documenting asbestos-containing materials (pipe insulation elbow fittings and roof flashing) and lead-based paint findings from Buildings 531 and 532. The contractor must comply with federal, state, and local environmental regulations including the Clean Water Act, Clean Air Act, and Illinois Environmental Protection Agency requirements throughout the demolition project.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART SIX - ATTACHMENTS - Page 1
PART SIX - ATTACHMENTS
General 01_Permits Record of Decision (PROD) 02_ Base Access Forms: DON Local Population ID Card/Base Access Pass Registration & 2023 Statement of Purpose
Drawings 03_A-2-18 BEQ Reactivation 1st Floor Plan 04_A-2-19 BEQ Reactivation 2nd & 3rd Floor Plan 05_M-22 BEQ Reactivation Basement & Roof Plans 06_M-23 BEQ Reactivation 1st Floor Plan 07_M-24 BEQ Reactivation 2nd & 3rd Floor Plan 08_E-29 BEQ Reactivation Basement/1st Floor Plan – Electrical 09_E-30 BEQ Reactivation Second & Third Floor – Electrical 10_E-38 Fire Alarm Riser Diagram
Environmental 11_Construction Stormwater Manual 12_Refrigerant Compliance Plan Naval Station Great Lakes (January 2025) 13_Environmental Survey Buildings 531 and 532 for Demolition (3 DECEMBER 2009)
Utility Maps 14_Communication Ducts 15_Electrical Manholes and Ducts 16_Active/Abandoned Utilities Building 532 Area 17_B532 M42 18_Sanitary Sewer Demo Requirements 19_Sanitary 20_Street Lights 21_Steam 22_Storm 23_Fiber 24_Water
Templates 25_Asbestos Hazard Abatement Plan 26_Lead, Cadmium, Chromium Compliance Plan
DEMO VACANT BEQ B-532
NAVSTA Great Lakes, IL eProject# 1807260
PERMITS RECORD OF DECISION (PROD)
PERMIT PROJECT TITLE: WORK ORDER NUMBER:
REQUIRED LOCATION:
(Check Box) GOVERNMENT PROJECT MANAGER:
**Use referenced notes where additional space required.
Air Quality PERMIT: Construction Date Obtained: Date Closed:
Basis of Decision (Yes/No):**
Issuing Agency:
Special Provisions and Requirements:**
Air Quality PERMIT: Operating Date Obtained: Date Closed:
Air Quality PERMIT: Asbestos Demolition & Removal Date Obtained: Date Closed:
Air Quality PERMIT: Other Date Obtained: Date Closed:
Attachment 01_PROD
(Check Box) GOVERNMENT PROJECT MANAGER:
Water Pollution PERMIT: Wastewater Collection System Date Obtained: Date Closed:
Water Pollution PERMIT: Wastewater Pump Station Date Obtained: Date Closed:
Issuing Agency Special Provisions and Requirements:
Water Pollution PERMIT: Wastewater Treatment Plant Date Obtained: Date Closed:
Water Pollution PERMIT: Pretreatment, i.e. Oil/Water Separator Date Obtained: Date Closed:
Water Pollution PERMIT: Septic System Date Obtained: Date Closed:
Water Pollution PERMIT: Erosion & Sediment Control Date Obtained: Date Closed:
Water Pollution PERMIT: Stormwater Management Date Obtained: Date Closed:
Water Pollution PERMIT: Other Date Obtained: Date Closed:
Discharge Permit PERMIT: New or Increased Capacity NPDES Date Obtained: Date Closed:
Discharge Permit PERMIT: General NPDES (≥1 Acre Land Disturbance)
Date Obtained: Date Closed:
Discharge Permit PERMIT: Other Date Obtained: Date Closed:
Drinking Water PERMIT: Water Distribution System Date Obtained: Date Closed:
Drinking Water PERMIT: Water Treatment Plant Date Obtained: Date Closed:
Drinking Water PERMIT: Well Construction Date Obtained: Date Closed:
Drinking Water PERMIT: Underground Injection Date Obtained: Date Closed:
Drinking Water PERMIT: Other Date Obtained: Date Closed:
(Check Box) GOVERNMENT PROJECT MANAGER:
Fuel Tanks PERMIT: Underground Storage Tank Construction
Fuel Tanks PERMIT: Underground Storage Tank Operating
Fuel Tanks PERMIT: Other Date Obtained: Date Closed:
Special Provisions, and Requirements:
Solid and Hazardous Waste
PERMIT: Hazardous Waste Treatment, Storage, Disposal, Handling
(Check Box) GOVERNMENT PROJECT MANAGER:
Solid and Hazardous
PERMIT: Landfill Date Obtained: Date Closed:
PERMIT: Used Oil Collection Center, Aggregation Point, Transporter & Transfer Facility
PERMIT: Other Date Obtained: Date Closed:
Coastal Management Permit
PERMIT: Coastal Consistency Determination Authorization
(Check Box) GOVERNMENT PROJECT MANAGER:
Coastal Management
PERMIT: Coastal Barrier Date Obtained: Date Closed:
PERMIT: Floodplain Management Date Obtained: Date Closed:
PERMIT: Other Date Obtained: Date Closed:
Other Permits PERMIT: Work in Navigable Waters Date Obtained: Date Closed:
Other Permits PERMIT: Dredging Date Obtained: Date Closed:
Other Permits PERMIT: Clearing Date Obtained: Date Closed:
Other Permits PERMIT: Essential Fish Habitat Assessment Consultation
Other Permits PERMIT: Marine Mammal Protection Act Date Obtained: Date Closed:
Other Permits PERMIT: Take Permits Date Obtained: Date Closed:
Other Permits PERMIT: Work in Wetlands Date Obtained: Date Closed:
Other Permits PERMIT: Digging Permit Date Obtained: Date Closed:
Other Permits PERMIT: Traffic Date Obtained: Date Closed:
(Check Box) GOVERNMENT PROJECT MANAGER:
Other Permits PERMIT: Airport Hazard/Airfield Safety Clearances
Other Permits PERMIT: Railroad Crossing Date Obtained: Date Closed:
Other Permits PERMIT: Historic Preservation Date Obtained: Date Closed:
Other Permits PERMIT: Noise Abatement Date Obtained: Date Closed:
REQUIRED LOCATION:
Other Permits PERMIT: Endangered/Species/Critical Habitat Date Obtained: Date Closed:
Other Permits PERMIT: Other Date Obtained: Date Closed:
Special Provisions and Requirements:**
Prepared by: Date
OMB 0703-0061
07/31/2027
SECNAV 5512/1 (REV MAY 2021) Controlled by: DoN CUI Category: PRVCY
LDC: FEDCON
Page of CUI (when filled in) POC: Le'Ron Lawrence, leron.a.lawrence.civ@us.navy.mil, 703-601-0604
DEPARTMENT OF THE NAVY LOCAL POPULATION ID CARD/BASE ACCESS PASS REGISTRATION
PRIVACY ACT STATEMENT:
AUTHORITY: 10 U.S.C. 113, Secretary of Defense; DoD Directive 1000.25, DoD Personnel Identity Protection (PIP) Program; DoD Instruction 5200.08, Security of DoD Installations and Resources and the DoD Physical Security Review Board (PSRB); DoD 5200.08-R, Physical Security Program; DoD Directive 5200.27, Acquisition of Information Concerning Persons and Organizations not Affiliated with the Department of Defense (Exception to policy memos); Directive-Type Memorandum (DTM) 09-012, Interim Policy Guidance for DoD Physical Access Control; DTM 14-005, DoD Identity Management Capability Enterprise Services Application (IMESA) Access to FBI National Crime Information Center (NCIC) Files; and E.O. 9397 (SSN), as amended; OPNAVINST 5530.14E, Navy Physical Security and Law Enforcement Program; Marine Corps Order P5530.14, Marine Corps Physical Security Program Manual;
SORNNM05512-2 Badge and Access Control System Records and DMDC 16, Identity Management Engine for Security and Analysis (IMESA): http://dpcld.defense.gov/Privacy/ SORNsIndex
PURPOSE(S): To control physical access to Department of Defense (DoD), Department of the Navy (DON) or U.S. Marine Corps Installations/Units controlled information, installations, facilities, or areas over which DoD, DON, or U.S. Marine Corps has security responsibilities by identifying or verifying an individual through the use of biometric databases and associated data processing/information services for designated populations for purposes of protecting U.S./Coalition/allied government/national security areas of responsibility and information; to issue badges, replace lost badges, and retrieve passes upon separation; to maintain visitor statistics; collect information to adjudicate access to facility; and track the entry/exit times of personnel.
ROUTINE USE(S): To designated contractors, Federal agencies, and foreign governments for the purpose of granting Navy officials access to their facility.
DISCLOSURE: Providing registration information is voluntary. Failure to provide requested information may result in denial of access to benefits, privileges, and DoD installations, facilities and buildings.
IDENTITY PROOFING AND APPLICANT INFORMATION
1. LAST NAME: 2. FIRST NAME: 3. MIDDLE NAME: 4. NAME SUFFIX:
Jr. Sr. I II III IV
5. RACE AMERICAN INDIAN OR
ASIAN BLACK OR AFRICAN AMERICAN
(Check one or more): ALASKA NATIVE
NATIVE HAWAIIAN
HISPANIC OR LATINO OR OTHER PACIFIC
ISLANDER
WHITE
6. GENDER MALE FEMALE
(Check one):
7. DATE OF BIRTH: 8. CITY OF BIRTH: 9. STATE OF BIRTH: 10. BIRTH COUNTRY:
11. US CITIZEN (Check): YES NO 12. DUAL CITIZENSHIP: YES NO CITIZENSHIP IF OTHER THAN US (Country) :
U.S. Citizen Minimum Documentation Required:
By Birth - Social Security No and/or State ID/Drivers License.
Naturalized - Certification Number, Petition Number, Date, Place and Court, United States passport number, Social Security No and/or State ID/Drivers License.
Derived - Parent's certification number, Social Security No and/or State ID/Drivers License.
Alien Minimum Documentation Required:
Registration Number, Expiration date, Date of entry, Port of entry.
13. IDENTITY SOURCE
DOCUMENTS PRESENTED: 14. DOCUMENT NUMBER: 15. ISSUED BY
STATE/COURT:
16. ISSUED BY
COUNTRY:
17. ISSUED: 18. EXPIRES:
Social Security No. United States
State ID/Drivers License United States Passport No.
Certification Number and Petition Number
Derived - Parent's Certification Number: United States
Alien Registration No. United States
Date of Entry: Port of Entry:
OTHER APPROVED IDENTITY SOURCE DOCUMENTS:
19. WEIGHT
(Pounds):
20. HEIGHT
(Inches):
21. HAIR COLOR (Check one):
Blond Brown Black Gray Red
White Silver Auburn Bald
22. EYE COLOR (Check one):
Brown Green Blue Hazel
Black Gray Violet Unknown
23. HOME ADDRESS (Include city, state, zip code): HOME PHONE (Include Area Code):
24. BASE SPONSOR'S NAME: SPONSOR PHONE (Include Area Code):
Attachment 02_Base Access mailto:leron.a.lawrence.civ@us.navy.mil http://dpcld.defense.gov/Privacy/
SECNAV 5512/1 (REV MAY 2021) Controlled by: DoN CUI Category: PRVCY
LDC: FEDCON
Page of CUI (when filled in) POC: Le'Ron Lawrence, leron.a.lawrence.civ@us.navy.mil, 703-601-0604
EMPLOYMENT ACTIVITY INFORMATON
25. EMPLOYER NAME AND ADDRESS (Include city/state/zip code): EMPLOYER PHONE (Include Area Code):
26. SUPERVISOR NAME AND ADDRESS (Include city/state/zip code): SUPERVISOR PHONE (Include Area Code):
27. Check the applicable box for WORK HOURS box or check the OTHER box and enter the work hours, then check the applicable for WORK DAYS:
WORK HOURS: 0600-1800 0800-1700 OTHER WORK DAYS: SN M T W TH F ST
PRIOR FELONY CONVICTIONS
28. Have you ever been convicted of a Felony? YES NO Initial
REQUIREMENT TO RETURN LOCAL POPULATION ID CARD
29. I understand that I am required to return my Local Population Identification Card to the Base Pass Office when it expires or if my employment is terminated for any reason. (initial)
AUTHORIZATION AND RELEASE AND CERTIFICATION
30. I hereby authorize the DOD/DON and other authorized Federal agencies to obtain any information required from the Federal government and/or state agencies, including but not limited to, the Federal Bureau of Investigation (FBI), the Defense Security Service (DSS), the U.S. Department of Homeland Security (DHS).
I have been notified of DON right to perform minimal vetting and fitness determination as a condition of access to DON installation/facilities. I understand that I may request a record identifier; the source of the record and that I may obtain records from the State Law Enforcement Office as may be available to me under the law. I also understand that this information will be treated as privileged and confidential information.
I release any individual, including records custodians, any component of the U.S. Government or the individual State Criminal History Repository supplying information, from all liability for damages that may result on account of compliance, or any attempts to comply with this authorization. This release is binding, now and in the future, on my heirs, assigns, associates, and personal representative(s) of any nature. Copies of this authorization that show my signature are as valid as the original release signed by me.
FALSE STATEMENTS ARE PUNISHABLE BY LAW AND COULD RESULT IN FINES AND/OR IMPRISONMENT UP TO FIVE YEARS.
BEFORE SIGNING THIS FORM, REVIEW IT CAREFULLY TO MAKE SURE YOU HAVE ANSWERED ALL QUESTIONS FULLY AND CORRECTLY.
I DECLARE UNDER PENALTY OF PERJURY THAT THE STATEMENTS MADE BY ME ON THIS FORM ARE TRUE, COMPLETE AND CORECT.
DATE SIGNATURE
FINAL DETERMINATION ON YOUR ACCESS: The Base Commanding Officer has final authority for determination on granting physical access to DON controlled installations/facilities under his/her jurisdiction.
BELOW COMPLETED BY BASE REGISTRAR PERSON CONDUCTING IDENTY PROOFING and NCIC CHECK
31. INFORMATION VERIFIED BY: 32. ENTERED IN C/S SYSTEM BY: 33. PASS ISSUE DATE: 34. PASS EXPIRATION DATE:
35. NCIC CHECK PERFORMED BY: 36. RESULTS OF NCIC CHECK: 37. RESULTS OF LOCAL RECORDS CHECK:
NO RECORDS RECORD IDENTIFIER NO RECORDS RECORD IDENTIFIER
RECORD NUMBER: RECORD NUMBER:
Office of Under Secretary of Defense, DoD Manual 5200.08 VOLUME 3, PHYSICAL SECURITY PROGRAM: "ACCESS TO DOD INSTALLATIONS," January 2, 2019. The DoD Manual requires DoD installation government representatives query the National Crime Information Center (NCIC) and Terrorist Screening Database to vet the claimed identity and to determine the fitness of non-federal government and non-DoD-issued card holders (i.e.
visitors) who are requesting unescorted access to a DoD installation. The minimum criteria to determine the fitness of a visitor is: 1) not on a terrorist watch list; 2) not on an DoD installation debarment list; and 3) not on a FBI National Criminal Information Center (NCIC) felony wants and warrants list.
Additionally, SECNAV Memo, Policy for Sex Offender Tracking and Assignment and Access Restrictions within the Department of the Navy, of 7 Oct 08 and OPNAVINST 1752.3 established the Navy's policy on sex offenders, requiring Region Commanders (REGCOMs) and Installation Commanding Officers (COs) to prohibit sex offender access to DoN facilities and Navy owned, leased or PPV housing. This form describes the authority and purpose to collect and share the required information; and identifies the applicant/visitor and sponsor; and authorizes the DoD to perform the minimum vetting and fitness determination criteria. A favorable response on the vetting and fitness determination is required to receive access to DOD controlled installation/facilities.
SECNAV 5512/1 (REV MAY 2021) Controlled by: DoN CUI Category: PRVCY
LDC: FEDCON
Page of CUI (when filled in) POC: Le'Ron Lawrence, leron.a.lawrence.civ@us.navy.mil, 703-601-0604
Instruction for completing the Local Population Access Registration Form INSTRUCTIONS: Please complete all information in black ink (printed) or by typing. By voluntarily providing your Personal Information, you agree to the following terms and restrictions:
RESTRICTIONS: Local Population Identification Card/Base Access Pass may only be used by person to whom they are issued and for the specific business/purpose issued. Applicants are reminded that soliciting (i.e., door-to-door sales) is prohibited on the base, and that such activity is grounds for cancellation of the Pass.
Additionally, such action may result in debarment from the base and legal action. The Base Commanding Officer has discretion over specifying the period of validity for any Local Population ID Cards/Base Access Passes that are issued under his/her jurisdiction.
Review the Privacy At Statement that is printed at the top of the form
Block 1: Enter the Last Name.
Block 2: Enter the First Name.
Block 3: Enter the Middle Name.
Block 4: If applicable, check the box for Name Suffix.
Block 5: Check the applicable box for Race.
Block 6: Check the applicable box for Gender.
Block 7: Enter Date of Birth.
Block 8: Enter City of Birth.
Block 9: Enter State of Birth.
Block 10: Enter Country of Birth.
Block 11: Check the applicable box for US Citizenship.
Block 12: If not a US Citizen, enter the name of the Country of Citizenship.
Block 13: Two forms of identity source documents from the list of acceptable documents listed below must be presented to the base registrar with this completed form. Check the box for the type of Documents that will be presented for identity proofing. If the document type is not listed, use the two rows under Other Approved Identity Source Documents to enter the type of document(s) that you will present.
Block 14: Enter the Document Number located on the Identity Proofing Source document that was checked in Block 13.
Block 15: Enter the State that issued the Identity Source Document.
Block 16: Enter the Country that issued the Identity Source Document.
Block 17: Enter the Date that the Identity Source Document was issued.
Block 18: Enter the Date that the Identity Source Document will expire.
Block 19: Enter Weight in pounds.
Block 20: Enter Height in inches.
Block 21: Check the applicable box for Hair Color.
Block 22: Check the applicable box for Eye Color.
Block 23: Enter Home Address Including City, State, Zip Code, and Home Telephone Number.
Block 24: Enter Name of Registrant's Base Sponsor and Base Sponsor's Telephone Number.
Block 25: Enter Employer Name and address including City, State, Zip Code, and Employer's Telephone Number.
Block 26: Enter Supervisor's Name including City, State, Zip Code, and Supervisor's Telephone Number.
Block 27: Check the applicable box for Work Hours box or check the OTHER box and enter the work hours, then check applicable boxes for Work Days.
Block 28: Check the applicable answer if you have been convicted of Felony and enter initials.
Block 28: Check the applicable box for felony conviction.
Block 29: Enter initials to accept terms for returning Local Population Identification Card.
Block 30: Sign and date the form to attest that the foregoing information is true and complete to best of your knowledge.
LIST OF ACCEPTABLE DOCUMENTS - All documents must not be expired.
Must present one selection from List A or a combination of one selection from List B and one selection from List C.
List A - Documents that Establish Identity and Employment Authorization
1. U.S. Passport or U.S. Passport Card.
2. Permanent Resident Card or Alien Registration
Receipt Card (Form I-551).
3. Foreign passport that contains a temporary I-551 stamp or temporary I-551 printed notation on a machine-readable immigrant visa.
4. Employment Authorization Document that contains a photograph (Form I-766).
5. For a nonimmigrant alien authorized to work for a specific employer because of his or her status:
a. Foreign Passport; and
b. Form I-94 or Form I-94A that has the following:
(1) The same name as the passport; and
(2) An endorsement of the alien's nonimmigrant status as long as that period of endorsement has not yet expired and the proposed employment is not in conflict with and restrictions or limitations identified on form.
6. Passport from the Federal States of Micronesia (FSM) or the Republic of the Marshal Islands (RM) with Form I-94 or Form I-94A indicating nonimmigrant admission under the Compact of Free Association Between the United Stated and FSM or RM.
OR List B - Documents that Establish Identity
1. Driver's license or ID card issued by a State or outlying possession of the United States provided it contains a photograph or information such as name, date of birth, gender, height, eye color, and address.
2. ID card issued by federal, state or local government agencies or entities, provided it contains a photograph or information such as name, date of birth, gender, height, eye color, and address.
3. School ID card with a photograph
4. Voter's registration card.
5. U.S. Military card or draft record.
6. Military dependent's ID card.
7. U.S. Coast Guard Merchant Mariner Card.
8. Native American tribal document.
9. Driver's license issued by a Canadian government authority.
For persons under age 18 who are unable to present a document listed above:
10. School record or report card.
11. Clinic, doctor, or hospital record.
12 Day-care or nursery school record.
AND List C - Documents that Establish Employment Authorization
1. A Social Security Account Number card, unless the card includes one of the following restrictions:
(1) NOT VALID FOR EMPLOYMEMT
(2) VALID FOR WORK ONY WITH INS
AUTHORIZATION.
(3) VALID FOR WORK ONLY WITH DHS
AUTHORIZATION.
2. Certification of Birth Abroad issued by the
Department of State (Form FS-545).
3. Certification of Birth issued by the Department of
State (Form DS-1360).
4. Original or certified copy of birth certificate issued by a State, county, municipal authority or territory of the United States bearing an official seal.
5. Native American tribal document.
6. U.S. Citizen ID Card (Form I-197).
7. Identification Card for Use of Resident Citizen in the United States (Form I-179).
8. Employment authorization document issued by the Department of Homeland Security.
The remainder of the form will be completed by the Base Registrar Person conducting Identify Proofing process and NCIC check.
AGENCY DISCLOSURE STATEMENT:
The public reporting burden for this collection of information, OMB 0703-0061, is estimated to average ten (10) minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services, Executive Services, at whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN RESPONSE TO THE ABOVE ADDRESS.
Responses should be sent to the Base Registrar.
mailto:whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil
5000-82 Memo
MEMORANDUM
From (Trusted Agent, Command):
To: Commanding Officer, Naval Station Great Lakes (N34/VCC)
Subj: INSTALLATION ACCESS REQUEST STATEMENT OF PURPOSE
1. ______________________________________________(Company Name) has a legitimate need to access the installation due to contracted or service agreement.
Or
1. _____________________________________________(Individual’s name) has a legitimate need to access the installation for the purpose of:
2. The following information is provided:
a. Government Sponsor (Trusted Agent):
Name (First MI. Initial):
Phone Number:
Email Address:
b. Company Information:
Address:
Point of Contact Name:
Phone Number:
Email Address:
Contract Number/Project Number:
Contract Period of Performance:
RENEWAL
3. DBIDS Credential Information:
a. DBIDS Registration: NEW;
b. Length (Provide specific dates):
c. Access Days/Times Required (E.g. Mon-Fri, 0500-1800). 24/7 access requires justification:
4. Access to Recruit Training Complex Required: YES (justification required); NO
5. Company List of Employees Name (Last, First MI):
GOVERNMENT SPONSOR’S SIGNATURE
5530.1 SOP 05JUN23
@) © © ©) @) QO © @)
GENERAL NOTES
WINDOW, DOOR ELEVATIONS.
t
3. REFER TO SHEET AO-3 FOR BEQ REACTIVATION GENERAL NOTES.
| CORRIDOR
zits
4. REFER TO SPECIFICATIONS FOR TECHNICAL REQUIREMENTS.
H om a
BEDROM
BUILDING ABOVE
Fi le na m e:
P:
\P
AP
ER
\S
AP
S0
2B
U se r:
AM
FO
I2 M S in gs
D at e& tim e:
/1 0/
:2 7:
BEDROOM
cael i £
! AN
N
BUILDING 532 - ist FLOOR PLAN
4 BEDROOM
COURTYARD
i nt
MAINTENANCE
N
FOR OFFICAL USE ONLY
t
GRAPHIC SCALE
SCALE 1/8" = 1'-0"
549 West Randolph Street
= SEPARTHENT OF THE NAVY NAVAL
SCALE: 1/8°=1'-0"
MAVAL TRAINING CENTER GREAT LAKES, NOS
530 COMPLEX
OFFICERFE A2-18
gh wae
REDUCED
Attachment 03-10 Drawings
4. REFER TO SHEET A2-16 FOR 530 COMPLEX GENERAL NOTES.@) @ ©) ©) © QO © @)
GENERAL NOTES
3. REFER TO SHEET AO~3 FOR BEQ REACTIVATION GENERAL NOTES.
4. REFER TO SPECIFICATIONS FOR TECHNICAL REQUIREMENTS.
f eA
» TE
E
(20
BEDROOM
212]
SEDROOK
BEDROOM
oO
'-0
N e
A g
AM
ED
D
IL
D
LI
D
IL
D
LD4
tf aud
'-2
BEDROOM
a q qt t
REDUCED DRAWING
t a La) h a
-530 COMPLEX
SCALE 1/8" = 1-0"
wo
HAVAL
SOUTHERN DIVISION
BEQ REACTIVATION
530 COMPLEX
CONSTR CONTR MO. NG2467--94--C--0638
E 22x140N
GRAVITY TYPE BACK
DRAFT DAMPER
E 22M MDN
EX. SUPPLY
UN T HV-3
UNIT HV-1
SUPPLY
HV-4
22X14DN
i j
X. SUPPLY
EX. SUPPLY
UNIT Hvr2
E 22x1 mn
PROVIDE 24x10.
YP!
EX. SUPPLY
UNIT HV-7
(ON BOTTOM)
t
Ehl1/2t Hw =fOSNEW 6800 CFM
EF
UNIT HV-6
2300 CFM:
E 11/2" HW
E 50x18
2100 CFM.
HE 62x13 |
HY 190% OUTSIDE AIR UNIT SEQUENCE OF
(TYPICAL FOR HV-1, HV-2, HV-3, HV-4, HV-6 SAND HV-7)
TEM CONSISTS OF A SINGLE ZONE CONSTANT VOLUME
PLAN
SCALE: 1/16"=1'-0"
M-22
AIR HANDLING UNIT INTERLOCKED WITH EX. EXHAUST FANS. MODIFY
EXISTING CONTROLS TO INCORPORATE DUCT SMOKE DETECTOR CONTROL.
WHEN SMOKE DETECTOR IN THE SUPPLY AIR {S ACTIVATED AND
A SIGNAL IS RECEIVED FROM THE FIRE ALARM PANEL THE FOLLOWING
EVENTS SHALL OCCUR:
1. AN ALARM SHALL BE ANNUNCIATED AT THE FIRE ALARM CONTROL PANEL.
2. SUPPLY FANS HV~1, HV-2, HV-3, HV--4, HV-6 AND HV-7 SHALL STOP.
3. INTERLOCKED EXHAUST FANS SHALL STOP
4. THE OUTSIDE AIR DAMPERS SHALL CLOSE.
Hy-§ UNT SEQUENCE OPERATION
THE SYSTEM CONSISTS OF A SINGLE ZONE, CONSTANT VOLUME AIR HANDLING UNIT.
MODIFY EXISTING CONTROL.S TO INCORPORATE DUCT SMOKE DETECTOR CONTROL.
WHEN SMOKE DETECTOR IN THE SUPPLY AIR IS ACTIVATED AND
A SIGNAL IS RECEIVED FROM THE FIRE ALARM PANEL THE FOLLOWING
EVENTS SHALL OCCUR:
SUPPLY FAN SHALL STOP.
PW
N e
GENERAL, NOTES
THE OUTSIDE AIR DAMPER SHALL CLOSE.
RETURN AIR DAMPER SHALL CLOSE.
AN ALARM SHALL BE ANNUNCIATED AT THE FIRE ALARM CONTROL PANEL.
1. ALL EXISTING REGISTERS SHALL BE REPLACED WITH NEW REGISTERS
EXCEPT AS NOTED.
2. ALL REGISTERS SHALL BE BALANCED TO CFM INDICATED ON
DRAWING.
E 34x13 E 2-1/2"
71 (IN CENTER)
= 00 CFM
600 CFM
tT 7 fe
PROVIDE 24x10
TYPE
i
E 36X24 r16°6
LOUVER.,
PROVIDE 24X24
GRAVITY TYPE BACK
DRAFT DAMPER
d
GRAPHIC SCALE
16° 8 0' 16°
SCALE 1/16" = 1'-0"
GRAPHIC SCALE
5 10°) 15" 20"
PLAN NOTES :
AND DRYER. PROVIDE NEW 4"¢ GALVANIZED DUCT DOWN TO NEW
FABRICATED CONDUIT CLAMP (ANCHOR, BOLTED TO WALL) AND SECURE
CD REMOVE EXISTING 4°@ FLEXIBLE, DUCT CONNECTION FROM EXISTING DUCT
PROVIDE 24X24
4"@ DUCT. PROVIDE NEW 4"¢6 FLEXIBLE DUCT PORTION.
NEW 4"@ 90° GRLVANIZED ELBOW USING (2) 4"@ DUCT CLAMPS.
TYPICAL FOR (8) DRYERS. SEE SECTION #2 SHEET M--8.
THE EXISTING LOUVER
PROVIDE 2" RPZ TYPE
SUPPLY AND 1 1/2" RPZ TYPE BA
HW SUPPLY TO WASHING MACHINE
REMOVE EXISTING DUCTWORK
PROVIDE NEW 20 MESH LINT FIXTER TQ REPLACE EXISTING.
C4) PROVIDE NEW 18X18,HINGED ACSESS DOORS AT NEW OR EXISTING
DRYER EXHAUST DUCT. FOR SIZE AND LOCATION SEE FLOOR PLAN.
REMOVE EXISTING LAUNDRY TUB FAUCET AND REPLACE WITH NEW
BACK MOUNT FAUCET WITH INTAGRAL VACUUM BREAKER.
INSTALL NEW 2 1/2" CALIBRATED BALANCING VALVE UPSTREAM OF 3WAY
VALVE ASSEMBLY. BALANCE TO GPM i
SEE DETAIL # 3 SHEET M-42 FQR MOUNTING OF EXHAUST FAN.
INSTALL NEW DUCT SMOKE DETEG@TOR PN EXISTING DUCT
AS INDICATED ON DRAWING. PROVID
DOWNSTREAM OF DUCT SMOKE D OR.
BACK FLO REVENTER AT EX. 2"
ROWNSTREAM OF THIS POINT TO
ICATED ON DRAWING.
16X16 ACCESS DOOR
K FLOW PREVENTER AT EX. 1 1/2°
SEE DETAIL # 10 SHEET M-42.
CONNECT TO
i
| EX. 12000 €FM
Cw
'DRIVE
(0 --
EX!
UN
EX. SUPPLY
(ON TOP)
1@D
THE
Svs mt
BACK DR
BA
SCALE: 1/8"=1'-0"
SCALE 1/8" = 1-0"
FOR ONLY
Z
631 1101
~ KEY PLAN
ee.
SOUTHERN DIMSIONses
CHERN oeSANTOS: <8] sev RAUCH oo Enc
& EWR. SEAL
NAVAL CENTER
BEQ REACTIVA
530 COMPLEX
BUILDING 532 - BASEMENT & ROOF PLANS
M-22 Cons Com NO. 'N62467-94-C-0638
APPROED, v3 wa g0091 5276816 SME AS NOTED #EC 06-94-0638 jee 79 & 152
'REDUCED DRAWING VERIFYSTALE
+ REPRESENTATIONS
@ @) NOTES
SCALE 1/8 1 0
KEY PLAN ENGR SEAL sue /B 06 94 0638 'SET7
845 GPM CD NEW 1. CALBRATED BALANCNG VALVE
10 GPM <> REMOVE EX STNG SLOP SNK FAUCET AND REPLACE WITH
NEW BACK MOUNT FAUCET WTH NTEGRAL VACUUM BREAKER
e- '<> PROVDE NON FREEZE TYPE VACUUM BREAKER AT WALL HYDRANT é fo
ND CATED ON DRAWING
aro
QUARTER
BEDROM 8X12 REG
150 CFM
H E 30X8 RA
E 48%8 SA CORR DOR.
H 532/4 ve
OWDER
L_ff F
175 73
FOR OFICIAL USE ONLY
6.2 GPM 10 GPM
HWP 532/2 GRAPH C SCALE
5 5 10 15 20 25
SOUTHERN DIVISION
OFFICE
G WERIFY SCALE
8.40 GPM 2ND FL.
9.60 GPM 3RD FL.
(1.\.SECOND FLOOR PLAN
NORTH
( THIRD FLOOR SIMILAR EXCEPT AS NOTED )
PLAN NOTES :
CD NEW 3/4" BALL VALVE AND 3/4". THERMOSTATIC SELF CONTAINED
CONTROL VALVE TO REPLACE EXISTING THERMOSTATIC VALVE.
CG} NEW 1 1/4" CALIBRATED BALANCING VALVE TO REPLACE EXISTING.
BALANCE TO GPM INDICATED ON DRAWING.
NEW 1" CALIBRATED BALANCING VALVE TO REPLACE EXISTING.
BALANCE TO GPM INDICATED ON DRAWING.
C4) REMOVE EXISTING SLOP SINK FAUCET AND REPLACE WITH
NEW BACK MOUNT FAUCET WITH INTEGRAL VACUUM BREAKER.
CS RECAP CLEANOUTS WITH NEW PLUG & COVER PLATE AS REQUIRED.
C&> INSTALL NEW DUCT SMOKE DETECTOR TIGHT TO UNDERSIDE OF
THE ROOF. PROVIDE 16X16 ACCESS DOOR DOWNSTREAM OF
DUCT SMOKE DETECTOR.
-©207
GENERAL NOTES :
1. ALL EXISTING REGISTERS SHALL BE REPLACED
WITH NEW REGISTERS EXCEPT AS NOTED.
2. ALL REGISTERS SHALL BE BALANCED TO CFM24x15 EF-532/5
9BA
FL. ONLY
2ND FL. 'ONLY 18X24 REG
feral
BEDROOM
a a -_
{ 1 1 2ND FL. IONLY
BEDROM
D
3.7 GPM 2ND FL.
(c)
HEAD
FOR OFFICIAL USE ONLY
GRAPHIC SCALE
1 4 i
(DEPARTMENT OF THE NAVY NAVAL FACILITIES NGINERING COMAND4
SOUTHERN DIVISION
CHARLESTON, S.C.
NAVAL TR CENTER 'T Ss.
BEQ REACTIVATION
530 COMPLEX
BUILDING 532 - 2nd & 3rd FLOOR PLAN
CHERN peSANTOS peCORDERO
DIMSCALE: 1/8"=1'-0"
ENGR. SEAL
TAWNG NO.
REDUCED DRAWING. semntsentanions
CONSTR CONTR NO. N62467-94-C--0638
FOR NOTES SEL DRAWNG F 28
THRU WALL
Wer
BEDROOM BO BEDROOM
HV 6
LOCATED CABLE BEDROOM 2P S/N FUSED
FOR FACR (EX STNG)
L
32/8
& i 5 ae
E 29
FOR OFFICIAL USE ONL
GRAPH C SCALE
5 0 5 10 15 20 25
SCALE 1/810
n
TO PNL X
Gx 1 J
> @X 1
YER
SOUTHERN DIVISION
NAVAL TRAIN NG CENTER GREAT LAKES, QUNOS
530 COMPLEX ~ BUILDING 532
E 29
KEY
BAYTAS.
Ft 06 94 0633 ser 24 F 52
REDUCED DRAWING VERIFY SCALEa
LOCATED ON 3rd FLOOR
LOCATED ON 3rd FLOOR
BEDROOMBEDROOMBEDROOMBEDROOM BEDROOMSTAR BEDROOMBEDROOMBEDROOM BEDROOM BEDROOM
TYP
a a
BEDROOM BEDROOM * BEDROOM BEDROOM
iS__§8 1.8 8
FOR NOTES SEE DRAWNG E 28
GRAPH C SCALE
5S 0 15 20 25
LOCATED ON 3rd FLOOR LOCATED ON Srd FLOOR
SCALE 1/81 0
at Je
A ca r
JAN TOR
V+3 tig sh) LOCATED ON 3rd FLOOR BEDROOM t
# BEDROOM BEDROOM i BEDROOM
'ct
BEDROOM
S _ 6 &
1 (>) r
LOCATED ON 3rd FLOOR
BEDROM
GF &
A
FOR OFIGAL USE ONL
SOUTHERN DIVISION
SCALE 1/8 =1 0 530 COMPLEX - BUILDING 532
ARCH & ENGR. SEAL
WERIFY SCALEaREDUCED DRAWING
2ND FLOOR
2ND FLOOR
2ND FLOOR
2ND FLOOR
ZND FLOOR
2ND FLOOR
2ND FLOOR
2ND FLOOR
2ND FLOOR
1ST FLOOR
1ST FLOOR
1ST FLOOR
1ST FLOOR
1ST FLOOR
1ST FLOOR
1ST FLOOR
1ST FLOOR
1ST FLOOR
1ST FLOOR
BASEMENT
BASEMENT
NORTH
NORTH
WEST
WEST
SOUTH
SOUTH
souTH
EAST
EAST
NORTH
NORTH
NORTH
WEST
WEST
SOUTH
SOUTH
SOUTH
EAST
EAST
INPUT
MATCH UNE
OUTPUT
200N200N
SLEEPING ROOMS
THRU
202 204 206 232 229 20 TOTAL 205 203
200W 282 200W 200W296 200W
SLEEPING ROOMS
THRU
294 284 279 16 TOTAL 295 .297
2005 2005 2003 200S 2008
200S 2005
SLEEPING ROOMS
280 278 256 252 250 251 19: TOTAL 975 277 276
200E 248 200E 200E 234 200E
SLEEPING ROOMS
THRU
236 246 249 16 TOTAL 523 234
189N 129 189N 1B9N 189N 189N
129 1-1
SLEEPING ROOMS
THRU
st 179 187 188 181
ME
187 185
181 184 182 185 186
151 1895 1895 1895 1895 1895 177 1855
FA
CP
181 STR#2
SLEEPING ROOMS
THRU
189E 148 189E 189E 134 189E
SLEEPING ROOMS
THRU
BR2
GM
MS 2ND FLOOR NORTH
2-1 200N 200N 2-2 200N
MM 2ND FLOOR WEST
200w 200W
MS 2ND FLOOR SOUTH
2-4 2008S 200S 2-3 2008
FLOOR EAST
2005 2005
Ms 1ST FLOOR NORTH
1-1 189N 189N i-2 189N
1ST FLOOR WEST
hh- 8- eon
CHARGER;
BATTERY
183 181 185
FLOOR SOUTH
1-4 189S 189S 189S 1-3
FLoor EAST
189E 1 89E
WB ASEMENT
RADIO
\coaxiat
CABLE
CONVERTER/
FLOAT
CHARGER
BATTERY
TO EXISTING 120V
CIRCUIT DEDICATED
TO FIRE ALARM SYSTEM.
LTG
PANEL
LOCK
ROOF
BASEMENT
BASEMENT
BASEMENT
3RD FLOOR CENTRAL
SRD FLOOR CENTRAL
SRD FLOOR
SRD FLOOR
3RD FLOOR
3RD FLOOR
3RD FLOOR
3RD FLOOR
SRD FLOOR
3RD FLOOR
NORTH
NORTH
NORTH
WEST
WEST
SOUTH
SOUTH
SOUTH
SRD FLOOR EAST
2ND FLOOR CENTRAL
2ND FLOOR CENTRAL
ANTENNA
SRD FLOOR EAST
"2ND FLOOR NORTH
Fy
FIRE ALARM RISER DIAGRAM
NOT TO SCALE
INPUT OUTPUT
ZONE 19] ROOF
o-D-o-__»-
HV-1 HV-2 HV-4 HV-3ZONE 21 HV-1,2,3,4
HV-7
HV-6
Hv-5
300M 300M 300M
SLEEPING ROOMS
THRU
324 358 372 16 TOTAL 319 310
SO
ST#3 300N300N 356 300N
300N
SEEEPING ROOMS
302 304 306 332 329 29 TOTAL. sos 393
300N 300N ST#1
SOOW 382 BOOWBDOW 396 JOOW
SLEEPING ROOMS
THRU
394 384379- '6 TOTAL 395 307
SS
300S 300S ST¥2ST¥4 3005S 3060S 3005
"3008 3008
SLEEPING ROOMS 4.
THRU
380 378 356 352 350 351
19 TOTAL
375 377 376
300E 334 3006
SLEEPING ROOMS
THRU
336 346 349. 18 TOTAL 355 333
200M 200M 200M
SLEEPING ROOMS
THRU
2O0N 200N 200N 200N 200N
300M 300M
$8 300W 3O0W
200M 200M
BASEMENTZONE 18
ZONE 39ZONE 20 HV-7
BASEMENTZONE 17
ZONE 19 ZONE 38
HV-6
BASEMENTZONE 16
ZONE 18 ZONE 37
HV-5
SRD FLOOR CENTRALZONE 36 ZONE 15
ZONE 17
ZONE 35
SRD FLOOR NORTHZONE 14
ZONE 34
THRU
EOZONE 33
3-1 300N 300N 3-2 SOON
300N H i
ZONE Z
ZONE 32 RU
SRD FLOOR WEST
ZONE 13
ZONE 13
ZONE 31
ZONE 12
ZONE 30
ZONE 11] £8) ZONE 29
3RD FLOOR SOUTHZONE 28ZONE 10 ZONE 12
102 122 127 105 10324 TOTAL
-fo 3-4 3008S 3008 3-3 3005Sa
ZONE ZONE ZONE 27
3RD FLOOR EASTZONE 11
q
300E 348 ,300E
SO0E300E
ZONE 7.ZONE ZONE 25
2ND FLOOR CENTRAL
BATCH UNE
FOR OFFAL USE ONLY
GMM,
A lgoun, DEPARTMENT OF THE WAVY sc.
NAVAL F;
SOUTHERN DIVISION
ARCH & ENGR, SEAL
NAVAL TRAINING CENTER
BEQ REACTIVATION
530 COMPLEX = BUILDING 532
FIRE ALARM RISER DIAGRAM
E-38 RAVFAC xan MO.
CONSTR CONTE ID. NB2467--94-C-OG638
9b lee wor to Some SK 06-94-0638 133 452
REDUCED DRAWIN
4 eR tha
ZONE 24 ZONE 10
ZONE 5ZONE
170 150 153 173 17523 TOTAL ZONE 23
224 258 272 212 21016 TOTAL
ZONE ZONE 224
q
ZONE 3
136 146 149 133 131
3 88-8,TOTAL
ALARM
TRANSMITER
an OF Mn, VIRION GREAT LAKES, UNOS a suey POPOVIC
SUEMITTED BY2
0.36096 P49
| [TT]
relsont
80091 5276879
20A DEDICATED CIRCUIT F
CIRCUIT BREAKER W/LOCK KEY PLAN
This guidance manual provides contractors working at Naval Station Great Lakes (NSGL) with expectations regarding the need for strict compliance with the Federal Clean Water Act (CWA), the National Pollution Discharge Elimination System (NPDES) permit requirements, and similar federal, state, and local laws regulating stormwater run-off and erosion and sediment control on construction job-sites. The content of this manual represents the minimum requirements for compliance with construction stormwater discharge regulations.
Contractor Guidance Manual Construction Stormwater Management
Naval Station Great Lakes Public Works Department, Environmental Operations January 24, 2023
Attachment 11_Stormwater
- This page intentionally left blank -
NSGL Construction Stormwater Management Contractor Guidance Manual –January 2023
Page ii
NAVAL STATION GREAT LAKES
CONSTRUCTION STORMWATER MANAGEMENT
CONTRACTOR GUIDANCE MANUAL
TABLE OF CONTENTS
Part I Overview of NSGL Policy, Stormwater Requirements, and Responsibilities
1-1 Scope 1-2 Navy Environmental Policy 1-3 Summary of Applicable Regulatory Requirements 1-4 Responsibilities
1-4.1 General Contractor Responsibilities 1-4.2 Subcontractor Responsibilities
Part II Construction Stormwater Requirements – NPDES Permitted Projects
2-1 Pre-Construction Requirements 2-1.1 Procedures and Paperwork 2-1.2 Borrow and Spoil Conditions
2-2 Active Construction Requirements 2-2.1 General Contractor Inspection Procedures 2-2.2 Inspection, Paperwork, and Training Requirements 2-2.3 Spill Prevention and Response Procedures 2-2.4 Regulatory Inspection Procedures
2-3 Post Construction Requirements 2-3.1 Notice of Termination (NOT) and Close Out 2-3.2 Records Turn-Over
Part III – NSGL Erosion and Sedimentation Control Standards
3-1 Structural Controls 3-2 Non Structural Controls 3-3 Materials Management Plan 3-4 Other Stormwater Pollution Prevention Requirements
Part IV – NSGL Water Resources
4-1 Additional Requirements for Construction in or near Station Water Bodies (Pettibone Creek, Skokie River, and Lake Michigan)
4-2 Total Maximum Daily Load (TMDL) for Station Water Resources
Page iii
SWPPP FORMS
1. General Contractor Certification (NSGL)
2. Construction Site SWPPP Notice (NSGL)
3. 2022 CGP Site Inspection Report (EPA – *Found on the EPA website)
4. 2022 CGP Corrective Action Log (EPA – *Found on the EPA website)
5. SWPPP Template (EPA – *Found on the EPA website)
*See details to download in the SWPPP Forms section
List of Appendices
A B
Not Used NSGL Watershed Boundary and Drainage Areas Map
Part I Overview of NSGL Policy, Stormwater Requirements, and Responsibilities
1-1 Scope
The purpose of this manual is to provide contractors working at Naval Station Great Lakes (NSGL) with the expectations and requirements for strict compliance with the Federal Clean Water Act (CWA), the National Pollution Discharge Elimination System (NPDES) permit requirements, and similar federal, state and local laws regulating stormwater run-off and erosion and sediment control on construction job-sites. This manual specifically pertains to contractors at NSGL performing construction activities requiring NPDES permitting. This is defined as construction activities disturbing greater than one acre of land.
In general terms, NSGL expects its contractors:
To independently investigate, understand and comply with all such laws, both as their independent obligation under the law and as well as their affirmative obligation under their construction contracts with NSGL;
To assign only personnel to NSGL projects trained in understanding and complying with such laws;
To have a system of monitoring and quality control on NSGL construction job-sites to ensure compliance with such laws and to prevent the discharge of any impermissible substances from NSGL construction job-sites;
To promptly report any impermissible discharges to the appropriate NSGL representative and, where required by law, to allow NSGL to report such discharges to appropriate public officials, and to work with NSGL and any governmental agencies with jurisdiction to correct the problem which caused the impermissible discharges and to correct and mitigate any harm from the impermissible discharges; and
To maintain at all times accurate and timely records required under such laws and required under this manual. NSGL expects its contractors to be proactive in meeting all of these requirements and to communicate on a regular basis with the Navy Construction Manager and/or Environmental Engineer assigned to a NSGL construction project on stormwater compliance related matters.
This manual will form part of the Contract Documents on any NSGL construction project.
Although this manual is intended to provide certain basic guidance on NSGL expectations, this manual does not relieve a contractor of its independent obligation to investigate, understand and comply with all laws on a NSGL construction project.
1-2 Navy Environmental Policy
Navy policy for the management of environmental, natural, and cultural resources for all Navy ship and shore activities is stated in Navy Operations Instruction (OPNAVINST) 5090.1E. As required by OPNAVINST 5090.1E (9-4), Navy facilities will comply with all substantive and procedural requirements applicable to point and non-point sources of pollution as required by E.O. 12088 and the CWA. These requirements include Federal, State, interstate, and local laws and regulations regarding the control and abatement of water pollution such as load reduction requirements resulting from the development of total maximum daily limits (TMDLs) for impaired water bodies. Navy facilities must comply in the same manner and to the same extent as any nongovernmental entity, including the payment of reasonable service charges.
1-3 Summary of Applicable Regulatory Requirements
The Illinois Environmental Protection Agency (IEPA) has authority to implement the federal stormwater regulations under the National Pollutant Discharge Elimination System (NPDES) program (40 CFR § 122.26). IEPA NPDES permits requirements are codified under 35 Ill. Adm. Code 309 which regulate discharges into navigable waters. This authority to implement the federal NPDES requirements is codified by IEPA under Sections 13 and 13.3 and authorized by Section 27 of the Illinois Environmental Protection Act [415 ILCS 5/13, 13.3 and 27].
Person or persons with either operational control of construction project plans and specifications, or day-to-day operational control of activities necessary to ensure compliance with stormwater NPDES permit conditions are required to obtain permit coverage for construction activity that results in a total land disturbance of 1 acre or more or common plan of development or sale. Below is a link to the IEPA General NPDES Permit (ILR10) For Stormwater Discharges from Construction Site Activities.
https://www2.illinois.gov/epa/topics/forms/water-permits/storm-water/Documents/General-NPDES-Permit-ILR10-Construction.pdf
The Lake County Stormwater Management Commission (LCSMC) has adopted a Watershed Development Ordinance (WDO) as part of the county’s Comprehensive Stormwater Management Plan (adopted by ordinance June 11, 1990). A memorandum of understanding (MOU) exists between LCSMC and NSGL dated April 1995 regarding coordination between the two government entities over stormwater management procedures within a shared watershed. The MOU generally requires NSGL to submit for comment and approval specific construction plans for compliance with the WDO. Below is a link to the LCSMC WDO.
https://www.lakecountyil.gov/2358/Watershed-Development-Ordinance
1-4 Responsibilities
1-4.1 General Contractor Responsibilities
The following list provides responsibilities and NSGL expectations of the General Contractor (GC) working on an NSGL project under an approved NPDES construction stormwater discharge permit:
1. One of the keys to success on a construction project is NSGL’s relationship with its contractors. NSGL contractors will be responsible for effectively communicating with NSGL personnel, and its consultants, inspectors and other occupants and contractors present on the site. Examples of common communications include:
a. Results of stormwater permit required inspections;
b. Major modifications or revisions to project Stormwater Pollution
Prevention Plan (SWPPP);
c. Major modification to site Best Management Practices (BMPs); and
d. Monthly SWPPP training of personnel and subcontractors.
2. NSGL policy for all projects disturbing greater than one acre requires the contractor to file a Notice of Intent (NOI) for coverage under the IEPA construction stormwater discharge permit (ILR10). Department of Navy (DON) shall be listed as the owner and the Naval Facilities Engineering Command (NAVFAC) Mid-Atlantic NSGL Public Works Officer (PWO) or authorized designee shall sign as Owner.
3. GC prepares a site specific SWPPP and NOI that are reviewed as part of contract submittals. The NOI will be completed online through the EPA’s NPDES eReporting Tool, NeT, found at the following link:
https://usepa.servicenowservices.com/oeca_icis?id=net_homepage. The GC will input information for the project profile and create the NOI as a “Preparer”.
When complete, the form will be assigned to a “Signatory” (PWO) to be certified before EPA review. As before, operators will be required to provide the following information:
Approval to use a paper NOI form if granted a waiver from electronic reporting by an EPA Regional Office;
Permit information;
Operator information;
Project/site information;
Discharge information;
Chemical treatment information, if applicable;
SWPPP information;
Endangered species protection information;
Historic preservation information;
Certification of NOI; and Contact information for NOI preparer.
a. Unless notified by the Agency with a Notice of Incompleteness letter, coverage under the Stormwater General NPDES permit is automatic, and operators are authorized to discharge stormwater from construction sites under the terms and conditions of the permit 30 days after the date the NOI is received by the Agency, provided the project has received sign-off from Illinois Department of Natural Resources (IDNR) and Illinois Historic Preservation Act (IHPA) that the project complies with endangered species and historic preservation laws and appropriate application fee has been received by the Agency.
b. IEPA will issue a Notice of Coverage (NOC) which is typically sent to the owner and contact listed on the NOI. The NOC will be forwarded to the GC for inclusion in the site SWPPP binder and posting at the site.
c. A copy of the NOI submittal shall be included with the on-site SWPPP.
Proof of submission, such as a notification of receipt, with the NOI in the on-site SWPPP. This will serve as the basis for permit coverage in absence of the NOC. As stated above, coverage under the Stormwater General NPDES permit is automatic after 30 days of receipt by the Agency of the
NOI. UNDER NO CIRCUMSTANCES SHALL CONSTRUCTION
ACTIVITIES BEGIN WITHOUT A FULLY EXECUTED
STORMWATER PERMIT NOI AND A NOC FROM THE AGENCY
or 30 DAYS HAS PASSED SINCE AGENCY RECEIPT OF THE
NOI.
4. GC is responsible for regulatory stormwater inspections and providing qualified individual(s) to conduct such inspections. The IEPA construction stormwater discharge general permit specifies requirements for qualifications of stormwater inspectors. The qualification requirement as stated in Part IV.D.4 of the ILR10 general permit states:
…..Qualified personnel means a person knowledgeable in the principles and practices of erosion and sediment controls measures, such as a licensed Professional Engineer (P .E.), a Certified Professional in Erosion and Sediment Control (CPESC), a Certified Erosion Sediment and Stormwater Inspector (CESSWI) or other knowledgeable person who possesses the skills to assess conditions at the construction site that could impact stormwater quality and to assess the effectiveness of any sediment and erosion control measures selected to control the quality of stormwater discharges from the construction activities.
IEPA’s phrase “…or other knowledgeable person who possesses the skills to assess…” is not interpreted to mean superintendents or other contract labor are qualified based solely on years of experience on construction projects.
NSGL requires that the GC provide qualified personnel for stormwater inspection that have clear demonstration of knowledge in the principles and practices of erosion and sediment controls measures. NSGL retains the right to review and reject a contractor’s stormwater inspector based on the lack of applicable experience and demonstration of knowledge.
The identification and qualification of the GC’s stormwater inspector shall be provided in the contract submittals for approval prior to submittal of the NOI.
5. The GC is to hold a SWPPP preconstruction meeting prior to starting any work on a construction project. This can be added as an agenda item to the general pre-construction meeting. This starts the communication process and lays out the stormwater management expectations for the project team members. All applicable members of the project team are required to attend including the Contractor’s Superintendent, Project Manager, Site Work Subcontractor, Stormwater Inspector, Navy Construction Manager, Navy PWD Environmental Representative, and other subcontractors as necessary.
6. GC will be required to provide to NSGL copies of all project SWPPP documentation including site inspection reports for NSGL files. Inspection reports are to be completed in a timely manner as required by the IEPA general permit. All reports are to be transmitted to the Navy Environmental Representative via email as they are completed and must also be retained in the project log book at the site.
7. Outside utility companies are not fully exempt from adhering to the SWPPP. It is the GC responsibility to inform them of the approved SWPPP project requirements and include inspections as part of their work to ensure appropriate BMPs are implemented.
1-4.2 Subcontractor Responsibilities
NSGL and its GC are ultimately responsible for compliance with the CWA and NPDES/SWPPP. The subcontractors shall be held accountable for their actions.
The following are the requirements of subcontractors on all NSGL projects:
1. All subcontractors must abide by the SWPPP. A subcontractor and GC will be held liable jointly for all costs NSGL incurs as a result of a violation of permit caused by the subcontractor.
2. They are required to have qualified people who are trained on the
SWPPP/BMPs.
3. The maintenance and adherence to the SWPPP is the subcontractor’s responsibility and must be made enforceable by GC’s subcontract.
4. All staging areas must be located more than 150 feet away from the waterways and discharge points (if possible).
5. The subcontractor shall provide the GC with a notification that their off-site disposal of trash, debris, and soil is in accordance with the federal, state, and local requirements.
Part II Construction Stormwater Requirements – NPDES Permitted Projects
2-1 Pre-Construction Requirements
This section outlines specific pre-construction requirements that need to be met prior to the start of any earth disturbing activities.
2-1.1 Procedures and Paperwork
The key to successfully managing a construction site SWPPP program is to conduct regular inspections and maintain the required records. This is specifically required as a condition of the general permit. The following lists the basic steps for the minimum pre-construction requirements on a NSGL NPDES permitted project.
1. This NSGL Construction Stormwater Management – Contractor Guidance
Manual is to be provided or made accessible to all GC Superintendents and Project Managers. The manual is to be used as a reference and shall not replace the site specific SWPPP.
2. No project that disturbs greater than one (1) acre of land is allowed to start without an executed Notice of Intent (NOI) (No exceptions).
3. SWPPP Pre-construction Meeting – A pre-construction meeting must be held prior to starting any project. The GC Superintendent and GC Project Manager must attend this meeting.
4. The following forms must be executed and signed prior to starting work:
a. Illinois Environmental Protection Agency (IEPA) – Notice of Intent (NOI) for coverage under the General NPDES Permit for Stormwater Discharges from Construction Site Activities. Note that this includes a 30 day period for automatic coverage under ILR10 if the IEPA has not provided notice of coverage earlier than the 30 days. This must be completed online, through the EPA’s NeT portal.
b. General Contractor Certification - The general contractor certification form must be completed by the GC in accordance with Part VI.G of the general permit.
5. The following paperwork and forms must be posted prior to starting work:
a. Notice Of Intent (NOI) – On the job trailer wall and at the main entry to the site for public viewing.
b. Construction Site SWPPP Notice – This must be posted at the main entrance to the project and in the project job trailer. Emergency contact numbers must be included along with a schedule where and when the SWPPP can be viewed by the public.
c. Working As Built SWPPP Drawing – On the job trailer wall.
d. Spill Notification Procedures (Appendix B) – On the job trailer wall and material storage area.
2-1.2 Borrow and Spoil Conditions
All offsite borrow or spoil, including topsoil haul-off, must be to a licensed/permitted site.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .