Amendment 0006 Continuation Sheet.pdf
PDF 85 KB Posted
- Attached to
- Q-1075 SOF Operations Building Addition and Renovation, NAS Oceana Dam Neck Annex, Virginia Beach, Virginia
- Solicitation number
- N4008525R2663
About this file
This is a Continuation Sheet Amendment 006 to Construction Contract N4008524F6462 for the Q1075 SOF Operations Building 368 Addition, issued by NAVFAC Mid-Atlantic on 6 February 2026. The amendment revises drawing and specification sections for this federal construction project.
Drawing revisions include replacement of life safety plans (GI011 and GI012), roof demolition and wall elevation drawings (AD107, AE111, AE202), wall sections (AE302), door schedule and hardware sets (AE601), and curtain wall and storefront details (AE704). Specification revisions address RFI/EMI Shielding (Section 13 49 20.00 10), Door Hardware Sets insert (Section 08 71 00), and addition of an Enthalpy Analytical Test Report as an attachment to Temporary Environmental Controls (Section 01 57 19). Additional specification changes include revised audiovisual equipment design, procurement, and installation requirements (Section 01 30 02.00 22) establishing a Government AV budget of $672,800.00 excluding the Contractor's Handling and Administration Rate, steel doors and frames specifications (Section 08 11 13) requiring minimum 25 percent recycled content with data documentation, and gypsum board finishing standards (Section 09 29 00) specifying ASTM C840, GA 214, and GA 216 compliance with detailed finishing levels and protective measures for workers and HVAC systems.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Continuation Sheet Amendment 006 eProjects Work Order Number: 1625040
Construction Contract Number: N4008524F6462
Building: Building 368
Project Title: Q1075 SOF Operations Building 368 Addition
Date: 6 February 2026
DRAWINGS:
REVISE the following sections:
GI011 FIRST FLOOR LIFE SAFETY PLAN & GI012 SECOND FLOOR LIFE SAFETY PLAN
Replace general life safety drawings sheets GI011 and GI012 with provided sheets.
AD107 ROOF DEMOLITION PLAN, AE111 & AE202 WALL ELEVATIONS
Replace architecture drawings sheets AD107, AE111, and AE202 with provided sheets.
AE302 WALL SECTIONS
Replace architecture drawings sheet AE302 with provided sheet.
AE601 DOOR SCHEDULE & HARDWARE SETS
Replace architecture drawings sheet AE601 with provided sheet.
AE704 CURTAIN WALL & STOREFRONT DETAILS
Replace architecture drawings sheet AE704 with provided sheet.
SPECIFICATIONS:
REVISE the following sections:
Section 13 49 20.00 10 RFI/EMI SHIELDING Replace entire section.
Section 08 71 00 DOOR HARDWARE Replace Door Hardware Sets insert.
Section 01 57 19 TEMPARY ENVIORNMENTAL CONTROLS Add the attached report as an attachment: Enthalpy Analytical Test Report
Section 01 30 02.00 22 DESIGN, PROCUREMENT, AND INSTALLATION OF AUDIOVISUAL
EQUIPMENT
Replace paragraph 1.3 GENERAL REQUIREMENTS (second paragraph after 1.3.l.) with the following:
The design and documentation of the AV system shall be funded as the AV Services Option.
The purchase and installation of the AV Package shall be funded separately as the AV Option.
The Government AV budget on the Bid Schedule/Price Proposal Form for the AV Option is $672,800.00 and does NOT include the Contractor's Handling and Administration Rate (HAR).
This Government AV estimate shall not be altered by Contractors during the bid process.
Section 08 11 13 STEEL DOORS AND FRAMES Replace paragraph 2.1 with the following:
SDI/DOOR A250.8, except as specified otherwise. Prepare doors to receive door hardware as specified in Section 08 71 00 DOOR HARDWARE. Undercut where indicated. Provide exterior doors with top edge closed flush and sealed to prevent water intrusion. Provide doors at 1-3/4 inch thick, unless otherwise indicated. Provide door material that uses a minimum of 25 percent recycled content. Provide data indicating percentage of recycled content for steel door product.
Section 09 29 00 GYPSUM BOARD Replace paragraph 3.4 FINISHING OF GYPSUM BOARD with the following:
Tape and finish gypsum board in accordance with ASTM C840, GA 214 and GA 216. Finish plenum areas above ceilings to Level 1 in accordance with GA 214. Finish water resistant gypsum backing board, ASTM C1396/C1396M, to receive ceramic tile to Level 2 in accordance with GA 214. Unless otherwise specified, finish all gypsum board walls, partitions and ceilings to Level 4 in accordance with GA 214. Provide joint, fastener depression, and corner treatment. Tool joints as smoothly as possible to minimize sanding and dust. Do not use self-adhering fiber glass mesh tape with conventional drying type joint compounds; use setting or hardening type compounds only. Provide treatment for water-resistant gypsum board as recommended by the gypsum board manufacturer. Protect workers, building occupants, and HVAC systems from gypsum dust.