CS101 NEW WORK_Amended.pdf

PDF 471 KB Posted

Attached to
LP-40 Install In-Line Receipt Filtration, Naval Station Norfolk, Norfolk, Virginia
Solicitation number
N4008525R2655
Issued by

About this file

This document is an amended engineering drawing (CS101) for the LP-40 In Line Receipt Filtration project at Naval Station Norfolk, Virginia. The drawing details a new fuel filtration system installation, showing a complex piping layout with multiple valves (PRV, ARV, ball valves) ranging from 1-inch to 8-inch sizes. The site plan indicates new work involving the replacement of an existing aboveground fuel filtration system, with an existing AST LP-142 designated to be reused. Key components include 6-inch and 8-inch steel piping, vertical centrifugal pumps, filter/separators, and associated valving and supports, all to be installed within an existing concrete slab with containment. The drawing includes 13 detailed keynotes providing specifications for pipe connections, valve types, and installation requirements, with the project managed by NAVFAC MIDLANT and designed by J. Miller, P.E.

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LP-142 AST

PUMP

6-INCH

8-

IN

C H

8-

IN

C H

6-INCH

6-INCH

6-INCH

1.0-INCH

2-INCH

2-

IN

C H

8-

IN

C H

PRV ARVPRV

1.0-INCH

PRV ARVPRV

1.0-INCH

PRV ARVPRV

6-INCH

6-INCH

PRV

PRV

2-INCH

PRV

1.0-INCH

1.

0-

IN

C

H

FI

LE

N

AM

E:

P:

\V A\

Na va lS tat ion No rfo lk\

Si tew or k\S ite Ut ilit ies

\F ue l\2

1_

8_

LP

-4 0_

In- Lin e R ec eip t F iltr ati on \B

_D es ign \D

W

GS

\S he et\

_C

IV

\C S1

N

EW

W

OR

K_

Am en de d.d wg P

LO

TT

ED

: W ed ne sd ay

, A pr il 2 , 2

5 2

:57 :14

P M

U

SE

R:

jer em y.b

.jo ne s1

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALE

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

LA

NT

PW

D

N O

R

FO

LK

N

AV

AL

S

TA

TI

O

N N

O R

FO

LK

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

N

O R

FO

LK

, V A

LP

-4

IN

L

IN

E R

E C

E

IP

T

FI

LT

R

A

TI

O N

10/30/24

JBJ

J. MILLER, P.E.

NA

1694038

NA

W. BOUNDS, FLC

C

IV

IL

S

IT

E

W O

R K

JBJ JBJ WHW

AS NOTED

12913660

CS101

WHW

CIVIL SITE PLAN: NEW WORK

4'0'

1"=2' 2'

N

KEYNOTES

NEW WORK

AST LP-142 TO BE REUSED

AMENDED SHEET

VENT PIPING

AutoCAD SHX Text

CONCRETE JOINT

AutoCAD SHX Text

UG PULL BOX

AutoCAD SHX Text

8-INCH STEEL PIPING TO REMAIN (FILTRATION STAND BYPASS)

AutoCAD SHX Text

8-INCH FUEL

AutoCAD SHX Text

8-INCH FUEL

AutoCAD SHX Text

8-INCH FUEL

AutoCAD SHX Text

8-INCH FUEL

AutoCAD SHX Text

12-INCH CONCRETE PAD WITH 6-INCH WIDE CURBING

AutoCAD SHX Text 1.5'

AutoCAD SHX Text

CONCRETE JOINT

AutoCAD SHX Text

5.2 ' ++

AutoCAD SHX Text

SCALE:1"=2'

AutoCAD SHX Text A. ALL VALVES LARGER THAN 4-INCH DIAMETER ARE HANDWHEEL OPERATED. B. FUEL LINES MUST BE SCHEDULE 40 WELDED STEEL. STEEL PIPE MUST HAVE 150# PATTERN RASIED FLANGES WITH RING GASKETS. ALL GASKETS MUST BE RESISITANT TO HYDROCARBON FUELS. C. PIPING & VALVES: REFER TO SPECIFICATIONS FOR PAINTING REQUIREMENTS. D. RELIEF VENT PIPING FOR VERTICAL SEPARATORS AND DRAINAGE LINES TO AST MUST BE SCHEDULE 40 STAINLESS STEEL PIPING WITH SOCKET WELD FITTINGS. REFER TO SHEET C-501 FOR VENT PIPING SCHEMATICS AND VALVING CONFIGURATIONS. E. REFER TO ELECTRICAL SHEETS FOR GROUNDING PLAN.

AutoCAD SHX Text

1. 8-INCH BALL VALVE 8-INCH BALL VALVE 2. 480V, 3 PHASE API CERTIFIED PUMP CAPABLE OF DELIVERING TWO 480V, 3 PHASE API CERTIFIED PUMP CAPABLE OF DELIVERING TWO DISTINCT FLOW CONDITIONS: 900 GPM AT 85 FT TDH 600 GPM AT 97 FT TDH PUMP STYLE MUST BE OH4. PUMP MOTOR MUST BE CLASS 1 DIVISION 1, GROUP D AS EXPLOSION PROOF. PROVIDE COMPOUND GAUGE (30-0-30) ON SUCTION SIDE AND 0-60 PSI GAUGE ON DOWNSTREAM SIDE. EACH SHALL HAVE BALL VALE CUTOFF. 3. 8-INCH SCHEDULE 40 STEEL PIPING, 24-IN + AFF 8-INCH SCHEDULE 40 STEEL PIPING, 24-IN + AFF + AFF AFF 4. 8 X 8 X 6 WELDED TEE 8 X 8 X 6 WELDED TEE 5. 6-INCH SCHEDULE 40 STEEL PIPING, 24-IN + AFF 6-INCH SCHEDULE 40 STEEL PIPING, 24-IN + AFF + AFF AFF 6. 6-INCH DB&B PLUG VALVE 6-INCH DB&B PLUG VALVE 7. 6-INCH CONTROL VALVE, CLA-VAL MODEL 40-36 ACGS OR EQUAL, 6-INCH CONTROL VALVE, CLA-VAL MODEL 40-36 ACGS OR EQUAL, SEE SHEET C-501 FOR VALVE SPECIFICATIONS. 8. 8 X 8 X 8 WELDED TEE AND 8-INCH DB&B PLUG VALVE 8 X 8 X 8 WELDED TEE AND 8-INCH DB&B PLUG VALVE 9. 600 GPM VERTICAL FILTER/SEPARATOR, EI 1581 COMPLIANT, 600 GPM VERTICAL FILTER/SEPARATOR, EI 1581 COMPLIANT, CATEGORY M, TYPE S. FACET MODEL VCS-643-236 OR EQUAL. SEE SHEET C-501 FOR SPECIFICATIONS. REQUIRES CONCRETE PEDESTAL, SEE SHEET C-501. 10. CONNECT 2-INCH PIPING AT THE EXISTING PIPE UNION AT TANK CONNECT 2-INCH PIPING AT THE EXISTING PIPE UNION AT TANK LP-142. PROVIDE 2-INCH BALL VALVE AT THIS CONNECTION POINT. 11. USING THE EXISTING TANK PENETRATIONS AND PIPE COUPLINGS, INSTALL A NEW TANK OVERFILL VISUAL GAUGE, TANK LEVEL VISUAL GAUGE, AND LEAK DETECTION VISUAL GAUGE. REMOVE EXTERIOR STICKERS AND PLACARDS ON THE AST. REPAINT VENT CAPS AND CONCRETE VAULT EXTERIOR TO MATCH THE EXISTING COLOR PATTERN. PROVIDE NEW TANK LABELING TO MATCH EXISTING. 12. PRESSURE RELIEF AND AIR RELEASE PIPING, REFER TO PIPING SCHEMATIC ON SHEET C-501 13. 2-INCH FLANGED BALL VALVE DRAIN

AutoCAD SHX Text

OVERFILL ALERT

AutoCAD SHX Text

LEAK DETECTION

AutoCAD SHX Text

TANK LEVEL VISUAL GAUGE

AutoCAD SHX Text

ARV = AIR RELEASE VALVE (0.75-INCH) PRV = PRESSURE RELIEF VALVE (1.0-INCH)

Sheets and Views
NEW WORK

File details come from the government source that posted it. Updated .