Attachment C 12928005_ AE405 GFCI VOL 2 OF 2 .pdf
PDF 220 KB Posted
- Attached to
- W-143 COLES BISTRO RENOVATION
- Solicitation number
- N4008525R0100
About this file
This document is an architectural drawing for restroom specialty equipment mounting heights and an enlarged new work plan for a renovation project. The drawing provides detailed specifications for restroom equipment installation, including precise mounting heights and locations for various accessories such as grab bars (36" and 42"), toilet tissue dispensers, wall hooks, soap dispensers, waste receptacles, paper towel dispensers, mirrors, and hand dryers. The equipment schedule lists specific manufacturers and models for each item, with notes indicating that the specialty equipment is Government Furnished Contractor Installed (GFCI) and requires coordination with the Contracting Officer. The drawing includes a key plan, specialty equipment mounting heights diagram, and specific notes about installation requirements such as wood blocking, non-slip grab bar surfaces, and centered mounting of accessories.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RESTROOM
UTILITY CLOSET
625 627
A
C
3'- 7 1
/4"
1/ 2"
AE414 D1
D3
C1
C3
A
B
D D
D
D 4'-4 1/2"5'-3 1/2"
7'-
3/ 4"
4'-
1/ 4"
3'- 6"
MAX
12" 42" MIN
54" MIN
42" GRAB BAR
36" GRAB BAR
36" MIN
CL
MIN
24"
MIN
12"
SOAP DISPENSER
9"
CL
TOILET TISSUE DISPENSER
HC / AMBULATORY STALL
FINISHED FLOOR
WASTE RECEPTACLE
CL
PAPER TOWEL
DISPENSER
CL
STAINLESS STEEL FRAME
MIRROR (5'-0" H x 2'-0" W)
AUTOMATIC
HAND DRYER
" M
AX
STAINLESS STEEL FRAME
MIRROR (4'-0" H x 2'-0" W)
FINISHED FLOOR
SANITARY NAPKIN
DISPOSAL
FINISHED FLOOR
WALL HOOK
CL
" 60
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 14 SEP 2023
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
MI
D-
AT
LA
NT
IC
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
5/
/2
2:
:2
PM
C :\R ev it
L oc al M od el s\ W
3_
7_
A_ R
_s ar ah
.g ilp in 1.
rv t
AE405
BU
IL
D
IN
G W
-1
C
O
LE
'S B
IS
TR
O
EN
LA
G
ED
N
EW
BI
D O
PT
IO
N
ALP
12928005
SLG SLG
05/27/25
ALP/SLG
1834937
N/A
N O
R
FO
LK
, V
IR
G
IN
IA
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
J. MILLER, P.E.
ALP
M
ID
LA
N
T
PW
D N
O R
FO
LK
AE
NAVSUP
SCALE: 3/4" = 1'-0"A3 ENLARGED NEW WORK PLAN - BID OPTION 3
3/4" = 1' - 0" 0 1' 5'6" 2' 3' 4'
GRAPHIC SCALE(S)
KEY PLAN
KEYNOTES
GENERAL SHEET NOTES
# (THIS SHEET ONLY)
BID OPTION 3 AREA OF WORK
6TH FLOOR - BID OPTIONS 3 AREA OF WORK
A REFER TO SHEET GI002 FOR ADDITIONAL PROJECT NOTES.
B NOTED DIMENSIONS ARE BASED ON THE HISTORIC DOCUMENTATION AND
FIELD WORK. VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR
TO PERFORMING ANY WORK. BRING DISCREPANCIES TO THE ATTENTION OF
THE CONTRACTING OFFICER PRIOR TO PERFORMING ANY WORK.
C ALL FINISHED SURFACES WHICH ARE DAMAGED WHILE PERFORMING WORK
UNDER THIS CONTRACT MUST BE PATCHED AND/OR REPLACED AND FINISHED
TO MATCH ADJACENT AREAS AT NO COST TO THE GOVERNMENT.
D REFER TO ARCHITECTURAL, ELECTRICAL AND MECHANICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
E PROJECT IS DIVIDED INTO 4 BID OPTIONS. REFER TO A-003 FOR BID OPTION
BREAKDOWN.
SCALE: NOT TO SCALEA1 SPECIALTY EQUIPMENT MOUNTING HEIGHTS
RESTROOM SPECIALTY EQUIPMENT SCHEDULE NOTES
1 PROVIDE WOOD BLOCKING OR 18 GA X 6 IN WIDE METAL PLATE IN WALLS AS REQUIRED TO SECURE TOILET ACCESSORY.
2 GRAB BAR MUST HAVE PEENED (NON-SLIP) GRIPPING SURFACE.
3 ALIGN BOTTOM OF MIRROR WITH TOP OF BACKSPLASH.
4 MOUNT WITH LONG DIMENSION VERTICAL.
5 MOUNT TOILET ACCESSORY CENTERED ON AVAILABLE WALL SPACE.
6 MOUNTING HEIGHT TO CENTER LINE OF DISCHARGE NOZZLE.
7 SPECIALTY EQUIPMENT IS GOVERNMENT FURNISHED CONTRACTOR INSTALLED (GFCI). COORDINATE WITH CONRACTING OFFICER ON OBTAINING GFCI SPECIALTY
EQUIPMENT.
RESTROOM EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER MODEL NOTES
1 36" GRAB BAR BOBRICK B-6806 SERIES 1, 2
2 42" GRAB BAR BOBRICK B-6806 SERIES 1, 2
3 TOILET TISSUE DISPENSER BOBRICK B-2892 1, 7
4 WALL HOOK MOEN YB5003CH 1, 7
5 SOAP DISPENSER BOBRICK KCC-92145 1, 5, 8, 7
6 WASTE RECEPTACLE BOBRICK B-277 1
7 PAPER TOWEL DISPENSER KIMBERLY-CLARK KCC-09990 1, 7
8 STAINLESS STEEL FRAMED MIRROR (5'-0" H X 2'-0" W) BOBRICK B-165-2460 1, 4
9 STAINLESS STEEL FRAMED MIRROR (4'-0"H X 2'-0"W) BOBRICK B-165-2436 1, 3, 5
10 HAND DRYER EXCEL DRYER - XLERATOR XL-SB 1
1 NEW SOLID SURFACE COUNTER WITH INTEGRAL SINK. ADA COMPLIANT
PLASTIC LAMINATE CABINET BELOW. SEE CASEWORK DETAILS. (QTY: 7 SF
SOLID SURFACE)
2 NEW PLUMBING FIXTURE. SEE PLUMBING DRAWINGS.
3 REFER TO RESTROOM SPECIALTY EQUIPMENT SCHEDULE FOR RESTROOM
SPECIALTY EQUIPMENT INFORMATION.
4 ALL NEW WORK IS NOT SHOWN ON NEW WORK PLAN. REFER TO WALL
CONDITIONS PLAN FOR MORE INFORMATION.
5 NEW DOOR AND FRAME. REFER TO DOOR SCHEDULE AND FINISH SCHEDULE.
6 RE-ENAMEL CAST IRON SINK THAT WAS SALVAGED DURING DEMOLITION
PHASE. RE-INSTALL AT NEW LOCATION. (QTY: 1 GOVERNMENT FURNISHED
CAST IRON SINK THAT IS TO BE RE-ENAMELED AND RE-INSTALLED IN NEW
CONSTRUCTION.)
7 NEW WALL. REFER TO PARTITION TYPES AND FINISH SCHEDULE.
8 EXISTING WALL TO REMAIN. NEW FINISH TO BE APPLIED. REFER TO
PARTITION TYPES AND FINISH SCHEDULE.
9 NEW CERAMIC TILE FLOOR. REFER TO FINISH SCHEDULE. (QTY: 105 SF)
PLAN
NORTH
MA
RK
D
ES
CR
IP
TI
ON
DA
TE
sarah.gilpin1 Highlight sarah.gilpin1 Highlight sarah.gilpin1 Highlight
File details come from the government source that posted it. Updated .