Attachment B 1834937_Drawings VOL 1 of 2.pdf

PDF 21 MB Posted

Attached to
W-143 COLES BISTRO RENOVATION
Solicitation number
N4008525R0100
Issued by

About this file

This document is a comprehensive set of architectural and engineering drawings for the W-143 Cole's Bistro Renovation project at Naval Station Norfolk, Virginia. The detailed plans cover multiple disciplines including architectural, structural, mechanical, electrical, plumbing, and fire protection work for a complete sixth-floor renovation of an existing building. The project involves multiple bid options and includes comprehensive modifications to spaces such as food service areas, dining training rooms, mechanical spaces, restrooms, and utility areas.

The drawings specify extensive renovations including new interior partitions, flooring, ceilings, electrical systems, fire alarm and suppression systems, HVAC equipment, plumbing fixtures, and specialized kitchen equipment. The project appears to be a comprehensive upgrade of a Navy food service and training facility, with specific attention to details like sprinkler systems, fire alarms, specialized kitchen infrastructure, and compliance with various naval and safety standards. The drawings indicate multiple optional bid packages that allow for phased or scalable implementation of the renovation work.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL STATION - NORFOLK, VIRGINIA

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

MID-ATLANTIC

DESIGN AND CONSTRUCTION

FACILITIES ENGINEERING AND ACQUISITION DIVISION

NORFOLK, VIRGINIA

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 14 SEP 2023

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

5/

/2

2:

:1

PM

C :\R ev it

L oc al M od el s\ W

3_

7_

A_ R

_s ar ah

.g ilp in 1.

rv t

G-001

BU

IL

D

IN

G W

-1

C

O

LE

'S B

IS

TR

O

C O

VE

R

S H

EE

T

ALP

12927957

SLG SLG

05/27/25

ALP/SLG

1834937

N/A

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

J. MILLER, P.E.

ALP

M

ID

LA

N

T

PW

D N

O R

FO

LK

G -0

NAVSUP

BUILDING W-143 - COLE'S BISTRO

COLE'S BISTRO RENOVATION

MA

RK

D

ES

CR

IP

TI

ON

DA

TE

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 14 SEP 2023

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

5/

/2

2:

:5

PM

C :\R ev it

L oc al M od el s\ W

3_

7_

A_ R

_s ar ah

.g ilp in 1.

rv t

GI002

BU

IL

D

IN

G W

-1

C

O

LE

'S B

IS

TR

O

LI

ST

O F

SH

EE

TS

ALP

12927958

SLG AS

05/27/25

ALP/SLG

1834937

N/A

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

J. MILLER, P.E.

ALP

M

ID

LA

N

T

PW

D N

O R

FO

LK

G I0

NAVSUP

LIST OF SHEETS

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

77 FX001 12928033 FIRE SUPPRESSION SYMBOLS, LEGEND, ABBREVIATIONS AND NOTES

78 FX101 12928034 SIXTH FLOOR PLAN - FIRE SUPPRESSION

79 FX502 12928035 SPRINKLER DETAILS

PLUMBING

80 P-001 12928036 PLUMBING LEGEND, ABBREVIATIONS AND NOTES

81 P-002 12928037 6TH FLOOR - PLUMBING PLAN - BID OPTIONS

82 PD101 12928038 6TH FLOOR - DEMOLITION - SANITARY PLAN - BASE BID

83 PD102 12928039 6TH FLOOR - DEMOLITION - DOMESTIC WATER PLAN - BASE BID

84 PD103 12928040 6TH FLOOR - DEMOLITION - SANITARY PLAN - OPT 1

85 PD104 12928041 6TH FLOOR - DEMOLITION - DOMESTIC WATER PLAN - OPT 1

86 PD401 12928042 ENLARGED 6TH FLOOR - DEMOLITION - PLUMBING PLANS - OPT 3

87 PL101 12928043 6TH FLOOR - SANITARY PLAN - BASE BID

88 PL102 12928044 6TH FLOOR - SANITARY PLAN - OPT 1

89 PL111 12928045 6TH FLOOR - DOMESTIC WATER PLAN - BASE BID

90 PL112 12928046 6TH FLOOR - DOMESTIC WATER PLAN - OPT 1

91 PL113 12928047 ROOF - NATURAL GAS PLAN - BASE BID

92 PL114 12928048 ROOF - NATURAL GAS PLAN - OPT 1

93 P-401 12928049 ENLARGED 6TH FLOOR - PLUMBING PLANS - OPT 3

94 P-501 12928050 PLUMBING DETAILS

95 P-502 12928051 PLUMBING DETAILS

96 P-503 12928052 PLUMBING DETAILS

97 P-504 12928053 PLUMBING DETAILS

98 P-601 12928054 PLUMBING SCHEDULES

99 P-701 12928055 PLUMBING DIAGRAM

100 P-702 12928056 PLUMBING DIAGRAM

101 P-703 12928057 PLUMBING DIAGRAMS

102 P-801 12928058 PLUMBING PHOTOS

MECHANICAL

103 M-001 12928059 MECHANICAL LEGEND, ABBREVIATIONS AND NOTES

104 M-002 12928060 6TH FLOOR - MECHANICAL PLAN - BID OPTIONS

105 M-003 12928061 ROOF - MECHANICAL PLAN - BID OPTIONS

106 MD101 12928062 6TH FLOOR - DEMOLITION - MECHANICAL HVAC PLAN - BASE BID

107 MD102 12928063 6TH FLOOR - DEMOLITION - MECHANICAL PIPING PLAN - BASE BID

108 MD103 12928064 6TH FLOOR - DEMOLITION - MECHANICAL HVAC PLAN - OPT 1

109 MD104 12928065 6TH FLOOR - DEMOLITION - MECHANICAL HVAC PLAN - OPT 2

110 MD105 12928066 ROOF - DEMOLITION - MECHANICAL PLAN - BASE BID

111 MD106 12928067 ROOF - DEMOLITION - MECHANICAL PLAN - OPT 1

112 MD107 12928068 ROOF - DEMOLITION - MECHANICAL PLAN - OPT 2 & 3

113 MD401 12928069 ENLARGED 6TH FLOOR - DEMOLITION - MECHANICAL PLAN - OPT 3

114 MD701 12928070 MECHANICAL PHOTOS

115 MH101 12928071 6TH FLOOR - MECHANICAL DUCTWORK PLAN - BASE BID

116 MH102 12928072 6TH FLOOR - MECHANICAL DUCTWORK PLAN - OPT 1

117 MH103 12928073 6TH FLOOR - MECHANICAL DUCTWORK PLAN - OPT 2 & 3

118 MH104 12928074 ROOF - MECHANICAL DUCTWORK PLAN - BASE BID

119 MH105 12928075 ROOF - MECHANICAL DUCTWORK PLAN - OPT 1

120 MH106 12928076 ROOF - MECHANICAL DUCTWORK PLAN - OPT 2 & 3

121 MP101 12928077 6TH FLOOR - MECHANICAL PIPING PLAN - BASE BID

122 MP102 12928078 6TH FLOOR - MECHANICAL PIPING PLAN - OPT 1

123 MP103 12928079 6TH FLOOR - MECHANICAL PIPING PLAN - OPT 2 & 3

124 MP104 12928080 ROOF - MECHANICAL PIPING PLAN - BASE BID

125 MP105 12928081 ROOF - MECHANICAL PIPING PLAN - OPT 1

126 MP106 12928082 ROOF - MECHANICAL PIPING PLAN - OPT 2 & 3

127 M-301 12928083 MECHANICAL SECTIONS

128 M-501 12928084 MECHANICAL DETAILS

129 M-502 12928085 MECHANICAL DETAILS

130 M-503 12928086 MECHANICAL DETAILS

131 M-504 12928087 MECHANICAL DETAILS

132 M-505 12928088 MECHANICAL DETAILS

133 M-601 12928089 MECHANICAL SCHEDULES

134 M-602 12928090 MECHANICAL SCHEDULES

135 MI801 12928091 MECHANICAL CONTROLS

136 MI802 12928092 MECHANICAL CONTROLS

137 MI803 12928093 MECHANICAL CONTROLS

ELECTRICAL

138 E-001 12928094 ELECTRICAL SYMBOLS, LEGEND, ABBREVIATIONS, AND NOTES

139 ED101 12928095 6TH FLOOR DEMOLITION PLAN - LIGHTING

140 ED102 12928096 6TH FLOOR DEMOLITION PLAN - POWER

141 ED401 12928097 ENLARGED ROOF DEMOLITION PLAN - POWER

142 EL101 12928098 6TH FLOOR PLAN - LIGHTING

143 EP401 12928099 3RD & 5TH FLOOR PLANS - POWER

144 EP402 12928100 6TH FLOOR PLAN - POWER

145 EP403 12928101 ENLARGE KITCHEN PLAN - POWER

146 EP404 12928102 ENLARGED ROOF PLAN - POWER

147 EP501 12928103 ELECTRICAL DETAILS

148 EP701 12928104 PANELBOARD SCHEDULES

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

GENERAL

1 G-001 12927957 COVER SHEET

2 GI002 12927958 LIST OF SHEETS

3 GI003 12927959 GENERAL PROJECT SYMBOLS

4 GI101 12927960 SIXTH FLOOR PLAN - LIFE SAFETY

STRUCTURAL

5 S-001 12927961 STRUCTURAL SYMBOLS, LEGENDS, ABBREVAITIONS AND NOTES

6 S-002 12927962 STRUCTURAL NOTES

7 SD101 12927963 DEMOLITION FRAIMING PLAN - SIXTH FLOOR

8 SD401 12927964 ENLARGED DEMO PLAN - BASE BID AND BID 3 OPTION

9 SD901 12927965 DEMOLITION STRUCTURAL PHOTOS

10 SF101 12927966 FRAMING PLAN - SIXTH FLOOR

11 SF102 12927967 FRAMING PLAN - ROOF

12 SF401 12927968 ENLARGED FRAMING SECTIONS AND DETAILS

13 SF402 12927969 ENLARGED FRAMING PLANS

14 SF501 12927970 FRAMING DETAILS

15 SF502 12927971 FRAMING DETAILS

ARCHITECTURE

16 A-001 12927972 ARCHITECTURAL NOTES AND SYMBOLS

17 A-002 12927973 OVERALL BUILDING PLAN - SIXTH FLOOR

18 A-003 12927974 OVERALL BUILDING PLAN - ROOF PLAN

19 A-004 12927975 BID OPTION BREAKDOWN

20 AD101 12927976 OVERALL DEMO 6TH FLOOR - AREA OF WORK

21 AD102 12927977 OVERALL DEMO ROOF - AREA OF WORK

22 AD401 12927978 ENLARGED DEMO - BASE BID

23 AD402 12927979 ENLARGED DEMO - BID OPTION 1

24 AD403 12927980 ENLARGED DEMO - BID OPTION 2 & 3

25 AD404 12927981 ENLARGED DEMO - BID OPTION 3

26 AD405 12927982 ENLARGED DEMO - WALL CONDITIONS - BASE BID

27 AD406 12927983 ENLARGED DEMO - WALL CONDITIONS - BID OPTION 1

28 AD407 12927984 ENLARGED DEMO - WALL CONDITIONS - BID OPTION 2 & 3

29 AD408 12927985 ENLARGED DEMO - WALL CONDITIONS - BID OPTION 3

30 AD409 12927986 ENLARGED DEMO - RCP - BASE BID

31 AD410 12927987 ENLARGED DEMO - RCP - BID OPTION 1

32 AD411 12927988 ENLARGED DEMO - RCP - BID OPTION 2 & 3

33 AD412 12927989 ENLARGED DEMO - RCP - BID OPTION 3

34 AD900 12927990 PHOTO REFERENCE PLAN - ROOF EXISTING

35 AD901 12927991 PHOTO REFERENCE PLAN - BASE BID

36 AD902 12927992 PHOTO REFERENCE PLAN - BID OPTION 1

37 AD903 12927993 PHOTO REFERENCE PLAN - BID OPTIONS 2 & 3

38 AD904 12927994 PHOTO SHEET - EXISTING CONDITIONS 1

39 AD905 12927995 PHOTO SHEET - EXISTING CONDITIONS 2

40 AD906 12927996 PHOTO SHEET - EXISTING CONDITIONS 3

41 AD907 12927997 PHOTO SHEET - EXISTING CONDITIONS 4

42 AD908 12927998 PHOTO SHEET - EXISTING CONDITIONS 5

43 AE101 12927999 OVERALL NEW 6TH FLOOR - AREA OF WORK

44 AE102 12928000 OVERALL NEW ROOF - AREA OF WORK

45 AE401 12928001 ENLARGED NEW - BASE BID

46 AE402 12928002 ENLARGED GALLEY KITCHEN PLAN - BASE BID

47 AE403 12928003 ENLARGED NEW - BID OPTION 1

48 AE404 12928004 ENLARGED NEW - BID OPTIONS 2 & 3

49 AE405 12928005 ENLAGED NEW - BID OPTION 3

50 AE406 12928006 ENLARGED NEW - WALL CONDITIONS - BASE BID

51 AE407 12928007 ENLARGED NEW - WALL CONDITIONS - BID OPTION 1

52 AE408 12928008 ENLARGED NEW - WALL CONDITIONS - BID OPTION 2 & 3

53 AE409 12928009 ENLARGED NEW - WALL CONDITIONS - BID OPTION 3

54 AE410 12928010 ENLARGED NEW - RCP - BASE BID

55 AE411 12928011 ENLARGED NEW - RCP - BID OPTION 1

56 AE412 12928012 ENLARGED NEW - RCP - BID OPTION 2 & 3

57 AE413 12928013 ENLARGED NEW - RCP - BID OPTION 3

58 AE414 12928014 INTERIOR ELEVATIONS - RESTROOM

59 AE415 12928015 INTERIOR ELEVATIONS - CASEWORK

60 AE501 12928016 DOOR SCHEDULE AND DETAILS

61 AE502 12928017 STOREFRONT DETAILS

62 AE503 12928018 STOREFRONT DETAILS

63 AE504 12928019 STOREFRONT DETAILS

64 AE505 12928020 STOREFRONT DETAILS

65 AE506 12928021 DOOR DETAILS

66 AE507 12928022 DOOR DETAILS

67 AE508 12928023 ILTUO WALL DETAILS

68 AE509 12928024 WINDOW SILL DETAILS

69 AE510 12928025 WINDOW SCREEN DETAILS

70 AE511 12928026 ROOF DETAILS

71 AE601 12928027 PARTITION TYPES

72 AE602 12928028 PARTITION TYPES

73 AF601 12928029 INTERIOR FINISH SCHEDULE

FIRE PROTECTION

74 FA001 12928030 FIRE ALARM SYMBOLS, LEGEND, ABBREVIATIONS AND NOTES

75 FA101 12928031 6TH FLOOR PLAN - FIRE ALARM/ MASS NOTIFICATION

76 FD101 12928032 6TH FLOOR DEMO PLAN - FIRE PROTECTION

A WHERE EXISTING CONSTRUCTION IS DAMAGED BY

CONSTRUCTION REQUIRED BY THESE DOCUMENTS. REPAIR

THE DAMAGED ITEM(S) WITH MATERIALS TO MATCH THE

ADJACENT MATERIAL, TEXTURE AND COLOR.

B FIELD VERIFY EXISTING DIMENSIONS, PRIOR TO ORDERING

MATERIALS OR BEGINNING DEMOLITION.

C ALL ITEMS NOT SHOWING AS "EXISTING" MUST BE PROVIDED

AND INSTALLED UNDER THE REQUIREMENTS OF THIS

CONTRACT.

D COORDINATE LAY DOWN AREA WITH THE CONTRACTING

OFFICER PRIOR TO THE PRECONSTRUCTION MEETING. THE

ALLOWABLE AREA SIZE MUST BE ESTABLISHED BY THE

CONTRACTING OFFICER.

E MANUFACTURER'S TRADE NAMES LISTED ARE NOT INTENDED

TO BE PROPRIETARY. PRODUCTS OF OTHER

MANUFACTURERS WILL BE ACCEPTABLE PROVIDED THEY

MATCH THE COLOR, FINISHES, TEXTURES AND PATTERNS OF

THE MANUFACTURER LISTED, AND MEET THE TECHNICAL

REQUIREMENTS OF THE SPECIFICATIONS.

F OBSERVE AND MAINTAIN BUILDING AND COMPOUND SECURITY

REQUIREMENTS AS DIRECTED BY THE CONTRACTING

OFFICER.

G CONSTRUCTION WILL BE ACCOMPLISHED IN AND AROUND

AREAS WHICH WILL REMAIN OPERATIONAL. AVOID

INTERFERENCE WITH THE OPERATIONAL WORK ROUTINE.

H ALL SUBMITTALS REQUIRED BY THESE DRAWINGS OR

SPECIFICATIONS MUST BE SUBMITTED TO THE CONTRACTING

OFFICER FOR APPROVAL TO COMMENCEMENT OF RELATED

WORK.

BUILDING CODE:

UNIFIED FACILITIES CRITERIA (UFC) 1-200-01 (20 JUNE 2016)

UNIFIED FACILITIES CRITERIA (UFC) 1-200-02 (01 DEC. 2016)

UNIFIED FACILITIES CRITERIA (UFC) 3-110-03 (01 MAY 2012)

ACCESSIBILITY CODE:

UNIFORM ACCESSIBILITY STANDARDS (UFAS)

AMERICANS WITH DISABILITIES ACT (ADA)

ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES

(ADAAG)

MECHANICAL CODE:

INTERNATIONAL MECHANICAL CODE (IMC) 2009

ELECTRICAL CODE:

NFPA 70, NATIONAL ELECTRIC CODE

PLUMBING CODE:

INTERNATIONAL PLUMBING CODE (IPC) 2009

FIRE PREVENTION & LIFE SAFETY CODE:

UNIFIED FACILITIES CRITERIA (UFC) 3-600-01 (15 DEC. 2009)

NFPA 101, LIFE SAFETY CODE

GENERAL NOTES

GOVERNING REGULATIONS

MA

RK

D

ES

CR

IP

TI

ON

DOOR NUMBER

(REFER TO DOOR SCHEDULE)

DOOR TAG

GENERAL PROJECT SYMBOLS

WINDOW TYPE LETTER

WINDOW TYPE TAG

SPECIALITY ITEM NUMBER

SPECIALITY ITEM TAG

PARTITION TYPE DESIGNATION

(REFER TO PARTITION SCHEDULE)

PARTITION TYPE

INDICATOR

PARTITION IN PLAN

A1 A-301

- - - - - - - - - - - - - - - - - - - - - - - - - - - - A-401 INTERIOR ELEVATION

INDICATOR

INTERIOR ELEVATION NUMBER

SHEET WHERE DRAWN

EXTERIOR ELEVATION

INDICATOR

ELEVATION NUMBER

DIRECTION OF VIEW

SHEET WHERE DRAWN

A1 A-301

WALL / PARTIAL

BUILDING SECTION

INDICATOR

SECTION NUMBER

SHEET WHERE DRAWN

A1 A-301

BUILDING SECTION

INDICATORA1

A-301

BUILDING

A1

A1

A1

234B

A1

ROOM

101 ROOM IDENTIFIER

DETAIL NUMBER

SHEET WHERE DRAWN

DETAIL

INDICATOR

ROOM NAME

ROOM NUMBER

A-901 PHOTOGRAPH

INDICATOR

PHOTOGRAPH NUMBER

SHEET WHERE SHOWN

A1

A-501

VIEW NUMBERSHEET

BACK-REFERENCE

VIEW BACK-REFERENCE

ENLARGED PLAN NUMBERSHEET

BACK-REFERENCE

VIEW BACK-REFERENCE

KEYNOTE INDICATOR

KEYNOTE NUMBER

PLAN NUMBER

A1 SCALE: 1/8" = 1'-0"

PLAN TITLE A1A1

A-101

ENLARGED PLAN

SCALE: 1/4" = 1'-0" A1 DETAIL/SECT/ELEV

SCALE: 1/8" = 1'-0"

A1

A-101

SECTION NUMBER

SHEET WHERE DRAWNNAVAL SUPPORT

ACTIVITY

U.S. NAVAL STATION

SEWELLS POINT

PROJECT SITE

WILLOUGHBY BAY

U.S. NAVAL

AIR STATION

LITTLE CREEK

U.S. NAVAL

AMPHIBIOUS BASE

CHESAPEAKE BAY

NORFOLK

EASTERN BRANCH

VA BEACH

OCEANA

NAVAL AIR

STATION

CHESAPEAKE

PORTSMOUTH

NANSEMOND RIVER

CRANEY

ISLAND NAVY

DEPOT

ST. JULIEN'S CREEK

U.S. NAVAL ANNEX

NORTH

NORTH

Y-109

W-143

PIER 9

PIER 8

PIER 7

PIER 6

W ADMIRAL TAUSSIG BLVD

VI

RG

IN

IA

A

VE

MA

RY

LA

ND

A

VE

MORRIS ST

GILBERT ST

POWHATAN ST

MONSOOR MANOR

X-70

X-73

X-1 PARKING

X-2

DECATUR HALL

A-51

DE

CA

TU

R

AV

E

P

OW

HA

TA

N

ST

MANCON - SERVMART

Z-309

LARGE PARKING LOTS

Z-133

TRUXTON ST

PIERSEY ST

Z-138

Z-140

PARKING LOT

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 14 SEP 2023

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

5/

/2

2:

:2

PM

C :\R ev it

L oc al M od el s\ W

3_

7_

A_ R

_s ar ah

.g ilp in 1.

rv t

GI003

BU

IL

D

IN

G W

-1

C

O

LE

'S B

IS

TR

O

G

EN

ER

AL

P R

O

JE

C T

SY

M

BO

LS

ALP

12927959

SLG SLG

05/27/25

ALP/SLG

1834937

N/A

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

J. MILLER, P.E.

ALP

M

ID

LA

N

T

PW

D N

O R

FO

LK

G I0

NAVSUP

A WHERE EXISTING CONSTRUCTION IS DAMAGED BY

CONSTRUCTION REQUIRED BY THESE DOCUMENTS. REPAIR

THE DAMAGED ITEM(S) WITH MATERIALS TO MATCH THE

ADJACENT MATERIAL, TEXTURE AND COLOR.

B FIELD VERIFY EXISTING DIMENSIONS, PRIOR TO ORDERING

MATERIALS OR BEGINNING DEMOLITION.

C ALL ITEMS NOT SHOWING AS "EXISTING" MUST BE PROVIDED

AND INSTALLED UNDER THE REQUIREMENTS OF THIS

CONTRACT.

D COORDINATE LAY DOWN AREA WITH THE CONTRACTING

OFFICER PRIOR TO THE PRECONSTRUCTION MEETING. THE

ALLOWABLE AREA SIZE MUST BE ESTABLISHED BY THE

CONTRACTING OFFICER.

E MANUFACTURER'S TRADE NAMES LISTED ARE NOT INTENDED

TO BE PROPRIETARY. PRODUCTS OF OTHER

MANUFACTURERS WILL BE ACCEPTABLE PROVIDED THEY

MATCH THE COLOR, FINISHES, TEXTURES AND PATTERNS OF

THE MANUFACTURER LISTED, AND MEET THE TECHNICAL

REQUIREMENTS OF THE SPECIFICATIONS.

F OBSERVE AND MAINTAIN BUILDING AND COMPOUND SECURITY

REQUIREMENTS AS DIRECTED BY THE CONTRACTING

OFFICER.

G CONSTRUCTION WILL BE ACCOMPLISHED IN AND AROUND

AREAS WHICH WILL REMAIN OPERATIONAL. AVOID

INTERFERENCE WITH THE OPERATIONAL WORK ROUTINE.

H ALL SUBMITTALS REQUIRED BY THESE DRAWINGS OR

SPECIFICATIONS MUST BE SUBMITTED TO THE CONTRACTING

OFFICER FOR APPROVAL TO COMMENCEMENT OF RELATED

WORK.

GENERAL NOTESVICINITY MAP

LOCATION MAP

MA

RK

D

ES

CR

IP

TI

ON

ROOM / ZONE AREA

OCCUPANT LOAD

FACTOR

OCCUPANT

OCCUPANCY, TYPE

A - ASSEMBLY

B - BUSINESS

K - KITCHEN

L - LOCKER ROOMS

M - MERCANTILE

S - STORAGE

1500 SF

B 150

N: EXIT NUMBER

W: NET EXIT WIDTH (INCHES)

C: CAPACITY (PEOPLE)

P: EXIT WIDTH PER PERSON

A: ACTUAL EGRESS (PEOPLE)

2 HOUR FIRE BARRIER

SYMBOL DESCRIPTION

AREA NOT IN CONTRACT

COMMON PATH OF TRAVEL

MAXIMUM TRAVEL DISTANCE

MTD = X'-XX"

DEAD -END CORRIDOR

DE = X'-XX"

W

C

P

A

N

CPT = X'-XX"

OCCUPANT LOAD

FACTOR (SF/PERSON)

OCCUPANCY/ USE GROUP KEY AND OCCUPANT LOAD FACTORS

OCCUPANCY/ USE GROUP

50 NETCLASSROOM - VOCATIONAL

KEY

500 GROSSSTORAGE

100 GROSS

KITCHEN

60 GROSS

MERCANTILE

SYMBOL DESCRIPTIONQUANTITY

FIRE EXTINGUISHER SCHEDULE

K-CLASS KITCHEN EXTINGUISHER

FIRE EXTINGUISHER - 10 LB. 4A:80BC

CASUAL DINING

TRAINING

MECHANICAL

CONSUMABLES

ROOM

HALL B

FOOD SERVICE

OFFICE

GALLEY

FREEZER BOX 1

HALL A

WOMEN'S

LOCKER ROOM

FREEZER BOX 2

JANITORIAL

ROOM

MEN'S LOCKER

ROOM

LINEN STORAGE

SCULLERY

SERVING LINE

TRAINING

FORMAL DINING

TRAINING

MECHANICAL

DEMONSTRATION

AREA

CASUAL DINING

TRAINING

MECHANICAL

DRY FOOD

STORAGE

TENANT UPFIT

SPACE

UTILITY CLOSET

RESTROOM

CHILL BOX 1

S

TD1

112' - 0"

TD2

244' - 6"TD3

292' - 0"

41 0.3

41 0.3

ABC

ABC ABC

ABC

S

K

C

M

APPLICABLE CODES, STANDARD, AND DESIGN CRITERIA

STANDARD TITLE REVISION DATE

UFC 1-200-01 DOD BUILDING CODE 26 FEBRUARY 2024

FC 1-300-09N NAVY AND MARINE CORPS DESIGN PROCEDURES 17 MAY 2024

IBC INTERNATIONAL BUILDING CODE 2021

NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER

SYSTEMS

NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE 2022

NFPA 101 LIFE SAFETY CODE (LSC) 2024

UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES 6 MAY 2021

NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS

CONSTRUCTION TYPE - IA

FLOORS, COLUMNS - 2 HR FIRE RATED CONSTRUCTION

ROOF DECK - 1 HR FIRE RATED CONSTRUCTION

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

/2

/2

:1

:1

A M

C

U s e rs \d a v id

.h a d d o c k \D o c u m e n ts

\W

F

R d a v id

.h a d d o c k .r v t

GI101

B U

IL

D

IN

G

W -1

C O

L E

'S B

IS

T

R O

S

IX

T H

F L O

O R

P L A

N

L

IF

E S

A F

E T

Y

KEK

12927960

KEK DMH

05/27/25

ALP/SLG

1834937

N/A

N O

R F

O L K

V

IR

G

IN

IA

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

J. MILLER, P.E.

HPN

HPN

M

ID

L A

N T

D C

C O

R E

G I1

NAVSUP

TRAVEL DISTANCE SUMMARY

ID ACTUAL MAXIMUM

TD1 112' - 0" 300'

TD2 244' - 6" 300'

TD3 292' - 0" 300'

EXIT CAPACITY SCHEDULE

EXIT

NUMBER

NET CLEAR EXIT

WIDTH (INCHES)

EXIT WIDTH PER

PERSON (EGRESS

FACTOR)

EXIT

CAPACITY

(PEOPLE)

ACTUAL

PERSONS

USING EXIT

1 41 0.3 137 82

2 41 0.3 137 82

TOTAL 274 164

OCCUPANT LOAD SUMMARY

USE

OCCUPIED

AREA

OCCUPANT LOAD

FACTOR (SF PER

OCCUPANT)

OCCUPANT

LOAD

STORAGE 1073 SF 500 1

KITCHEN 2952 SF 100 30

CLASSROOM 4187 SF 50 84

MERCANTILE 2934 SF 60 49

TOTAL 164

GENERAL NOTES GRAPHIC SCALE(S)

KEY PLAN

LIFE SAFETY LEGEND

SCALE: 1" = 10'-0"

B1

NEW WORK - 6TH FLOOR PLAN - LIFE SAFETY

6TH FLOOR AREA OF WORK

OVERALL 6TH FLOOR AREA OF WORK - INCLUDES ALL BID OPTIONS

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

1" = 10' - 0" 0 5' 10' 40'20'

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 14 SEP 2023

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

5/

/2

2:

:4

PM

C :\R ev it

L oc al M od el s\ W

3_

7_

S_ R

_s ar ah

.g ilp in 1.

rv t

S-001

BU

IL

D

IN

G W

-1

C

O

LE

S

BI

ST

R

O

ST

R

U C

TU

R

AL

S

YM

BO

LS

, L

EG

EN

D S, A

BB

R

EV

AI

TI

O N

S

AN

D N

O

TE

S

ADB

12927961

CAH CAH

5/27/25

ALP/SLG

1834937

N/A

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

J. MILLER, P.E.

ALP

M

ID

LA

N

T D

C C

O R

E

S-

NAVSUP

GENERAL NOTES DESIGN CRITERIA NOTES

1 STRUCTURAL DRAWINGS MUST BE USED IN CONJUNCTION WITH DRAWINGS

OF ALL OTHER DISCIPLINES AND SPECIFICATIONS. VERIFY REQUIREMENTS

OF OTHER TRADES AS TO SLEEVES, CHASES, HANGERS, INSERTS, ANCHORS,

HOLES AND OTHER ITEMS TO BE PLACED OR SET IN THE STRUCTURAL WORK

AS WELL AS TO BE TEMPORARILY DISCONNECTED AND RECONNECTED TO

ALLOW FOR THE INSTALLATION OF THE STRUCTURAL WORK.

2 THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH SAFETY

PRECAUTIONS AND REGULATIONS DURING THE WORK. THE STRUCTURAL

ENGINEER WILL NOT ADVISE ON, NOR ISSUE DIRECTION AS TO SAFETY

PRECAUTIONS AND PROGRAMS.

3 STRUCTURAL DRAWINGS HEREIN REPRESENT THE FINISHED STRUCTURE.

PROVIDE ALL TEMPORARY SHORING, TEMPORARY SUPPORTS, GUYING AND

BRACING REQUIRED TO ERECT AND HOLD THE STRUCTURE IN PROPER

ALIGNMENT UNTIL ALL STRUCTURAL WORK AND CONNECTIONS HAVE BEEN

COMPLETED. THE INVESTIGATION, DESIGN, SAFETY, ADEQUACY AND

INSPECTION OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS,

ETC., IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

4 THE STRUCTURAL ENGINEER IS NOT RESPONSIBLE FOR THE METHODS,

TECHNIQUES, AND SEQUENCES OF PROCEDURES TO PERFORM THE WORK.

SUPERVISION OF WORK IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

5 DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION.

WHERE CONDITIONS ARE NOT SPECIFICALLY SHOWN, USE SIMILAR DETAILS

OF CONSTRUCTION, SUBJECT TO APPROVAL BY THE CONTRACTING OFFICER.

6 ALL STRUCTURAL SYSTEMS WHICH ARE TO BE COMPOSED OF COMPONENTS

TO BE FIELD ERECTED MUST BE SUPERVISED BY THE SUPPLIER DURING

MANUFACTURING, DELIVERY, HANDLING, STORAGE AND ERECTION IN

ACCORDANCE WITH THE SUPPLIER’S INSTRUCTIONS AND REQUIREMENTS.

7 LOADING APPLIED TO THE STRUCTURE DURING THE PROCESS OF

CONSTRUCTION MUST NOT EXCEED THE SAFE LOAD-CARRYING CAPACITY OF

STRUCTURAL MEMBERS. LIVE LOADINGS USED IN DESIGN OF THIS

STRUCTURE ARE INDICATED IN "DESIGN CRITERIA NOTES". DO NOT APPLY

ANY CONSTRUCTION LOADS UNTIL STRUCTURAL FRAMING IS PROPERLY

CONNECTED TOGETHER AND UNTIL ALL TEMPORARY BRACING IS IN PLACE.

8 ALL ASTM AND OTHER REFERENCES ARE PER THE LATEST EDITIONS OF

THESE STANDARDS, UNLESS OTHERWISE NOTED.

9 SHOP DRAWINGS AND OTHER ITEMS MUST BE SUBMITTED FOR REVIEW BY

THE GENERAL CONTRACTOR PRIOR TO FABRICATION. ALL SHOP DRAWINGS

MUST BE REVIEWED BY THE GENERAL CONTRACTOR BEFORE SUBMITTAL.

THE REVIEW IS TO BE FOR CONFORMANCE WITH THE DESIGN CONCEPT AND

GENERAL COMPLIANCE WITH THE RELEVANT CONTRACT DOCUMENTS. THE

REVIEW DOES NOT RELIEVE THE CONTRACTOR OF THE SOLE

RESPONSIBILITY TO REVIEW, CHECK, AND COORDINATE THE SHOP

DRAWINGS PRIOR TO SUBMISSION. THE CONTRACTOR REMAINS SOLELY

RESPONSIBLE FOR ERRORS AND OMISSIONS ASSOCIATED WITH THE

PREPARATION OF SHOP DRAWINGS AS THEY PERTAIN TO MEMBER SIZES,

DETAILS, DIMENSIONS, ETC. ANY PROPOSED CHANGES MUST BE SUBMITTED

IN A LETTER OR DETAIL TO THE CONTRACTING OFFICER FOR APPROVAL.

10 IN NO CASE MAY REPRODUCTION OF THE CONTRACT DRAWINGS BE USED AS

SHOP DRAWINGS. SUBCONTRACTOR / FABRICATOR MUST PROVIDE

INDEPENDENTLY CREATED DRAWINGS BASED ON THE PLANS AND DETAILS.

11 IN ACCORDANCE WITH THE IBC, SPECIAL INSPECTIONS WILL BE REQUIRED

FOR THIS PROJECT. SPECIAL INSPECTIONS MUST BE PERFORMED IN

ACCORDANCE WITH THE "SCHEDULE OF SPECIAL INSPECTIONS". THE

CONTRACTOR MUST NOTIFY THE SPECIAL INSPECTOR AT LEAST 48 HOURS IN

ADVANCE FOR WORK THAT WILL REQUIRE INSPECTION OR TESTING. IF

REQUIRED, THE CONTRACTOR MUST EMPLOY THIRD PARTY SPECIAL

INSPECTOR.

12 CONTRACTOR MUST VISIT THE SITE PRIOR TO BID TO ASCERTAIN

CONDITIONS WHICH MAY ADVERSELY AFFECT THE WORK OR COST THEREOF.

13 CONTRACTOR MUST FIELD VERIFY DIMENSIONS, ELEVATIONS,

INTERFERENCES AND OTHER REQUIREMENTS NECESSARY FOR THE PROPER

CONSTRUCTION AND ALIGNMENT OF NEW PORTIONS OF THE STRUCTURE TO

EXISTING. MAKE ALL MEASUREMENTS NECESSARY FOR FABRICATION AND

ERECTION OF STRUCTURAL MEMBERS. DISCREPANCIES MUST BE BROUGHT

TO THE ATTENTION OF THE CONTRACTING OFFICER PRIOR TO ORDERING

MATERIALS OR BEGINNING WORK (CONSTRUCTION OR DEMOLITION).

14 ALL ITEMS NOTED TO BE DEMOLISHED OR REMOVED WILL BECOME THE

CONTRACTOR'S PROPERTY, UNLESS NOTED OTHERWISE. DISPOSITION OF

THE ITEMS / MATERIALS IS THE RESPONSIBILITY OF THE CONTRACTOR AND

MUST ADHERE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL

REGULATIONS.

15 TAKE CARE NOT TO DAMAGE THE EXISTING STRUCTURE. WHERE EXISTING

CONSTRUCTION IS DAMAGED BY THE CONSTRUCTION REQUIRED BY THESE

DOCUMENTS, REPAIR THE DAMAGE ITEM(S) WITH MATERIALS TO MATCH THE

ADJACENT MATERIAL, TEXTURE, AND COLOR.

16 DO NOT HANG ITEMS FROM EXISTING STRUCTURE, UNLESS NOTED

OTHERWISE.

1 THE STRUCTURAL WORK TO BE PERFORMED UNDER THIS CONTRACT MUST

BE DESIGNED TO THE APPLICABLE DESIGN STANDARD AND / OR CRITERIA

OF THE FOLLOWING, UNLESS NOTED OTHERWISE:

A. ACI 318-19, “BUILDING CODE REQUIREMENTS FOR STRUCTURAL

CONCRETE”

B. UFC 3-301-01 (11 APRIL 2023, CH2 4 SEPTEMBER 2024), "STRUCTURAL

ENGINEERING"

C. AISI 100-16, "SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL

STRUCTURAL MEMBERS"

D. ANSI/AISC 360-22, “SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS”

E. ASCE 7-22, “MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER

STRUCTURES”

F. INTERNATIONAL BUILDING CODE 2021

G. INTERNATIONAL EXISTING BUILDING CODE 2021

H. SDI RD-2017, "STEEL DECK INSTITUTE STANDARD FOR STEEL ROOF DECK"

I. SJI 100-15, "STANDARD SPECIFICATIONS, LOAD TABLES, AND WEIGHT

TABLES

FOR STEEL JOISTS AND JOIST GIRDERS"

J. UFC 1-200-01 (08 OCTOBER 2019, CH4 17 DECEMBER 2024),

“DOD BUILDING CODE”

K. ALL ASTM AND OTHER REFERENCES ARE PER THE LATEST EDITIONS OF

THESE STANDARDS AT THE CONTRACT AWARD DATE

2 LIVE LOADS USED IN THE DESIGN OF THESE STRUCTURAS ARE AS

FOLLOWS:

MAU-1 HVAC UNIT..................................6000 LBS

DOAU-1 HVAC UNIT................................5000 LBS

RTU-1 HVAC UNIT...................................5000 LBS

ROOF LIVE LOAD......................................150 PSF

3 WIND DESIGN CRITERIA:

A. BUILDING CRITERIA: RISK CATEGORY = II

B. WIND LOADS:

- BASIC WIND SPEED, V (ULTIMATE) = 118 MPH

- BASIC WIND SPEED, V (NOMINAL) = 92 MPH

- EXPOSURE CATEGORY = C

- PRESSURE COEFFICIENT, GCPI = ±0.18

C. SEISMIC LOADS:

- SITE CLASS = D

- SEISMIC DESIGN CATEGORY = A

-SHORT PERIOD SPECTRAL RESPONSE ACCEL, SS = 0.11

- 1.0 SEC SPECTRAL RESPONSE ACCELERATION, S1 = 0.04

D. SNOW LOADS:

-GROUND SNOW LOAD = 118 MPH

- EXPOSURE FACTOR, CE = 1.0

- THERMAL FACTOR, CT = 1.2

CAST-IN-PLACE CONCRETE NOTES

1 CONCRETE WORK MUST CONFORM TO THE REQUIREMENTS OF ACI 301-16,

"SPECIFICATION FOR STRUCTURAL CONCRETE BUILDINGS". MIXING

OPERATIONS, ETC. MUST CONFORM TO ASTM C94. CONCRETE MUST BE

MECHANICALLY VIBRATED IN ACCORDANCE WITH ASTM 309R.

2 CONCRETE MUST BE NORMAL WEIGHT AND MUST OBTAIN A 28 DAY

COMPRESSIVE STRENGTH (UNLESS OTHERWISE NOTED):

A. FOUNDATION, GRADE BEAM, PILE CAP 4,000 PSI, 4 1/2"

B. EXTERIOR WALL 5,000 PSI, 4 1/2" WITH AIR

C. ELEVATED SLAB 5,000 PSI, 4 1/2" WITH AIR

D. INTERIOR SLAB ON GRADE 4,000 PSI, 4 1/2"

E. CONCRETE NOT OTHERWISE NOTED 3,000 PSI

F. SLUMP ±1/2" (MEASURED PRIOR TO SUPERPLASTICIZER, WHERE

OCCURS)

3 CONCRETE EXPOSED TO FREEZE/THAW CYCLE MUST HAVE 6% (±1 1/2%)

ENTRAINED AIR.

4 ALL EMBEDDED ITEMS MUST BE PROPERLY LOCATED, POSITIONED, AND

SECURED PRIOR TO PLACEMENT OF CONCRETE OR GROUT. NO "WET

SETTING" IS ALLOWED. DO NOT FIELD BEND BAR PARTIALLY EMBEDDED IN

HARDENED CONCRETE UNLESS INDICATED OR APPROVED BY THE

CONTRACTING OFFICER.

5 CONSTRUCTION JOINTS (CJ) AND SAWCUT JOINTS (SC) MUST BE LOCATED

AS SHOWN ON DRAWINGS. CJ'S MUST HAVE FORMED POUR STOPS. CJ'S IN

WALLS & FOOTINGS NEED NOT OCCUR AT THE SAME LOCATION.

DEVIATIONS WILL ONLY BE PERMITTED PENDING CONTRACTING OFFICER'S

REVIEW.

6 SLAB JOINTS MUST BE FILLED WITH AN APPROVED MATERIAL. THIS MUST

TAKE PLACE AS LATE AS POSSIBLE, PREFERABLY 4 TO 6 WEEKS AFTER THE

SLAB AS BEEN CAST. PRIOR TO FILLING, REMOVE ALL DEBRIS FROM THE

SLAB JOINTS.

7 INTERIOR FINISHED FLOOR MUST BE MOIST CURED OR SPRAYED WITH A

DISPLACING / REMOVABLE CURING COMPOUND. SLAB FINISH TOLERANCE

MUST BE IN ACCORDANCE WITH ACI 301, CLASS A, UNLESS OTHERWISE

NOTED.

8 EXPOSED CONCRETE WALL SURFACES MUST RECEIVE A FINISH,

COORDINATE WITH ARCHITECTURAL.

9 FORMWORK MUST REMAIN IN PLACE UNTIL CONCRETE HAS OBTAINED AT

LEAST 70% OF ITS 28 DAY COMPRESSIVE STRENGTH. CONTRACTOR TO

PROVIDE ALL SHORING AND RESHORING.

10 EDGES OF PERMANENTLY EXPOSED CONCRETE SURFACES MUST BE

CHAMFERED 3/4" UNLESS OTHERWISE NOTED.

STRUCTURAL SCOPE OF WORK

1 THE STRUCTURAL WORK CONSISTS OF WALL CRACK REPAIRS, WALL JOINT

REPAIRS, CONCRETE REPAIRS, BOLT GRINDING AND REPAIRS, AND THE

PROVISION OF A ROOF-MOUNTED STRUCTURAL STEEL SUPPORT FRAME

FOR (3) LARGE HVAC UNITS. WORK MUST BE COORDINATED W/ THE ARCH,

MECH, & ELECT DWGS. BRING ANY DISCREPANCIES TO THE ATTENTION OF

THE CONTRACTING OFFICER PRIOR TO BEGINNING FABRICATION OF THE

STRUCTURAL STEEL.

2 THE PROJECT INCLUDES MULTIPLE OTHER DEMOLITION & NEW WORK

TASKS WHICH ARE NOT SHOWN ON THE STRUCTURAL DRAWINGS.

REFERENCE ALL THE OTHER DISCIPLINE DRAWINGS FOR THIS PROJECT.

SPECIAL INSPECTION NOTES

1 CONTRACTOR MUST NOTIFY THE SPECIAL INSPECTOR AT LEAST 48 HOURS IN

ADVANCE FOR WORK THAT WILL REQUIRE INSPECTION OR TESTING.

CONTRACTOR MUST EMPLOY THIRD PARTY SPECIAL INSPECTOR.

2 SPECIAL INSPECTIONS MUST BE COMPLETED FOR THE FOLLOWING

ELEMENTS ACCORDING TO IBC SECTION 1704.

3 CONCRETE AND ELEMENTS EMBEDDED IN CONCRETE MUST BE SPECIAL

INSPECTED PRIOR TO AND DURING PLACEMENT OF CONCRETE. SPECIAL

INSPECTIONS MUST INCLUDE THE FOLLOWING:

A. PERIODIC INSPECTION:

1. REINFORCING STEEL SIZE AND PLACEMENT

2. VERIFY USE OF APPROVED MIX DESIGN

3. AFTER PLACEMENT TO ENSURE ADEQUATE CURING AND

WEATHER PROTECTION PROCEDURES

B. CONTINUOUS INSPECTION:

1. BOLTS TO BE INSTALLED IN CONCRETE PRIOR TO AND DURING

PLACEMENT OF CONCRETE

2. DURING PLACEMENT OF CONCRETE

4 STRUCTURAL STEEL FABRICATION AND ERECTION MUST BE SPECIAL

INSPECTED AS FOLLOWS:

A. PERIODIC INSPECTION:

1. HIGH-STRENGTH BOLTS, NUTS AND WASHERS ACCORDING TO

AISC 360-10

5 POST-INSTALLED ANCHORS, INCLUDING BUT NOT LIMITED TO EXPANSION

ANCHORS, ADHESIVE ANCHORS, AND LOW VELOCITY FASTENERS MUST BE

SPECIAL INSPECTED ACCORDING TO THE RELEVANT ANCHOR CODE

EVALUATION REPORTS.

A. PERIODIC SPECIAL INSPECTION IS REQUIRED DURING THE INSTALLATION

OF POST-INSTALLED ANCHORS. SPECIAL INSPECTOR MUST VERIFY

THE FOLLOWING:

1. ANCHOR SIZE AND STEEL GRADE

2. HOLE DIAMETER, LOCATION AND TYPE OF DRILL BIT

3. COMPLIANCE WITH MANUFACTURER'S INSTRUCTIONS, INCLUDING HOLE

AND ANCHOR CLEANLINESS, AND ADHESIVE APPLICATON

4. ANCHOR EMBEDMENT DEPTH

6 SEE THE IBC AND OTHER DISCIPLINE'S DRAWINGS FOR NON-STRUCTURAL

ITEMS REQUIRED TO BE SPECIAL INSPECTED.

REINFORCING STEEL NOTES

1 REINFORCING MATERIALS MUST BE AS FOLLOWS:

A. REINFORCING BARS – ASTM A615, GRADE 60, DEFORMED

2 UNLESS OTHERWISE NOTED, THE FOLLOWING MINIMUM CONCRETE COVER

MUST BE PROVIDED FOR CONCRETE PROTECTION OF REINFORCING, AS WELL

AS PLACING AND FABRICATION OF REINFORCING, IN ACCORDANCE WITH

RECOMMENDATIONS IN ACI 318:

A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH = 3"

B. CONCRETE CAST IN FORMS AND EXPOSED TO EARTH OR WEATHER:

I. STRUCTURAL SLAB ON GRADE = 2”

II. #6 AND LARGER BARS = 2”

III. #5 BAR, W31 OR D31 WIRE & SMALLER = 1-1/2"

IV. COLUMNS, GIRDERS AND BEAMS = 1-1/2"

V. INTERIOR WALLS AND SLABS = 1-1/2"

3 SHOP DRAWINGS MUST BE SUBMITTED FOR REVIEW PRIOR TO FABRICATION

AND DELIVERY OF REINFORCING STEEL.

4 LAP CONTINUOUS REINFORCING STEEL A MINIMUM LENGTH OF:

A. CONCRETE - 36 X BAR DIAMETER OF SMALLER BAR BEING LAPPED

B. MASONRY - 48 X BAR DIAMETER OF SMALLER BAR BEING LAPPED

5 EACH REINFORCING BAR MUST BE WIRED TO A CROSS BAR AT A MAXIMUM

SPACING OF 2’-0” ON CENTER.

6 DETAIL BARS IN ACCORDANCE WITH ACI DETAILING MANUAL, LATEST EDITION.

PROVIDE ALL ACCESSORIES NECESSARY TO SUPPORT REINFORCING IN

POSITIONS SHOWN. BAR SUPPORTS AND HOLDING BARS MUST BE PROVIDED

FOR ALL REINFORCING STEEL TO INSURE MINIMUM CONCRETE COVER. BAR

SUPPORTS MUST BE PLASTIC TIPPED OR STAINLESS STEEL.

7 USE OF POLYPROPYLENE FIBERS (IN LIEU OF WELDED WIRE FABRIC) IS

PROHIBITED.

8 PLACE REINFORCING STEEL IN ACCORDANCE WITH THE CONCRETE

REINFORCING STEEL INSTITUTE (CRSI) “MANUAL OF STANDARD PRACTICE”.

REINFORCING STEEL MUST NOT CONTAIN RUST, SCALE, OIL, GREASE, CLAY,

OR FOREIGN SUBSTANCES THAT WOULD REDUCE THE BOND. REMOVE

LOOSE RUST PRIOR TO PLACEMENT.

9 UNLESS OTHERWISE APPROVED, ALL WELDED WIRE FABRIC MUST BE

BLOCKED INTO THE POSITION INDICATED WITH PRECAST CONCRETE BLOCKS

HAVING A COMPRESSIVE STRENGTH EQUAL TO THAT OF THE SLAB (4,000 PSI).

10 ALL REINFORCING STEEL, DOWELS, ANCHORS RODS, AND OTHER HARDWARE

TO BE SET IN CONCRETE MUST BE TIED IN PLACE PRIOR TO THE PLACEMENT

OF CONCRETE TO PREVENT DISPLACEMENT BEYOND PERMITTED

TOLERANCES.

11 ANCHOR RODS WITH UPSET THREADS ARE NOT ALLOWED.

MA

RK

D

ES

CR

IP

TI

ON

W12X26

W12X26

TOF X' - X"

FRAMING SIZE

EXISTING FRAMING SIZE

X

BEAM TO BEAM

MOMENT CONNECTIONTOP OF FOUNDATION

COLUMN GRID MARK

BEAM TO HSS COLUMN

MOMENT CONNECTION

TOC X' - X" TOP OF CONCRETE

TOS X' - X" TOP OF STEEL

TOM X' - X" TOP OF MASONRY

X" TOP OF SLAB

SPOT ELEVATION

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 14 SEP 2023

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

5/

/2

2:

:0

PM

C :\R ev it

L oc al M od el s\ W

3_

7_

S_ R

_s ar ah

.g ilp in 1.

rv t

S-002

BU

IL

D

IN

G W

-1

C

O

LE

S

BI

ST

R

O

ST

R

U C

TU

R

AL

N

O

TE

S

ADB

12927962

CAH CAH

5/27/25

ALP/SLG

1834937

N/A

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

J. MILLER, P.E.

ALP

M

ID

LA

N

T D

C C

O R

E

S-

NAVSUP

STRUCTURAL STEEL NOTES STRUCTURAL STEEL NOTES (CONT'D)

LIGHT GAUGE STEEL FRAMING NOTES

14 REFER TO DRAWINGS OF OTHER DISCIPLINES FOR ADDITIONAL STEEL (IF

ANY) NOT SHOWN ON THE STRUCTURAL DRAWINGS.

15 UNLESS OTHERWISE NOTED, THE TOP AND BOTTOM OF ALL EXTERIOR

STEEL COLUMNS OR OPEN ENDED STEEL BEAMS MUST HAVE A STEEL CAP

PLATE. UNLESS OTHERWISE DETAILED OR NOTED, MINIMUM CAP PLATE

DIMENSIONS MUST MATCH MEMBER WIDTH AND DEPTH, WITH A THICKNESS

MATCHING THE MEMBER WEB THICKNESS (1/4" MINIMUM).

1 ALL STRUCTURAL STEEL MUST CONFORM TO THE FIFTEENTH EDITION OF

THE ALLOWABLE STRESS DESIGN "STEEL CONSTRUCTION MANUAL" OF THE

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC).

2 UNLESS OTHERWISE NOTED, ALL MATERIALS MUST BE IN ACCORDANCE WITH

THE FOLLOWING ASTM SPECIFICATIONS:

MEMBER, ALL GALVANIZED ASTM MIN. STRENGTH

STAINLESS STEEL (SS) MEMBER ASTM

3 HIGH STRENGTH BOLTS AND NUTS MUST BE SHIPPED TOGETHER IN THE

SAME SHIPPING CONTAINER. FASTENER COMPONENTS MUST BE

PROTECTED FROM DIRT AND MOISTURE IN CLOSED CONTAINERS AT THE

SITE OF THE INSTALLATION. FASTENER COMPONENTS THAT ARE NOT

INCORPORATED INTO THE WORK MUST BE RETURNED TO PROTECTED

STORAGE AT THE END OF THE WORK SHIFT. HIGH STRENGTH BOLTS MAY BE

TIGHTENED TO "SNUG FIT" CONDITION IN LIEU OF FULL PRETENSIONING.

4 UNLESS NOTED OTHERWISE, ALL CONNECTIONS MUST BE AISC TYPE 2

“STANDARD FRAMED BEAM CONNECTIONS” WITH ASTM A325 BOLTS,

DESIGNED FOR THE UNIFORM LOAD CONSTANTS FOR LATERALLY

SUPPORTED BEAMS GIVEN IN THE “CONNECTIONS” SECTION OF THE

“MANUAL OF STEEL CONSTRUCTION”.

5 ALL INTERIOR STEEL MUST BE SHOP PAINTED, HOWEVER GALVANIZED IS

ENCOURAGED. EXTERIOR EXPOSED STEEL MUST BE HOT DIPPED

GALVANIZED IN ACCORDANCE WITH ASTM A153 OR A123 AS APPLICABLE.

REPAIR DAMAGE TO GALVANIZED COATINGS USING ASTM A780 ZINC RICH

PAINT FOR GALVANIZING DAMAGED BY HANDLING, TRANSPORTING,

CUTTING, WELDING, BOLTING, ETC. DO NOT HEAT SURFACES TO WHICH

REPAIR PAINT HAS BEEN APPLIED. ZINC RICH COMPOUND MUST BE 95%

METALLIC ZINC, BY WEIGHT IN DRIED FILM CONFORMING TO FED. SPEC.

DOD-P-21035A AND MEETING MIL SPEC. MIL-P-26915A. PROVIDE TWO COATS

WITH 2 MIL THICKNESS PER COAT FOR A TOTAL OF 4 MILS. GALVANIZE

STRUCTURAL STEEL AFTER FABRICATION WHERE PRACTICAL. FINIAL FINISH

MUST BE UNIFORM.

6 HARDENED STEEL SCREWS CANNOT BE HOT DIPPED GALVANIZED. USE

MANUFACTURER'S PROPRIETARY EPOXY COATING SYSTEM OR

MECHANICALLY GALVANIZE SUCH FASTENERS IN ACCORDANCE WITH ASTM

B695, CLASS 55 OR C-3 MECHANICALLY GALVANIZED.

7 WELDING OF STRUCTURAL STEEL MUST BE IN ACCORDANCE WITH AWS D1.1

"STRUCTURAL WELDING CODE - STEEL". WELD ELECTRODES MUST BE

E70XX. UNLESS OTHERWISE NOTED, PROVIDE CONTINUOUS FILLET WELDS

WITH MINIMUM SIZE REQUIRED BY TABLE J2.4 OF THE “MANUAL OF STEEL

CONSTRUCTION, ALLOWABLE STRESS DESIGN”. ALL FILLER MATERIAL MUST

HAVE A MINIMUM YIELD STRENGTH OF 58 KSI.

8 PRIOR TO WELDING, THE CONTRACTOR MUST SUBMIT CERTIFICATION FOR

EACH WELDER STATING THE TYPE OF WELDING AND POSITIONS QUALIFIED

FOR, THE CODE AND PROCEDURE QUALIFIED UNDER, DATE QUALIFIED, AND

THE FIRM AND INDIVIDUAL CERTIFYING THE QUALIFICATION TESTS.

9 HOLES IN STEEL MUST BE DRILLED OR PUNCHED. BURNING OF HOLES AND

TORCH CUTTING AT THE SITE IS PROHIBITED.

10 SPLICING OF STEEL MEMBERS IS PROHIBITED.

11 USE LEVELING GROUT AS REQUIRED UNDER BASE PLATES TO A DEPTH OF

1". FILL WITH GROUT ANY HOLES, OPENINGS, OR CRACKS WITHIN EXISTING

CONCRETE LEFT BY THE REMOVAL OF THE OLD. NON-SHRINK GROUT MUST

CONFORM TO ASTM C1107, WITH NO ASTM C827 SHRINKAGE (GROUT MUST

BE NON-METALLIC).

12 PROPRIETARY FRAMING CONNECTIONS MAY BE CONSIDERED FOR USE AT

THE CONTRACTORS OPTION AND EXPENSE. THE CONTRACTOR MUST

SUBMIT COMPLETE PRODUCT DATA FOR ALL COMPONENTS PRIOR TO

ORDERING MATERIALS.

13 COORDINATE WITH ARCHITECTURAL DRAWINGS FOR STEEL MEMBERS TO

RECEIVE PAINT AND PREPARE STEEL AS REQUIRED.

W-SHAPES A992 (GRADE 50) / A572 50 KSI

OTHER ROLLED PLATES / SHAPES A36 36 KSI

PIPES A63 (GRADE B) 35 KSI

CONNECTION BOLTS A325 (TYPE I) 60 KSI

NUTS A563 (GRADE TO MATCH BOLT)

WASHERS F436

ANCHOR BOLTS / THREADED

RODS

F1554 36 KSI

SS BOLTS F593 (TYPE 316)

SS NUTS F594 (TYPE 316)

SS WASHER ANSI B18.22.1 (TYPE A PLAIN)

(FOR DIMENSIONAL

REQUIREMENTS)

1 ALL COLD-FORMED STEEL FRAMING MEMBERS, THEIR DESIGN, FABRICATION,

AND ERECTION MUST CONFORM TO THE "SPECIFICATION FOR THE DESIGN OF

COLD-FORMED STEEL STRUCTURAL MEMBERS" OF THE AISI. THIS INCLUDES

STUDS, TRACKS, SECTIONS, SLIDE CLIPS, AND BRIDGING.

2 ALL FRAMING MEMBERS MUST BE FORMED FROM STEEL CONFORMING TO

ASTM A446 WITH A MINIMUM YIELD STRENGTH AS FOLLOWS:

A. 12, 14, 16 GAUGE MEMBERS FY=50 KSI (GRADE D)

B. 18, 20 GAUGE MEMBERS FY=33 KSI (GRADE A)

3 ALL FRAMING MEMBERS MUST BE GALVANIZED WITH A G-90 COATING

MEETING THE REQUIREMENTS OF ASTM A525.

4 GAUGE OF ALL TRACKS MUST BE NO LIGHTER THAN THE FRAMING BEING

CONNECTED.

5 WELDING MUST BE IN CONFORMANCE WITH AMERICAN WELDING SOCIETY

SPECIFICATION D1.3. WELDS MUST BE TOUCHED UP WITH ZINC RICH PAINT.

6 ALL STRUCTURAL MEMBERS MUST BE PROPERLY CONNECTED TO EACH

OTHER AND TO THE SUPPORTING BACK-UP FRAMING. FASTENINGS MUST BE

MADE WITH SELF TAPPING SCREWS OR WELDS OF SUFFICIENT SIZE TO

INSURE THE CONNECTION STRENGTH. UNLESS OTHERWISE NOTED,

CONNECT ALL INTERIOR STUDS BASED ON A 10 PSF HORIZONTAL LOAD.

7 COMPONENTS ARE TO BE CUT SQUARELY FOR ATTACHMENT TO

PERPENDICULAR MEMBERS OR AS REQUIRED FOR AN ANGULAR FIT AGAINST

ABUTTING MEMBERS. FIELD CUTTING OF LIGHT GAUGE MEMBERS MUST BE

DONE BY SAWING OR SHEARING. TORCH CUTTING IS NOT ACCEPTABLE.

8 PROVIDE VERTICAL SLIDE TRACKS OR SLIDE CLIPS, WHERE INDICATED ON

THE DRAWINGS, TO ALLOW FOR VERTICAL STRUCTURAL MOVEMENTS.

MAXIMUM EXPECTED LIVE LOAD DEFLECTION IS L/240 AT ROOFS.

9 PROVIDE BRIDGING FOR STUDS AND JOIST AT MIDSPAN AND AT A MAXIMUM

SPACING NOT TO EXCEED 6'-0".

10 PROVIDE THE MANUFACTURER'S STANDARD TRACK, CLIP ANGLES, BRACING,

REINFORCEMENTS, FASTENERS AND ACCESSORIES AS RECOMMENDED BY

THE MANUFACTURER FOF THE APPLICATION INDICATED AND AS NEEDED TO

PROVIDE A COMPLETE FRAMING SYSTEM. UNLESS OTHERWISE NOTED,

INSTALL METAL FRAMING SYSTEM IN ACCORDANCE WITH THE

MANUFACTURER'S WRITTEN INSTRUCTIONS AND RECOMMENDATIONS.

11 PIECE DESIGNATION NUMBERS, AS INDICATED ON DRAWINGS, ARE TAKEN

FROM STEEL STUD MANUFACTURER'S ASSOCIATION CATALOG

(WWW.SSMA.COM).

12 SEE ARCHITECTURAL DRAWINGS FOR NON-LOAD BEARING METAL STUD

PARTITIONS, REQUIRED SHEETING, FINISHES, INSULATION, AND THE

LOCATION OF ANY OPENINGS NOT SHOWN.

15 MECHANICAL SCREW ANCHORS MUST BE SCREW ANCHORS WITH 360

DEGREE CONTACT WITH THE BASE MATERIAL AND MUST NOT REQUIRE

OVERSIZED HOLES FOR INSTALLATION. FASTENERS MUST BE

MANUFACTURED FROM CARBON STEEL, AND MUST BE HEAT-TREATED.

ANCHORS MUST BE ZINC PLATED IN ACCORDANCE WITH ASTM B633 OR

MECHANICALLY GALVANIZED IN ACCORDANCE WITH ASTM B695. ANCHORS

ARE NOT TO BE RE-USED AFTER INITIAL INSTALLATION.

16 ANCHOR BAR MUST HAVE AN EMBEDMENT DEPTH AND HOLE DIAMETER

CAPACITY OF DEVELOPING 125% OF THE ANCHOR BAR ULTIMATE TENSILE

CAPACITY. ALL ANCHORAGE STRENGTH MUST BE BASED ON TESTING PER

ASTM E488, WITH ALLOWABLE LOADS NOT GREATER THAN 25% OF

ULTIMATE LOADS. ADHESIVE MATERIAL MUST COMPLY WITH AC308,

"ACCEPTANCE CRITERIA FOR POST-INSTALLED ADHESIVE ANCHORS IN

CONCRETE ELEMENTS", ISSUED BY THE INTERNATIONAL CODE COUNCIL

EVALUATION SERVICE (ICC-ES). OTHER ADHESIVE TYPES WILL BE

EVALUATED BASED ON EQUIVALENT PERFORMANCE.

17 REBAR IS BELIEVED TO BE PRESENT IN THE EXISTING CONCRETE. PRIOR

TO DRILLING ANY HOLES, SCANNING TOOLS AND METHODS MUST BE USED

TO IDENTIFY THE LOCATION OF EXISTING REBAR. ADJUST ANCHOR

POSITION AS NECESSARY TO FACILITATE CORE DRILLING WHILE

MAINTAINNING MINIMUM COVER REQUIREMENTS.

18 ANCHOR BAR HOLES MUST BE DRILLED TO A DEPTH AND DIAMETER AS

RECOMMENDED BY THE ADHESIVE MANUFACTURER, BUT NOT LESS THAN

4-INCH EMBEDMENT, UNLESS OTHERWISE NOTED.

19 EDGE DISTANCE FOR ADHESIVE BAR ANCHORS MUST BE 4-INCH MINIMUM,

UNLESS OTHERWISE NOTED.

1 ALL POST INSTALLED ANCHORS MUST BE SUITABLE AND INDEPENDENTLY

TESTED FOR USE IN CRACKED AND UNCRACKED CONCRETE.

2 ANCHOR CAPACITIES MUST BE DETERMINED PER AN INDEPENDENT

TESTING LABORATORY AND ANCHORS MUST MEET THE ASSESSMENT

CRITERIA OF ACI 355.2, ACI 355.4, OR HAVE AN ICC-ES EVALUATION REPORT

INDICATING CONFORMANCE WITH THE CONTRACT DOCUMENTS.

3 ANCHORS TO BE EXTERIOR TO THE STRUCTURE MUST BE HOT DIPPED

GALVANIZED PER ASTM A153 OR MECHANICALLY GALVANIZED.

4 INSTALLATION MUST BE PERFORMED BY PERSONNEL TRAINED TO INSTALL

POST INSTALLED ANCHORS IN ACCORDANCE WITH THE SPECIFICATIONS.

5 SPECIAL INSPECTOR MUST PERFORM PERIODIC SPECIAL INSPECTION OF

POST INSTALLED ANCHORS. WHERE ANCHORS ARE INSTALLED IN

HORIZONTAL OR UPWARDLY INCLINED ORIENTATIONS TO RESIST

SUSTAINED TENSION LOADS, INSTALLATION MUST BE CONTINUOUSLY

INSPECTED. SPECIAL INSPECTOR MUST SUBMIT A REPORT OF ANCHORS

FAILING INSPECTIONS TO THE CONTRACTING OFFICER IN ACCORDANCE

WITH THE SPECIFICATIONS.

6 POST INSTALLED ANCHORS MUST BE PULL TESTED, IN ACCORDANCE WITH

THE SPECIFICATIONS. RESULTS MUST BE SUBMITTED TO THE ENGINEER OF

RECORD, THROUGH THE CONTRACTING OFFICER. ANCHORS THAT CANNOT

PHYSICALLY BE PULL TESTED, IN ACCORDANCE WITH THE SPECIFICATIONS,

MUST BE CONTINUOUSLY INSPECTED.

7 ADHESIVE ANCHOR BAR MUST CONSIST OF A REINFORCING BAR AND AN

INJECTABLE ADHESIVE CAPSULE(S).

8 WHEN PROVIDED IN NON-CAPSULE FORM, EPOXY ADHESIVE MUST BE

CONDITIONED, PROPORTIONED, MIXED AND APPLIED IN ACCORDANCE WITH

THE MANUFACTURERS RECOMMENDATIONS.

9 EXISTING REINFORCING MUST NOT BE DAMAGED DURING INSTALLATION OF

POST INSTALLED ANCHORS. ANY HOLES MADE FOR ANCHORS THAT ARE

NOT USED MUST BE FILLED WITH HIGH STRENGTH, NON-SHRINK,

NON-METALLIC EPOXY GROUT.

10 CHEMICAL ANCHORS MUST BE A TWO-COMPONENT, 100% SOLIDS EPOXY

BASED SYSTEM SUPPLIED IN MANUFACTURER’S STANDARD CARTRIDGE

AND DISPENSES THROUGH A STATIC-MIXING NOZZLE SUPPLIED BY THE

MANUFACTURER.

11 DRILL HOLES INTO THE EXISTING CONCRETE USING A ROTARY

(NON-HAMMERING) DRILL. HOLES MUST HAVE A ROUGHENED INTERIOR

SURFACE IN ACCORDANCE WITH ADHESIVE MANUFACTURERS

RECOMMENDATIONS.

12 VACUUM DUST FROM THE BOTTOM AND SIDES OF EACH HOLE USING A

NOZZLE THAT WILL REACH THE BOTTOM OF THE HOLE. INSPECT EACH

HOLE WITH A LIGHT TO ENSURE THAT ALL DUST IS REMOVED.

13 EPOXY BONDING COMPOUND MUST CONFORM TO ASTM C881/C881M.

PROVIDE TYPE II FOR BONDING FRESHLY MIXED CONCRETE TO HARDENED

CONCRETE. PROVIDE GRADE 1 OR 2 FOR HORIZONTAL SURFACES AND

GRADE 3 FOR VERTICAL SURFACES. PROVIDE CLASS A IF PLACEMENT TEMP

IS <40 DEGREES F; CLASS B IF PLACEMENT TEMP IS BETWEEN 40 AND 60

DEGREES F; OR CLASS C IF PLACEMENT TEMP IS <60 DEGREES F. EPOXY

MUST DEVELOP A MINIMUM OF 12,650 PSI F’C (YIELD) AFTER 7 DAY CURE.

EPOXY MUST HAVE A HEAT DEFLECTION TEMPERATURE OF A MINIMUM OF

136 DEGREES FAHRENHEIT.

14 ANCHORS MUST HAVE BEEN SUCCESSFULLY TESTED IN ACCORDANCE WITH

ICC-ES ESR-4945 CRITERIA FOR WIND / SEISMIC LOADING, LONG-TERM

CREEP AT ELEVATED TEMPERATURES, AND STATIC LOADING AT ELEVATED

TEMPERATURES. ADHESIVE MUST BE EPOXY-TIE SET ADHESIVE FROM

SIMPSON STRONG-TIE, PLEASANTON, CA OR CONTRACTING OFFICER

APPROVED EQUIVALENT. ANCHORS MUST BE INSTALLED IN ACCORDANCE

WITH MANUFACTURER’S INSTRUCTIONS.

POST-INSTALLED & ADHESIVE ANCHOR

NOTES

POST-INSTALLED & ADHESIVE ANCHOR

NOTES (CONT'D)

PLAN LEGEND

AFF ABOVE FINISHED FLOOR

ARCH ARCHITECT, -URAL

B.P. BASE PLATE

BLDG BUILDING

BOD BOTTOM OF DECK

BOF BOTTOM OF FOOTING

BOT BOTTOM

C CHANNEL

CFMF COLD FORMED METAL FRAMING

CFS COLD FORMED STEEL

CJ CONTROL JOINT

CL CENTER LINE

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

DEMO DEMOLISH

DIA (OR) Ø DIAMETER

DIM(S) DIMENSION(S)

DWGS DRAWINGS

E, EXIST EXISTING

E.W. EACH WAY

EA EACH

EF EACH FACE

EL, ELEV ELEVATION

EQ, EQUIV EQUAL, EQUIVALENT

F'C COMPRESSIVE STRESS

FDN FOUNDATION

FF EL FINISHED FLOOR ELEVATION

FOS FACE OF SLAB

FY ALLOWABLE YIELD STRESS

GA GAUGE

HDG, GALV HOT DIPPED GALVANIZED

HORIZ HORIZONTAL

HSS HOLLOW STRUCTURAL SHAPES

IAW IN ACCORDANCE WITH

INFO INFORMATION

INT INTERIOR

JBE JOIST BEARING ELEVATION

KSI KILOPOUNDS (KIPS) PER SQUARE INCH

L ANGLE

LB, LBS POUNDS

LF LINEAR FEET

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LONG LONGITUDINAL

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MOS MID-DEPTH OF SLAB

MPH MILES PER HOUR

NTS NOT TO SCALE

OC ON CENTER

OPH OPPOSITE HAND

P.A.F. POWDER ACTUATED FASTENER

PL PLATE

PLF POUNDS PER LINEAR FOOT

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

RE, REF REFERENCE

REINF REINFORCE, -MENT

REQD REQUIRED

SF SQUARE FEET

SIM SIMILAR

SPA SPACING

SPEC CONTRACT SPECIFICATIONS

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

T&B TOP AND BOTTOM

THK THICKNESS

TOC TOP OF CONCRETE

TOF TOP OF FOOTING / FOUNDATION

TOS TOP OF STEEL

TS THICKENED SLAB

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

VERT VERTICAL

W/, W/O WITH, WITHOUT

WWF WELDED WIRE FABRIC

~ , APPROX APPROXIMATELY

STRUCTURAL ABBREVIATIONS

MA

RK

D

ES

CR

IP

TI

ON

B3

SD401

A1

SD401

25 26 27 28 29 30 31 32 33 34 35 36

E

D

C

B

2 3

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 14 SEP 2023

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

5/

/2

2:

:5

PM

C :\R ev it

L oc al M od el s\ W

3_

7_

S_ R

_s ar ah

.g ilp in 1.

rv t

SD101

BU

IL

D

IN

G W

-1

C

O

LE

S

BI

ST

R

O

D

EM

O

LI

TI

O

N F

R

AI

M

IN

G P

LA

N

SI

XT

H

F

LO

O R

ADB

12927963

CAH CAH

5/27/25

ALP/SLG

1834937

N/A

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

J. MILLER, P.E.

ALP

M

ID

LA

N

T D

C C

O R

E

SD

NAVSUP

SCALE: 1/8" = 1'-0"A1 DEMOLITION FRAMING PLAN - SIXTH FLOOR

1 REMOVE ANY LOSE DEBRIS OR DUST FROM WALL CRACK, SEE SD401 FOR

DETAILS.

2 REMOVE ANY LOSE DEBRIS OR DUST FROM JOINT BETWEEN CMU

WALLS..SEE SD401 FOR DETAILS.

3 REMOVE ANY LOSE DEBRIS OR DUST. CUT REBAR 1/4" BELOW WALL

SURFACE. SEE SD401 FOR DETAILS.

4 GRIND EXISTING BOLTS 1/4" BELOW FINISHED FLOOR SURFACE SMOOTH.

SEE SD401 FOR LOCATION, AND SD901 FOR REFERENCE PHOTO.

A REFER TO S-001 FOR GENERAL NOTES AND PLAN LEGEND.

B REFER TO SD901 FOR STRUCTURAL DEMOLITION PHOTOS.

C DEMOLITION PLAN SHOWS EXTENT OF STRUCTURAL AND SOME

ARCHITECTURAL DEMOLITION. REFER TO OTHER DISCIPLINE DRAWINGS

FOR ADDITIONAL ARCHITECTURAL DEMOLITION AND DEMOLITION OF

MECHANICAL, ELECTRICAL, CIVIL AND OTHER DEMOLITION REQUIREMENTS.

D ELEVATIONS SHOWN ON THE STRUCTURAL DRAWINGS ARE RELATIVE TO A

REFERENCE ELEVATION OF 0'-0" THAT CORRESPONDS TO AN ELEVATION

FROM TOP OF FINISH FLOOR.

E ALL DIMENSIONS OF EXISTING ELEMENTS ARE APPROXIMATE AND ARE THE

RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY.

KEYPLANKEYNOTES

PLAN

NORTH

GENERAL SHEET NOTES # (THIS SHEET ONLY)

PLAN

NORTH

GRAPHIC SCALE(S)

4' 8' 16'0' 1/8" =1'-0"

AREA OF WORK

MA

RK

D

ES

CR

IP

TI

ON

A

REMOVE MORTAR TO A DEPTH

OF 1/2". ANY LOSE DEBRIS OR

DUST FROM JOINT BETWEEN

CMU WALLS SHOULD BE

REMOVED.

GRIND EXISTING

CUTOUT BOLTS 1/8"

BELOW SURFACE

SMOOTH.

REMOVE MORTAR TO A DEPTH OF

3/8". AFTER TAKING OUT OLD

MORTAR, LOOSE PARTICLES SHOULD

BE REMOVED FROM THE JOINT.

25 26 27 28 29

E

D

C

B

SAWCUT AROUND

SPALL. CUT REBAR 1"

PAST WALL

CRACK/SPALL. SEE

SF501 C1 FOR DETAILS

SD901

D1

SD901D2

D3

D4

SD901

D5

A

A3

SD401

- - - - - - - - - - - - - - - - - - - - - - - - - - - - SAWCUT AND REMOVE BRICK WALL

FROM FLOOR TO ROOF SLAB. SEE

ARCHITECTURAL DWG FOR

LOCATION, AND SIZE OF OPENING.

± 3' - 6"

DEMO AND REMOVE EXIST.

DRYWALL WALL, SEE

ARCHITECTURAL DRAWINGS FOR

LOCATION AND EXTENTS.

EXIST. BRICK AND DRYWALL, TO

REMAIN, UON, TYP.

± 1' - 10"

EXIST. BRICK AND DRYWALL, TO

REMAIN, UON, TYP.

± 5

3 1 /2"

SIXTH FLOOR

54' - 0"

B.O.SLAB ROOF

65' - 11 7/8"

EXISTING ROOF

SLAB, TO REMAIN

EXISTING FLOOR

SLAB, TO REMAIN.

SAWCUT AND REMOVE

BRICK BETWEEN ROOF

AND FLOOR SLAB. SEE

ARCHITECTURAL DWGS

FOR SIZE AND LOCATION

REFER TO OTHER

DISCIPLINES DWGS

FOR COORDINATION

PURPOSES.

± 4' - 8"

0"

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 14 SEP 2023

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

5/

/2

2:

:2

PM

C :\R ev it

L oc al M od el s\ W

3_

7_

S_ R

_s ar ah

.g ilp in 1.

rv t

SD401

BU

IL

D

IN

G W

-1

C

O

LE

S

BI

ST

R

O

EN

LA

R G

ED

D

EM

O

P

LA

N

BA

SE

B

ID

A N

D B

ID

O

PT

IO

N

ADB

12927964

CAH CAH

5/27/25

ALP/SLG

1834937

N/A

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

J. MILLER, P.E.

ALP

M

ID

LA

N

T D

C C

O R

E

SD

NAVSUP

SCALE: 1/8" = 1'-0"A1 DEMOLITION FRAMING PLAN - SIXTH FLOOR - BASE BID

SCALE: 1/2" = 1'-0"B3 DEMOLITION FRAMING PLAN - SIXTH FLOOR - BID OPT 3

SCALE: 1/2" = 1'-0"

B3

SD401 A3 BRICK WALL - DOOR OPENING - BID OPTION 3

PLAN

NORTH

PLAN

NORTH

1' 2' 4'0' 1/2" =1'-0"

1' 2' 4'0' 1/2" =1'-0"

4' 8' 16'0' 1/8" =1'-0"

MA

RK

D

ES

CR

IP

TI

ON

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 14 SEP 2023

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

5/

/2

2:

:0

PM

C :\R ev it

L oc al M od el s\ W

3_

7_

S_ R

_s ar ah

.g ilp in 1.

rv t

SD901

BU

IL

D

IN

G W

-1

C

O

LE

S

BI

ST

R

O

D

EM

O

LI

TI

O

N S

TR

U

C

TU

R

AL

P H

O

TO

S

ADB

12927965

CAH CAH

5/27/25

ALP/SLG

1834937

N/A

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

J. MILLER, P.E.

ALP

M

ID

LA

N

T D

C C

O R

E

SD

NAVSUP

SCALE: 12" = 1'-0"D1 REFERENCE PHOTO

SCALE: 12" = 1'-0"D2 REFERENCE PHOTO

1 REMOVE MORTAR TO A DEPTH OF 1/2". ANY LOSE DEBRIS OR DUST FROM

JOINT BETWEEN CMU WALLS SHOULD BE REMOVED. USE 30 LF FOR BIDDING

PURPOSES. SEE SD401/A1 FOR DETAILS.

2 REMOVE MORTAR TO A DEPTH OF 3/8". AFTER RAKING OUT OLD MORTAR,

LOOSE PARTICLES SHOULD BE REMOVED FROM THE JOINT. USE 60LF FOR

BIDDING PURPOSES.

3 EXISTING COLUMN TO REMAIN, UON.

4 SAWCUT AND REMOVE DAMAGED CONCRETE PER SF501 DETAILS. USE 3SF

FOR BIDDING PURPOSES.

5 GRIND (3) BOLTS 1/4" BELOW FINISHED FLOOR SURFACE.

KEYNOTES

GENERAL SHEET NOTES

SCALE: 12" = 1'-0"D3 REFERENCE PHOTO

SCALE: 12" = 1'-0"D4 REFERENCE PHOTO

A REFER TO S-001 FOR GENERAL NOTES AND PLAN LEGEND.

B REFER TO SD101 FOR DEMOLITION FRAMING PLAN.

C REFER TO SD401 FOR ENLARGED DEMOLITION FRAMING PLAN - BASE BID

AND BID 3 OPTION.

D DEMOLITION PHOTOS SHOW EXTENT OF STRUCTURAL DEMOLITION. REFER

TO OTHER DISCIPLINE DRAWINGS FOR DEMOLITION OF ARCHITECTURAL,

MECHANICAL, ELECTRICAL, PLUMBING, CIVIL AND OTHER DEMOLITION

REQUIREMENTS.

SCALE: 12" = 1'-0"D5 REFERENCE PHOTO

SCALE: 12" = 1'-0"D6 REFERENCE PHOTO

MA

RK

D

ES

CR

IP

TI

ON

25 26 27 28 29 30 31 32 33 34 35 36

E

D

C

B

2 3 4

C4

SF501

A1

SF501

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .