Amendment_0002_B-4 and B-5.pdf
PDF 137 KB Posted
- Solicitation number
- N4008525R0001
About this file
This document is a boring log from a geotechnical investigation, specifically a detailed boring log for an evaluation/test facility project. The log contains multiple columns (B-1, B-2, B-4, B-5) recording soil and drilling characteristics for different bore locations. The boring log legend indicates soil classification details including color (Brown), grain size (Coarse, Medium, Fine Grained), and penetration resistance measurements. Each column includes systematic entries documenting drilling depth, soil strata, recovery percentages, and standard penetration test (SPT) sample details. The document appears to be part of a geotechnical site investigation for a federal facility, with specific project details noted in the bottom right corner referencing an evaluation/test facility and including drawing/document control numbers.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G1-Sheet 1 Of 71 - Site Plan Vicinity & Index Of Drawings
| General |
| G1A-Sheet 2 Of 71 - Key Plan |
| Civil |
| C6-Sheet 7 Of 71 - Boring Logs |
| C7-Sheet 8 Of 71 - Boring Logs |
| Architectural |
| A1-Sheet 9 Of 71 - Air Compressor Test Facility Plan & Elevation |
| A2-Sheet 10 Of 71 - Electrical Test Facility Plan & Elevation |
| A3-Sheet 11 Of 81 - Fire Pump House Floor Plan & Elevations |
| Structural |
| S1-Sheet 12 Of 71 - Structural Key Plan & General Notes |
| S2-Sheet 13 Of 71 - Propulsion Unit No. 1 Foundation |
| S3-Sheet 14 Of 71 - Propulsion Unit No. 2 Foundation |
| S4-Sheet 15 Of 71 - Air Compressor Test Facility & S.S.G.S. Foundations |
| S5-Sheet 16 Of 71 - Electrical Test Facility Foundation & Slab Plan & Details |
| S6-Sheet 17 Of 71 - Electrical Test Facility - Steel Framing Plan, Sections & Details |
| S7-Sheet 18 Of 71 - Electrical Power Distrubtion Foundation & Support Details, Misc. Details |
| S8-Sheet 19 Of 71 - Pipe Trench Details & Subsurface Storage Tank Plans |
| S10-Sheet 21 Of 71 - Cooling Tower Basin Plan, Sections & Details |
| S11-Sheet 22 Of 71 - Cooling Tower Basin & Misc. Details |
| S11A-Sheet 22A Of 71 - Pipe Support Details |
| Mechanical |
| M1-Sheet 23 Of 71 - Removal Plan Bldg 77H, South |
| M2-Sheet 24 Of 71 - Removal Plan, Bldg 77H, North |
| M4-Sheet 25 Of 71 - Fuel Oil, Piping & Condensate Piping, Building 77H Col 1 To 18 |
| M5-Sheet 27 Of 71 - Fuel Oil, Piping & Condensate Piping, Building 77H Col 18 to 35 |
| M7-Sheet 29 Of 71 - Cooling Water Piping Plan |
| M8-Sheet 30 Of 71 - Cooling Water Pumps - Plans & Details |
| M9-Sheet 31 Of 71 - Cooling Water Piping Sections & Elevation |
| M10-Sheet 32 Of 71 - Cooling Water System Schematic |
| M11-Sheet 33 Of 71 - Cooling Water System Control Sequence |
| M12-Sheet 34 Of 71 - Cooling Tower Fire Pumphouse |
| M13-Sheet 35 Of 71 - Air Compressor Test Facility Plan |
| M14-Sheet 36 Of 71- Air Compressor Test Facility Elevations |
| M15-Sheet 37 Of 71 - Air Compressor Test Facility Elevaions & Sections |
| M16-Sheet 38 Of 71 - Air Compressor Test Facility - Plumbing |
| M17-Sheet 39 Of 71 - Air Compressor Facility Steam Piping - Plan & Details |
| M18-Sheet 40 Of 71 - Air Compressor Test Facility Partial Plan & Schedules |
| M20-Sheet 42 Of 71 - Air Compressor Test Facility Details |
| M25-Sheet 47 Of 71 - Electric Test Facility Plan Ductwork |
| M26-Sheet 48 Of 71 - Electric Test Facility Ductwork Elevation & Sections |
| M27-Sheet 49 Of 71 - Electric Test Facility Plan Heating Piping |
| M28-Sheet 50 Of 71 - Electric Test Facility Equipment Schedule & Controls |
| M29-Sheet 51 Of 71 - Electric Test Facility Sections & Details |
| M30-Sheet 52 Of 71 - Electric Test Facility Sections & Details |
| Electrical |
| E1-Sheet 53 Of 71 - Electrical Symbols |
| E2-Sheet 54 Of 71 - Incoming Feeder - Bldg. 664 Removals |
| E3-Sheet 55 Of 71 - Substation 664 Electrical One Line Diagram |
| E4-Sheet 56 Of 71 - Substation 664 Floor Plan Switchgear |
| E5-Sheet 57 Of 71 - Substation 77-High Site Plan & Exterior Duct Bank Plan |
| E6-Sheet 58 Of 71 - Building 77-High Interior Distribution Plan |
| E7-Sheet 59 Of 71 - New Test Facility Eletrical One Line Diagrams |
| E8-Sheet 60 Of 71 - New Substation Floor Plan & Grounding |
| E9-Sheet 61 Of 71 - Switchgear Elevations |
| E10-Sheet 62 Of 71 - Test Facility Equipment Legend |
| E11-Sheet 63 Of 71 - Feeder Bus Details |
| E12-Sheet 64 Of 71 - Air Compressor Test Area Light & Receptacle Plan |
| E14-Sheet 66 Of 71 - Electrical Test Area & Building 670 Power |
| E15-Sheet 67 Of 71 - Propulstion & Compressor Test Area Power |
| E16-Sheet 68 Of 71 - Fuel Oil Pumphouse |
| E17-Sheet 69 Of 71 - Fire Pumphouse - Lighting, Power & Fire Alarm Riser Diagram |
| E18-Sheet 70 Of 71 - Panelboard Schedules |
| E19-Sheet 71 of 71 - Manhole & Duct Bank Details |
| Evaluation-Test Facility Revised 08151984.pdf |
| Civil |
| C2 - Sheet 3 of 71 - Site Plan & Details |
| C2 - Sheet 3 of 71 - Site Plan & Details |
| Structural |
| S1 - Sheet 12 of 71 - Structural Key Plan & General Notes |
| S9 - Sheet 20 of 71 - Elevated Water Tank Foundation & Subsurface Storage Tank Details |
| Mechanical |
| M21 - Sheet 43 of 71 - Air Compressor Test Facility Salt Water Cooling - Plans & Details |
| Evaluation-Test Facility - As Built 06201990.pdf |
| G1-Sheet 1 Of 71 - Site Plan Vicinity & Index Of Drawings |
| General |
| G1A-Sheet 2 Of 71 - Key Plan |
| Civil |
| C6-Sheet 7 Of 71 - Boring Logs |
| C7-Sheet 8 Of 71 - Boring Logs |
| Architectural |
| A1-Sheet 9 Of 71 - Air Compressor Test Facility Plan & Elevation |
| A2-Sheet 10 Of 71 - Electrical Test Facility Plan & Elevation |
| A3-Sheet 11 Of 81 - Fire Pump House Floor Plan & Elevations |
| Structural |
| S1-Sheet 12 Of 71 - Structural Key Plan & General Notes |
| S2-Sheet 13 Of 71 - Propulsion Unit No. 1 Foundation |
| S3-Sheet 14 Of 71 - Propulsion Unit No. 2 Foundation |
| S4-Sheet 15 Of 71 - Air Compressor Test Facility & S.S.G.S. Foundations |
| S5-Sheet 16 Of 71 - Electrical Test Facility Foundation & Slab Plan & Details |
| S6-Sheet 17 Of 71 - Electrical Test Facility - Steel Framing Plan, Sections & Details |
| S7-Sheet 18 Of 71 - Electrical Power Distrubtion Foundation & Support Details, Misc. Details |
| S8-Sheet 19 Of 71 - Pipe Trench Details & Subsurface Storage Tank Plans |
| S10-Sheet 21 Of 71 - Cooling Tower Basin Plan, Sections & Details |
| S11-Sheet 22 Of 71 - Cooling Tower Basin & Misc. Details |
| S11A-Sheet 22A Of 71 - Pipe Support Details |
| Mechanical |
| M1-Sheet 23 Of 71 - Removal Plan Bldg 77H, South |
| M2-Sheet 24 Of 71 - Removal Plan, Bldg 77H, North |
| M4-Sheet 25 Of 71 - Fuel Oil, Piping & Condensate Piping, Building 77H Col 1 To 18 |
| M5-Sheet 27 Of 71 - Fuel Oil, Piping & Condensate Piping, Building 77H Col 18 to 35 |
| M7-Sheet 29 Of 71 - Cooling Water Piping Plan |
| M8-Sheet 30 Of 71 - Cooling Water Pumps - Plans & Details |
| M9-Sheet 31 Of 71 - Cooling Water Piping Sections & Elevation |
| M10-Sheet 32 Of 71 - Cooling Water System Schematic |
| M11-Sheet 33 Of 71 - Cooling Water System Control Sequence |
| M12-Sheet 34 Of 71 - Cooling Tower Fire Pumphouse |
| M13-Sheet 35 Of 71 - Air Compressor Test Facility Plan |
| M14-Sheet 36 Of 71- Air Compressor Test Facility Elevations |
| M15-Sheet 37 Of 71 - Air Compressor Test Facility Elevaions & Sections |
| M16-Sheet 38 Of 71 - Air Compressor Test Facility - Plumbing |
| M17-Sheet 39 Of 71 - Air Compressor Facility Steam Piping - Plan & Details |
| M18-Sheet 40 Of 71 - Air Compressor Test Facility Partial Plan & Schedules |
| M20-Sheet 42 Of 71 - Air Compressor Test Facility Details |
| M25-Sheet 47 Of 71 - Electric Test Facility Plan Ductwork |
| M26-Sheet 48 Of 71 - Electric Test Facility Ductwork Elevation & Sections |
| M27-Sheet 49 Of 71 - Electric Test Facility Plan Heating Piping |
| M28-Sheet 50 Of 71 - Electric Test Facility Equipment Schedule & Controls |
| M29-Sheet 51 Of 71 - Electric Test Facility Sections & Details |
| M30-Sheet 52 Of 71 - Electric Test Facility Sections & Details |
| Electrical |
| E1-Sheet 53 Of 71 - Electrical Symbols |
| E2-Sheet 54 Of 71 - Incoming Feeder - Bldg. 664 Removals |
| E3-Sheet 55 Of 71 - Substation 664 Electrical One Line Diagram |
| E4-Sheet 56 Of 71 - Substation 664 Floor Plan Switchgear |
| E5-Sheet 57 Of 71 - Substation 77-High Site Plan & Exterior Duct Bank Plan |
| E6-Sheet 58 Of 71 - Building 77-High Interior Distribution Plan |
| E7-Sheet 59 Of 71 - New Test Facility Eletrical One Line Diagrams |
| E8-Sheet 60 Of 71 - New Substation Floor Plan & Grounding |
| E9-Sheet 61 Of 71 - Switchgear Elevations |
| E10-Sheet 62 Of 71 - Test Facility Equipment Legend |
| E11-Sheet 63 Of 71 - Feeder Bus Details |
| E12-Sheet 64 Of 71 - Air Compressor Test Area Light & Receptacle Plan |
| E14-Sheet 66 Of 71 - Electrical Test Area & Building 670 Power |
| E15-Sheet 67 Of 71 - Propulstion & Compressor Test Area Power |
| E16-Sheet 68 Of 71 - Fuel Oil Pumphouse |
| E17-Sheet 69 Of 71 - Fire Pumphouse - Lighting, Power & Fire Alarm Riser Diagram |
| E18-Sheet 70 Of 71 - Panelboard Schedules |
| E19-Sheet 71 of 71 - Manhole & Duct Bank Details |