About this file

This document is a Utility Test Hole Report - Quality Level "A" for the P-1564U Connector Road project at Camp Lejeune, North Carolina, Contract Number NC23-018. The report provides information on seven test holes dug to identify existing utilities, including telephone, fiber optic, water, and unknown utilities. Key details include the size, material, depth, and elevation of the utilities found, as well as the soil conditions at each test hole location. The report was prepared by Bamforth Engineers on behalf of Accumark, Inc. for the Naval Facilities Engineering Command (NAVFAC). The related federal contract opportunity is for the P-1584U Parachute Tower Road Upgrades and P-1564U Connector Road project, Solicitation Number N4008524R2716, which is limited to Civil/Paving MACC Contractors listed on the General Requirements cover page.

View the file

Other files

File Type Posted
Amend 0010 N40085-24-R-2716 RFI 0004 Q and A.pdf PDF
Amend 0009 N40085-24-R-2716.pdf PDF
P1584U CS501 SITE DETAILS - REVISED.pdf PDF
Amend 0008 N40085-24-R-2716 Proj P1584U and P1564.pdf PDF
P1564U CS501 SITE DETAILS - REVISED.pdf PDF
20231716 P1584 approval letter.pdf PDF
P1564 final signed MEF P 1564 NW 14.pdf PDF
Final signed Parachute Tower P 1584 NW 14.pdf PDF
NC23-025 P1584U Test Hole Reports.pdf PDF
Amend 0007 N40085-24-R-2716.pdf PDF
20231717 IP correction letter.pdf PDF
2021 NWP 14.pdf PDF
Amend 0006 N40085-24-R-2716 Site Visit Date.pdf PDF
1734894dwg05of07CIVIL.pdf PDF
1734894dwg04of07GEOTECHNICAL.pdf PDF
Amend 0005 N40085-24-R-2716 P1564U Drawings.pdf PDF
1734894dwg07of07ELECTRICAL.pdf PDF
1734894dwg06of07LANDSCAPE.pdf PDF
1734894dwg02of07ENVIRONMENTAL.pdf PDF
1734894dwg01of07GENERAL.pdf PDF
1734894dwg03of07SURVEY.pdf PDF
1734893dwg04of07GEOTECHNICAL.pdf PDF
1734893dwg07of07ELECTRICAL.pdf PDF
1734893dwg06of07LANDSCAPE.pdf PDF
1734893dwg02of07ENVIRONMENTAL.pdf PDF
Amend 0004 N40085-24-R-2716 P1584U Drawings.pdf PDF
1734893dwg01of07GENERAL.pdf PDF
1734893dwg03of07SURVEY.pdf PDF
1734893dwg05of07CIVIL.pdf PDF
Amendment 0003 N40085-24-R-2716.pdf PDF
Amend 0002 - 1734894 dwg.pdf PDF
Amend 0002 - 1734894_1734893 Specs.pdf PDF
Amend 0002 N40085-24-R-2716.pdf PDF
Amend 0001 N40085-24-R-2716 (1).pdf PDF
JA ML-24-55 P1584U WaveTronix (R).pdf PDF
RFP N4008524R2716 Project P1564U P1584U.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1 of 1

TEST HOLE INVENTORY REPORT - QUALITY LEVEL "A"

P-1564 Connecter Road , Camp Lejeune, NC

Bamforth Engineers

Date TH # Utility Requested Utility Found Existing Grade Depth

Material Type Utility Elevation

Pavement Thickness Utility Owner

8/8/23 1 Telephone & Fiber Optic 2.5" Telephone A 3.26 Cable -2.26 N/A NAVFAC

1.25" Fiber Optic B 3.26 Plastic -2.26 NAVFAC

8/8/23 2 Water 4" Unknown A 3.26 See Note -1.26 N/A NAVFAC

11/8/23 3 Water 1" Unknown A 2.79 Cable 0.21 N/A NAVFAC

8/9/23 4 Telephone Ductbank Telephone Duct A 1.85 Concrete 2.15 N/A NAVFAC

5" Telephone B 3.12 Cable 0.88 NAVFAC

8/9/23 5 Water 18" Unknown A 4.64 Asbestos Concrete 0.36 N/A NAVFAC

9/6/23 6 Water & Telephone Duct See Note Water A 4.17 See Note 1.83 N/A NAVFAC

Telephone Duct B 6.16 See Note -0.16 NAVFAC

9/6/23 7 Unknown 1" Unknown A 3.12 Cable 3.88 N/A NAVFAC

Bamforth Engineers - Point of Contact: Anna Lee Bamforth 757-627-7079

Accumark - Point of Contact: Mike Schwartz (757) 301-0592

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

3.26 -2.26 N/A N/A

3.26 -2.26 N/A N/A

NC23-018

N/A

Camp Lejeune Camp Lejeune, NC

P-1564 Connecter Road Test Holes Bamforth Engineers Norfolk, VA Anna Lee Bamforth 757-627-7079

9500 King Air Court, Ashland, Virginia 23005 / 804-550-7740 This form and it's contents are protected by copyright, 2023

Test Hole #:

Project Name:

Requested By:

Accumark Job#:

Project Location:

Soil Conditions:

Test Hole Cross Section Elevation / Survey Information:

Overall Utility Width:Drawn Facing:

Existing Grade

Northeast 4.5" +/-

Located By: Vertical Datum

General Notes:

Utility Test Hole Report - Quality Level "A"

Easting: Elevation:

Point of Contact:

IUS 11/8/23

Target utility found. Hub & tac set over the crown of the target utility.

Client Reference#:

Note: This report depicts and describes the conduits or cables that were visible to our crew upon excavating the test hole. There may be additional conduits or cables located below this configuration which were not visible to the test hole crew.

Exposed Utility Information

Test Hole Reference Mark

Test Hole Date:

Benchmarks Used:

BM#1 Elev:

BM#2 Elev:

Description:

Description:

"A"

1.00 1.00

NAVD88Accumark, Inc.

8/8/23

Telephone & Fiber Optic

A 2.5" Cable NAVFAC Good

N/A

N/A N/A

N/A

Utility SizeUtility Material

Type Depth @

Top of Utility Elevation

@ Top Duct Bank

Bottom Depth Elevation Utility Owner Condition

Site Diagram / Location Details: Scale: (NTS)

Pavement Condition:Utility Requested:

Dry, Soft N/A N/A

Utility Found

Telephone

1.00 Northing:

No Survey Requested

N/A

N/A

N/A

N/AB 1.25" Plastic NAVFAC GoodFiber Optic

Ho lco m b

Bl vd

UP

UP

S/L

119.20'

62.25'

56.45'

ACCUMARK, INC. (800) 542-2990 This form and it's contents are protected by copyright, 2023

Test Hole #:

Client:

Project Numbers:

Project Location:

Bamforth Engineers

NC23-018

Utility Test Hole Report - Quality Level "A"

LMB 01/04/23

Camp Lejenue, NC Project Name: P-1564U Connector Road Test Holes

NC23-018

Camp Lejeune Camp Lejeune, NC

P-1564 Connecter Road Test Holes Bamforth Engineers Norfolk, VA Anna Lee Bamforth 757-627-7079

9500 King Air Court, Ashland, Virginia 23005 / 804-550-7740

Test Hole #:

Project Name:

Requested By:

Accumark Job#:

Project Location:

Soil Conditions:

Test Hole Cross Section Elevation / Survey Information:

Overall Utility Width:Drawn Facing:

Existing Grade

Northeast

Located By: Vertical Datum

General Notes:

Utility Test Hole Report - Quality Level "A"

Northing: Easting: Elevation:

Point of Contact:

Client Reference#:

Note: This report depicts and describes the conduits or cables that were visible to our crew upon excavating the test hole. There may be additional conduits or cables located below this configuration which were not visible to the test hole crew.

Exposed Utility Information

Test Hole Reference Mark

Test Hole Date:

Benchmarks Used:

BM#1 Elev:

BM#2 Elev:

Description:

Description:

"A"

2.00 2.00

NAVD88

8/8/23

Water

Utility SizeUtility Material

Type Depth @

Top of Utility Elevation

@ Top Duct Bank

Bottom Depth Elevation Utility Owner Condition

Site Diagram / Location Details: Scale: (NTS)

Pavement Condition:Utility Requested:

Rocks, Moist, Soft, Sand N/A N/A

Utility Found

3.26 -1.26 N/A N/AA 4" See Note NAVFAC GoodUnknown

Accumark, Inc.

4.5" +/-

N/A

N/A N/A

N/A

IUS 11/8/23

2.00

This form and it's contents are protected by copyright, 2023

Target utility found. Hub & tac set over the crown of the target utility. Unable to determine material type.

No Survey Requested

N/A N/A

Ho lco m b

Bl vd

UP

UP

S/L

130.45'

69.85'

42.80'

Client:

Project Numbers:

Project Location:

Bamforth Engineers

NC23-018

Utility Test Hole Report - Quality Level "A"

IUS 11/8/23

Camp Lejeune Camp Lejeune, NC

P-1564 Connecter Road Test Holes Bamforth Engineers Norfolk, VA Anna Lee Bamforth 757-627-7079

9500 King Air Court, Ashland, Virginia 23005 / 804-550-7740

Test Hole #:

Project Name:

Requested By:

Accumark Job#:

Project Location:

Soil Conditions:

Test Hole Cross Section Elevation / Survey Information:

Overall Utility Width:Drawn Facing:

Existing Grade

Northeast

Located By: Vertical Datum

General Notes:

Utility Test Hole Report - Quality Level "A"

Northing: Easting: Elevation:

Point of Contact:

Client Reference#:

Note: This report depicts and describes the conduits or cables that were visible to our crew upon excavating the test hole. There may be additional conduits or cables located below this configuration which were not visible to the test hole crew.

Exposed Utility Information

Test Hole Reference Mark

Test Hole Date:

Benchmarks Used:

BM#1 Elev:

BM#2 Elev:

Description:

Description:

"A"

3.00 3.00

NAVD88

11/8/23

Water

A 1" Cable NAVFAC Good

Utility SizeUtility Material

Type Depth @

Top of Utility Elevation

@ Top Duct Bank

Bottom Depth Elevation Utility Owner Condition

Site Diagram / Location Details: Scale: (NTS)

Pavement Condition:Utility Requested:

Clay, Hard, Soft, Sand N/A N/A

Utility Found

Unknown 2.79 0.21 N/A N/A

Accumark, Inc.

1.0" +/-

N/A

N/A N/A

N/A

IUS 11/8/23

3.00

This form and it's contents are protected by copyright, 2023

Target utility found. Hub & tac set over the crown of the target utility.

No Survey Requested

N/A N/A

Ho lco m b

Bl vd

UP

UP

S/L

128.90'

65.70'

41.27'

Client:

Project Numbers:

Project Location:

Bamforth Engineers

NC23-018

Utility Test Hole Report - Quality Level "A"

LMB 01/04/23

Camp Lejeune, NC

Camp Lejeune Camp Lejeune, NC

P-1564 Connecter Road Test Holes Bamforth Engineers Norfolk, VA Anna Lee Bamforth 757-627-7079

9500 King Air Court, Ashland, Virginia 23005 / 804-550-7740

Test Hole #:

Project Name:

Requested By:

Accumark Job#:

Project Location:

Soil Conditions:

Test Hole Cross Section Elevation / Survey Information:

Overall Utility Width:Drawn Facing:

Existing Grade

Northwest

Located By: Vertical Datum

General Notes:

Utility Test Hole Report - Quality Level "A"

Northing: Easting: Elevation:

Point of Contact:

Client Reference#:

Note: This report depicts and describes the conduits or cables that were visible to our crew upon excavating the test hole. There may be additional conduits or cables located below this configuration which were not visible to the test hole crew.

Exposed Utility Information

Test Hole Reference Mark

Test Hole Date:

Benchmarks Used:

BM#1 Elev:

BM#2 Elev:

Description:

Description:

"B" 4.00 4.00

NAVD88

8/9/23

Telephone Ductbank

A N/A Concrete NAVFAC Good

B 5" Cable NAVFAC Good

C 1.5" Cable NAVFAC Good

Utility SizeUtility Material

Type Depth @

Top of Utility Elevation

@ Top Duct Bank

Bottom Depth Elevation Utility Owner Condition

Site Diagram / Location Details: Scale: (NTS)

Pavement Condition:Utility Requested:

Clay, Dry, Soft N/A N/A

Utility Found

Telephone Duct

Telephone

Telephone & Fiber

1.85 2.15 2.64 1.36

3.12 0.88 N/A N/A

1.85 2.15 N/A N/A

Accumark, Inc.

See Note

N/A

N/A N/A

N/A

IUS 11/8/23

4.00

This form and it's contents are protected by copyright, 2023

Target utility found. Hub & tac set over the northeast edge of the duct bank. Unable to determine total width of duct at this location.

No Survey Requested

N/A

N/A

N/A

N/A

N/A

N/A

Ho lco m b

Bl vd

UP

UP

130.25'

42.45'

Si de wa lk

46.80'

TMH

Tele

"C" "A"

Client:

Project Numbers:

Project Location:

Bamforth Engineers

NC23-018

Utility Test Hole Report - Quality Level "A"

IUS 11/8/23

Camp Lejeune Camp Lejeune, NC

P-1564 Connecter Road Test Holes Bamforth Engineers Norfolk, VA Anna Lee Bamforth 757-627-7079

9500 King Air Court, Ashland, Virginia 23005 / 804-550-7740

Test Hole #:

Project Name:

Requested By:

Accumark Job#:

Project Location:

Soil Conditions:

Test Hole Cross Section Elevation / Survey Information:

Overall Utility Width:Drawn Facing:

Existing Grade

Northeast

Located By: Vertical Datum

General Notes:

Utility Test Hole Report - Quality Level "A"

Northing: Easting: Elevation:

Point of Contact:

Client Reference#:

Note: This report depicts and describes the conduits or cables that were visible to our crew upon excavating the test hole. There may be additional conduits or cables located below this configuration which were not visible to the test hole crew.

Exposed Utility Information

Test Hole Reference Mark

Test Hole Date:

Benchmarks Used:

BM#1 Elev:

BM#2 Elev:

Description:

Description:

"A"

5.00 5.00

NAVD88

8/9/23

Water

A 18" Asbestos Concrete NAVFAC Good

Utility SizeUtility Material

Type Depth @

Top of Utility Elevation

@ Top Duct Bank

Bottom Depth Elevation Utility Owner Condition

Site Diagram / Location Details: Scale: (NTS)

Pavement Condition:Utility Requested:

Clay, Rocks, Dry, Hard, Soft, N/A N/A

Utility Found

Unknown 4.64 0.36 N/A N/A

Accumark, Inc.

20.0" +/-

N/A

N/A N/A

N/A

IUS 11/8/23

5.00

This form and it's contents are protected by copyright, 2023

Target utility found. Pk Nail set over the crown of the target utility.

No Survey Requested

N/A N/A

Ho lco m b

Bl vd

UP

UP

S/L

133.95'

71.70'

37.60'

Client:

Project Numbers:

Project Location:

Bamforth Engineers

NC23-018

Utility Test Hole Report - Quality Level "A"

IUS 11/8/23

Camp Lejeune Camp Lejeune, NC

P-1564 Connecter Road Test Holes Bamforth Engineers Norfolk, VA Anna Lee Bamforth 757-627-7079

9500 King Air Court, Ashland, Virginia 23005 / 804-550-7740

Test Hole #:

Project Name:

Requested By:

Accumark Job#:

Project Location:

Soil Conditions:

Test Hole Cross Section Elevation / Survey Information:

Overall Utility Width:Drawn Facing:

Existing Grade

Northeast

Located By: Vertical Datum

General Notes:

Utility Test Hole Report - Quality Level "A"

Northing: Easting: Elevation:

Point of Contact:

Client Reference#:

Note: This report depicts and describes the conduits or cables that were visible to our crew upon excavating the test hole. There may be additional conduits or cables located below this configuration which were not visible to the test hole crew.

Exposed Utility Information

Test Hole Reference Mark

Test Hole Date:

Benchmarks Used:

BM#1 Elev:

BM#2 Elev:

Description:

Description:

"A"

6.00 6.00

NAVD88

9/6/23

Water & Telephone Duct

A See Note See Note NAVFAC Good

B N/A See Note NAVFAC Good

Utility SizeUtility Material

Type Depth @

Top of Utility Elevation

@ Top Duct Bank

Bottom Depth Elevation Utility Owner Condition

Site Diagram / Location Details: Scale: (NTS)

Pavement Condition:Utility Requested:

Moist, Clay, Hard, Dry, Wet, Soft N/A N/A

Utility Found

Water

Telephone Duct

4.17 1.83 N/A N/A

6.16 -0.16 N/A N/A

Accumark, Inc.

See Note

N/A

N/A N/A

N/A

IUS 11/8/23

6.00

This form and it's contents are protected by copyright, 2023

Target utility found. Hub & tac set over the crown of the target utility. Unable to determine the size and condition of utility due to excessive ground water and soil conditions.

No Survey Requested

N/A

N/A

N/A

N/A

Ho lco m b

Bl vd

UP

UP

126.50'

44.90'

Si de wa lk

TMH

"B"

Tele

26.95'

Client:

Project Numbers:

Project Location:

Bamforth Engineers

NC23-018

Utility Test Hole Report - Quality Level "A"

IUS 11/8/23

Project Name: P-1564U Connecter Road Test Holes

Camp Lejeune Camp Lejeune, NC

P-1564 Connecter Road Test Holes Bamforth Engineers Norfolk, VA Anna Lee Bamforth 757-627-7079

9500 King Air Court, Ashland, Virginia 23005 / 804-550-7740

Test Hole #:

Project Name:

Requested By:

Accumark Job#:

Project Location:

Soil Conditions:

Test Hole Cross Section Elevation / Survey Information:

Overall Utility Width:Drawn Facing:

Existing Grade

Northeast

Located By: Vertical Datum

General Notes:

Utility Test Hole Report - Quality Level "A"

Northing: Easting: Elevation:

Point of Contact:

Client Reference#:

Note: This report depicts and describes the conduits or cables that were visible to our crew upon excavating the test hole. There may be additional conduits or cables located below this configuration which were not visible to the test hole crew.

Exposed Utility Information

Test Hole Reference Mark

Test Hole Date:

Benchmarks Used:

BM#1 Elev:

BM#2 Elev:

Description:

Description:

"A"

7.00 7.00

NAVD88

9/6/23

Unknown

A 1" Cable NAVFAC Good

Utility SizeUtility Material

Type Depth @

Top of Utility Elevation

@ Top Duct Bank

Bottom Depth Elevation Utility Owner Condition

Site Diagram / Location Details: Scale: (NTS)

Pavement Condition:Utility Requested:

Rocks, Dry, Hard N/A N/A

Utility Found

Unknown 3.12 3.88 N/A N/A

Accumark, Inc.

1.0" +/-

N/A

N/A N/A

N/A

IUS 11/8/23

7.00

This form and it's contents are protected by copyright, 2023

Target utility found. Hub & tac set over the crown of the target utility.

No Survey Requested

N/A N/A

Ho lco m b

Bl vd

UP

101.60'

68.95'

Si de wa lk

40.65'

UP

Tele

TMH

Client:

Project Numbers:

Project Location:

Bamforth Engineers

NC23-018

Utility Test Hole Report - Quality Level "A"

IUS 11/8/23

Sheets and Views
NC23-018 Test Hole Reports-Inventory-1
NC23-018 Test Hole Reports-1
NC23-018 TH-01-Model
NC23-018 Test Hole Reports-2
NC23-018 TH-02.p-Model
NC23-018 Test Hole Reports-3
NC23-018 TH-03.p-Model
NC23-018 Test Hole Reports-4
NC23-018 TH-04.p-Model
NC23-018 Test Hole Reports-5
NC23-018 TH-05.p-Model
NC23-018 Test Hole Reports-6
NC23-018 TH-06.p-Model
NC23-018 Test Hole Reports-7
NC23-018 TH-07-Model

File details come from the government source that posted it. Updated .