This document is an Amendment to a Solicitation for a federal contract opportunity. The amendment provides responses to 16 questions and answers related to the solicitation for the P-1584U Parachute Tower Road Upgrades and P-1564U Connector Road project at Camp Lejeune. Key details include:
The project includes civil/paving work for the two road upgrade projects. The amendment addresses questions regarding drawings, permits, working hours, soil disposal, milling machines, asphalt paving requirements, and concrete work. It also clarifies that only Civil/Paving MACC Contractors listed on the General Requirements cover page may submit proposals. The solicitation number is N4008524R2716 and the contracting agency is the Department of the Navy Naval Facilities Engineering Command. The original proposal due date remains unchanged.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 1
AMENDMENT NO. 0007 08/27/24 P1584U / P1564U
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107 A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-24-R-2716
08/12/24
P-1564U Connector Road; Wallace Creek to Holcomb Blvd and P-1584U Parachute Tower Road Upgrades.
Amendment 0007, RFI 0002 Questions & Answers
The time and date for receipt of proposals remains unchanged.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
N40085-24-R-2716 Amendment 0007 Q&A #1 - 16
CONTINUATION SHEET
1. The RFP lists the project title as P1584U Parachute Tower Road Upgrades/P1564U Connector Road. Amendment 0002 provided drawings for P1564U, but none for P1584U. Please provide drawings for P1584U and consider extending the RFI period so that prospective bidders have time to review those drawings.
Answer: Drawings for P1584U provided in previous amendment.
2. CD101 in the P1564U drawings has a single line running parallel to Holcomb Blvd titled, “Limit of Machine Excavation”. This is the only plan sheet with this line. What does this line mean? Where are the other limits of this area?
Answer: Excavation near existing underground utilities (within 5 feet vertically or horizontally), in this case an underground BaseCom duct bank and a water main, must be excavated by hand until the utilities can be properly located in the field. These are critical base assets, the line marks the northern limit were this is required and is bounded in the south by Holcomb Blvd and the limits of disturbance. Utility test hole conflict report will be provided in this response. Utility information in topographic survey reflects SUE level C services and therefore must be confirmed in the field prior to earthmoving activities.
3. Please provide a copy of the 404/401 Wetland Permits.
Answer: Wetland Permits provided.
4. 1.3.2 in Specification Section 01 14 00 states that the Contracting Officer will determine the Regular Working hours. What will these hours be?
Answer: Typical working hours in our contracts are generally 0730-1600 with the requirement for the contractor to request any outside normal working hours.
5. 1.5 in Specification Section 01 57 17 states that a Permit Record of Decision (PROD) would be attached. Please provide this information.
Answer: PROD provided.
6. 3.13 in Specification Section 31 23 00.00 20 states, “Remove from Government property surplus or other soil material not required or suitable for filler or backfilling…”. On most project, MCB Camp Lejeune requires surplus soils to be wasted on Government property, typically the Base Landfill. Can uncontaminated soils be wasted at the Camp Lejeune Landfill?
Answer: Yes, uncontaminated surplus soils from the project can be taken to the Base Landfill for disposal. Coordinate with Landfill Manager for location to place soils and delivery schedule at least 14 days in advance.
7. 1.5.1.1.1.2 in Specification Section 01 57 19 requires surplus soils to be mechanically screened prior to being transported from its originating site. Please consider removing this provision, as this will add unnecessary costs to the project. Where would the material separated by the screen be disposed of?
Answer: Soils containing debris (construction or natural, larger than specified screening requirements) will not be accepted at the landfill and thus must be screened at the site of origination so they can be sorted. Material generated by the screening process must be disposed of in an approved manner.
8. Specification Section 31 11 00 – Clearing and Grubbing has many references to
Herbicide. Where is Herbicide required to be applied?
Answer: Forested areas within the LOD for P1564U.
9. 1.5 in Specification Section 31 23 00.00 20 requires the Contractor to carry 1,500 CY of over excavation/replacement of geotechnically unsuitable soils in the Base Bid, but there is not Unit Price CLIN listed on the Bid Form for this work.
Answer: The 1,500 CY of unsuitable does not have a separate CLIN line as it is included in the base price.
10. 2.1 in Specification Section 32 01 16.71 states, “Milling machines will have a minimum cutting width of 6.5 feet”. There is a very small quantity of milling on this project.
Similar projects are frequently completed with milling machines that have cutting widths of 4 feet – 5 feet. Are milling machines with a minimum cutting width of 4 feet wide permitted for use on this project?
Answer: Yes a smaller milling machine is acceptable.
11. Can the Asphalt Paving Contractor’s NCDOT Approved Roadway and Laboratory
Technicians be utilized for acceptance testing?
Answer: No. Contractors Materials Testing Firm needs to be independent.
12. The first portion of 32 12 16.16 references Pay Factors and Payment Adjustments, typically utilized for Airfield Paving. Please consider amending this to require asphalt to be placed in accordance with NCDOT Standards.
Answer: No objection. Recommend deferring to ROICC.
13. Please consider removing the requirement for Joint Cores in 32 12 16.16. Joint Cores are typically only required on Airfield Paving projects.
Answer: Concrete pavements and joints are required for the truck apron in the roundabout on P1584U.
14. 2.6 in Specification Section 32 12 16.16 reference a Paving Reinforcement Grid. The drawings do not show any of this material. Please remove from the Specifications or advise where it is required.
Answer: Concrete pavements and joints are required for the truck apron in the roundabout on P1584U.
15. 3.9.2 in Specification Section 32 12 16.16 requires the Contractor to, “Cut back longitudinal joints which are irregular, damaged, uncompacted, cold (less than 175 degrees F at the time of placing adjacent lanes), or otherwise defective, a maximum of 3 inches from the top of the course with a cutting wheel to expose a clean, sound, near vertical surface for the full depth of the course”. Can a joint heater be used in lieu of saw cutting?
Answer: Joint heater is not an acceptable alternative to cutting as specified.
16. Specification Section 33 40 00 has numerous references to Hydrostatic Testing on
Watertight Joints, Leakage Tests, and Exfiltration Tests. On past projects, these requirements have made it difficult to find RCP suppliers willing to supply the project.
Can these tests be waived if the reinforced concrete pipe is manufactured in conformance to ASTM C76, and meets specification for use in similar applications on DOD, FAA, and NCDOT projects?
Answer: It is acceptable for joints meeting either ASTM C443 or ASTM C990.