This document is an amendment to the Request for Proposal (RFP) for the NWC B686 Conolly Hall Upgrades and NWC Modular Buildings contract (Contract Number N4008524R2601). The key details are:
The amendment includes changes to the drawings and specifications for the Conolly Hall upgrades project. Changes include demolition and abatement of lead-lined walls, modifications to doors and windows, plumbing, mechanical, and electrical systems, and the addition of significant new fiber optic cabling infrastructure within Conolly Hall and connecting to other buildings on the Naval War College campus. The amendment also adds new cybersecurity drawings related to the HVAC system. The contract will require the contractor to provide various materials as attic stock upon completion. The document provides detailed specifications and drawings for the required scope of work.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND, MID ATLANTIC
PUBLIC WORKS DEPARTMENT, NAVAL STATION NEWPORT
ONE SIMONPIETRI DRIVE
NEWPORT, RHODE ISLAND 02841-1711
Amendment
Date: 07 01 2024
Contract Number: N4008524R2601
P1 NWC B686 Conolly Hall Upgrades P2 NWC Modular Buildings
NAVAL WAR COLLEGE (NWC) NEWPORT, RHODE ISLAND
From: Bethany Collard Design Manager Naval Station Newport
This document serves as Amendment to the RFP.
Proposals to reflect the following changes:
P1 NWC B686 Conolly Hall Upgrades - DRAWINGS
Architectural
DRAWING AD103: Add “Keynote 26 Demolish, abate and properly dispose all walls which are lined with lead within area from column line 3 to column line 6, and column line A to column line B Medical Suite on the 1st floor, per Specification Section 028300 LEAD
REMEDIATION.”
DRAWINGS A-101 through A-106: At Construction Sheet Note 9, Add “Provide and install wood blocking at all digital signage locations, Refer to Drawings Et101, ET102, ET103, ET104, ET105, ET106 for locations.”
DRAWINGS A-104A & B: Add Construction Sheet Note #4 to all North walls (continuous along B683 Spruance Hall) and all South walls (continuous along B991 Hewitt Hall).
DRAWING A-104B: Change Door C-200A from a pair of 3’-6” doors to pair 3’-0” doors.
DRAWING A-104B: Option 1 - Change operable sash for the window in Secure Classroom C-204 to insulating glazing Type 2 for fixed window with opaque interlayer insulated backpan behind.
DRAWINGS A-105A & B: Add Construction Sheet Note #4 to all North walls (continuous along B683 Spruance Hall) and all South walls (continuous along B991 Hewitt Hall).
DRAWINGS A-106A & B: Add Construction Sheet Note #4 to all North walls (continuous along B683 Spruance Hall) and all South walls (continuous along B991 Hewitt Hall).
DRAWING A-201: Option 1 - Change operable sash for the window in Secure Classroom C-204 to insulating glazing Type 2 for fixed window with opaque interlayer insulated backpan behind.
DRAWING A-501: Option 1 - Change operable sash for the window in Secure Classroom C-204 to insulating glazing Type 2 for fixed window with opaque interlayer insulated backpan behind.
DRAWING A-601: At Door and Hardware General Notes, At Note #9, Change “Fail Safe” to “Fail Secure”.
DRAWING A-602: Door Schedule, Change Door C-200A Panel width 1 and Panel width 2 from 3’-6” doors to 3’-0” doors.
DRAWING A-602: Door Schedule, At Door C-204, under Remarks, Add “STC 55” requirement to Door C-204.
Plumbing DRAWINGS P-101 through P-107: At General Note, Add “Note 2: Provide and install isolation valves on piping for all fixtures, hot water heaters, and expansion tanks.”
Mechanical DRAWINGS M-101 through M-402: At Drawing Note, Add “Note: Provide a secondary temperature and humidity sensor in each IT Closet (C-L204, C-L130, C-118A, C-218A, C- 318A, & C-418A) connected to the direct digital controls system for monitoring and high temperature alarms.”
DRAWING M-102: At Office C-L108, Add thermostat in Office C-L108 and incorporate into programming associated with FCU B-6.03.
DRAWING M-102: Connect FCU B-6.02 to the FCU B-5.02 thermostat. Relocate thermostat to Corridor C-L100 wall, final location to be coordinated with Contracting Officer.
DRAWING M-106: Add thermostat for FCU 4-2.02 located in Copy/Storage C-404.
Electrical DRAWING ED101: At Demolition Keynotes #13, Add “The existing two transformers, outlets, and split HVAC system located in IT C-L204 are fed from Spruance Hall Electrical Panel EL-LB-1, Breakers 32, 34, 36.”
DRAWING ED107: Add “Demolition Note: Demolish vertical antenna attached to the granite façade of the South Mechanical Penthouse between the double doors and Penthouse roof ladder. Remove all wiring and conduit back to the source located in Mech Equip’t Room P-501.”
DRAWING EP107: At Generator note: Add “RI Energy to provide 14” w.c. at meter station. New gas piping must be based on 14” w.c. outlet at the meter and internal pressure drop must allow for between 7” – 11” w.c. at the new generator. RI Energy will not be supplying 5 PSI.”
DRAWING EP601: At Generator note: Add “RI Energy to provide 14” w.c. at meter station. New gas piping must be based on 14” w.c. outlet at the meter and internal pressure drop must allow for between 7” – 11” w.c. at the new generator. RI Energy will not be supplying 5 PSI.”
Telecommunications
ADD “DRAWING ET002 – NWC CAMPUS PLAN” to the contract drawing set
ADD “DRAWING ET003 – CONOLLY HALL FIBER – BASEMENT & FIRST FLOOR” to the contract drawing set
ADD “DRAWING ET004 – CONOLLY HALL FIBER - PHOTOS” to the contract drawing set
ADD “DRAWING ET005 – CONOLLY AND SPRUNACE HALL GARGAE FIBER” to the contract drawing set
ADD “DRAWING ET006 – SPRUANCE HALL FIBER – FIRST FLOOR” to the contract drawing set
ADD “DRAWING ET007 – MAHAN HALL FIBER – BASEMENT & FIRST FLOOR” to the contract drawing set
ADD “DRAWING ET008 – MLH FIBER – FIRST FLOOR” to the contract drawing set
ADD “DRAWING ET009 – MLH FIBER – SECOND FLOOR” to the contract drawing set
ADD “DRAWING ET009 – MLH FIBER – SECOND FLOOR” to the contract drawing set
ADD “DRAWING ET010 – MLH FIBER – THIRD FLOOR” to the contract drawing set
ADD “DRAWING ET011 – HEWITT HALL FIBER – MAIN LEVEL” to the contract drawing set
ADD “DRAWING ET012 – HEWITT HALL FIBER – MIDDLE LEVEL” to the contract drawing set
ADD “DRAWING ET013 – HEWITT HALL FIBER – THIRD FLOOR” to the contract drawing set
DRAWING ET102: At Telecommunication Keynote, Change Note 19 to read “(1) – 2” category 2 rated PDS conduits for fiber optic cabling from it C-218A to existing pull box located in Hewitt Hall as shown on drawing ET104. (1) - 2” conduit for network cabling/data jacks in secure classroom C-204/IT C-204A from it C-218A.”
DRAWING ETS104: At Door to Electrical C-218, Add symbol “DS” for card reader and associated card access system components to Electrical C-218.
DRAWING ETS105: At Door to Electrical C-318, Add symbol “DS” for card reader and associated card access system components to Electrical C-318.
DRAWING ETS106: At Door to Electrical C-418, Add symbol “DS” for card reader and associated card access system components to Electrical C-418.
Cyber Security ADD “DRAWING TS001 – HVAC Network Boundary” to contract drawing set
ADD “DRAWING TS002 – HVAC Riser Diagram” to contract drawing set
P1 NWC B686 Conolly Hall Upgrades - SPECIFICATIONS
SPECIFICATION 265100, 3.3 CLOSEOUT ACTIVITIES: Add “3.3.2.3 Provide minimum of 2 extra light fixtures, per each type of light fixture specified, as attic stock to Contracting Officer/Naval War College.”
SPECIFICATION 220000: Add “3.13 CLOSEOUT ACTVITIES: Provide minimum of 1 extra flushometers, per each type of flushometer specified, as attic stock to Contracting Officer/Naval War College.”
SPECIFICATION 102813: Add “3.3 CLOSEOUT ACTVITIES: Provide minimum of 1 extra toilet accessory, per each type of toilet accessory specified, as attic stock to Contracting Officer/Naval War College.”
SPECIFICATION 271000: Add “Part 1.4.1 SYSTEM DESCRIPTION CONTINUED”
“CONOLLY HALL RENOVATION – FIBER OPTIC COMMUNICATION DISTRIBUTION UPGRADES
The work includes demolishing and modifying existing fiber and other low voltage cabling as well as providing new fiber optic cabling to link several buildings in support of the renovation of Conolly Hall. General notes, as shown below, apply to all components of the following work.
Conolly Hall - Existing Telecommunications & Low Voltage Infrastructure
Demolish existing telecommunications, security, and other low voltage system infrastructure including cabling and conduit pathways to the construction boundary demarcation unless otherwise indicated for reuse and as excluded below:
Remove from service and protect the existing phone switch, uninterrupted power supply (UPS), and associated batteries that are presently located in
IT C-L204. Prior to construction, deliver those items to the Base
Communications Office (BCO) located at Naval Station Building 76.
Protect the existing Verizon infrastructure including the incoming fiber and enclosures on the North wall of IT C-L204. All Verizon infrastructure is existing to remain. Protect during construction.
Pre-test, disconnect and protect the existing 24 Strand Multi-Mode (MM) fiber optic cable from Hewitt Hall IT H-L134. Protect the cable throughout construction and reterminate in the new fiber cabinets. Test and certify.
Pre-test, disconnect, and protect the TWO existing 72-strand Single-Mode
(SM) fiber optic cables from McCarty Little Hall (MLH). Protect the cables throughout construction and reterminate in the new fiber cabinets. Test and certify.
Pre-test, disconnect, and protect the existing 72-strand Single-Mode (SM) fiber optic cable from Luce Hall IT B-06. Protect the cable throughout construction and reterminate in the new fiber cabinets. Test and certify.
For all existing-to-remain fiber optic cabling, provide pre-testing, disconnecting, protecting in place, re-terminating, and testing. The MLH and Luce
Hall fiber optic cables enter into Conolly Hall IT C-L204 via underground conduit pathways that are part of the exterior communication distribution system. Coil fiber cables in the vicinity of the underground service entrance locations and protect in place during construction. The Hewitt Hall fiber optic cable pathway is part of the interior communication distribution system. Pull the existing
Hewitt fiber back to the wall mounted junction box located on the North wall of
Corridor C-L100C adjacent to the North elevator to facilitate the execution of demolition and renovation work within Conolly. Upon completion of the construction of the new cable management system in Conolly, reinstall the Hewitt fiber to Conolly Hall IT C-L204.
Provide new connector housings (Corning CCH-04U or approved equal) in the new cabinets shown on Detail B1 / Drawing ET-402. Provide one additional cabinet as spare.
For all existing-to-remain fiber cables, re-terminate utilizing new connectors to match the original ST-type terminations.
Conolly Hall - New Fiber
Provide fiber optic cable links to connect Conolly Hall (B686) to McCarty Little
Hall (MLH; Bldg 27 CHI), Hewitt Hall (Bldg 991 CHI), and Spruance Hall (Bldg
683 CHI). In addition, provide a fiber optic cable link to connect Spruance
Hall to Mahan Hall (Bldg 3 CHI) to ensure continuous network connectivity for
Spruance Hall during construction. Finally, provide fiber optic cable links between telecommunications closets within Conolly Hall. Sheet ET-002 includes a block diagram of the existing and new fiber optic cabling requirement as well as a campus diagram that illustrates the various War College buildings.
Provide 144-Strand SM fiber optic cable - Mahan Hall IT M11 to Spruance
Hall IT/Projection SP-010. (This work must be completed prior to demolition in Conolly Hall to avoid an interruption of network services.)
Provide 288-Strand SM fiber optic cable - Conolly Hall (various rooms -
IT C-L204, IT C-L130, C-118A, C-218A, C-318A, & C-418A) to McCarty
Little Hall IT 113 & 327.
Provide 144-Strand SM fiber optic cable - Conolly Hall IT C-L204 to
Hewitt Hall IT H-L134.
Provide 144-Strand SM fiber optic cable - Conolly Hall IT C-L204 to
Spruance Hall IT/Projection SP-110.
Provide 24-Strand SM fiber optic cable - Conolly Hall IT C-L204 to IT
C-L130.
Provide 24 Strand SM fiber optic cable - Conolly Hall IT C-L130 to IT
C-118A.
Provide 24-Strand SM fiber optic cable - Conolly Hall IT C-118A to IT
C-218A.
Provide 24-Strand SM fiber optic cable - Conolly Hall IT C-218A to IT
C-318A.
Provide 24-Strand SM fiber optic cable - Conolly Hall IT C-318A to IT
C-418A.
Mahan Hall to Spruance Hall - New Fiber
Provide 144-strand, single-mode, indoor/outdoor-rated, fiber optic cabling
(Corning FREEDM Loose Tube, Gel-Free Cable, Riser or approved equal) to connect
Spruance Hall to Mahan Hall. This work must be completed in advance of any demolition within Conolly Hall to ensure continuity of service.
In Mahan Hall, provide a new connector housing (Corning CCH-04U or approved equal) in the existing Panduit cabinet located in IT M11 on Level 1.0 (1st
Floor). Utilize the existing cable management system and transition to adjacent
Archive Storage M10C. In the Southeast corner of Archive Storage M10C, provide
3” conduit to transition vertically from the cable tray to Crawl Space B12D below. Provide 3” horizontal conduit within Crawl Space B12D to existing underground IT service entrance located at the North Wall. Approximate conduit length is 150LF. Utilize existing underground conduit connecting Mahan Hall to
Spruance Hall. Approximate underground distance is 75LF. Note: The crawl space within Mahan Hall is a confined space.
In Spruance Hall, the underground pathway from Mahan Hall enters in the Spruance
Hall Parking Garage Level P2 and connects to an existing horizontal junction box. From the junction box, an existing conduit pathway goes vertical up to the suspended ceiling of the 1st Floor in Comm & Dist SP-019 (recently repurposed as dining area). Utilize the cable management system above/in ceiling consisting of “J” hooks and cable tray in Comm & Dist SP-019, through Vestibule
SP-21, and into IT/Projection Room SP-010. Within IT/Projection Room SP-010 there are existing cabinets with sufficient space for the new cable terminations. Provide new connector housings (Corning CCH-04U or approved equal) within the existing cabinet.
The estimated length of fiber cabling to connect Mahan Hall to Spruance Hall is
500LF.
Terminate all strands as LC-type. Test.
Conolly Hall to McCarty Little Hall - New Fiber
Provide 288-strand, single-mode, indoor/outdoor-rated, fiber optic cabling
Conolly Hall to Hewitt Hall. In Conolly, terminate 48 strands in IT C-L204.
Extend and terminate 48 strands into each of the following teledata closets within Conolly Hall: IT C-L130, C-118A, C-218A, C-318A, & C-418A. In MLH, terminate all strands in Room 327. Note: This scope of work supersedes the
Unclassified Fiber Distribution shown on Drawing ET001 and provides updated fiber infrastructure requirements for Drawings ET301, ET402, ET403, and ET601.
In Conolly Hall, utilize the existing cable management system from IT C-L204 up to the 1st Floor North Wall. Provide one new 3” conduit from Conolly Hall 1st
Floor to existing horizontal junction box/4” vertical conduits above the suspended ceiling of the vestibule between Conolly and Hewitt Halls. The estimated length of the new 3” conduit pathway is 100LF. The existing conduits continue vertically up to a vertical junction box in the East wall on Hewitt
Hall 3rd Floor. The conduits then transition horizontally into the pedestrian bridge connecting Conolly Hall to McCarty Little Hall. Provide new connector housings (Corning CCH-04U or approved equal) in the new cabinets shown on Detail
B1 / Drawing ET-402.
In McCarty Little Hall, utilize the existing conduit pathway in the ceiling soffit of the pedestrian bridge. These conduits continue into the 2nd Floor of
McCarty Little Hall and transition vertically down to the 1st Floor. The conduits transition horizontally and run above the suspended ceiling of Open
Office Suite 104 to IT 113. Within IT 113, there is existing vertical ladder rack and conduits to transition up IT 327 with an intermediate access point in
IT 224. Assume final termination of fiber in IT 327 within 50 linear feet of the vertical access point. Provide new connector housings with connector panels
(Corning CCH-04U or approved equal) within the existing cabinet.
The estimated length of fiber cabling to connect Conolly Hall to McCarty Little
Hall is 1000_LF.
Conolly Hall to Hewitt Hall - New Fiber
Conolly Hall to Hewitt Hall.
In Conolly Hall, utilize existing cable management system from IT C-L204 up to the Basement/L1 Level and North to the existing-to-remain wall mounted junction on the North wall adjacent to the North elevator. Provide new connector housings
(Corning CCH-04U or approved equal) in the new cabinets shown on Detail B1 /
Drawing ET-402.
In Hewitt Hall, utilize existing conduit pathway as shown on Sheet ET-003 to
Hewitt Hall IT H-L134. In Hewitt Hall IT H-L134, provide a new connector housing (Corning CCH-04U or approved equal) in the existing rack.
The estimated length of fiber cabling to connect Conolly Hall to McCarty Little
Hall is 600LF.
Conolly Hall to Spruance Hall - New Fiber
(Corning FREEDM Loose Tube, Gel-Free Cable, Riser or approved equal) to connect
Conolly Hall to Spruance Hall.
In Conolly Hall, provide new conduit/cable management pathway through the East wall of IT C-L204 to connect to the existing-to-remain COAX conduit infrastructure. Approximate length of new 3” conduit/cable management pathway is 50LF. Utilize existing conduit system from Electrical C-L202 through
Mechanical L-200 and into the Parking Garage Level P1. Conduit will continue south into Spruance Hall Parking Garage Level P1. Provide new connector housings (Corning CCH-04U or approved equal) in the new cabinets shown on Detail
B1 / Drawing ET-402.
In Spruance Hall, the existing conduit will incline with the ramp connecting the P1 and P2 levels. At the top of the ramp on the P2 level, there is an existing horizontal junction box. From the junction box, an existing conduit pathway goes vertical up to the suspended ceiling of the 1st Floor in Comm &
Dist SP-019 (since repurposed as dining area). Above/in ceiling cable management system consists of “J” hooks and cable tray in Comm & Dist SP-019, through Vestibule SP-21, and into IT/Projection Room SP-010. Within
IT/Projection Room SP-010 there are existing cabinets with sufficient space for the new cable terminations. Provide new connector housing (Corning CCH-04U or approved equal) within the existing cabinet.
The estimated length of fiber cabling to connect Conolly Hall to Spruance Hall is 500LF.
Conolly Hall IT Closet Interconnectivity – New Fiber
Provide 24-strand, single-mode, MIC cables (Corning MIC 250 interconnect cable
Single-Mode OS2 or approved equal) to interconnect the IT closets within Conolly
Hall as indicated above and below. Fiber to be terminated in the same fiber enclosure as the primary fiber from McCarty Little Hall. Placement of fiber in the fiber termination enclosures will be finalized via the submittal review process. This scope of work supersedes the Unclassified Fiber Distribution shown on Drawing ET001 and provides updated fiber infrastructure requirements for Drawings ET301, ET402, ET403, and ET601.
Provide 24 Strand SM fiber optic cable - Conolly Hall IT C-L204 to IT
C-L130. Terminate all strands as LC-type. Test.
Provide 24 Strand SM fiber optic cable - Conolly Hall IT C-L130 to IT
C-118A. Terminate all strands as LC-type. Test.
Provide 24 Strand SM fiber optic cable - Conolly Hall IT C-118A to IT
C-218A. Terminate all strands as LC-type. Test.
Provide 24 Strand SM fiber optic cable - Conolly Hall IT C-218A to IT
C-318A. Terminate all strands as LC-type. Test.
Provide 24 Strand SM fiber optic cable - Conolly Hall IT C-318A to IT
C-418A. Terminate all strands as LC-type. Test.
General Notes (applicable to all work areas):
Provide ST-type (for existing-to-remain fiber) or LC-type terminations (for new fiber) (Corning or approved equal) as indicated. Throughout this SOW, all instances of “terminate” shall indicate fusion-spliced connectorization. All terminations and all splices shall be fusion spliced. Mechanical splicing is not permitted.
Provide connector panels for all terminations. Provide connector panels to match the type, number and manufacturer of the cables and connector housings provided.
MIC cables shall be Corning MIC 250 Interconnect cable Single-Mode OS2 or approved equal.
Include thirty (30) linear foot slack loops at the following locations (Mahan
Hall Crawlspace B12D, Mahan Hall IT M11, Spruance Hall IT/Projection Room SP-
010, Hewitt Hall IT H-L134, McCarty Little Hall IT 113, and Conolly Hall IT C-
L204, C-L130, C-118A, C-218A, C-318A, C-418A)
Provide horizontal and vertical cable management with each connector housing.
Connector housings shall be rack or cabinet mounted unless stated otherwise.
Provide hard copies and electronic copies of all certification reports. OTDR test reports shall contain detailed graphs/traces and data in addition to pass/fail analysis. All underground cabling shall be run in conduit and shall be run continuous (unbroken) from indoor termination point to indoor termination point.
Include 25-year manufacturer system warranty to repair or replace any defective products free of charge after installation (Corning Network of Preferred
Installers (NPI) program or approved equal).
Contractor shall field verify existing conditions prior to ordering materials.”
ET002
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
A
TL
A N
TI
C
RE
PA
IR
C
O
NO
LL
Y
HA
LL
N W
C
- B
LD
G
C
HI
S
Scale: 1"=50'
NAVAL WAR COLLEGE CAMPUS
N
McCARTY
LITTLE HALL
IT 327
McCARTY
LITTLE HALL
IT 224
McCARTY
LITTLE HALL
IT 113
HEWITT
HALL
IT H-L134 LUCE HALL
IT B-06
SPRUANCE HALL
IT/PROJECTION
SP-010
MAHAN HALL
IT M11
CONOLLY
HALL
IT C-118A
CONOLLY
HALL
IT C-318A
CONOLLY
HALL
IT C-418A
CONOLLY
HALL
IT C-218A
CONOLLY
HALL
IT C-L130
CONOLLY HALL
IT C-L204
CONOLLY HALL FIBER ONE-LINE DIAGRAM
GREEN: EXISTING TO REMAIN / RE-TERMINATED
BLUE: NEW FIBER
MAGENTA: NEW FIBER INTERCONNECTS
KEYNOTES:
1. PROVIDE 144-STRAND SM FIBER OPTIC CABLE - MAHAN
HALL IT M11 TO SPRUANCE HALL IT/PROJECTION SP-010.
(THIS WORK MUST BE COMPLETED PRIOR TO DEMOLITION
IN CONOLLY HALL TO AVOID AN INTERRUPTION OF
NETWORK SERVICES.)
2. PROVIDE 288-STRAND SM FIBER OPTIC CABLE - CONOLLY
HALL (VARIOUS ROOMS - IT C-L204, IT C-L130, C-118A,
C-218A, C-318A, & C-418A) TO MCCARTY LITTLE HALL IT 113
& 327.
3. PROVIDE 144-STRAND SM FIBER OPTIC CABLE - CONOLLY
HALL IT C-L204 TO HEWITT HALL IT H-L134.
4. PROVIDE 144-STRAND SM FIBER OPTIC CABLE - CONOLLY
HALL IT C-L204 TO SPRUANCE HALL IT/PROJECTION SP-110.
5. PROVIDE 24-STRAND SM FIBER OPTIC CABLE - CONOLLY
HALL IT C-L204 TO IT C-L130.
6. PROVIDE 24 STRAND SM FIBER OPTIC CABLE - CONOLLY
HALL IT C-L130 TO IT C-118A.
7. PROVIDE 24-STRAND SM FIBER OPTIC CABLE - CONOLLY
HALL IT C-118A TO IT C-218A.
8. PROVIDE 24-STRAND SM FIBER OPTIC CABLE - CONOLLY
HALL IT C-218A TO IT C-318A.
9. PROVIDE 24-STRAND SM FIBER OPTIC CABLE - CONOLLY
HALL IT C-318A TO IT C-418A.
10. PRE-TEST, DISCONNECT AND PROTECT THE EXISTING 24
STRAND MULTI-MODE (MM) FIBER OPTIC CABLE FROM
HEWITT HALL IT H-L134. PROTECT THE CABLE
THROUGHOUT CONSTRUCTION AND RETERMINATE IN THE
NEW FIBER CABINETS. TEST AND CERTIFY.
11. PRE-TEST, DISCONNECT, AND PROTECT THE TWO
EXISTING 72-STRAND SINGLE-MODE (SM) FIBER OPTIC
CABLES FROM MCCARTY LITTLE HALL (MLH). PROTECT
THE CABLES THROUGHOUT CONSTRUCTION AND
RETERMINATE IN THE NEW FIBER CABINETS. TEST AND
CERTIFY.
12. PRE-TEST, DISCONNECT, AND PROTECT THE EXISTING
72-STRAND SINGLE-MODE (SM) FIBER OPTIC CABLE FROM
LUCE HALL IT B-06. PROTECT THE CABLE THROUGHOUT
CONSTRUCTION AND RETERMINATE IN THE NEW FIBER
CABINETS. TEST AND CERTIFY.
NOTES:
1. FIBER PATHWAYS ARE SHOWN TO ILLUSTRATE THE
CONCEPT.
2. SUPPLEMENTAL INFORMATION REGARDING THE
PATHWAYS IS PROVIDED IN THE ATTACHED NARRATIVE.
3. CONTRACTOR SHALL VERIFY ALL PATHWAYS PRIOR TO
ORDERING MATERIALS.
2 3
AutoCAD SHX Text S75
AutoCAD SHX Text
10CHI
AutoCAD SHX Text 27A
AutoCAD SHX Text
1A-CHI PRINGLE HALL
AutoCAD SHX Text
1CHI LUCE HALL
AutoCAD SHX Text
683 SPRUANCE HALL
AutoCAD SHX Text
686 CONOLLY HALL
AutoCAD SHX Text
991 HEWITT HALL
AutoCAD SHX Text
27 MCCARTY LITTLE HALL
AutoCAD SHX Text
3CHI MAHAN HALL
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 07 AUG 2018
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
PM/DM
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
NWC CAMPUS PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AS-SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT - NEWPORT
AutoCAD SHX Text
NAVAL STATION - NEWPORT, RI
AutoCAD SHX Text
NAVAL STATION NEWPORT, RI
AutoCAD SHX Text
NEWPORT, RI
AutoCAD SHX Text
NAVAL STATION NEWPORT
AutoCAD SHX Text
MM/DD/YY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1691406
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
IT M11
AutoCAD SHX Text
IT/PROJECTION ROOM SP-010
AutoCAD SHX Text
IT 113. VERTICAL PATH UP TO IT 327 VIA IT 224
AutoCAD SHX Text
IT C-L204
AutoCAD SHX Text
IT H-L134
AutoCAD SHX Text
MH#2073
AutoCAD SHX Text
MH#2318
AutoCAD SHX Text
MH#2303
AutoCAD SHX Text
MH#2302
AutoCAD SHX Text
MH#2301
AutoCAD SHX Text
MH#2331
AutoCAD SHX Text
MH#2332A
AutoCAD SHX Text
MH#2028
AutoCAD SHX Text
MH#2029
AutoCAD SHX Text
MH#1
AutoCAD SHX Text
MH#2
AutoCAD SHX Text
MH#3
Scale: GRAPHIC
BUILDING 686 - BASEMENT PLAN1
IT CLOSET
JUNCTION BOX UP TO
1ST FLOOR TO HEWITT
DEMOLISH, COIL, PROTECT.
PULLBACK.
Scale: GRAPHIC
BUILDING 686 - FIRST FLOOR PLAN1
JUNCTION BOX UP FROM
BASEMENT TO HEWITT.
EXACT PATHWAY TO BE
DETERMINED
ET003
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
A
TL
A N
TI
C
RE
PA
IR
C
O
NO
LL
Y
HA
LL
N W
C
- B
LD
G
C
HI
S
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 411.98
AutoCAD SHX Text B10001
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 424.74
AutoCAD SHX Text B10002
AutoCAD SHX Text
HB200
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 456.69
AutoCAD SHX Text B10003
AutoCAD SHX Text B202
AutoCAD SHX Text
MAIL CENTER
AutoCAD SHX Text 598.41
AutoCAD SHX Text B10004
AutoCAD SHX Text B202
AutoCAD SHX Text
MAIL CENTER
AutoCAD SHX Text 178.49
AutoCAD SHX Text B10005
AutoCAD SHX Text
MAIL CENTER
AutoCAD SHX Text 955.45
AutoCAD SHX Text B10006
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 198.32
AutoCAD SHX Text B10007
AutoCAD SHX Text B204
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 2941.26
AutoCAD SHX Text B10008
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 153.41
AutoCAD SHX Text B10009
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 159.30
AutoCAD SHX Text B10010
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 103.14
AutoCAD SHX Text B10011
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 178.94
AutoCAD SHX Text B10012
AutoCAD SHX Text B211
AutoCAD SHX Text
LIBRARY
AutoCAD SHX Text 554.63
AutoCAD SHX Text B10013
AutoCAD SHX Text B203
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 1451.79
AutoCAD SHX Text B10014
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 248.50
AutoCAD SHX Text B10015
AutoCAD SHX Text B210
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text 128.71
AutoCAD SHX Text B10016
AutoCAD SHX Text B208
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text 97.45
AutoCAD SHX Text B10017
AutoCAD SHX Text B206
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 905.19
AutoCAD SHX Text B10018
AutoCAD SHX Text B205
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 255.72
AutoCAD SHX Text B10019
AutoCAD SHX Text B209
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 261.79
AutoCAD SHX Text B10020
AutoCAD SHX Text B207
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 372.30
AutoCAD SHX Text B10021
AutoCAD SHX Text B207
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 145.71
AutoCAD SHX Text B10022
AutoCAD SHX Text B207B
AutoCAD SHX Text
DATA PROCESSING
AutoCAD SHX Text 13.87
AutoCAD SHX Text B10023
AutoCAD SHX Text B201
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 177.48
AutoCAD SHX Text B10024
AutoCAD SHX Text B201A
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 615.39
AutoCAD SHX Text B10025
AutoCAD SHX Text
MAIL CENTER
AutoCAD SHX Text 393.23
AutoCAD SHX Text B10026
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 61.85
AutoCAD SHX Text B10027
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 26.40
AutoCAD SHX Text B10029
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 28.80
AutoCAD SHX Text B10028
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DOORWAY TO BUILDING 683
AutoCAD SHX Text
DOORWAY TO BUILDING 683
AutoCAD SHX Text
DOORWAY TO BUILDING 991
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 2263.48
AutoCAD SHX Text 010003
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 149.84
AutoCAD SHX Text 010004
AutoCAD SHX Text
CLO2
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 9.26
AutoCAD SHX Text 010005
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 144.17
AutoCAD SHX Text 010006
AutoCAD SHX Text
CLO1
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 8.08
AutoCAD SHX Text 010007
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 138.12
AutoCAD SHX Text 010008
AutoCAD SHX Text C139
AutoCAD SHX Text
UNASSIGNED
AutoCAD SHX Text 114.43
AutoCAD SHX Text 010009
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text 149.60
AutoCAD SHX Text 010010
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 25.56
AutoCAD SHX Text 010011
AutoCAD SHX Text C142
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 212.01
AutoCAD SHX Text 010012
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 206.05
AutoCAD SHX Text 010013
AutoCAD SHX Text C121
AutoCAD SHX Text
UNASSIGNED
AutoCAD SHX Text 540.65
AutoCAD SHX Text 010014
AutoCAD SHX Text C141
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 111.47
AutoCAD SHX Text 010015
AutoCAD SHX Text
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text 221.90
AutoCAD SHX Text 010016
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 273.80
AutoCAD SHX Text 010017
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text 114.54
AutoCAD SHX Text 010018
AutoCAD SHX Text C129
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 140.90
AutoCAD SHX Text 010019
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 127.33
AutoCAD SHX Text 010020
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 155.80
AutoCAD SHX Text 010021
AutoCAD SHX Text C126
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 139.71
AutoCAD SHX Text 010022
AutoCAD SHX Text C124
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 538.17
AutoCAD SHX Text 010023
AutoCAD SHX Text C122
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 102.94
AutoCAD SHX Text 010024
AutoCAD SHX Text C120
AutoCAD SHX Text
UNASSIGNED
AutoCAD SHX Text 222.82
AutoCAD SHX Text 010025
AutoCAD SHX Text C119
AutoCAD SHX Text
UNASSIGNED
AutoCAD SHX Text 297.81
AutoCAD SHX Text 010026
AutoCAD SHX Text C119A
AutoCAD SHX Text
UNASSIGNED
AutoCAD SHX Text 144.28
AutoCAD SHX Text 010027
AutoCAD SHX Text C116
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 135.54
AutoCAD SHX Text 010028
AutoCAD SHX Text C116
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 168.03
AutoCAD SHX Text 010029
AutoCAD SHX Text C106
AutoCAD SHX Text
CLINIC / HEALTH CENTER
AutoCAD SHX Text 164.18
AutoCAD SHX Text 010030
AutoCAD SHX Text C106
AutoCAD SHX Text
CLINIC / HEALTH CENTER
AutoCAD SHX Text 94.00
AutoCAD SHX Text 010031
AutoCAD SHX Text C106
AutoCAD SHX Text
CLINIC / HEALTH CENTER
AutoCAD SHX Text 62.40
AutoCAD SHX Text 010032
AutoCAD SHX Text C106
AutoCAD SHX Text
CLINIC / HEALTH CENTER
AutoCAD SHX Text 103.61
AutoCAD SHX Text 010033
AutoCAD SHX Text C106
AutoCAD SHX Text
CLINIC / HEALTH CENTER
AutoCAD SHX Text 115.01
AutoCAD SHX Text 010034
AutoCAD SHX Text C135
AutoCAD SHX Text
CONFERENCE / CLASSROOM
AutoCAD SHX Text 1017.27
AutoCAD SHX Text 010035
AutoCAD SHX Text C138
AutoCAD SHX Text
CONFERENCE / CLASSROOM
AutoCAD SHX Text 1579.75
AutoCAD SHX Text 010036
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 141.89
AutoCAD SHX Text 010037
AutoCAD SHX Text C116
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 699.75
AutoCAD SHX Text 010038
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 159.31
AutoCAD SHX Text 010039
AutoCAD SHX Text C112
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 125.54
AutoCAD SHX Text 010040
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 64.41
AutoCAD SHX Text 010041
AutoCAD SHX Text C112
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 217.34
AutoCAD SHX Text 010042
AutoCAD SHX Text C139A
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 348.74
AutoCAD SHX Text 010043
AutoCAD SHX Text C139A
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 132.91
AutoCAD SHX Text 010044
AutoCAD SHX Text C139A
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 121.20
AutoCAD SHX Text 010045
AutoCAD SHX Text C142
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 142.81
AutoCAD SHX Text 010046
AutoCAD SHX Text C142
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 182.48
AutoCAD SHX Text 010047
AutoCAD SHX Text C110
AutoCAD SHX Text
CLINIC / HEALTH CENTER
AutoCAD SHX Text 100.41
AutoCAD SHX Text 010048
AutoCAD SHX Text C110
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 101.12
AutoCAD SHX Text 010049
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 07 AUG 2018
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
PM/DM
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
CONOLLY HALL FIBER - BASEMENT & FIRST FLOOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AS-SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT - NEWPORT
AutoCAD SHX Text
NAVAL STATION - NEWPORT, RI
AutoCAD SHX Text
NAVAL STATION NEWPORT, RI
AutoCAD SHX Text
NEWPORT, RI
AutoCAD SHX Text
NAVAL STATION NEWPORT
AutoCAD SHX Text
MM/DD/YY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1691406
AutoCAD SHX Text
CONOLLY HALL IT C-L204 72SM TO 27 MLH (WEST WALL) CONOLLY HALL IT C-L204 72SM TO 27 MLH (WEST WALL)
CONOLLY HALL IT C-L204 EXISTING CONDITIONS - NORTH WALL CONOLLY HALL IT C-L204 EXISTING CONDITIONS - SOUTH WALL
CONOLLY HALL IT C-L204 EXISTING CONDITIONS - EAST WALL CONOLLY HALL IT C-L204 EXISTING CONDITIONS - WEST WALL
ET004
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
A
TL
A N
TI
C
RE
PA
IR
C
O
NO
LL
Y
HA
LL
N W
C
- B
LD
G
C
HI
S
CONOLLY HALL IT C-L204 EXISTING TO REMAIN
JUNCTION BOX ON BASEMENT/L1 LEVEL NORTH WALL
CONOLLY HALL IT C-L204 TO SPRUANCE HALL
IT/PROJECTION ROOM SP-010
CONOLLY HALL IT C-L204 VERIZON SERVICE
(NORTH WALL)
CONOLLY HALL IT C-L204 VERIZON SERVICE
(NORTH WALL)
CONOLLY HALL IT C-L204 TO HEWITT HALL IT H-L134
FIBER (WEST WALL)
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 07 AUG 2018
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
PM/DM
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
CONOLLY HALL FIBER - PHOTOS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AS-SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT - NEWPORT
AutoCAD SHX Text
NAVAL STATION - NEWPORT, RI
AutoCAD SHX Text
NAVAL STATION NEWPORT, RI
AutoCAD SHX Text
NEWPORT, RI
AutoCAD SHX Text
NAVAL STATION NEWPORT
AutoCAD SHX Text
MM/DD/YY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1691406
AutoCAD SHX Text
CONOLLY SPRUANCEHEWITT
COLBERT PLAZA OVERHANG
B686 B683B991
LOBBYLOBBY
GARAGE ENTRANCELUCE AVEPLAZA STAIR
CONOLLY SPRUANCEHEWITT
COLBERT PLAZA OVERHANG
B686 B683B991
LOBBYLOBBY
GARAGE ENTRANCELUCE AVEPLAZA STAIR
LEVEL 1 - GARAGE
LEVEL 2 - GARAGE
JUNCTION BOX GOES
UP TO SPRUANCE
JUNCTION BOX
IT CLOSET
C-L204
JUNCTION BOX
SPRUANCE HALL PARKING GARAGE
UNDERGROUND ENTRANCE/EXIT
ET005
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
A
TL
A N
TI
C
RE
PA
IR
C
O
NO
LL
Y
HA
LL
N W
C
- B
LD
G
C
HI
S
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 07 AUG 2018
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
PM/DM
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
CONOLLY AND SPRUANCE HALL GARAGE FIBER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AS-SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT - NEWPORT
AutoCAD SHX Text
NAVAL STATION - NEWPORT, RI
AutoCAD SHX Text
NAVAL STATION NEWPORT, RI
AutoCAD SHX Text
NEWPORT, RI
AutoCAD SHX Text
NAVAL STATION NEWPORT
AutoCAD SHX Text
MM/DD/YY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1691406
AutoCAD SHX Text
BUILDING 683 - FIRST FLOOR PLAN1
10' 20'
UP FROM
GARAGE
NETWORK
SWITCH
SPRUANCE HALL IT/PROJECTION ROOM
SP-010 CABLE MANAGEMENT
SPRUANCE HALL IT/PROJECTION ROOM
SP-010 NETWORK & FIBER CABINETS
ET006
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
A
TL
A N
TI
C
RE
PA
IR
C
O
NO
LL
Y
HA
LL
N W
C
- B
LD
G
C
HI
S
AutoCAD SHX Text
FELIX DE WELDON
AutoCAD SHX Text
WALKWAY
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 111.08
AutoCAD SHX Text 010001
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 207.50
AutoCAD SHX Text 010002
AutoCAD SHX Text
REAR PROJECTION ROOM
AutoCAD SHX Text
AUDITORIUM
AutoCAD SHX Text 1022.40
AutoCAD SHX Text 010003
AutoCAD SHX Text
AV ROOM
AutoCAD SHX Text
AUDITORIUM
AutoCAD SHX Text 215.87
AutoCAD SHX Text 010004
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 96.99
AutoCAD SHX Text 010006
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 22.81
AutoCAD SHX Text 010007
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 47.42
AutoCAD SHX Text 010008
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 50.66
AutoCAD SHX Text 010009
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 46.56
AutoCAD SHX Text 010010
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 47.45
AutoCAD SHX Text 010011
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 47.06
AutoCAD SHX Text 010012
AutoCAD SHX Text
AUDITORIUM
AutoCAD SHX Text 7326.32
AutoCAD SHX Text 010013
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 23.78
AutoCAD SHX Text 010015
AutoCAD SHX Text
PREP ROOM
AutoCAD SHX Text
FOOD SERVICE
AutoCAD SHX Text 152.74
AutoCAD SHX Text 010016
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 36.51
AutoCAD SHX Text 010017
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 26.86
AutoCAD SHX Text 010018
AutoCAD SHX Text
SEMINAR ROOM C
AutoCAD SHX Text
AUDITORIUM
AutoCAD SHX Text 399.61
AutoCAD SHX Text 010019
AutoCAD SHX Text
SEMINAR ROOM B
AutoCAD SHX Text
AUDITORIUM
AutoCAD SHX Text 397.46
AutoCAD SHX Text 010020
AutoCAD SHX Text
SEMINAR ROOM A
AutoCAD SHX Text
AUDITORIUM
AutoCAD SHX Text 399.88
AutoCAD SHX Text 010021
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 234.23
AutoCAD SHX Text 010022
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 188.63
AutoCAD SHX Text 010023
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 398.04
AutoCAD SHX Text 010024
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 171.16
AutoCAD SHX Text 010025
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text 87.32
AutoCAD SHX Text 010026
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 149.81
AutoCAD SHX Text 010027
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text 58.85
AutoCAD SHX Text 010028
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 120.44
AutoCAD SHX Text 010029
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 16.33
AutoCAD SHX Text 010030
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text 111.29
AutoCAD SHX Text 010031
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text 197.64
AutoCAD SHX Text 010032
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 07 AUG 2018
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
PM/DM
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
SPRUANCE HALL FIBER - FIRST FLOOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AS-SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT - NEWPORT
AutoCAD SHX Text
NAVAL STATION - NEWPORT, RI
AutoCAD SHX Text
NAVAL STATION NEWPORT, RI
AutoCAD SHX Text
NEWPORT, RI
AutoCAD SHX Text
NAVAL STATION NEWPORT
AutoCAD SHX Text
MM/DD/YY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1691406
AutoCAD SHX Text
DN
UP
ROOM
M13
ER
M11
ARCHIVE
STORAGE
M10A
ARCHIVE
STORAGE
N18B
OFFICE
M14
OFFICE
N18
CLASSROOM
N18A
CORRIDOR
N14A
CLASSROOM
N19
STAIR
ST02
ARCHIVE
STORAGE
M10C
CORR
M10
OFFICE
M14A
STOR
M19
STAIR
ST01
STOR
S01
SHAFT
S03
STAIR
ST04
CORR
M13A
UP
CRAWL
SPACE
B12B
CRAWL
SPACE
B12A
CRAWL
SPACE
B12C
MECH
B12
CRAWL
SPACE
B12D
EXISTING WALKWAY FOUNDATION
FROM FIRST FLOOR
RUNS UNDERGROUND TO
SPRUANCE GARAGE
FROM M11 DOWN
TO CRAWLSPACE MAHAN HALL IT M11
MAHAN HALL STORAGE M10C
MAHAN HALL FIRST FLOOR
MAHAN HALL BASEMENT
MAHAN HALL CRAWL SPACE / BASEMENT
UNDERGROUND ENTRANCE/EXIT
ET007
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
A
TL
A N
TI
C
RE
PA
IR
C
O
NO
LL
Y
HA
LL
N W
C
- B
LD
G
C
HI
S
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 07 AUG 2018
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
PM/DM
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
MAHAN HALL FIBER - BASEMENT & FIRST FLOOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AS-SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT - NEWPORT
AutoCAD SHX Text
NAVAL STATION - NEWPORT, RI
AutoCAD SHX Text
NAVAL STATION NEWPORT, RI
AutoCAD SHX Text
NEWPORT, RI
AutoCAD SHX Text
NAVAL STATION NEWPORT
AutoCAD SHX Text
MM/DD/YY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1691406
AutoCAD SHX Text
BUILDING 27 - FIRST FLOOR PLAN1
10' 20'
THROUGH 2ND FLOOR UP
TO 3RD FLOOR
FROM 2ND FLOOR
ET008
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
A
TL
A N
TI
C
RE
PA
IR
C
O
NO
LL
Y
HA
LL
N W
C
- B
LD
G
C
HI
S
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MLH-100C
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 1842.60
AutoCAD SHX Text
MLH-104B
AutoCAD SHX Text
CONFERENCE / CLASSROOM
AutoCAD SHX Text 358.27
AutoCAD SHX Text
MLH-104A
AutoCAD SHX Text
CONFERENCE / CLASSROOM
AutoCAD SHX Text 205.37
AutoCAD SHX Text
MLH-104
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 6267.44
AutoCAD SHX Text
MLH-102A
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 197.94
AutoCAD SHX Text
MLH-102
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 289.81
AutoCAD SHX Text
MLH-104D
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 396.86
AutoCAD SHX Text
MLH-104C
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 150.21
AutoCAD SHX Text
MLH-103
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 249.35
AutoCAD SHX Text
MLH-103A
AutoCAD SHX Text
STAIRWELL 3
AutoCAD SHX Text 260.44
AutoCAD SHX Text
MLH-149
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 30.46
AutoCAD SHX Text
MLH-148
AutoCAD SHX Text
MEN RESTROOM
AutoCAD SHX Text 281.98
AutoCAD SHX Text
MLH-146
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 30.76
AutoCAD SHX Text
MLH-147
AutoCAD SHX Text
WOMEN RESTROOM
AutoCAD SHX Text 169.38
AutoCAD SHX Text
MLH-145
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 19.13
AutoCAD SHX Text
MLH-117
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 600.94
AutoCAD SHX Text
MLH-118
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 472.66
AutoCAD SHX Text
MLH-119C
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 134.09
AutoCAD SHX Text
MLH-119B
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 45.11
AutoCAD SHX Text
MLH-119A
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 45.19
AutoCAD SHX Text
MLH-119
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 458.28
AutoCAD SHX Text
MLH-121
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 235.59
AutoCAD SHX Text
MLH-100B
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 388.69
AutoCAD SHX Text
MLH-128
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 172.07
AutoCAD SHX Text
MLH-129
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 168.29
AutoCAD SHX Text
MLH-123
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 211.18
AutoCAD SHX Text
MLH-125
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 217.91
AutoCAD SHX Text
MLH-127
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 216.25
AutoCAD SHX Text
MLH-130B
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 91.17
AutoCAD SHX Text
MLH-130A
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 91.44
AutoCAD SHX Text
MLH-130
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 473.14
AutoCAD SHX Text
MLH-131
AutoCAD SHX Text
CONFERENCE / CLASSROOM
AutoCAD SHX Text 438.74
AutoCAD SHX Text
MLH-132
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 140.14
AutoCAD SHX Text
MLH-120
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 48.54
AutoCAD SHX Text
MLH-122
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 184.62
AutoCAD SHX Text
MLH-115
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 126.77
AutoCAD SHX Text
MLH-114
AutoCAD SHX Text
AUDITORIUM
AutoCAD SHX Text 350.62
AutoCAD SHX Text
MLH-113
AutoCAD SHX Text
DATA PROCESSING
AutoCAD SHX Text 123.63
AutoCAD SHX Text
MLH-112
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 241.06
AutoCAD SHX Text
MLH-111
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 526.32
AutoCAD SHX Text
MLH-136E
AutoCAD SHX Text
CONFERENCE / CLASSROOM
AutoCAD SHX Text 753.95
AutoCAD SHX Text
MLH-135
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 257.42
AutoCAD SHX Text
MLH-136D
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 97.30
AutoCAD SHX Text
MLH-136F
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 96.83
AutoCAD SHX Text
MLH-136G
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 97.74
AutoCAD SHX Text
MLH-136H
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 108.63
AutoCAD SHX Text
MLH-136I
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 99.96
AutoCAD SHX Text
MLH-136C
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 264.02
AutoCAD SHX Text
MLH-136
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 873.51
AutoCAD SHX Text
MLH-136A
AutoCAD SHX Text
CONFERENCE / CLASSROOM
AutoCAD SHX Text 604.77
AutoCAD SHX Text
MLH-137
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 1613.68
AutoCAD SHX Text
MLH-138A
AutoCAD SHX Text
DATA PROCESSING
AutoCAD SHX Text 181.03
AutoCAD SHX Text
MLH-138
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 675.00
AutoCAD SHX Text
MLH-141B
AutoCAD SHX Text
STAIRWELL 2
AutoCAD SHX Text 330.42
AutoCAD SHX Text
MLH-140
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 50.86
AutoCAD SHX Text
MLH-141
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text 230.27
AutoCAD SHX Text
MLH-142
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 40.92
AutoCAD SHX Text
MLH-143
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 66.00
AutoCAD SHX Text
MLH-144
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 78.67
AutoCAD SHX Text
MLH-110E
AutoCAD SHX Text
CONFERENCE / CLASSROOM
AutoCAD SHX Text 1628.68
AutoCAD SHX Text
MLH-110W
AutoCAD SHX Text
CONFERENCE / CLASSROOM
AutoCAD SHX Text 1614.86
AutoCAD SHX Text
MLH-109
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text 130.69
AutoCAD SHX Text
MLH-108
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 59.54
AutoCAD SHX Text
MLH-107
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 272.20
AutoCAD SHX Text
MLH-107A
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 105.63
AutoCAD SHX Text
MLH-106
AutoCAD SHX Text
STAIRWELL 1
AutoCAD SHX Text 314.60
AutoCAD SHX Text
MLH-105B
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 189.05
AutoCAD SHX Text
MLH-105A
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 160.94
AutoCAD SHX Text
MLH-105
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 660.11
AutoCAD SHX Text
MLH-116
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .