Attachment K-Package 1 NWC B686 Conolly Specs.pdf
PDF 12 MB Posted
- Solicitation number
- N4008524R2601
About this file
This document appears to be Attachment K - Package 1 NWC B686 Conolly Specifications, which is related to the federal contract opportunity for the NWC B686 Conolly Hall Upgrades/NWC Modular Buildings project solicited by the Department of the Navy Naval Facilities Engineering Command under Solicitation Number N4008524R2601.
The specifications outline the technical requirements for the Conolly Hall Upgrades project, including the scope of work, materials, and performance standards. Key details include the requirement to provide labor, materials, and equipment for interior and exterior renovations to Conolly Hall, such as replacing HVAC systems, upgrading electrical systems, and performing architectural finishes. The specifications also reference associated drawings available in Attachment J, which is posted separately. No pricing or response date information is provided in this attachment.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Conolly Hall NWC
Building 686
Naval War College
NAVAL STATION NEWPORT
Newport, RI 02841
SUBMITTED BY:
Symmes Maini & McKee Associates
1000 Massachusetts Avenue
Cambridge, MA 02138
A/E Contract Number: N40085-18-D-8703
(eProject#: 1691406)
PREPARED BY:
Structural: Symmes Maini & McKee Associates
Architectural: Symmes Maini & McKee Associates
Interior Design: Symmes Maini & McKee Associates
Plumbing: Symmes Maini & McKee Associates
Mechanical: Symmes Maini & McKee Associates
Electrical: Symmes Maini & McKee Associates
Code Consultant, FA/FP: Code Red Consultants
Cost Estimator: Crawford Consulting
Civil & Environmental: RI Analytical
Commissioning: Hallam ICS
SHPO Consultant: Epsilon Associates Inc.
Cyber Security Engr: Chinook
SPECIFICATIONS
Issue for Bid
02/16/2024
THIS PAGE INTENTIONALLY LEFT BLANK
REPAIR CONOLLY HALL - NWC ; BLDG 686 CHI S 1691406
ISSUE FOR BID
Cover Page 2
ISSUE FOR BID -
SEALS PAGE - REGISTERED PROFESIONALS FOR DESIGN
REPAIR CONOLLY HALL - NWC ; BLDG 686 CHI S 1691406
ISSUE FOR BID
Repair Conolly Hall NWC
Building 686
Naval War College
NAVAL STATION NEWPORT
Newport, RI 02841
Seals Page 1
02/16/2024
John Alfeo Mark O'Brien
Jennifer Howe
Maxwell French
Nicholas Koulbanis Paul Elliott
Seals Page 2
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 91 00.15 BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 SELECTIVE DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
DI VI SI ON 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 05 20 POST-INSTALLED CONCRETE AND MASONRY ANCHORS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 52 00 METAL RAILINGS
PROJECT TABLE OF CONTENTS Page 1
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 34 01 FORCED ENTRY RESISTANT COMPONENTS
08 34 02 BULLET-RESISTANT COMPONENTS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 PORCELAIN TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 66 16 TERRAZZO FLOOR TILE
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 84 20 ACOUSTICAL WOOD WALL PANELS
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 22 19 DEMOUNTABLE AND MOVABLE PARTITIONS
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
PROJECT TABLE OF CONTENTS Page 2
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DI VI SI ON 11 - EQUI PMENT
11 44 00 FOOD COOKING EQUIPMENT
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WINDOW SHADES
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 21 23.13 20 ELECTRIC TRACTION PASSENGER ELEVATORS - MODERNIZATION
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 12 00 STANDPIPE SYSTEMS
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 63 10 LOW-PRESSURE FACILITY GAS PIPING
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00 COMMISSIONING OF MECHANICAL AND PLUMBING SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 30 00 HVAC AIR DISTRIBUTION
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 29 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS
23 82 00.00 20 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -
BUILDING CONTROL SYSTEMS (BCS) - HVAC
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - FIRE
& LIFE SAFETY (FLS)
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
PROJECT TABLE OF CONTENTS Page 3
26 05 74 SHORT CIRCUIT, PROTECTIVE DEVICE COORDINATION AND ARC
FLASH STUDY
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 32 15.00 NATURAL GAS ENGINE-GENERATOR SET STATIONARY 15-2500 KW,
WITH AUXILIARIES
26 36 23 AUTOMATIC TRANSFER SWITCHES
26 51 00 INTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 29 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 53 19.13 FIRST RESPONDER DISTRIBUTED ANTENNAE SYSTEM (DAS)
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings and supplementary content for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS - Contract drawings are as follows:
# SHEET
NO.
NAVFAC
DWG NO
NAVSTA
DWG NO
SHEET NAME
GENERAL
1 G-001 1289761 46745 COVER
2 G-002 1289762 46746 INDEX OF DRAWINGS
NWC MOBILIZATION
3 AS-100 --- --- PROPOSED CONSTRUCITON SITE PLAN
HAZMAT
4 H-001 1289763 46747 ASBESTOS REMOVAL TABLE
5 H-100 1289769 46753 ACM REMOVAL - WALL AND FLOOR MATERIALS
6 H-101 1289770 46754 BASEMENT - ACM REMOVAL - PIPE INSULATION AND DUCTWORK
7 H-102 1289771 46755 BASEMENT MECHANICAL ROOM - ACM REMOVAL - PIPE
INSULATION AND DUCTWORK
8 H-103 1289772 46756 FIRST FLOOR - ACM REMOVAL - WALL AND FLOOR MATERIALS
9 H-104 1289773 46757 FIRST FLOOR - ACM REMOVAL - PIPE INSULATION AND
DUCTWORK
10 H-105 1289774 46758 SECOND FLOOR - ACM REMOVAL - WALL AND FLOOR MATERIALS
11 H-106 1289775 46759 SECOND FLOOR - ACM REMOVAL - PIPE INSULATION AND
DUCTWORK
12 H-107 1289776 46760 THIRD FLOOR - ACM REMOVAL - WALL AND FLOOR MATERIALS
13 H-108 1289777 46761 THIRD FLOOR - ACM REMOVAL - PIPE INSULATION AND
DUCTWORK
DOCUMENT 00 01 15 Page 1
14 H-109 1289778 46762 FOURTH FLOOR - ACM REMOVAL - WALL AND FLOOR MATERIALS
15 H-110 1289779 46763 FOURTH FLOOR - ACM REMOVAL - PIPE INSULATION AND
DUCTWORK
16 H-111 1289780 46764 NORTH & SOUTH PENTHOUSE - ACM REMOVAL - PIPE
INSULATION AND DUCTWORK
17 H-200 1289784 46768 ACM + PCB DRAWING EAST ELEVATION
18 H-201 1289785 46769 ACM + PCB DRAWING WEST ELEVATION
19 H-202 1289786 46770 ACM + PCB DRAWING SOUTH ELEVATION
* --- --- --- * Sheet #'s 20 through 26 (NOT ISSUED)
LIFE SAFETY
27 LS001 1289787 46771 CODE SUMMARY SHEET
28 LS101 1289788 46772 LEVEL 2 -MECHANICAL BASEMENT LIFE SAFETY PLAN -OVERALL
29 LS101A 1289789 46773 LEVEL 2 -MECHANICAL BASEMENT LIFE SAFETY PLAN -PART A
30 LS101B 1289790 46774 LEVEL 2 -MECHANICAL BASEMENT LIFE SAFETY PLAN -PART B
31 LS102 1289791 46775 LEVEL 1 -BASEMENT LIFE SAFETY PLAN -OVERALL
32 LS102A 1289792 46776 LEVEL 1 -BASEMENT LIFE SAFETY PLAN -PART A
33 LS102B 1289793 46777 LEVEL 1 -BASEMENT LIFE SAFETY PLAN -PART B
34 LS103 1289794 46778 1ST FLOOR LIFE SAFETY PLAN -OVERALL
35 LS103A 1289795 46779 1ST FLOOR LIFE SAFETY PLAN -PART A
36 LS103B 1289796 46780 1ST FLOOR LIFE SAFETY PLAN -PART B
37 LS104 1289797 46781 2ND FLOOR LIFE SAFETY PLAN
38 LS105 1289798 46782 3RD FLOOR LIFE SAFETY PLAN
39 LS106 1289799 46783 4TH FLOOR LIFE SAFETY PLAN
40 LS107 1289800 46784 PENTHOUSE AND ROOF LIFE SAFETY PLAN
ARCHITECTURE
41 A-001 1289801 46785 LEGENDS, NOTES, ABBREVIATIONS
42 A-002 1289802 46786 PARTITION TYPES, NOTES & DETAILS
43 AD100 1289803 46787 DEMOLITION PLAN NOTES AND LEGENDS
44 AD101 1289804 46788 LEVEL 2 - MECH. BASEMENT DEMOLITION PLAN
45 AD102 1289805 46789 LEVEL 1 - BASEMENT DEMOLITION PLAN
46 AD103 1289806 46790 1ST FLOOR DEMOLITION PLAN
DOCUMENT 00 01 15 Page 2
47 AD104 1289807 46791 2ND FLOOR DEMOLITION PLAN
48 AD105 1289808 46792 3RD FLOOR DEMOLITION PLAN
49 AD106 1289809 46793 4TH FLOOR DEMOLITION PLAN
50 AD107 1289810 46794 PENTHOUSE AND ROOF DEMOLITION PLAN
51 A-100 1289811 46795 CONSTRUCTION & RCP NOTES AND LEGENDS
52 A-101 1289812 46796 LEVEL 2 - MECH. BASEMENT CONSTRUCTION PLAN
53 A-101A 1289813 46797 LEVEL 2 - MECH. BASEMENT CONSTRUCTION PLAN - PART A
54 A-101B 1289814 46798 LEVEL 2 - MECH. BASEMENT CONSTRUCTION PLAN - PART B
55 A-102 1289815 46799 LEVEL 1 - BASEMENT CONSTRUCTION PLAN OVERALL
56 A-102A 1289816 46800 LEVEL 1 - BASEMENT CONSTRUCTION PLAN - PART A
57 A-102B 1289817 46801 LEVEL 1 - BASEMENT CONSTRUCTION PLAN - PART B
58 A-103 1289818 46802 1ST FLOOR CONSTRUCTION PLAN OVERALL
59 A-103A 1289819 46803 1ST FLOOR CONSTRUCTION PLAN - PART A
60 A-103B 1289820 46804 1ST FLOOR CONSTRUCTION PLAN - PART B
61 A-104 1289821 46805 2ND FLOOR CONSTRUCTION PLAN OVERALL
62 A-104A 1289822 46806 2ND FLOOR CONSTRUCTION PLAN - PART A
63 A-104B 1289823 46807 2ND FLOOR CONSTRUCTION PLAN - PART B
64 A-105 1289824 46808 3RD FLOOR CONSTRUCTION PLAN OVERALL
65 A-105A 1289825 46809 3RD FLOOR CONSTRUCTION PLAN - PART A
66 A-105B 1289826 46810 3RD FLOOR CONSTRUCTION PLAN - PART B
67 A-106 1289827 46811 4TH FLOOR CONSTRUCTION PLAN OVERALL
68 A-106A 1289828 46812 4TH FLOOR CONSTRUCTION PLAN - PART A
69 A-106B 1289829 46813 4TH FLOOR CONSTRUCTION PLAN - PART B
70 A-107 1289830 46814 PENTHOUSE AND ROOF CONSTRUCTION PLAN
71 AR101 1289831 46815 LEVEL 2 - MECH. BASEMENT RCP OVERALL
72 AR101A 1289832 46816 LEVEL 2 - MECH. BASEMENT RCP - PART A
73 AR101B 1289833 46817 LEVEL 2 - MECH. BASEMENT RCP - PART B
74 AR102 1289834 46818 LEVEL 1 - BASEMENT FLOOR RCP - OVERALL
75 AR102A 1289835 46819 LEVEL 1 - BASEMENT FLOOR RCP - PART A
76 AR102B 1289836 46820 LEVEL 1 - BASEMENT FLOOR RCP - PART B
77 AR103 1289837 46821 1ST FLOOR RCP - OVERALL
78 AR103A 1289838 46822 1ST FLOOR RCP - PART A
DOCUMENT 00 01 15 Page 3
79 AR103B 1289839 46823 1ST FLOOR RCP - PART B
80 AR104 1289840 46824 2ND FLOOR RCP - OVERALL
81 AR104A 1289841 46825 2ND FLOOR RCP - PART A
82 AR104B 1289842 46826 2ND FLOOR RCP - PART B
83 AR105 1289843 46827 3RD FLOOR RCP - OVERALL
84 AR105A 1289844 46828 3RD FLOOR RCP - PART A
85 AR105B 1289845 46829 3RD FLOOR RCP - PART B
86 AR106 1289846 46830 4TH FLOOR RCP - OVERALL
87 AR106A 1289847 46831 4TH FLOOR RCP - PART A
88 AR106B 1289848 46832 4TH FLOOR RCP - PART B
89 AR107 1289849 46833 PENTHOUSE AND ROOF RCP - OVERALL
90 A-201 1289850 46834 EXTERIOR ELEVATIONS
91 A-202 1289851 46835 EXTERIOR ELEVATIONS
92 A-251 1289852 46836 INTERIOR ELEVATIONS
93 A-252 1289853 46837 INTERIOR ELEVATIONS
94 A-301 1289854 46838 BUILDING SECTIONS
95 A-401 1289855 46839 ENLARGED PLAN NOTES, SCHEDULES, LEGENDS
96 A-402 1289856 46840 ENLARGED PLANS AND ELEVATIONS - RESTROOMS
97 A-403 1289857 46841 ENLARGED PLANS AND ELEVATIONS - RESTROOMS
98 A-404 1289858 46842 ENLARGED PLANS AND ELEVATIONS - BREAKROOMS AND
WELLNESS
99 A-405 1289859 46843 ENLARGED PLANS AND ELEVATIONS
100 A-406 1289860 46844 ENLARGED PLANS AND SECTIONS - SOUTH STAIR
101 A-407 1289861 46845 ENLARGED PLANS AND SECTIONS - NORTH STAIR
102 A-408 1289862 46846 STAIR DETAILS
103 A-501 1289863 46847 EXTERIOR WINDOW ELEVATIONS
104 A-502 1289864 46848 EXTERIOR WINDOW DETAILS
105 A-503 1289865 46849 TYPICAL ROOF DETAILS
106 A-551 1289866 46850 INTERIOR DETAILS - CEILINGS AND MILLWORK
107 A-552 1289867 46851 INTERIOR DETAILS
108 A-553 1289868 46852 INTERIOR DETAILS
109 A-554 1289869 46853 INTERIOR DETAILS
110 A-556 1289870 46854 INTERIOR DETAILS - COLUMNS
DOCUMENT 00 01 15 Page 4
111 A-557 1289871 46855 INTERIOR DETAILS
112 A-558 1289872 46856 INTERIOR DETAILS
113 A-559 1289873 46857 INTERIOR DETAILS
114 A-560 1289874 46858 INTERIOR DETAILS
115 A-601 1289875 46859 DOOR & FRAME TYPES & DETAILS
116 A-602 1289876 46860 DOOR SCHEDULE
117 A-603 1289877 46861 DEMOUNTABLE SYSTEM SCHEDULE AND TYPES
INTERIORS
118 I-102 1289878 46862 LEVEL1 - BASEMENT FLOOR FINISH PLAN
119 I-103 1289879 46863 1ST FLOOR FINISH PLAN
120 I-104 1289880 46864 2ND FLOOR FINISH PLAN
121 I-105 1289881 46865 3RD FLOOR FINISH PLAN
122 I-106 1289882 46866 4TH FLOOR FINISH PLAN
123 I-107 1289883 46867 FINISH SCHEDULE LEGEND
124 I-108 1289884 46868 ROOM FINISH SCHEDULE
125 I-121 1289885 46869 LEVEL 2 - MECH. BASEMENT FLOOR SIGNAGE PLAN
126 I-112 1289886 46870 LEVEL 1 - BASEMENT FLOOR TEST FIT PLAN
127 I-113 1289887 46871 1ST FLOOR TEST FIT PLAN
128 I-114 1289888 46872 2ND FLOOR TEST FIT PLAN
129 I-115 1289889 46873 3RD FLOOR TEST FIT PLAN
130 I-116 1289890 46874 4TH FLOOR TEST FIT PLAN
131 I-122 1289891 46875 LEVEL 1 - BASEMENT FLOOR SIGNAGE PLAN
132 I-123 1289892 46876 1ST FLOOR SIGNAGE PLAN
133 I-124 1289893 46877 2ND FLOOR SIGNAGE PLAN
134 I-125 1289894 46878 3RD FLOOR SIGNAGE PLAN
135 I-126 1289895 46879 4TH FLOOR SIGNAGE PLAN
136 I-127 1289896 46880 PENTHOUSE FLOOR SIGNAGE PLAN
137 I-128 1289897 46881 SIGNAGE SCHEDULE
138 I-129 1289898 46882 SIGNAGE SCHEDULE
139 I-130 1289899 46883 SIGNAGE DETAILS
140 I-131 1289900 46884 SIGNAGE DETAILS
FIRE ALARM
DOCUMENT 00 01 15 Page 5
141 FA-001 1289901 46885 FIRE ALARM LEAD SHEET
142 FA-002 1289902 46886 FIRE ALARM SEQUENCE OF OPERATIONS
143 FA-003 1289903 46887 FIRE ALARM RISER DIAGRAM
144 FAD101 1289904 46888 P1-GARAGE FIRE ALARM -DEMOLITION PLAN
145 FAD102 1289905 46889 P2-GARAGE FIRE ALARM -DEMOLITION PLAN
146 FAD103 1289906 46890 LEVEL 2 -MECHANICAL BASEMENT FLOOR FIRE ALARM
-DEMOLITION PLAN
147 FAD104 1289907 46891 LEVEL 1 -BASEMENT FLOOR FIRE ALARM -DEMOLITION PLAN
148 FAD105 1289908 46892 1ST FLOOR FIRE ALARM -DEMOLITION PLAN
149 FAD106 1289909 46893 2ND FLOOR FIRE ALARM -DEMOLITION PLAN
150 FAD107 1289910 46894 3RD FLOOR FIRE ALARM -DEMOLITION PLAN
151 FAD108 1289911 46895 4TH FLOOR FIRE ALARM -DEMOLITION PLAN
152 FAD109 1289912 46896 PENTHOUSE AND ROOF FIRE ALARM -DEMOLITION PLAN
153 FA-101 1289913 46897 P1-GARAGE FIRE ALARM
154 FA-102 1289914 46898 P2-GARAGE FIRE ALARM
155 FA-103A 1289915 46899 LEVEL 2 -MECHANICAL BASEMENT FLOOR FIRE ALARM -PART A
156 FA-103B 1289916 46900 LEVEL 2 -MECHANICAL BASEMENT FLOOR FIRE ALARM -PART B
157 FA-104A 1289917 46901 LEVEL 1 -BASEMENT FLOOR FIRE ALARM -PART A
158 FA-104B 1289918 46902 LEVEL 1 -BASEMENT FLOOR FIRE ALARM -PART B
159 FA-105A 1289919 46903 1ST FLOOR FIRE ALARM -PART A
160 FA-105B 1289920 46904 1ST FLOOR FIRE ALARM -PART B
161 FA-106A 1289921 46905 2ND FLOOR FIRE ALARM -PART A
162 FA-106B 1289922 46906 2ND FLOOR FIRE ALARM -PART B
163 FA-107A 1289923 46907 3RD FLOOR FIRE ALARM -PART A
164 FA-107B 1289924 46908 3RD FLOOR FIRE ALARM -PART B
165 FA-108A 1289925 46909 4TH FLOOR FIRE ALARM -PART A
166 FA-108B 1289926 46910 4TH FLOOR FIRE ALARM -PART B
167 FA-109A 1289927 46911 PENTHOUSE AND ROOF FIRE ALARM -PART A
168 FA-109B 1289928 46912 PENTHOUSE AND ROOF FIRE ALARM -PART B
169 FA-501 1289929 46913 FIRE ALARM DETAILS
FIRE PROTECTION
170 FP-001 1289930 46914 FIRE PROTECTION LEAD SHEET
171 FP-002 1289931 46915 FIRE PROTECTION ONE LINE DIAGRAM
DOCUMENT 00 01 15 Page 6
172 FPD101 1289932 46916 P1-GARAGE FIRE PROTECTION -DEMOLITION PLAN
173 FPD102 1289933 46917 P2-GARAGE FIRE PROTECTION -DEMOLITION PLAN
174 FPD103 1289934 46918 LEVEL 2 -MECHANICAL BASEMENT FLOOR FIRE PROTECTION
-DEMOLITION PLAN
175 FPD104 1289935 46919 LEVEL 1 -BASEMENT FLOOR FIRE PROTECTION -DEMOLITION
PLAN
176 FPD105 1289936 46920 1ST FLOOR FIRE PROTECTION -DEMOLITION PLAN
177 FPD106 1289937 46921 2ND FLOOR THROUGH PENTHOUSE ROOF FIRE PROTECTION
-DEMOLITION PLAN
178 FP-101 1289938 46922 P1-GARAGE FIRE PROTECTION
179 FP-102 1289939 46923 P2-GARAGE FIRE PROTECTION
180 FP-103A 1289940 46924 LEVEL 2 -MECHANICAL BASEMENT FLOOR FIRE PROTECTION
-PART A
181 FP-103B 1289941 46925 LEVEL 2 -MECHANICAL BASEMENT FLOOR FIRE PROTECTION
-PART B
182 FP-104A 1289942 46926 LEVEL 1 -BASEMENT FLOOR FIRE PROTECTION -PART A
183 FP-104B 1289943 46927 LEVEL 1 -BASEMENT FLOOR FIRE PROTECTION -PART B
184 FP-105A 1289944 46928 1ST FLOOR FIRE PROTECTION -PART A
185 FP-105B 1289945 46929 1ST FLOOR FIRE PROTECTION -PART B
186 FP-106A 1289946 46930 2ND FLOOR FIRE PROTECTION -PART A
187 FP-106B 1289947 46931 2ND FLOOR FIRE PROTECTION -PART B
188 FP-107A 1289948 46932 3RD FLOOR FIRE PROTECTION -PART A
189 FP-107B 1289949 46933 3RD FLOOR FIRE PROTECTION -PART B
190 FP-108A 1289950 46934 4TH FLOOR FIRE PROTECTION -PART A
191 FP-108B 1289951 46935 4TH FLOOR FIRE PROTECTION -PART B
192 FP-109A 1289952 46936 PENTHOUSE AND ROOF FIRE PROTECTION -PART A
193 FP-109B 1289953 46937 PENTHOUSE AND ROOF FIRE PROTECTION -PART B
194 FP-401 1289954 46938 FIRE PROTECTION BUILDING SECTIONS
195 FP-501 1289955 46939 FIRE PROTECTION DETAILS
PLUMBING
196 P-001 1289956 46940 PLUMBING LEGEND
197 PD101 1289957 46941 MECHANICAL BASEMENT FLOOR DEMOLITION PLAN
198 PD102 1289958 46942 BASEMENT FLOOR DEMOLITION PLAN
199 PD103 1289959 46943 1ST FLOOR DEMOLITION PLAN
200 PD104 1289960 46944 2ND FLOOR DEMOLITION PLAN
201 PD105 1289961 46945 3RD FLOOR DEMOLITION PLAN
202 PD106 1289962 46946 4TH FLOOR DEMOLITION PLAN
DOCUMENT 00 01 15 Page 7
203 PD107 1289963 46947 PENTHOUSE FLOOR DEMOLITION PLAN
204 P-101 1289964 46948 MECHANICAL BASEMENT FLOOR CONSTRUCTION PLAN
205 P-102 1289965 46949 BASEMENT FLOOR CONSTRUCTION PLAN
206 P-103 1289966 46950 1ST FLOOR CONSTRUCTION PLAN
207 P-104 1289967 46951 2ND FLOOR CONSTRUCTION PLAN
208 P-105 1289968 46952 3RD FLOOR CONSTRUCTION PLAN
209 P-106 1289969 46953 4TH FLOOR CONSTRUCTION PLAN
210 P-107 1289970 46954 PENTHOUSE FLOOR CONSTRUCTION PLAN
211 P-501 1289971 46955 PLUMBING DETAILS I
212 P-502 1289972 46956 PLUMBING DETAILS II
213 P-503 1289973 46957 PLUMBING DETAILS III
214 P-601 1289974 46958 SCHEDULES
215 P-701 1289975 46959 SANITARY RISER DIAGRAMS
216 P-702 1289976 46960 WATER RISER DIAGRAMS
MECHANICAL
217 M-001 1289977 46961 ABBREVIATIONS
218 M-002 1289978 46962 SYMBOLS & NOTES
219 MD101 1289979 46963 MECHANICAL BASEMENT FLOOR DUCTWORK DEMOLITION PLAN
220 MD102 1289980 46964 BASEMENT FLOOR DUCTWORK DEMOLITION PLAN
221 MD103 1289981 46965 1ST FLOOR DUCTWORK DEMOLITION PLAN
222 MD104 1289982 46966 2ND FLOOR DUCTWORK DEMOLITION PLAN
223 MD105 1289983 46967 3RD FLOOR DUCTWORK DEMOLITION PLAN
224 MD106 1289984 46968 4TH FLOOR DUCTWORK DEMOLITION PLAN
225 MD107 1289985 46969 PENTHOUSE FLOOR DEMOLITION PLAN
226 MD111 1289986 46970 MECHANICAL BASEMENT FLOOR PIPING DEMOLITION PLAN
227 MD112 1289987 46971 BASEMENT FLOOR PIPING DEMOLITION PLAN
228 MD113 1289988 46972 1ST FLOOR PIPING DEMOLITION PLAN
229 MD114 1289989 46973 2ND FLOOR PIPING DEMOLITION PLAN
230 MD115 1289990 46974 3RD FLOOR PIPING DEMOLITION PLAN
231 MD116 1289991 46975 4TH FLOOR PIPING DEMOLITION PLAN
232 M-101 1289992 46976 MECHANICAL BASEMENT FLOOR DUCTWORK CONSTRUCTION PLAN
233 M-102 1289993 46977 BASEMENT FLOOR DUCTWORK CONSTRUCTION PLAN
DOCUMENT 00 01 15 Page 8
234 M-103 1289994 46978 1ST FLOOR DUCTWORK CONSTRUCTION PLAN
235 M-104 1289995 46979 2ND FLOOR DUCTWORK CONSTRUCTION PLAN
236 M-105 1289996 46980 3RD FLOOR DUCTWORK CONSTRUCTION PLAN
237 M-106 1289997 46981 4TH FLOOR DUCTWORK CONSTRUCTION PLAN
238 M-107 1289998 46982 PENTHOUSE FLOOR CONSTRUCTION PLAN
239 M-108 1289999 46983 ENLARGED PENTHOUSE CONSTRUCTION PLANS
240 M-111 1290000 46984 MECHANICAL BASEMENT FLOOR PIPING CONSTRUCTION PLAN
241 M-112 1290001 46985 BASEMENT FLOOR PIPING CONSTRUCTION PLAN
242 M-113 1290002 46986 1ST FLOOR PIPING CONSTRUCTION PLAN
243 M-114 1290003 46987 2ND FLOOR PIPING CONSTRUCTION PLAN
244 M-115 1290004 46988 3RD FLOOR PIPING CONSTRUCTION PLAN
245 M-116 1290005 46989 4TH FLOOR PIPING CONSTRUCTION PLAN
246 M-401 1290006 46990 ENLARGED MECHANICAL ROOM DEMOLITION PLAN
247 M-402 1290007 46991 ENLARGED MECHANICAL ROOM CONSTRUCTION PLAN
248 M-403 1290008 46992 ENLARGED 1ST FLOOR NORTH PLANS CONSTRUCTION
249 M-404 1290009 46993 ENLARGED 1ST FLOOR SOUTH PLANS CONSTRUCTION
250 M-501 1290010 46994 DETAILS
251 M-502 1290011 46995 DETAILS
252 M-503 1290012 46996 DETAILS
253 M-504 1290013 46997 DETAILS
254 M-505 1290014 46998 DETAILS
255 M-506 1290015 46999 DETAILS
256 M-507 1290016 47000 DETAILS
257 M-508 1290017 47001 DETAILS
258 M-509 1290018 47002 DETAILS
259 M-601 1290019 47003 SCHEDULES
260 M-602 1290020 47004 SCHEDULES
261 M-603 1290021 47005 SCHEDULES
262 M-604 1290022 47006 SCHEDULES
263 M-605 1290023 47007 SCHEDULES
264 M-701 1290024 47008 DOAS CONTROL DIAGRAM
265 M-702 1290025 47009 CONTROL DIAGRAMS
DOCUMENT 00 01 15 Page 9
266 M-703 1290026 47010 CONTROL DIAGRAM
267 M-704 1290027 47011 CONTROL DIAGRAMS
268 M-705 1290028 47012 CONTROL DIAGRAMS
269 M-801 1290029 47013 EXISTING RISERS - AIR SIDE
270 M-802 1290030 47014 DEMOLITION RISERS - AIR SIDE
271 M-803 1290031 47015 NEW CONSTRUCTION RISERS - AIR SIDE PHASE 1
272 M-803A 1290032 47016 WINTER CHILLER RISER DIAGRAM
273 M-804 1290033 47017 EXISTING PIPING - MECH ROOM
274 M-805 1290034 47018 DEMOLITION RISER DIAGRAM
275 M-806 1290035 47019 NEW CONSTRUCTION RISERS - MECH ROOM
276 M-807 1290036 47020 EXISTING RISER DIAGRAM - WATER SIDE
277 M-808 1290037 47021 DEMOLITION RISER DIAGRAM - WATER SIDE
278 M-809 1290038 47022 NEW RISERS - WATER SIDE
ELECTRICAL
279 E-001 1290039 47023 SYMBOL LEGEND AND NOTES
280 ED101 1290040 47024 MECHANICAL BASEMENT FLOOR DEMOLITION PLAN
281 ED102 1290041 47025 BASEMENT FLOOR DEMOLITION PLAN
282 ED103 1290042 47026 1ST FLOOR DEMOLITION PLAN
283 ED104 1290043 47027 2ND FLOOR DEMOLITION PLAN
284 ED105 1290044 47028 3RD FLOOR DEMOLITION PLAN
285 ED106 1290045 47029 4TH FLOOR DEMOLITION PLAN
286 ED107 1290046 47030 PENTHOUSE FLOOR DEMOLITION PLAN
287 EL101 1290047 47031 MECHANICAL BASEMENT FLOOR LIGHTING PLAN
288 EL102 1290048 47032 BASEMENT FLOOR LIGHTING PLAN
289 EL103 1290049 47033 1ST FLOOR LIGHTING PLAN
290 EL104 1290050 47034 2ND FLOOR LIGHTING PLAN
291 EL105 1290051 47035 3RD FLOOR LIGHTING PLAN
292 EL106 1290052 47036 4TH FLOOR LIGHTING PLAN
293 EL107 1290053 47037 PENTHOUSE FLOOR LIGHTING PLAN
294 EP101 1290054 47038 MECHANICAL BASEMENT FLOOR POWER PLAN
295 EP102 1290055 47039 BASEMENT FLOOR POWER PLAN
296 EP103 1290056 47040 1ST FLOOR POWER PLAN
DOCUMENT 00 01 15 Page 10
297 EP104 1290057 47041 2ND FLOOR POWER PLAN
298 EP105 1290058 47042 3RD FLOOR POWER PLAN
299 EP106 1290059 47043 4TH FLOOR POWER PLAN
300 EP107 1290060 47044 PENTHOUSE FLOOR POWER PLAN
301 E-501 1290061 47045 ELECTRICAL DETAILS
302 E-502 1290062 47046 ELECTRICAL DETAILS
303 E-503 1290063 47047 HANGING DETAILS
304 EL501 1290064 47048 LIGHTING DETAILS
305 EL601 1290065 47049 LIGHTING SCHEDULES
306 EP600 1290066 47050 DEMOLITION POWER RISER DIAGRAM
307 EP601 1290067 47051 POWER RISER DIAGRAM
308 EP602 1290068 47052 POWER SCHEDULES
309 EP603 1290069 47053 ELECTRICAL PANEL SCHEDULES
310 EP604 1290070 47054 ELECTRICAL PANEL SCHEDULES
311 EP605 1290071 47055 ELECTRICAL PANEL SCHEDULES
312 EP606 1290072 47056 ELECTRICAL PANEL SCHEDULES
313 EP607 1290073 47057 ELECTRICAL PANEL SCHEDULES
314 EP608 1290074 47058 ELECTRICAL PANEL SCHEDULES
315 EP609 1290075 47059 ELECTRICAL PANEL SCHEDULES
316 EP610 1290076 47060 EQUIPMENT SCHEDULE I
317 EP611 1290077 47061 EQUIPMENT SCHEDULE II
318 EP612 1290078 47062 EQUIPMENT SCHEDULE III
319 ET001 1290079 47063 TELECOMMUNICATIONS LEGEND
320 ET101 1290080 47064 MECHANICAL BASEMENT FLOOR TELECOMMUNICATIONS PLAN
321 ET102 1290081 47065 BASEMENT FLOOR TELECOMMUNICATIONS PLAN
322 ET103 1290082 47066 1ST FLOOR TELECOMMUNICATIONS PLAN
323 ET104 1290083 47067 2ND FLOOR TELECOMMUNICATIONS PLAN
324 ET105 1290084 47068 3RD FLOOR TELECOMMUNICATIONS PLAN
325 ET106 1290085 47069 4TH FLOOR AND PENTHOUSE TELECOMMUNICATIONS PLAN
326 ETC102 1290086 47070 BASEMENT FLOOR CABLE TRAY PLAN
327 ETC103 1290087 47071 1ST FLOOR CABLE TRAY PLAN
328 ETC104 1290088 47072 2ND FLOOR CABLE TRAY PLAN
DOCUMENT 00 01 15 Page 11
329 ETC105 1290089 47073 3RD FLOOR CABLE TRAY PLAN
330 ETC106 1290090 47074 4TH FLOOR CABLE TRAY PLAN
331 ETS101 1290091 47075 MECHANICAL BASEMENT FLOOR SECURITY PLAN
332 ETS102 1290092 47076 BASEMENT FLOOR SECURITY PLAN
333 ETS103 1290093 47077 1ST FLOOR SECURITY PLAN
334 ETS104 1290094 47078 2ND FLOOR SECURITY PLAN
335 ETS105 1290095 47079 3RD FLOOR SECURITY PLAN
336 ETS106 1290096 47080 4TH FLOOR SECURITY PLAN
337 ETS107 1290097 47081 PENTHOUSE FLOOR SECURITY PLAN
338 ET401 1290098 47082 TELECOMMUNICATIONS PART PLANS
339 ET402 1290099 47083 TELECOMMUNICATIONS PART PLANS
340 ET403 1290100 47084 TELECOMMUNICATIONS PART PLANS
341 ET501 1290101 47085 TELECOMMUNICATIONS DETAILS
342 ET502 1290102 47086 TELECOMMUNICATIONS DETAILS
343 ET601 1290103 47087 TELECOMMUNICATIONS RISER DIAGRAM
344 ETS601 1290104 47088 ELECTRIFIED DOOR AND SECURITY DIAGRAM
345 TS001 1290105 47089 HVAC NETWORK BOUNDARY
346 TS002 1290106 47090 HVAC RISER DIAGRAM
1.3 NAVSTA-Newport - Soil Management Plan
This plan is part of this Contract and the recommendations and directives of the Soil Management Plan must implemented by the Contractor.
In addition to testing for all constituents in Table 1, Direct Exposure Criteria as described in the Naval Station Newport Soil Management Plan, DOCUMENT 00 01 15 Page 12 the contractor shall also test for total petroleum hydrocarbons (TPH) and asbestos. This applies to both imported fill proposed for use on the project as well as surplus soil and unsuitable soil to be disposed of off US Navy property.
The Soil Management Plan (SMP) has been prepared to establish procedures that will be followed should future construction, demolition or maintenance activities at the Naval Station Newport (NAVSTA) require the need to manage disturbed or excavated soil.
The plan cannot be used to manage soils on Navy Installation Restoration (IR) sites, soils with known contamination, such as PCBs, asbestos, or mercury, soils regulated by the State of RI with contamination other than arsenic, and on property leased to private entities.
a. Copy of Soil Management Plan follows this Specification Section
-- End of Document --
DOCUMENT 00 01 15 Page 13
DOCUMENT 00 01 15 Page 14
Soil Management Plan
Naval Station Newport, Newport, RI
This Soil Management Plan (SMP) has been prepared to establish procedures that will be followed should future construction, demolition or maintenance activities at the Naval Station Newport (NAYSTA) require the need to manage disturbed or excavated soil. The plan cannot be used to manage soils on Navy Installation Restoration (IR) sites, soils with known contamination, such as PCBs, asbestos, or mercury, soils regulated by the State of RI with contamination other than arsenic, and on propelty leased to private entities (e.g .
pri vatized Housing) .
Background
The property, located in Newport, RI, was established in 1869 with the construction of a torpedo station. The Navy War College was added in 1884 and the site was used for sailor training and housing and fueling facilities during World War II. Post WWII the property footprint and training activities were reduced while research and development efforts were increased . The soils on the property were found to contain arsenic that exceeds regulatory levels during a property-wide site investigation that included the collection and analysis of more than 1000 soil samples These soils must be removed and disposed of, or covered with Department (i.e. State of Rhode Island Department of Environmental Management) approved engineered controls, consisting of building foundations, asphalt pavement, and landscaping and environmental land use controls (ELUR) in order to prevent direct exposure to regulated soils.
Applicable Area
This SMP, and affiliated ELUR (when applicable), restricts the property to industrial or commercial usage, and pertains to the entire property. See attached site figure.
Soil Management
The direct exposure pathway is the primary concern at the site. Individuals engaged in activities at the site may be exposed through incidental ingestion, dermal contact, or inhalation of entrained soil particles if proper precautions are not taken. Therefore, the following procedures will be followed to minimize the potential of exposure.
During site work, the appropriate precautions will be taken to restrict unauthorized access to the property.
During all site/earth work, dust suppression (i.e. watering) techniques must be employed at all times. In the event that an unexpected observation or situation arises during site work, such activities will immediately stop (such as olfactory or visual evidence of waste material or contamination, PCB contamination or asbestos debris disposal). Workers will not attempt to handle the situation themselves but will contact the appropriate authority for fUlther direction.
REPAIR CONOLLY HALL - NWC ; BLDG 686 CHI S 1691406
Soil Management Plan - Pg. 1
If excess soil is generated /excavated from the property, the soil is to remain on-site for analytical testing, to be performed by an environmental professional, in order to determine the appropriate disposal and/or management options. The soil must be placed on and covered with polyethylene/plastic sheeting during the entire duration of its staging and secured with appropriate controls to limit the loss of the cover and protect against storm-water and/or wind erosion (i .e. hay bales, silt fencing, rocks, etc).
Excavated soils will be staged and temporarily stored in a designated area of the property.
Within reason, the storage location will be selected to limit the unauthorized access to the materials (i.e. away from public roadways/walkways). No soil will be stockpiled on-site for greater than 60 days without prior Department approval.
Soils excavated from the site may not be re-used as fill on residential property.
Excavated fill material shall not be re-used as fill on commercial or industrial properties unless it meets the Department's Method 1 Residential Direct Exposure Criteria for all constituents listed in Table 1 of the Rules and Regulations for the Investigation and Remediation of Hazardous Material Releases (Remediation Regulations) .
Excavated soil to be reused on non-Navy commercial or industrial properties must be sampled and analyzed, by a qualified environmental professional, at a frequency of one sample per 500 tons for all constituents in Table 1. Copies of the laboratory analysis results shall be maintained by the site owner and included in the annual inspection report for the site, or the closure report if applicable. In the event that the soil does not meet any of these criteria, the material must be properly managed and disposed of off site at a licensed facility.
Site soils, which are to be disposed of off-site (and not reused off-site), must be done so at a licensed facility in accordance with all local, state, and federal laws. Copies of the material shipping records associated with the disposal of the material shall be maintained by the site owner and included in the annual inspection report for the site.
Best soil management practices should be employed at all times and regulated soils should be segregated into separate piles (or cells or containers) as appropriate based upon the results of analytical testing, when mUltiple reuse options are planned (i.e. reuse on site, reuse at a Department approved industrial/commercial property, or disposal at a Department approved licensed facility) .
All non-disposable equipment used during the soil disturbance activities will be properly decontaminated as appropriate prior to removal from the site. All disposable equipment used during the soil disturbance activities will be properly containerized and disposed of following completion of the work. All vehicles utilized during the work shall be properly decontaminated as appropriate prior to leaving the site.
At the completion of site work, all exposed soils that remain on the site (i.e. have not been removed to licensed disposal facility) are required to be recapped with Department approved engineered controls (i.e. 2 feet of clean fill or equivalent; building foundations;
4 inches of pavement/concrete underlain with 6 inches of clean fill; and/or 1 foot of clean
REPAIR CONOLLY HALL - NWC ; BLDG 686 CHI S 1691406
Soil Management Plan - Pg. 2 fill underlain with a geotextile liner) consistent or better than the site surface conditions prior to the work that took place. These measures must also be consistent with the Department approved ELUR recorded on the property. Any clean fill material brought on site is required to meet the Department's Method I Residential Direct Exposure Criteria or be designated by an Environmental Professional as Non-Jurisdictional under the Remediation Regulations. The Annual Inspection Report for the site, or Closure Report if applicable, should include either analytical sampling results from the fill demonstrating compliance or alternatively include written certification by an Environmental Professional that the fill is not jurisdictional.
Worker Health and Safety
To ensure the health and safety of on-site workers, persons involved in the excavation and handling of the material on site are required to wear a minimum of Level D personal protection equipment, including gloves, work boots and eye protection. Workers are also required to wash their hands with soap and water prior to eating, drinking, smoking, or leaving the site.
Department Approval
In accordance with the Departments ' requirements, no soil at the property is to be disturbed after an engineering control has been implemented in any manner without prior written permission of the Department's Office of Waste Management, except for minor inspections, maintenance, and landscaping activities that do not disturb the contaminated soil that is left in place.
As patt of the notification process, the Navy shall publish a notice, annually in the Newport Daily News that indicates that soil contain arsenic above the Department's Method 1 Direct Exposure Criteria, that soil work is planned on the property, and that individuals will be notified if work is to be done adjacent to privately-owned property.
In addition, the Navy will prepare an annual report to be submitted to the Department that summarizes construction work done on the property were soil was removed and inspections of sites on the property were soils with arsenic have been left in place and land use restrictions have been applied.
For soil that is removed, the report will identify the location, quantity, and ultimate destination. For sites with land use restrictions the inspections will include the location of the site and certification that the engineering controls remain in place.
-)--'av=-)id-D---=~-rocZ~P=E'--:U--==---<"""''''''Y=::::-=---~I~u----' Environmental Division Director Chief of Office of Waste Management Naval Station Newport Department of Environmental Management
REPAIR CONOLLY HALL - NWC ; BLDG 686 CHI S 1691406
Soil Management Plan - Pg. 3
I I
I
If
I
NAVSTA Newport
Commander Navy Region
Mid-Atlantic GeoReadlness
Center
Legend
• GalftS c=J Base BoundDry
E:I(\~lir.g Struclur$S
.. Ammunition SIOfftglt N ea
- Fence Line
_RUflWlIY
" TaXIway_H
_ /<fit"" ~ Shoulder Overrun l1li AJrcraU PArking Alfie
- Railroad
_ GoHe""",, .. Playground
SYfinlrring Pool
_ Athle6c Court
" AthiellCFTOld l1li Existing Pien;
_ O<y<lo<k
AM ·CWS"'..ol.",~ NcrioJ,. V,13511 (7$1) . ... .,)01]
_._---.,.-...._______._"'Oot_
REPAIR CONOLLY HALL - NWC ; BLDG 686 CHI S 1691406
Soil Management Plan - Pg. 4
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 BACKGROUND
The Conolly Hall Building 686, NWC, located on the NAVSTA Newport, RI campus, is a seven level structure constructed in 1974 and is comprised of 2 parking levels (P-1, P-2), 4 levels of classroom, multi-function and administrative use and MEP/Penthouse/Roof.
The modular buildings are required to support Package 1 B686 Conolly Hall Upgrades during construction. The project scope of work is to provide and install modular buildings, and all required site demolition, utilities scope of work, and storm water management construction, for the duration of construction contract for scope of work noted in Package 1 - B686 Conolly Hall Upgrades.
a. Package 1 B686 Conolly Hall Upgrades- The work is located on the NAVSTA-Newport campus, US Naval War College, Conolly Hall, 686 Cushing Road, Newport, RI 02841-1207.
b. Package 2 Modular Buildings - The work is located on the NAVSTA-Newport campus, US Naval War College, Sims Hall, North and East Parking Lots, Newport, RI 02841-1207
1.2 WORK COVERED BY CONTRACT DOCUMENTS
The scope of work for this construction solicitation is prepared in two packages, awarded under one construction contract. The contractor is responsible for providing scope of work noted in both packages:
a. Package 1: NWC B686 Conolly Hall Upgrades
b. Package 2: NWC Modular Buildings to support B686 Conolly Hall
Package 2 Modular Buildings - scope of work is required to be ready for occupancy, accepted as Substantially Complete (Beneficial Occupancy Date) by the Contracting Officer prior to start of mobilization and demolition of Package 1 B686 Conolly Hall Upgrades.
SUBMI SSI ON OF THE MODULAR BUI LDI NG SUBMI TTAL I S CRI TI CAL AND SHALL BE
SUBMI TTED TO THE GOVERNMENT WI THI N 30 DAYS AFTER AWARD. THE CONTRACTOR
SHALL PROVI DE A COMPLETE PACKAGE WI TH ALL REQUI RED I TEMS AND ATTACH A
GOVERNMENT FURNI SHED TRANSMI TTAL SHEET.
Beneficial Occupancy Date (BOD) means that All work is 100% complete including all punchlist items complete and accepted by the Contracting Officer. The Contracting Officer will establish BOD when the Fire Protection System has been accepted by the NAVFAC Fire Protection Engineer, the HVAC system (including all DDC controls) have been accepted by the NAVFAC Mechanical Engineer, the IT systems have been accepted by the Naval War College CIO (IT Systems Manager), the Electronic Security Systems (ESS) that includes Intrusion Detection System and Access Control
SECTION 01 11 00 Page 1
System is accepted by the Naval War College Security Department and when all other work on the project not included in the previously mentioned elements of work, is accepted by the Contracting Officer.
SUBMI SSI ON OF THE TRANSFORMER ( Gover nment f ur ni shed/ cont r act or i nst al l ed) , SWI TCHBOARD, GENERATOR AND OTHER LONG LEAD TI ME SUBMI TTALS I S CRI TI CAL AND
SHALL BE SUBMI TTED TO THE GOVERNMENT WI THI N 30 DAYS AFTER AWARD. THE
CONTRACTOR SHALL PROVI DE A COMPLETE PACKAGE WI TH ALL REQUI RED I TEMS AND
ATTACH A GOVERNMENT FURNI SHED TRANSMI TTAL SHEET.
Demobilization of Modular Buildings may not occur until Package 1 B686 Conolly hall Upgrades is ready for occupancy, accepted as Substantially Complete (Beneficial Occupancy Date set by the Contracting Officer).
Beneficial Occupancy Date (BOD) means that All work is 100% complete including all punchlist items complete and accepted by the Contracting Officer. The Contracting Officer will establish BOD (Beneficial Occupancy Date) when the Fire Protection System has been accepted by the NAVFAC Fire Protection System, the HVAC system (including all DDC controls) have been accepted by the NAVFAC Mechanical Engineer, the IT systems have been accepted by the Naval War College CIO (IT Systems Manager the Electronic Security Systems (ESS) that includes Intrusion Detection System and Access Control System is accepted by the Naval War College Security Department, the elevators are accepted & certified by the NAVFAC Elevator Inspector and when all other work on the project not included in the previously mentioned elements of work, is accepted by the Contracting Officer.
1.3 CONTRACTOR PROPOSALS
Contractor bid proposal prices for Option 1 shall be maintained and valid through 3 January 2025.
If Option 1 is awarded/exercised, no additional time will be provided for the work in Option 1 and the Contract Completion Date remains the same.
1.4 PROJECT PHASING / MILESTONE DATES (all dates subject to change)
Phase I: All work described in Package 2 Modular Buildings:
Date of Award to 31 March 2025
Phase II: After BOD of Modular Buildings, Move furniture and equipment from NWC to Modular Buildings:
1 April 2025 to 30 June 2025
Phase III: All work described in Package 1 to renovate Conolly Hall:
1 July 2025 to 31 March 2027
Phase IV: After BOD of Conolly Hall, move furniture and equipment from modular buildings back into NWC:
1 April 2027 to 30 July 2027
Phase V: After all modular buildings have been vacated and all furniture moved out, disassemble & remove modular buildings and restore modular building site to its original condition:
1 August 2027 to 30 September 2027
Pl anned Cont r act Compl et i on Dat e ( CCD) i s 30 Sept ember 2027.
Note: No on-site work shall be performed for either Bldg 686 Conolly Hall (work described in package 1) or the Modular Buildings (work described in
SECTION 01 11 00 Page 2 package 2) during the periods of September 15 -19 2025, and September 13 - 17, 2027 (dates subject to change).
The NWC is hosting the Chief of Naval Operations International Seapower Symposium (ISS). The Contractor is responsible for preparing all the project worksites in a safe and presentable manner prior to 12 September 2025 and 10 September 2027.
The Contractor is responsible and required to relocate all construction items from exteriors and laydown area along B686 Conolly Hall to a limited laydown area in the eastern half of the gravel parking lot to the north of B991 Hewitt Hall during these times of no construction work.
The exterior areas along B686 Conolly Hall will be turned over for Government use during this exclusionary work period. This period of exclusionary work shall be listed in the project schedule and show no work being performed. The limited laydown area must be vacated and turned back to government, in same condition as received, no later than September 26, 2025, or upon Contracting Office Rep and NWC determination. All dates subject to change.
The construction schedule shall reflect the project phasing/milestone dates and the two exclusionary work periods described above.
1.4.1 Package 1 BASE BID :
The project scope of work is to repair and renovate 80,000SF of the basement level and all upper levels of the building interiors. The project scope of the work is to provide upgrades to 60,000 SF of lower parking levels life safety & fire protection systems and lighting.
Repairs and renovations to the building include full demolition of all interiors, to face of existing exterior wall including hazardous material abatement and incidental related work, all new interior floor plan layout with architectural upgrades and finishes, new mechanical, electrical, plumbing and toilet rooms, life safety, fire alarm & protection systems, and physical and cyber security systems to meet current building codes.
The project requires Contractor sponsored Commissioning, Acceptance Testing, Building Envelope Acceptance/Testing and Third Party Certifications - refer to all specifications.
Package 1 NWC B686 Conolly Hall Upgrades OPTION 1:
(1) The project scope of work is to replace in-kind exterior window systems and exterior door and frames including hazardous material abatement and incidental related work.
The base bid includes the contractor to provide professional movers to remove all furniture, fixtures, equipment and boxed items located at NWC Conolly Hall and move all items into the modular buildings constructed under package 2 or into a storage facility located onboard Naval Station Newport. The Naval War College will tag all furniture, fixtures, equipment to identify whether the furniture, fixtures, equipment is being relocated to the modular buildings or if the furniture fixtures, equipment will be placed in storage onboard Naval Station Newport. There will also be some items the Naval War College will tag for removal and disposal.
The professional movers will be responsible for the following:
SECTION 01 11 00 Page 3
a. Disassembling and preparing all furniture, fixtures and equipment to be moved into the modular buildings
b. Moving the furniture, fixtures and equipment into either the modular buildings or storage onboard Naval Station Newport
c. Re-assembling and setting up furniture, fixtures and equipment in the new spaces of the modular buildings.
Any damages caused by the movers shall be repaired, corrected or replaced by the contractor at no additional cost to the Government.
1.4.2 Package 2 NWC Modular Buildings BASE BID:
Modular buildings are required to support Package 1 B686 Conolly Hall Upgrades during construction. This scope of work is required to be ready for occupancy, and accepted as Substantially Complete (Beneficial Occupancy Date), by the Contracting Officer, (see paragraph 1.2 for definition of BOD for modular buildings) prior to start of mobilization and demolition of scope of work noted in Package 1- B686 Conolly Hall Upgrades.
1.4.2.1 Modular Buildings Installation
The scope of work includes mobilization and demobilization, only after the scope of work noted in Package 1 B686 Conolly Hall Upgrades has been accepted as Substantially Complete (Beneficial Occupancy Date) by the Contracting Officer.
a. The project scope of work is to provide and install modular buildings, and all required site demolition, utilities scope of work, and storm water management construction, for the duration of construction contract for scope of work noted in Package 1 - B686 Conolly Hall Upgrades.
b. In the existing eastern parking lot, the scope of work includes providing and installing three additional one-story modular buildings, each about 2,800 SF to hold 2 classrooms and offices. Each are served by a proposed adjacent handicapped parking lot.
c. The modular building are proposed to be located in existing northern and eastern parking lot areas around B29 Sims Hall, NWC. The northern one-story modular building is about 14,500 SF and holds 14 classrooms with proposed adjacent handicapped parking lot and building accessibility.
Modular Building Components
The modular buildings' exteriors are to be constructed of vinyl siding with 4" reveal, and vertical vinyl siding skirt, and soffit. The roofs are to be constructed of low-sloped membrane.
(1) The scope of work includes providing each modular building with all required utilities, and storm water management construction.
(2) All underground utilities must be verified by means of the contractor's independent private third party utility locating company prior to start of work.
(3) All site work must follow NAVSTA Newport Soil Management Plan.
SECTION 01 11 00 Page 4
1.4.2.2 Modular Building Installation - Existing Conditions
a. The existing East Parking Lot scheduled for Modular Buildings installation contains solid bedrock approximately two feet below grade. Refer to existing boring logs. The Contractor shall take solid bedrock into account when constructing all required Modular Buildings footings and underground utilities as noted in the contract documents.
b. The contractor must provide all construction schedules, construction phasing plan, and construction site plans per the contract documents to NAVFAC Contracting Officer and no work may begin without prior approval of all required construction plans from NAVFAC Contracting Officer and NWC.
c. The Contractor must provide all required means to maintain and provide repairs as needed as associated with Modular Building fabrication and installation throughout the duration of the contract.
1.4.2.3 Modular Building Demobilization
Upon Substantial Completion and BOD of Package 1 Conolly Hall Upgrades, (see paragraph 1.2 for definition of BOD for Bldg 686 Conolly Hall), the contractor must decommission and demobilize Package 2 Modular Buildings, including construction site demolition to one foot below grade. All work to follow the Naval Station Newport Soil Management Plan. The site must be turned over to NAVFAC Contracting Officer in original condition, (paved at east site, gravel lot north site) prepared and ready for future follow-on parking lot project.
1.5 SUBMITTALS
Government approval is required for submittals with a "G", "DOR" or "S" classification. Submittals not having a "G", "DOR" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Salvage Plan; G, DOR
Move Plan; G
SD-05…